Notes:

15000
1.All dimensions to be checked on the site.
300
11850 3159 2.where applicable the contractor is to
check on site size of components to
manufactured before production.

1650
3.Contractor is responsible for the correct
setting out of the buildings, all external and
internal walls with particular reference to
boundaries , building lines e.t.c.
4. Contractors to verify all levels , heights and
dimensions on site and to check the same
against the drawings before commercement of
Construction.
DISCLAIMER
The elements shown on this drawing have been
approved by the client , and he accepts
responsibility for materials , content and
statement

Project:

PROPOSED RESIDENTIAL
DEVELOPMENT @
OGWA,UMUEZEALAIJE,OCHII OGWA,
OGWA, MBAITOLI LOCAL

11100

14475
GOVERNMENT AREA ,IMO STATE

Client:

A A
Mr. UZUEGBU ISHMAEL
UGOCHUKWU

consultants:

HAMZ PROJECTS & LOGISTICS LTD.


Architecture,Building / Civil Engineering,Property
Development.

600
PLOT 127 IKENEGBU EXTENSION
600 OWERRI,IMO STATE
07037592537

1723
3,3rd Eweka street,
Benin City, Edo State.

designed Henry Ugochukwu


sheet no.
drawn Henry Ugochukwu
3675 6898 4427
checked Ifeanyi Obani

14950 Approved
B

scale Nil
6
Roof Plan date July,2017