S.No Item no.

Description of item
Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate
SCHEDULE A EXCAVATION, TUNNEL 1
1 A1002 Earthwork in cutting in formation, trolley refuges, side drains, yard
drains, catch water drains, etc. including leading usable cut spoils up
to 200 M and making formation in filling using the cut spoils, site
clearances, setting out and demarcation, disposing off surplus
unusable cut spoils as per directions of the engineer, and top and
side dressing to provide final formation as per designed profile. The
rate shall not include cutting of trees with girth above 60 CM and
compaction, which shall be paid separately.

1002 a Soil excluding rock. cum 65.00 111.41 7,241.52 RVNL


1002 b Rock not requiring blasting. cum 130.00 2,000.00 260,000.00 RVNL
1002 c Rock requiring blasting. cum 274.00 44,330.00 12,146,420.00 RVNL
1002 d Rock requiring blasting, but blasting not permitted hence to be excavat cum 354.00 2,000.00 708,000.00 RVNL
2 A102 Underground excavation for tunnel, trolley refuge niches, including
drilling, blasting, or other means of excavation for provision of
surface drainage, construction ventilation, lighting arrangement
during construction, removal and disposal of excavated material
including water inflow up to 50 l/s, transportation to the embankment
location up to 2 kms from portals / shaft head as per approved
drawings, technical specifications as directed by Engineer-in-Charge.
Rock classes I to V are as per Bieniawski clasification refered to in
the Geotechnical Interpretative Report included in the Bid documents.

A1021 KONKAN proporcionate rate, Tunnel T-5 from km 42/900 to


Excavation in Rock Class I cum 1,495.00 14,365.62 21,476,594.43 48/940 (May 2010)
A1022 KONKAN proporcionate rate, Tunnel T-5 from km 42/900 to
Excavation in Rock Class II cum 1,632.00 10,808.36 17,639,240.26 48/940 (May 2010)
A1023 KONKAN proporcionate rate, Tunnel T-5 from km 42/900 to
Excavation in Rock Class III cum 2,019.00 18,460.81 37,272,365.30 48/940 (May 2010)
A1024 KONKAN proporcionate rate, Tunnel T-5 from km 42/900 to
Excavation in Rock Class IV cum 2,144.00 9,115.54 19,543,707.04 48/940 (May 2010)
A1025 KONKAN proporcionate rate, Tunnel T-5 from km 42/900 to
Excavation in Rock Class V and Recesses cum 2,422.00 6,738.66 16,321,022.41 48/940 (May 2010)
A1027 KONKAN proporcionate rate, Tunnel T-5 from km 42/900 to
Trolley refuges I & II, Cross passages I &II and M&E Rooms I & II cum 2,091.00 761.41 1,592,113.12 48/940 (May 2010)
3 Extra for tunnel excavation due to excessive water inflow as per
A103 technical specifications and directed by Engineer-in-Charge.
A1031 Water inflow more than 50 I/sec cum 225.00 32,087.77 7,219,748.25 KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May 2010)
4 A104 Extra for transportation of spoils over 2 km from the portal / shaft
head but up to a lead of 20 km as per technical specifications and
directed by Engineer-in-Charge cum/km 25.00 1,141,263.78 28,531,594.43 KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May 2010)
S.No Item no. Description of item
Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate
SCHEDULE A EXCAVATION, TUNNEL 1
5 A105 Earthwork in filling in formation including cut & covers, portals, trolley
refuges, etc using contractor's earth of approved quality procured
from outside railway land including site clearances, setting out and
demarcation, benching, initial compaction of subsoil after leveling the
surface after site clearance, spreading loose earth in 30 cm layers
using grader up to extra width of 50 cm beyond designed profile,
compaction using vibratory compactors so as to achieve minimum in
situ dry density of 98% of MDD, top and side dressing and removal of
extra earth from sides to provide final formation as per designed
profile and directed by the Engineer-in-Charge. . The rate shall not
include compaction which shall be paid separately.

cum 184.00 9,955.00 1,831,720.00 As per Rate analisys


6 1005 Mechanical compaction of earth and blanket materials in layers of 30
cm in loose state using vibratory compactors so as to achieve
minimum in situ dry density of 98% of maximum dry density as
directed by the Engineer-in-Charge. cum 12.00 9,955.00 119,460.00 RVNL
7 1008 Cutting down trees and uprooting of roots including transporting the
wood to nearby railway store or forest godown as directed by the
Engineer-in-Charge.
Note: Clearance of trees with girth less than 60 cm and their
clearance is covered under item No. A101. Girth will be measured at
a height of 1 m above the ground level.
1008 a Girth above 60 cm and up to 90 cm each 258.00 40.00 10,320.00 RVNL
1008 b Girth above 90 cm and up to 180 cm each 644.00 20.00 12,880.00 RVNL
1008 c Girth above 180 cm and up to 270 cm each 1,319.00 10.00 13,190.00 RVNL
1008 d Girth above 270 cm each 2,623.00 10.00 26,230.00 RVNL
Total 164,731,846.74
S.No Item no. Description of item
Unit Number Length Width Heigth Partial Total Qty
SCHEDULE A EXCAVATION, TUNNEL 1
1 A1002 Earthwork in cutting in formation, trolley refuges, side drains, yard
drains, catch water drains, etc. including leading usable cut spoils up
to 200 M and making formation in filling using the cut spoils, site
clearances, setting out and demarcation, disposing off surplus
unusable cut spoils as per directions of the engineer, and top and
side dressing to provide final formation as per designed profile. The
rate shall not include cutting of trees with girth above 60 CM and
compaction, which shall be paid separately.

1002 a Soil excluding rock. cum 111.41


Side drains (as per drawing tunnel/2.6, 1 of 4 and 4 of 4) cum 1.00 844.00 0.12 1.00 101.28
10% increase cum 0.10 101.28 1.00 1.00 10.13
1002 b Rock not requiring blasting. cum 2,000.00 1.00 1.00 1.00 2,000.00 2,000.00
1002 c Rock requiring blasting. cum 44,330.00
Portal 1 cum 21,400.00 1.00 1.00 1.00 21,400.00
Portal 2 cum 18,900.00 1.00 1.00 1.00 18,900.00
10% increase cum 0.10 40,300.00 1.00 1.00 4,030.00
Rock requiring blasting, but blasting not permitted hence to be
1002 d excavated by chieseling . cum 2,000.00 1.00 1.00 1.00 2,000.00 2,000.00
2 A102 Underground excavation for tunnel, trolley refuge niches, including
drilling, blasting, or other means of excavation for provision of
surface drainage, construction ventilation, lighting arrangement
during construction, removal and disposal of excavated material
including water inflow up to 50 l/s, transportation to the embankment
location up to 2 kms from portals / shaft head as per approved
drawings, technical specifications as directed by Engineer-in-Charge.
Rock classes I to V are as per Bieniawski clasification refered to in
the Geotechnical Interpretative Report included in the Bid documents.

A1021 Excavation in Rock Class I (as per drawing tunnel/2.4.1, 1 of 5) cum 1.00 233.00 56.05 1.00 13,059.65 14,365.62
10% increase cum 0.10 13,059.65 1.00 1.00 1,305.97
A1022 Excavation in Rock Class II (as per drawing tunnel/2.4.1, 2 of 5) cum 1.00 174.00 56.47 1.00 9,825.78 10,808.36
10% increase cum 0.10 9,825.78 1.00 1.00 982.58
A1023 Excavation in Rock Class III (as per drawing tunnel/2.4.1, 3 of 5) cum 1.00 295.00 56.89 1.00 16,782.55 18,460.81
10% increase cum 0.10 16,782.55 1.00 1.00 1,678.26
A1024 Excavation in Rock Class IV (as per drawing tunnel/2.4.1, 4 of 5) cum 1.00 143.00 57.95 1.00 8,286.85 9,115.54
10% increase cum 0.10 8,286.85 1.00 1.00 828.69
A1025 Excavation in Rock Class V and Recesses cum 6,738.66
Excavation in Rock Class V (as per drawing tunnel/2.4.1, 5 of 5) cum 1.00 70.00 58.59 1.00 4,101.30
Recesses (as per drawing tunnel/2.4.4, 2 of 2) cum 1.00 25.00 80.99 1.00 2,024.75
10% increase cum 0.10 6,126.05 1.00 1.00 612.61
A1027 Trolley refuges I & II, Cross passages I &II and M&E Rooms I & II cum 761.41
Trolley refuges I (as per drawing tunnel/2.4.2, 1 of 3) cum 1.00 10.50 15.63 1.00 164.12
Trolley refuges II (as per drawing tunnel/2.4.2, 2 of 3) cum 1.00 10.50 16.95 1.00 177.98
Cross passages I (as per drawing tunnel/2.4.3, 1 of 4) cum 1.00 13.80 10.05 1.00 138.69
Cross passages II (as per drawing tunnel/2.4.3, 2 of 4) cum 1.00 13.80 11.10 1.00 153.18
M&E Rooms I (as per drawing tunnel/2.4.5, 1 of 2) cum 1.00 2.35 11.82 1.00 27.78
M&E Rooms II (as per drawing tunnel/2.4.5, 2 of 2) cum 1.00 2.35 12.96 1.00 30.46
S.No Item no. Description of item
Unit Number Length Width Heigth Partial Total Qty
SCHEDULE A EXCAVATION, TUNNEL 1
10% increase cum 0.10 692.19 1.00 1.00 69.22
S.No Item no. Description of item
Unit Number Length Width Heigth Partial Total Qty
SCHEDULE A EXCAVATION, TUNNEL 1
3 A103 Extra for tunnel excavation due to excessive water inflow
A1031 Water inflow more than 50 I/sec cum 32,087.77
Sections III, IV, V and V* 29,170.70 1.00 1.00 1.00 29,170.70
10% increase cum 0.10 29,170.70 1.00 1.00 2,917.07
4 A104 Extra for transportation of spoils over 2 km from the portal / shaft
head but up to a lead of 20 km cum/km 0.70 15.00 108,691.79 1.00 1,141,263.78 1,141,263.78
5 A105 Earthwork in filling in formation including cut & covers, portals, trolley
refuges, etc using contractor's earth of approved quality procured
from outside railway land including site clearances, setting out and
demarcation, benching, initial compaction of subsoil after leveling the
surface after site clearance, spreading loose earth in 30 cm layers
using grader up to extra width of 50 cm beyond designed profile,
compaction using vibratory compactors so as to achieve minimum in
situ dry density of 98% of MDD, top and side dressing and removal of
extra earth from sides to provide final formation as per designed
profile and directed by the Engineer-in-Charge. . The rate shall not
include compaction which shall be paid separately.
cum 9,955.00
Portal 1 cum 6,410.00 1.00 1.00 1.00 6,410.00
Portal 2 cum 2,640.00 1.00 1.00 1.00 2,640.00
10% increase Cum 0.10 9,050.00 1.00 1.00 905.00
6 1005 Mechanical compaction of earth and blanket materials in layers of 30
cm in loose state using vibratory compactors so as to achieve
minimum in situ dry density of 98% of maximum dry density as
directed by the Engineer-in-Charge. cum 9,955.00 1.00 1.00 1.00 9,955.00 9,955.00
7 1008 Cutting down trees and uprooting of roots including transporting the
wood to nearby railway store or forest godown as directed by the
Engineer-in-Charge.
Note: Clearance of trees with girth less than 60 cm and their
clearance is covered under item No. A101. Girth will be measured at
a height of 1 m above the ground level.

1008 a Girth above 60 cm and up to 90 cm each 40.00 1.00 1.00 1.00 40.00 40.00
1008 b Girth above 90 cm and up to 180 cm each 20.00 1.00 1.00 1.00 20.00 20.00
1008 c Girth above 180 cm and up to 270 cm each 10.00 1.00 1.00 1.00 10.00 10.00
1008 d Girth above 270 cm each 10.00 1.00 1.00 1.00 10.00 10.00
S.No Item no. Description of item
SCHEDULE B SUPPORT SYSTEM, TUNNEL 1 Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate
SCHEDULE B1 ROCK BOLTS AND OTHER STEEL SUPPORTS ETC.
1 B101 Supply, drilling and installation of Swellex type rockbolts, Fy>=140 KN (tunnel
support), Bolt diameter 36 mm, as per approved drawings and technical
specifications and as directed by Engineer-in-Charge. The rate shall include
costs of all materials, labour, equipment, etc required for the complete job

B1010 IRCON proportionate rate, Tunnel T-74R, February


Lenght 2 m each 4,070.00 69.00 280,830.00 2010
B1011 KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
Lenght 3 m each 5,834.00 923.00 5,384,782.00 2010)
B1012 KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
Lenght 4 m each 6,803.00 203.00 1,381,009.00 2010)
2 B103 Supply, installation and grouting of self-drilling bolts, bolt diameter 32 mm,
(Fy>=230 kN), as per approved drawings and technical specifications and as
directed by Engineer-in-Charge. The rate shall include costs of all
materials, labour, equipments etc. required for the complete job

B1031 KONKAN proporcionate rate, Tunnel T-5 from km


Length 15 m each 18,200.00 36.00 655,200.00 42/900 to 48/940 (May 2010)
3 B103B Supply, drilling, installation and grouting of fiberglass self-drilling type rockbolts in
face excavation of 9 meters lenght, perforation diameter 101 mm, as per
approved drawings and specifications and as directed by Engineer-in-Charge.
each 9,168.00 494.00 4,528,992.00 IRCON, Tunnel T-74R, Febryary 2010
4 B105 Supply, drilling, installation and grouting of self-drilling bolts, Fy>=1200 KN (Dint=
51 mm/Dext= 76 mm) with lenght as per aproved drawings and technical
specifications and as directed by Engineer-in-Charge. The rate shall include
costs of all materials, labour, equipments, etc, required for the complete job. KONKAN proporcionate rate, Tunnel T-5 from km
m 7,385.00 2,081.51 15,371,983.00 42/900 to 48/940 (May 2010)
5 B102 Supply, drilling, installation and grouting of SN type rockbolts of the specified
length, Fy>= 200 KN (slopes and tunnel support) as per approved drawings &
technical specifications and as directed by Engineer-in-Charge. The rate shall
include costs of all materials, labour, equipments etc. required for the complete
job.
B1021 KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
3 meters, diameter 25 mm each 1,704.00 5,526.00 9,416,304.00 2010)
B1022 KONKAN proporcionate rate, Tunnel T-5 from km
5 meters, diameter 25 mm each 2,748.00 385.00 1,057,980.00 42/900 to 48/940 (May 2010)
B1023 KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
9 meters, diameter 32 mm each 5,355.00 2,821.00 15,106,455.00 2010)
6 B107 Fabrication and erection of reticular lattice girders type TE-50-25-20/50-32-20 of
grade steel Fe500 and all accessories including all lead, lift, wastage, storing,
holes drilling, fixing in phases etc. and installation of accessories for joining the
lattice girder segments as per approved workshop drawings of contractor and
technical specifications and as directed by Engineer-in-Charge. The rate shall
include costs of all materials, labour, equipment, welding, etc for the complete
job. (Cost of steel will be paid separately under item No. E102)
KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
MT 28,872.00 52.47 1,515,050.03 2010)
S.No Item no. Description of item
SCHEDULE B SUPPORT SYSTEM, TUNNEL 1 Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate
SCHEDULE B1 ROCK BOLTS AND OTHER STEEL SUPPORTS ETC.
7 B108 Cutting, bending, placing, binding steel reinforcement of grade Fe500 as per
approved drawings and technical specifications and as directed by Engineer-in-
Charge. The rate shall include straightening, hooking all lead, lift etc. (Nothing
extra shall be paid for wastage for reinforcement and binding wire) (Cost of Steel KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
will be paid separately under item No. E102) MT 9,627.00 185.10 1,781,928.82 2010)
8 B109 Supply and placing of 150x150x6mm welded wire fabric of Fe500 as
reinforcement as per approved drawings and technical specifications and as
directed by Engineer-in-Charge. The rate shall include all labour, materials, cost
of pins, hooks, lead, lift, handling, wastage complete with contractors own KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
equipment for complete job. MT 75,351.00 21.74 1,637,861.40 2010)
total 58,118,375.24
S.No Item no. Description of item
SCHEDULE B SUPPORT SYSTEM, TUNNEL 1 Unit Number Length Width Heigth Partial Total Qty
SCHEDULE B1 ROCK BOLTS AND OTHER STEEL SUPPORTS ETC.
1 B101 Supply, drilling and installation of Swellex type rockbolts, Fy>=140 KN (tunnel support), Bolt
diameter 36 mm, as per approved drawings and technical specifications and as directed by
Engineer-in-Charge. The rate shall include costs of all materials, labour, equipment, etc
required for the complete job
B1010 Lenght 2 m each 69.00
Trolley refuges I (as per drawing tunnel/2.4.2, 1 of 3) each 10.50 3.00 1.00 32.00
Cross passages I (as per drawing tunnel/2.4.3, 1 of 4) each 13.80 1.75 1.00 25.00
M&E Rooms I (as per drawing tunnel/2.4.5, 1 of 2) each 2.35 1.75 1.00 5.00
10% increase each 0.10 62.00 1.00 1.00 7.00
B1011 Lenght 3 m each 923.00
Rock Class I (as per drawing tunnel/2.4.1, 1 of 5) each 233.00 3.60 1.00 839.00
10% increase each 0.10 839.00 1.00 1.00 84.00
B1012 Lenght 4 m each 203.00
Trolley refuges (Lateral reinforcing main tunnel) (as per drawing tunnel/2.4.2, 3 of 3) each 6.00 14.00 1.00 84.00
Cross passages (Lateral reinforcing main tunnel) (as per drawing tunnel/2.4.3, 3 of 4) each 10.00 10.00 1.00 100.00
10% increase each 0.10 184.00 1.00 1.00 19.00
2 B103 Supply, installation and grouting of self-drilling bolts, bolt diameter 32 mm, (Fy>=230 kN), as
per approved drawings and technical specifications and as directed by Engineer-in-
Charge. The rate shall include costs of all materials, labour, equipments etc.
required for the complete job
B1031 Length 15 m each 36.00
Portal 1 (as per drawing tunnel/2.6, 1 of 2) each 16.00 1.00 1.00 1.00 16.00
Portal 2 (as per drawing tunnel/2.6, 2 of 2) each 16.00 1.00 1.00 1.00 16.00
10% increase each 0.10 32.00 1.00 1.00 4.00
3 B103B Supply, drilling, installation and grouting of fiberglass self-drilling type rockbolts in face
excavation of 9 meters lenght, perforation diameter 101 mm, as per approved drawings and
specifications and as directed by Engineer-in-Charge. each 494.00
Front excavation section IV, V y V* (as per drawing tunnel/2.5) each 0.45 153.00 0.11 58.59 449.00
10% increase each 0.10 449.00 1.00 1.00 45.00
4 B105 Supply, drilling, installation and grouting of self-drilling bolts, Fy>=1200 KN (Dint= 51
mm/Dext= 76 mm) with lenght as per aproved drawings and technical specifications and as
directed by Engineer-in-Charge. The rate shall include costs of all materials, labour,
equipments, etc, required for the complete job. m 2,081.51
Portal 1, 15 m lenght (as per drawing tunnel/2.6, 1 of 2) m 16.00 15.00 1.00 1.00 240.00
Portal 2, 15 m lenght (as per drawing tunnel/2.6, 2 of 2) m 16.00 15.00 1.00 1.00 240.00
Cross Passages, 6 m lenght (Connection Main tunnel) (as per drawing tunnel/2.4.3, 4 of 4) m 11.00 6.00 3.00 1.00 198.00
Pipe umbrela in low points, 10 m lenght (as per drawing tunnel/2.5) m 17.00 10.00 7.14 1.00 1,214.29
10% increase m 0.10 1,892.29 1.00 1.00 189.23
S.No Item no. Description of item
SCHEDULE B SUPPORT SYSTEM, TUNNEL 1 Unit Number Length Width Heigth Partial Total Qty
SCHEDULE B1 ROCK BOLTS AND OTHER STEEL SUPPORTS ETC.
5 B102 Supply, drilling, installation and grouting of SN type rockbolts of the specified length, Fy>=
200 KN (slopes and tunnel support) as per approved drawings & technical specifications
and as directed by Engineer-in-Charge. The rate shall include costs of all materials, labour,
equipments etc. required for the complete job. 5,526.00
B1021 Lenght 3 meters, diameter 25 each
Rock Class II (as per drawing tunnel/2.4.1, 2 of 5) each 6.50 174.00 1.00 1.00 1,131.00
Rock Class III (as per drawing tunnel/2.4.1, 3 of 5) each 8.67 295.00 1.00 1.00 2,557.00
Rock Class IV (as per drawing tunnel/2.4.1, 4 of 5) each 9.33 143.00 1.00 1.00 1,335.00
10% increase each 0.10 5,023.00 1.00 1.00 503.00
B1022 Lenght 5 meters, diameter 25 each 385.00
Recesses (as per drawing tunnel/2.4.4, 1 of 2) 14.00 25.00 1.00 1.00 350.00
10% increase each 0.10 350.00 1.00 1.00 35.00
B1023 Lenght 9 meters, diameter 32 each 2,821.00
Portal 1, left slope (as per drawing tunnel/2.6, 1 of 2) each 3.00 1,170.00 1.00 1.00 390.00
Portal 1, right slope(as per drawing tunnel/2.6, 1 of 2) each 2.00 1,230.00 1.00 1.00 615.00
Portal 1, front slope(as per drawing tunnel/2.6, 1 of 2) each 2.50 385.00 1.00 1.00 154.00
Portal 2, left slope(as per drawing tunnel/2.6, 2 of 2) each 2.00 1,410.00 1.00 1.00 705.00
Portal 2, right slope(as per drawing tunnel/2.6, 2 of 2) each 2.00 1,400.00 1.00 1.00 700.00
10% increase each 0.10 2,564.00 1.00 1.00 257.00
6 B107 Fabrication and erection of reticular lattice girders type TE-50-25-20/50-32-20 of grade steel
Fe500 and all accessories including all lead, lift, wastage, storing, holes drilling, fixing in
phases etc. and installation of accessories for joining the lattice girder segments as per
approved workshop drawings of contractor and technical specifications and as directed by
Engineer-in-Charge. The rate shall include costs of all materials, labour, equipment, welding,
etc for the complete job. (Cost of steel will be paid separately under item No. E102)
MT 52.47
Excavation in Rock Class IV (as per drawing tunnel/2.4.1, 4 of 5) MT 143.00 139.38 0.001 19.93
Excavation in Rock Class V (as per drawing tunnel/2.4.1, 5 of 5) MT 70.00 262.46 0.001 18.37
Trolley refuges II (as per drawing tunnel/2.4.2, 2 of 3) MT 10.50 68.48 0.001 0.72
Cross passages II (as per drawing tunnel/2.4.3, 2 of 4) MT 13.80 56.86 0.001 0.78
M&E Rooms II (as per drawing tunnel/2.4.5, 2 of 2) MT 2.35 60.80 0.001 0.14
Recesses (as per drawing tunnel/2.4.4) MT 25.00 226.14 0.001 5.65
Portals (as per drawing tunnel/2.6, 1 of 4, 3 of 4 and 4 of 4) MT 10.00 20.80 10.10 0.001 2.10
10% increase MT 0.10 47.70 1.00 1.00 4.77
7 B108 Cutting, bending, placing, binding steel reinforcement of grade Fe500 as per approved
drawings and technical specifications and as directed by Engineer-in-Charge. The rate shall
include straightening, hooking all lead, lift etc. (Nothing extra shall be paid for wastage for
reinforcement and binding wire) (Cost of Steel will be paid separately under item No. E102)
MT 185.10
C&C portal (spread footing solution) (as per drawing tunnel/2.7) MT 73.00 2.290 1.00 167.17
Retention basin (as per drawing tunnel/2.8.3) MT 10.00 0.001 110.00 1.10
10% increase MT 0.10 168.27 1.00 1.00 16.83
S.No Item no. Description of item
SCHEDULE B SUPPORT SYSTEM, TUNNEL 1 Unit Number Length Width Heigth Partial Total Qty
SCHEDULE B1 ROCK BOLTS AND OTHER STEEL SUPPORTS ETC.
8 B109 Supply and placing of 150x150x6mm welded wire fabric of Fe500 as reinforcement as per
approved drawings and technical specifications and as directed by Engineer-in-Charge.
The rate shall include all labour, materials, cost of pins, hooks, lead, lift, handling, wastage
complete with contractors own equipment for complete job. MT 21.74
Manholes main drain(as per drawing tunnel/2.8.2) MT
MT 22.00 0.90 0.65 0.003 0.04
MT 22.00 0.60 0.65 0.003 0.03
MT 22.00 0.30 0.30 0.003 0.01
Portal 1, left slope (as per drawing tunnel/2.6, 1 of 2) MT 1,170.00 3.08 0.001 3.60
Portal 1, right slope(as per drawing tunnel/2.6, 1 of 2) MT 1,230.00 3.08 0.001 3.79
Portal 1, front slope(as per drawing tunnel/2.6, 1 of 2) MT 385.00 3.08 0.001 1.19
Portal 2, left slope(as per drawing tunnel/2.6, 2 of 2) MT 1,410.00 3.08 0.001 4.34
Portal 2, right slope(as per drawing tunnel/2.6, 2 of 2) MT 1,400.00 3.08 0.001 4.31
Portal 2, front slope(as per drawing tunnel/2.6, 2 of 2) MT 468.00 3.08 0.001 1.44
Portal 1, portal protection (as per drawing tunnel/2.6, 1 of 2) MT 2.00 82.32 3.08 0.001 0.51
Portal 2, portal protection (as per drawing tunnel/2.6, 2 of 2) MT 2.00 82.32 3.08 0.001 0.51
10% increase MT 0.10 19.76 1.00 1.00 1.98
S.No Item no. Description of item
SCHEDULE B SUPPORT SYSTEM, TUNNEL 1 Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate
SCHEDULE B2 SHOTCRETE AND CONCRETE WORKS
1 B201 Shotcreting with designed mix cement concrete M25, 20 mm aggregate stone
with reinforcement fibers as per specifications and drawings and as directed
by Engineer-in-Charge including all materials, labour, equipments, etc,
required for complete job (Cost of Cement shall be paid separately under item
No. E101) (Cost of reinforcement fibers shall be paid separately under item
No. E1041)

B2011 KONKAN proporcionate rate, Tunnel T-5


30 mm thickess sqm 214.00 21,603.91 4,623,236.38 from km 42/900 to 48/940 (May 2010)
B2012 KONKAN, Tunnel T-5 from km 42/900 to
50 mm thickess sqm 356.00 5,606.89 1,996,051.77 48/940 (May 2010)
B2013 KONKAN proporcionate rate, Tunnel T-5
70 mm thickess sqm 564.00 6,675.43 3,764,941.71 from km 42/900 to 48/940 (May 2010)
B2014 KONKAN, Tunnel T-5 from km 42/900 to
100 mm thickess sqm 702.00 156.12 109,598.35 48/940 (May 2010)
B2015 KONKAN proporcionate rate, Tunnel T-5
120 mm thickess sqm 844.00 3,884.21 3,278,269.37 from km 42/900 to 48/940 (May 2010)
B2016 KONKAN, Tunnel T-5 from km 42/900 to
150 mm thickess sqm 1,057.00 1,611.87 1,703,743.07 48/940 (May 2010)
B201a Shotcreting with designed mix cement concrete M25 and 20 mm aggregate
stone as per specifications and drawings and as directed by Engineer-in-
Charge including all materials, labour, equipments, etc, required for complete
job (Cost of cement shall be paid separately under item No. E101)

B201a1 KONKAN proporcionate rate, Tunnel T-5


30 mm thickness sqm 214.00 6,177.44 1,321,971.44 from km 42/900 to 48/940 (May 2010)
B201a2 KONKAN, Tunnel T-5 from km 42/900 to
Shotcrete in slope stabilization (50 mm thickness) sqm 356.00 6,669.30 2,374,270.80 48/940 (May 2010)
B201a3 KONKAN, Tunnel T-5 from km 42/900 to
Shotcrete for slopes protection (100 mm thickness) sqm 702.00 181.10 127,135.01 48/940 (May 2010)
2 B202 Design mix cement concrete M30 and 20 mm aggregate stone in following
PCC works including machine mixed, machine batched, machine vibrated,
formwork, etc but excluding the cost of reinforcement as per specifications
and drawings and as directed by Engineer-in-Charge (Cost of cement shall
be paid separately under item No. E101) (Cost of reinforcement steel shall be
paid separately under item No. E102)
Cum 6,404.00 8,111.90 51,948,575.58 IRCON, Tunnel T-74R, Febryary 2010
3 B202B Design mix cement concrete M30 and 20 mm aggregate stone in following
RCC works including machine mixed, machine batched, machine vibrated,
formwork, etc but excluding the cost of reinforcement as per specifications
and drawings and as directed by Engineer-in-Charge (Cost of cement shall
be paid separately under item No. E101) Cum 6,404.00 1,734.73 11,109,210.06 IRCON, Tunnel T-74R, Febryary 2010
4 B203 Design mix cement concrete M25 and 20 mm aggregate stone in tunnel
works including machine mixed, machine batched, machine vibrated, form
work, etc but excluding the cost of reinforcement as per specifications &
drawings and as directed by Engineer-in-Charge. (Cost of cement shall be
paid separately under item No. E101) Cum 5,625.00 1,002.87 5,641,143.75 IRCON, Tunnel T-74R, Febryary 2010
5 B204 Design Mix cement concrete M20 and 20 mm aggregate stone in
following PCC works including mechanically mixed, machine batched,
machine vibrated form work, etc as per specifications & drawings and as
directed by Engineer-in-Charge. (Cost of cement shall be paid separately
under item No. E101) Cum 3,250.00 2,498.57 8,120,368.33 As per rate analysis
6 BMT-M.38 Supply of Thermocole 19 mm thick sheets as directed by Engineer-in- Goverment of Andhra Pradesh, BUILDING
Charge. sqm 40.00 128.91 5,156.21 - SoR: 2010-2011
TOTAL 96,123,671.83
S.No Item no. Description of item
SCHEDULE B SUPPORT SYSTEM, TUNNEL 1 Unit Number Length Width Heigth Partial Total Qty
SCHEDULE B2 SHOTCRETE AND CONCRETE WORKS
1 B201 Shotcreting with designed mix cement concrete M25, 20 mm aggregate stone with
reinforcement fibers as per specifications and drawings and as directed by
Engineer-in-Charge including all materials, labour, equipments, etc, required for
complete job (Cost of Cement shall be paid separately under item No. E101) (Cost
of reinforcement fibers shall be paid separately under item No. E1041)
B2011 30 mm thick sqm 21,603.91
Excavation in Rock Class I (as per drawing tunnel/2.4.1, 1 of 6) sqm 233.00 0.61 0.03 4,737.67
Excavation in Rock Class II (as per drawing tunnel/2.4.1, 2 of 6) sqm 174.00 0.62 0.03 3,596.00
Excavation in Rock Class III (as per drawing tunnel/2.4.1, 3 of 6) sqm 295.00 0.62 0.03 6,096.67
Excavation in Rock Class IV (as per drawing tunnel/2.4.1, 4 of 6) sqm 143.00 0.62 0.03 2,955.33
Excavation in Rock Class V (as per drawing tunnel/2.4.1 5 of 6) sqm 70.00 0.62 0.03 1,446.67
Trolley refuges II (as per drawing tunnel/2.4.2, 2 of 3) sqm 10.50 0.31 0.03 108.50
Cross passages II (as per drawing tunnel/3.4.3, 2 of 4) sqm 13.80 0.26 0.03 119.60
Recesses (as per drawing tunnel/3.4.4, 1 of 2) sqm 25.00 0.67 0.03 558.33
M&E Rooms II (as per drawing tunnel/3.4.5, 2 of 2) sqm 2.35 0.27 0.03 21.15
10% increase sqm 0.10 19,639.92 1.00 1.00 1,963.99
B2012 50 mm thick sqm 5,606.89
Excavation in Rock Class II (as per drawing tunnel/3.4.1, 2 of 6) sqm 174.00 1.02 0.05 3,549.60
Trolley refuges I (as per drawing tunnel/3.4.2 1 of 3) sqm 66.50 0.49 0.05 651.70
Cross passages I (as per drawing tunnel/3.4.3 1 of 4) sqm 92.00 0.41 0.05 754.40
M&E Rooms I (as per drawing tunnel/3.4.5 1 of 2) sqm 16.45 0.43 0.05 141.47
10% increase sqm 0.10 5,097.17 1.00 1.00 509.72
B2013 70 mm thick sqm 6,675.43
Excavation in Rock Class III (as per drawing tunnel/3.4.1, 3 of 6) sqm 295.00 1.44 0.07 6,068.57
10% increase sqm 0.10 6,068.57 1.00 1.00 606.86
B2014 100 mm thick sqm 156.12
Trolley refuges II (as per drawing tunnel/3.4.2, 2 of 3) sqm 10.50 1.01 0.10 106.05
Cross passages II (as per drawing tunnel/3.4.3, 2 of 4) sqm 13.80 0.26 0.10 35.88
10% increase sqm 0.10 141.93 1.00 1.00 14.19
B2015 120 mm thick sqm 3,884.21
Excavation in Rock Class IV (as per drawing tunnel/3.4.1, 4 of 6) sqm 143.00 2.48 0.12 2,955.33
Recesses (as per drawing tunnel/3.4.4, 1 of 2) sqm 25.00 2.68 0.12 558.33
M&E Rooms II (as per drawing tunnel/3.4.5, 2 of 2) sqm 2.35 0.89 0.12 17.43
10% increase sqm 0.10 3,531.10 1.00 1.00 353.11
B2016 150 mm thick sqm 1,611.87
Excavation in Rock Class V (as per drawing tunnel/3.4.1 5 of 6) sqm 70.00 3.14 0.15 1,465.33
10% increase sqm 0.10 1,465.33 1.00 1.00 146.53
B201a Shotcreting with designed mix cement concrete M25 and 20 mm aggregate stone as
per specifications and drawings and as directed by Engineer-in-Charge including all
materials, labour, equipments, etc, required for complete job (Cost of cement shall
be paid separately under item No. E101)
B201a1 30 mm thickness sqm 6,177.44
Sprayed concrete in face in SC IV and V (as per drawing tunnel/2.5.1) sqm 0.45 213.00 58.59 1.00 5,615.85
10% increase sqm 0.10 5,615.85 1.00 1.00 561.59
S.No Item no. Description of item
SCHEDULE B SUPPORT SYSTEM, TUNNEL 1 Unit Number Length Width Heigth Partial Total Qty
SCHEDULE B2 SHOTCRETE AND CONCRETE WORKS
B201a2 50 mm thickness sqm 6,669.30
Portal 1, left slope stabilization (as per drawing tunnel/2.6, 1 of 2) sqm 1,170.00 1.00 1.00 1,170.00
Portal 1, right slope stabilization (as per drawing tunnel/2.6, 1 of 2) sqm 1,230.00 1.00 1.00 1,230.00
Portal 1, front slope stabilization (as per drawing tunnel/2.6, 1 of 2) sqm 385.00 1.00 1.00 385.00
Portal 2, left slope stabilization(as per drawing tunnel/2.6, 2 of 2) sqm 1,410.00 1.00 1.00 1,410.00
Portal 2, right slope stabilization (as per drawing tunnel/2.6, 2 of 2) sqm 1,400.00 1.00 1.00 1,400.00
Portal 2, front slope stabilization (as per drawing tunnel/2.6, 2 of 2) sqm 468.00 1.00 1.00 468.00
10% increase sqm 0.10 6,063.00 1.00 1.00 606.30
B201a3 100 mm thickness sqm 181.10
Portal 1 Cut&Cover protection (as per drawing tunnel/3.6, 1 of 2) sqm 82.32 1.00 1.00 82.32
Portal 2 Cut&Cover protection (as per drawing tunnel/3.6, 2 of 2) sqm 82.32 1.00 1.00 82.32
10% increase sqm 0.10 164.64 1.00 1.00 16.46
2 B202 Design mix cement concrete M30 and 20 mm aggregate stone in following PCC
works including machine mixed, machine batched, machine vibrated, formwork, etc
but excluding the cost of reinforcement as per specifications and drawings and as
directed by Engineer-in-Charge (Cost of cement shall be paid separately under item
No. E101) (Cost of reinforcement steel shall be paid separately under item No.
E102)
Cum 8,111.90
Excavation in Rock Class I (as per drawing tunnel/2.3) Cum 233.00 5.79 1.00 1,349.07
Excavation in Rock Class II (as per drawing tunnel/2.3) Cum 174.00 5.79 1.00 1,007.46
Excavation in Rock Class III (as per drawing tunnel/2.3) Cum 295.00 5.79 1.00 1,708.05
Excavation in Rock Class IV (as per drawing tunnel/2.3) Cum 143.00 5.79 1.00 827.97
Excavation in Rock Class V (as per drawing tunnel/2.3) Cum 70.00 5.79 1.00 405.30
Recesses (as per drawing tunnel/2.3) Cum 25.00 6.63 1.00 165.75
Trolley refuges I (as per drawing tunnel/2.3) Cum 10.50 1.89 1.00 19.85
Trolley refuges II (as per drawing tunnel/2.3) Cum 10.50 1.89 1.00 19.85
Cross passages I (as per drawing tunnel/2.3) Cum 13.80 1.55 1.00 21.39
Cross passages II (as per drawing tunnel/2.3) Cum 13.80 1.55 1.00 21.39
M&E Rooms I (as per drawing tunnel/2.3) Cum 2.35 1.66 1.00 3.90
M&E Rooms II (as per drawing tunnel/2.3) Cum 2.35 1.66 1.00 3.90
End of Cross passages Cum 80.99 0.20 3.00 48.59
End of Trolley refuges Cum 11.82 0.20 6.00 14.18
End of M&E rooms Cum 0.00 0.20 1.00 0.00
Slabs (as per drawing tunnel/2.3) Cum 940.00 1.87 1.00 1,757.80
10% increase Cum 0.10 7,374.45 1.00 1.00 737.45
3 B202B Design mix cement concrete M30 and 20 mm aggregate stone in following RCC
works including machine mixed, machine batched, machine vibrated, formwork, etc
but excluding the cost of reinforcement as per specifications and drawings and as
directed by Engineer-in-Charge (Cost of cement shall be paid separately under item
No. E101) Cum 1,734.73
C&C portals (spread footing solution) (as per drawing tunnel/2.7) Cum 73.00 20.71 1.00 1,511.83
Manholes main drain(as per drawing tunnel/2.8.2) Cum
Cum 22.00 0.9 0.65 0.075 0.97
Cum 22.00 0.6 0.65 0.075 0.64
Cum 22.00 0.30 0.30 0.080 0.16
Retention basin (as per drawing tunnel/2.8.3) Cum 40.00 0.25 1.00 10.00
S.No Item no. Description of item
SCHEDULE B SUPPORT SYSTEM, TUNNEL 1 Unit Number Length Width Heigth Partial Total Qty
SCHEDULE B2 SHOTCRETE AND CONCRETE WORKS
Technical building T11 (as per drawing tunnel/2.19, 1 of 1) Cum 53.43 1.00 1.00 53.43
10% increase Cum 0.10 1,577.03 1.00 1.00 157.70
4 B203 Design mix cement concrete M25 and 20 mm aggregate stone in tunnel works
including machine mixed, machine batched, machine vibrated, form work, etc but
excluding the cost of reinforcement as per specifications & drawings and as
directed by Engineer-in-Charge. (Cost of cement shall be paid separately under
item No. E101) Cum 1,002.87
Concrete below gauge base (as per drawing tunnel/6.1) Cum 1,013.00 0.90 1.00 911.70
10% increase Cum 0.10 911.70 1.00 1.00 91.17
5 B204 Design Mix cement concrete M20 and 20 mm aggregate stone in following PCC
works including mechanically mixed, machine batched, machine vibrated form
work, etc as per specifications & drawings and as directed by Engineer-in-Charge.
(Cost of cement shall be paid separately under item No. E101)
Cum 2,498.57
Side drains (as per drawing tunnel/2.6, 1 of 4 and 4 of 4) Cum 844.00 0.09 1.00 75.96
Main drain coverage Cum 1,013.00 0.45 0.65 296.30
Cum -1,013.00 3.14 0.04 -127.23
Tunnel walkways (as per drawing tunnel/6.1) Cum 1,013.00 1.88 1.00 1,904.44
Basement of Cross Passages (as per drawing tunnel/2.3) Cum 27.60 2.90 0.10 8.00
Basement of Trolley refuges (as per drawing tunnel/2.3) Cum 21.00 4.10 0.10 8.61
Basement of M&E Rooms (as per drawing tunnel/2.3) Cum 4.70 0.34 1.00 1.60
Exces slabs receses (as per drawing tunnel/2.3) Cum 25.00 0.84 1.00 21.00
Blinding concrete in C&C tunnel (spread footing solution) (as per drawing
tunnel/2.7) Cum 73.00 0.71 1.00 51.83
Blinding concrete below Technical building T11 (as per drawing tunnel/2.19, 1 of 1) Cum 30.92 1.00 1.00 30.92
10% increase Cum 0.10 2,271.43 1.00 1.00 227.14
6 BMT-M.38 Supply of Thermocole 19 mm thick sheets as directed by Engineer-in-Charge. sqm 128.91
Slab joints sqm 940.00 0.07 1.87 117.19
10% increase sqm 0.10 117.19 1.00 1.00 11.72
S.No Item no. Description of item
Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate
SCHEDULE C DRAINAGE AND MISCELLANEOUS WORKS, TUNNEL 1
1 C101 Providing and installing PVC pipes of following diameters in the tunnel as
per approved drawings and specifications and as directed by Engineer-
in-Charge.
C1011 100 mm internal diameter/ 110 mm external diameter PVC pipe Meter 107.00 232.69 24,898.26 IRCON, Tunnel T-74R, Febryary 2010
2 C102 Providing and installing of perforated PVC pipes in the tunnel of following
diameters as per approved drawings and specifications and as directed
by Engineer-in-Charge.
C1021 100 mm internal diameter/ 110 mm external diameter PVC pipe Meter 256.00 1,117.60 286,105.60 IRCON, Tunnel T-74R, Febryary 2010
3 C113 Providing and installation of metal grid cover in tunnel as per approved
KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
drawings and as a complete job and as directed by Engineer-in-Charge.
MT 60,828.00 15.37 934,894.83 2010)
4 C106 Exploratory drilling & drainage holes, up to 35 m length and up to 10m
overlap as per approved drawings and specifications and as directed by
Engineer-in-Charge. (in Tunnel & open Excavation).
C1061 Horizontal / inclined in all kind of rocks , Diameter equal or greater than KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
50 mm Meter 1,081.00 3,026.10 3,271,214.10 2010)
C106a Drilling for installation of monitoring instruments up to 90 mm diameter in
all kinds of rock and in any direction, including widening of 500 mm length
at the borehole mouth up to diameter of 120mm
C106a1 KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
Up to 12m length Meter 1,081.00 43.56 47,088.36 2010)
C106a2 KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
> 12m and up to 30 m length Meter 1,622.00 495.00 802,890.00 2010)
5 C107 Providing and laying of pipe of following diameters as main collector pipe,
connection pipes, cleaning access pipes, pipe sleeves, etc, as per
approved drawings and specifications and as directed by Engineer-in-
Charge.
C10712 300 mm external diameter RCC4 NP4 pipe Meter 2,000.00 1,114.30 2,228,600.00 IRCON, Tunnel T-74R, Febryary 2010
6 C109 Providing, laying and fixing of protective felt (geotextile) with a minimum
weight of 500 g/m2 for protection of the waterproofing membranes and
drainage on the finished outer lining surface including the cost of all
materials, labour, equipments, etc required for the completion of job, as
per specifications and as directed by the Engineer-in-Charge. KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
Sqm 276.00 3,556.54 981,605.59 2010)
7 C110 Providing, placing, welding of 2 mm thick PVC or ECB waterproofing
membrane including the cost of all materials, labour, equipments, etc.
required for the completion of job as per specifications and as directed by KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
the Engineer-in-Charge. Sqm 1,081.00 3,556.54 3,844,621.90 2010)
8 C112 Pumping of water by furnishing, transporting, installing the
equipment & system including pneumatic pumps as per the
requirement and as per specifications and as directed by the Engineer-in-
Charge as a complete job. (Note: Payment will be made only for
actual use for dewatering as payable as per specifications and as per
the certified Log book for each pump by the Engineer-in-Charge) KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
KWH 21.00 1,000.00 21,000.00 2010)
S.No Item no. Description of item
Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate
SCHEDULE C DRAINAGE AND MISCELLANEOUS WORKS, TUNNEL 1
9 C114 Providing and laying of pipe of following diameters as cable ducts pipe,
connection pipes, cleaning access pipes, pipe sleeves, etc, as per
approved drawings and as directed by Engineer-in-Charge.
C1141 KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
Cable Ducts diam. 100 mm PVC pipe Meter 143.00 26,794.68 3,831,639.24 2010)
10 C117 Providing and fixing porta cabin of approved make (20ft x 8ft) with
furnishing and toilet block facility at the designated places including the
cost of all materials, labour, equipments, etc required for the completion KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
of job and as directed by Engineer-in-Charge. Each 250,000.00 2.00 500,000.00 2010)
11 C118 Random rubble masonry, hammer dressed wherever necessary, in
cement and sand 1:6 in retaining wall, including providing weep holes of
100mm dia. PVC pipe at 1.0m c/c horizontally and vertically, with
contractors men,material,consumables, tools and plants, equipments,
machinaries, including all lead & lifts, loading, unloading, as per
specifications and directed by Engineer-in-Charge, etc complete.
(Payment of cement shall be made under item no. E101) KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
Cum 848.00 500.00 424,000.00 2010)
12 C116 Dismantling/breaking cement concrete including clearing of site and
leading of broken concrete to disposal site to be arranged by the KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
contractor at their own cost as per the direction of Engineer-in-Charge cum 5,883.00 100.00 588,300.00 2010)
13 C119 Fabrication, supply and erection of Stainless Steel hand rail using 50 mm
dia. Tube for hand rail and 32 mm dia. for supports all with 16 Swg wall
thick confirming to 304-AASi of No. 4 glassy finish duly bending, welding
at site where ever required, polishing the same for tunnel handrail with all
contractor materials, labour, tools and plants and as directed by the
Engineer-in-charge.
kg 769.44 4,468.47 3,438,223.23 RVNL
Total 21,225,081.11
S.No Item no. Description of item
Unit Number Length Width Heigth Partial Total Qty
SCHEDULE C DRAINAGE AND MISCELLANEOUS WORKS, TUNNEL 1
1 C101 Providing and installing PVC pipes of following diameters in the tunnel as per
approved drawings and specifications and as directed by Engineer-in-
Charge.
C1011 100 mm internal diameter/ 110 mm external diameter PVC pipe Meter 232.69
Connections, SC IV and V (as per drawing tunnel/2.8.2) Meter 2.00 12.00 0.50 1.00 12.00
Connections sidewalk gutter (as per drawing tunnel/2.8.2) Meter 22.00 1.00 1.40 1.00 30.80
Meter 22.00 1.00 4.69 1.00 103.18
Connections platform gutter (as per drawing tunnel/2.8.2) Meter 22.00 1.00 2.98 1.00 65.56
10% increase Meter 0.10 211.54 1.00 1.00 21.15
2 C102 Providing and installing of perforated PVC pipes in the tunnel of following
diameters as per approved drawings and specifications and as directed by
Engineer-in-Charge.
C1021 100 mm internal diameter/ 110 mm external diameter PVC pipe Meter 1,117.60
(walls) (as per drawing tunnel/2.8.2) Meter 2.00 508.00 1.00 1.00 1,016.00
10% increase Meter 0.10 1,016.00 1.00 1.00 101.60
3 C113 Providing and installation of metal grid cover in tunnel as per approved
drawings and as a complete job and as directed by Engineer-in-Charge. MT 15.37
Manholes main drain (36x60 cm) each 50 m (as per drawing tunnel/2.8.2, 1
of 2) MT 22.00 1.00 0.16 0.016 0.06
Manholes instalations (36x60 cm) in main tunnel MT 27.00 1.00 0.22 0.016 0.09
Manholes instalations (36x60 cm) in cross pasages and M&E rooms MT 4.00 1.00 0.22 0.016 0.01
Retention basin manholes (as per drawing tunnel/2.8.3, 1 of 2) MT 2.00 1.00 1.00 0.016 0.03
Gutter in platform (as per drawing tunnel/2.9, 4 of 5) MT 1.00 1,013.00 0.25 0.016 4.05
Gutters in walkways (as per drawing tunnel/2.9, 4 of 5) MT 2.00 1,013.00 0.30 0.016 9.72
10% increase MT 0.10 13.97 1.00 1.00 1.40
4 C106 Exploratory drilling & drainage holes, up to 35 m length and up to 10m
overlap as per approved drawings and specifications and as directed by
Engineer-in-Charge. (in Tunnel & open Excavation).
C1061 Horizontal / sub horizontal in all kind of rocks , Diameter equal or greater
than 50 mm 3,026.10
In front of section SC IV and V (78 mm diameter) (20 m lenght) (as per
drawing tunnel/2.5) meter 3.00 508.00 0.07 20 2,032.00
Drainage ducts (80 mm diameter) (25 cm lenght)
Portal 1, left slope (as per drawing tunnel/2.6, 1 of 2) meter 1,170.00 3.00 0.25 97.50
Portal 1, right slope(as per drawing tunnel/2.6, 1 of 2) meter 1,230.00 2.00 0.25 153.75
Portal 1, front slope(as per drawing tunnel/2.6, 1 of 2) meter 385.00 2.50 0.25 38.50
Portal 2, left slope(as per drawing tunnel/2.6, 2 of 2) meter 1,410.00 2.00 0.25 176.25
Portal 2, right slope(as per drawing tunnel/2.6, 2 of 2) meter 1,400.00 2.00 0.25 175.00
Portal 2, front slope(as per drawing tunnel/2.6, 2 of 2) meter 468.00 1.50 0.25 78.00
10% increase meter 0.10 2,751.00 1.00 1.00 275.10
S.No Item no. Description of item
Unit Number Length Width Heigth Partial Total Qty
SCHEDULE C DRAINAGE AND MISCELLANEOUS WORKS, TUNNEL 1
C106a Drilling for installation of monitoring instruments up to 90 mm diameter in all
kinds of rock and in any direction, including widening of 500 mm length at
the borehole mouth up to diameter of 120mm
C106a1 Up to 12m length Meter 43.56
Convergence Anchors or Groutable Anchors (as per drawing tunnel/2.10) Meter 66.00 0.60 1.00 1.00 39.60
10% increase meter 0.10 39.60 1.00 1.00 3.96
C106a2 > 12m and up to 30 m length Meter 495.00
Vibrating wire Type Piezometer (as per drawing tunnel/2.10) Meter 10.00 18.00 1.00 1.00 180.00
Incremental extensometer (as per drawing tunnel/2.10) Meter 15.00 18.00 1.00 1.00 270.00
10% increase Meter 0.10 450.00 1.00 1.00 45.00
5 C107 Providing and laying of pipe of following diameters as main collector pipe,
connection pipes, cleaning access pipes, pipe sleeves, etc, as per approved
drawings and specifications and as directed by Engineer-in-Charge.

C10712 300 mm external diameter RCC4 NP4 pipe Meter 1,114.30


Main collector pipe (as per drawing tunnel/2.9) Meter 1,013.00 1.00 1.00 1,013.00
10% increase Meter 0.10 1,013.00 1.00 1.00 101.30
6 C109 Providing, laying and fixing of protective felt (geotextile) with a minimum
weight of 500 g/m2 for protection of the waterproofing membranes and
drainage on the finished outer lining surface including the cost of all
materials, labour, equipments, etc required for the completion of job, as per
specifications and as directed by the Engineer-in-Charge. Sqm 3,556.54
Tunnel secciones IV and V (as per drawing tunnel/2.8.1 1 of 3) Sqm 508.00 3.39 1.00 1,722.12
Portal 1 and 2 (as per drawing tunnel/2.7) Sqm 73.00 20.70 1.00 1,511.10
10% increase Sqm 0.10 3,233.22 1.00 1.00 323.32
7 C110 Providing, placing, welding of 2 mm thick PVC or ECB waterproofing
membrane including the cost of all materials, labour, equipments, etc.
required for the completion of job as per specifications and as directed by
the Engineer-in-Charge. Sqm 3,556.54
Tunnel secciones IV and V (as per drawing tunnel/2.8.1 1 of 3) Sqm 508.00 3.39 1.00 1,722.12
Portal 1 and 2 (as per drawing tunnel/2.7) Sqm 73.00 20.70 1.00 1,511.10
10% increase Sqm 0.10 3,233.22 1.00 1.00 323.32
8 C112 Pumping of water by furnishing, transporting, installing the
equipment & system including pneumatic pumps as per the requirement
and as per specifications and as directed by the Engineer-in-Charge as a
complete job. (Note: Payment will be made only for actual use for
dewatering as payable as per specifications and as per the certified Log
book for each pump by the Engineer-in-Charge)
KWH 1,000.00 1.00 1.00 1,000.00 1,000.00
9 C114 Providing and laying of pipe of following diameters as cable ducts pipe,
connection pipes, cleaning access pipes, pipe sleeves, etc, as per approved
drawings and as directed by Engineer-in-Charge.
C1141 Cable Ducts diam. 100 mm PVC pipe Meter 26,794.68
Main Tunnel (as per drawing tunnel/2.9 4 of 5) Meter 1.00 1,013.00 4.00 6.00 24,312.00
Conection with E&M Rooms (as per drawing tunnel/2.17) Meter 2.00 11.70 1.00 2.00 46.80
10% increase Meter 0.10 24,358.80 1.00 1.00 2,435.88
S.No Item no. Description of item
Unit Number Length Width Heigth Partial Total Qty
SCHEDULE C DRAINAGE AND MISCELLANEOUS WORKS, TUNNEL 1
10 C117 Providing and fixing porta cabin of approved make (20ft x 8ft) with furnishing
and toilet block facility at the designated places including the cost of all
materials, labour, equipments, etc required for the completion of job and as
directed by Engineer-in-Charge. Each 2.00 1.00 1.00 1.00 2.00 2.00
11 C118 Random rubble masonry, hammer dressed wherever necessary, in cement
and sand 1:6 in retaining wall, including providing weep holes of 100mm
dia. PVC pipe at 1.0m c/c horizontally and vertically, with contractors
men,material,consumables, tools and plants, equipments, machinaries,
including all lead & lifts, loading, unloading, as per specifications and
directed by Engineer-in-Charge, etc complete. (Payment of cement shall be
made under item no. E101)
Cum 500.00 1.00 1.00 1.00 500.00 500.00
12 C116 Dismantling/breaking cement concrete including clearing of site and leading
of broken concrete to disposal site to be arranged by the contractor at their
own cost as per the direction of Engineer-in-Charge Cum 100.00 1.00 1.00 1.00 100.00 100.00
13 C119 Fabrication, supply and erection of Stainless Steel hand rail using 50 mm
dia. Tube for hand rail and 32 mm dia. for supports all with 16 Swg wall thick
confirming to 304-AASi of No. 4 glassy finish duly bending, welding at site
where ever required, polishing the same for tunnel handrail with all
contractor materials, labour, tools and plants and as directed by the
Engineer-in-charge.
kg 4,468.47
Hand rail kg 2.00 1,013.00 0.00025 8,000.00 4,005.10
Supports kg 337.67 0.15 0.0001552 8,000.00 62.87
10% increase kg 0.10 4,005.10 1.00 1.00 400.51
S.No Item no. Description of item
Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate
SCHEDULE D ANCILLARY WORK, TUNNEL 1
1 D1022 Payment of overbreak as per technical specifications and adjudged by Engineer-in-
Charge as having occurred beyond the control of the contractor for tunnel excavation.
D10221 KONKAN, Tunnel T-5 from km 42/900 to 48/940
i) Overbreak up to 5% Cum 602.00 75.66 45,547.68 (May 2010)
D10222 KONKAN, Tunnel T-5 from km 42/900 to 48/940
i) Overbreak beyond 5% and up to 10% Cum 150.00 226.98 34,047.27 (May 2010)
2 C115 Cement concrete by pumping for ground improvement or filling of voids and cavities
using suitable materials and mixtures as appropriate as per specifications and as
directed by Engineer-in-Charge. (Cost of cement shall be paid separately under item
No. E101) MT 8,816.00 300.50 2,649,190.37 IRCON, Tunnel T-74R, February 2010
3 13.1 Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering,
as per drawing and technical specifications sqm 6,190.00 255.81 1,583,432.95 As per rate analysis
4 13.2 Pointing with cement mortar (1:3) on brick work in substructure as per Technical
specifications sqm 464.00 255.81 118,693.52 As per rate analysis
5 13.3 Plastering with cement mortar (1:3) on brick work in sub-structure as per Technical
specifications sqm 834.00 255.81 213,341.37 As per rate analysis
Total 4,644,253.16
S.No Item no. Description of item
Unit Number Length Width Heigth Partial Total Qty
SCHEDULE D ANCILLARY WORK, TUNNEL 1
1 D1022 Payment of overbreak as per technical specifications and adjudged by Engineer-
in-Charge as having occurred beyond the control of the contractor for tunnel
excavation.
D10221 i) Overbreak up to 5% Cum 7,566.06 0.01 1.00 75.66 75.66
D10222 i) Overbreak beyond 5% and up to 10% Cum 7,566.06 0.03 1.00 226.98 226.98
2 C115 Cement concrete by pumping for ground improvement or filling of voids and
cavities using suitable materials and mixtures as appropriate as per specifications
and as directed by Engineer-in-Charge. (Cost of cement shall be paid separately
under item No. E101) MT 5,463.60 50.00 0.001 273.18 300.50
10% increase MT 0.10 273.18 1.00 1.00 27.32
3 13.1 Brick masonry work in 1:3 in sub-structure complete excluding pointing and sqm
plastering, as per drawing and technical specifications 255.81
Cross passages sqm 3.00 1.00 10.05 1.00 30.15
Technical building T11 (as per drawing tunnel/2.19, 1 of 1) sqm 1.00 202.40 1.00 1.00 202.40
10% increase sqm 0.10 232.55 1.00 1.00 23.26
4 13.2 Pointing with cement mortar (1:3) on brick work in substructure as per Technical
specifications sqm 255.81 1.00 1.00 1.00 255.81 255.81
5 13.3 Plastering with cement mortar (1:3) on brick work in sub-structure as per Technical
specifications sqm 255.81 1.00 1.00 1.00 255.81 255.81
% TR-I % TR-II
Chainages Start Point End Point Length (m) Trolley Refuges 50.00 50.00
C&C (Start) 18+640 18+660 00+020 % CP-I % CP-II
Mining 18+660 19+600 940 Cross passages AND ROOMS 50.00 50.00
TUNNEL 1
C&C (End) 19+600 19+653 53 C&C
1013 73
C&C (Start) 23+348 23+370 22
Mining 23+370 28+330 4960
C&C (Stream) 28+330 28+480 150
TUNNEL 2
Mining 28+480 29+990 1510
C&C (End) 29+990 30+019 29 C&C
6671 6521 201

Tunnel 1
Excavation
Total Excavation Section (m2) Excavation Excavation
Length(m)/Unit Unit lenght(m) Length (m)-I Length (m) II Section (m2) I Section (m3) I Section (m3) II
II
Trolley Refuges(m) 3.5 6 21.0 10.5 10.5 15.63 16.95 164.115 177.975
Cross passages(m) 9.20 3.00 27.6 13.80 13.80 10.05 11.10 138.69 153.18
ME ROOMS 4.70 1.00 4.7 2.35 2.35 11.82 12.96 27.78 30.46
Recesses for Construction 25.00 1.00 25.0 25.00 80.99 2024.75
Recesses for counterweight 4.00 0.00 0.0 0.00 80.99 0.00

Tunnel 1
SC RMR % Length (m) Section (m) Rockbolts (u) el Rockbolts (u/m) Lattice girders (m) Lattice girders (kg/m lattice girder) Lattice girders (kg/m tunnel) SC RMR
SC-I >=70 233 56.05 9 2.5 3.60 SC-I >=70
SC-II 55-69 174 56.47 13 2 6.50 SC-II 55-69
SC-III 45-54 295 56.89 13 1.5 8.67 SC-III 45-54
SC-IV 35-44 143.00 57.95 14 1.5 9.33 13.8 10.1 139.4 SC-IV 35-44
SC-V 70 58.59 20.83 12.6 262.5 SC-V
<=35 <=35
SC-V* 0 59.77 20.83 12.6 262.5 SC-V*
TR I 10.5 TR I 15.63 4.5 1.5 3.00 TR I
REFUGES REFUGES
TR II 10.5 TR II 16.95 6.78 10.1 68.5 TR II
CP I 13.80 CP I 10.05 3.5 2 1.75 CP I
CP CP
CP II 13.8 CP II 11.10 5.63 10.1 56.9 CP II
MER I 2.35 MER I 11.82 3.5 2 1.75 MER I
MER MER
MER II 2.35 MER II 12.96 6.02 10.1 60.8 MER II
RECESSES 25.00 80.99 14 1 14.00 22.39 10.1 226.1 RECESSES

NOTA: EL RC EST EN SC-IV, AS QUE LO HEMOS RESTADO Medium perimeter (tunnel) 20.8
Slab/invert 6.0
26.8
Sprayed sealing (m) Sprayed concrete (m) Total
0.61 0.61
0.62 0.41 1.03
0.62 0.82 1.44
0.62 1.85 2.47
0.62 2.47 3.09
0.63 2.49 3.12
0.49 0.49
0.31 1.012 1.322
0.41 0.41
0.25 0.84 1.09
0.43 0.43
0.27 0.89 1.16
0.67 2.68 3.35
S.No Item no. Description of item
Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate
SCHEDULE E SUPPLY OF STEEL AND CEMENT, TUNNEL 1
1 E101 Supply of 43/53 grade cement conforming to relevant IS specifications and
using the same to work as per RVNLs approved mix design as per RVNLs
prescribed rates of consumption, including all lead lift, labour, loading,
unloading, ascent, descent, crossing of Railway line(s), royalty, taxes, transport
(contractors own), tools and plant complete. Bag 275.00 92,306.00 25,384,150.00 RVNL
2 E102 Supply of steel reinforcement of various diameters and grade Fe500 from
approved manufacturers at various sites including all transportation and freight
charges and all taxes, duties, etc. with contractors men, material, tools & plants,
equipments, machineries, testing, all lead & lifts, loading, unloading , as
directed by Engineer-in-Charge. MT 56,000.00 237.57 13,304,016.15 RVNL
3 E104 Extra for supply and mixing of double end hooked loose steel fibers of circular
cross section having diameter 0.75mm and aspect ratio equal to 49 confirming
to EC-certificate of conformity as per EN 14889 and Tensile Strength more than
1100 MPa and ultimate Strain less than 4% as per specifications and as
directed by Engineer-in-Charge.
E1041 KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
Fibers in shotcrete MT 111,681.00 66.96 7,478,391.67 2010)
Total 46,166,557.81
S.No Item no. Description of item
Unit Number Length Width Heigth Partial Total Qty
SCHEDULE E SUPPLY OF STEEL AND CEMENT, TUNNEL 1
1 E101 Supply of 43/53 grade cement conforming to relevant IS specifications and using the
same to work as per RVNLs approved mix design as per RVNLs prescribed rates of
consumption, including all lead lift, labour, loading, unloading, ascent, descent,
crossing of Railway line(s), royalty, taxes, transport (contractors own), tools and
plant complete. 92,305.23
Shotcrete M-25 (with SFRS) Bag 300.00 2,232.07 0.02 13,392.42
Shotcrete M-25 (without SFRS)
Sprayed concrete in face in SC IV, V and V* (30 mm thickness) Bag 300.00 185.32 0.02 1,111.94
Shotcrete in slope stabilization (50 mm thickness) Bag 300.00 333.47 0.02 2,000.79
Shotcrete for slopes protection (100 mm thickness) Bag 300.00 18.11 0.02 108.66
Concrete M30 Bag 300.00 8,111.90 0.02 48,671.37
Concrete M25 Bag 300.00 1,002.87 0.02 6,017.22
Concrete M20 Bag 250.00 2,498.57 0.02 12,492.87
Cement concrete by pumping Bag 50.00 5,463.60 0.02 5,463.60
Increase 10% cement concrete by pumping Bag 0.1 5,463.60 1.00 1.00 546.36
Masonry wall Bag 250.00 500.00 0.02 2,500.00
2 E102 Supply of steel reinforcement of various diameters and grade Fe500 from approved
manufacturers at various sites including all transportation and freight charges and all
taxes, duties, etc. with contractors men, material, tools & plants, equipments,
machineries, testing, all lead & lifts, loading, unloading , as directed by Engineer-in-
Charge. 237.57
Lattice girders MT 1.00 52.47 1.00 52.47
Steel reinforcement MT 1.00 185.10 1.00 185.10
3 E104 Extra for supply and mixing of double end hooked loose steel fibers of circular cross
section having diameter 0.75mm and aspect ratio equal to 49 confirming to EC-
certificate of conformity as per EN 14889 and Tensile Strength more than 1100 MPa
and ultimate Strain less than 4% as per specifications and as directed by Engineer-
in-Charge.
E1041 Fibers in shotcrete MT 30.00 2,232.07 0.001 66.96 66.96
S. no. Item No. Item description
Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate

SCHEDULE F Monitoring of excavations/ construction, tunnel 1


1 F101 Convergence Anchors or Groutable Anchors as per approved drawings, technical specifications
and directed by the Engineer-in-Charge. each 572.53 66.00 37,786.98 Encardio-Rite quotation rate
2 F102 Tape Extensometer : To measure the small change in distance between two refrence points as
per approved drawings, technical specification and directed by the Engineer-in-Charge.
each 68,703.60 1.00 68,703.60 Encardio-Rite quotation rate
3 F103 Shotcrete-concrete stress cell rectangular Type , Range : 5.0MPa ,200X300mm as per
approved drawings, technical specification and directed by the Engineer-in-Charge. each 28,626.50 15.00 429,397.50 Encardio-Rite quotation rate
4 F104 Multi point Borehole Extensometer for 5m, 10m 1nd 15m , Range 0-50mm as per approved
drawings, technical specification and directed by the Engineer-in-Charge. each 74,428.90 15.00 1,116,433.50 Encardio-Rite quotation rate
5 F105 Vibrating wire Type Piezometer, Range : 0.5MPa as per approved drawings, technical
specification and directed by the Engineer-in-Charge. each 11,450.60 10.00 114,506.00 Encardio-Rite quotation rate
6 F106 10-position junction cum switch boxes for taking readings as per approved drawings, technical
specification and directed by the Engineer-in-Charge. each 13,740.72 2.00 27,481.44 Encardio-Rite quotation rate
7 F107 Junction cum Switch box for Multipoint Bore hole 3:1 as per approved drawings, technical
specification and directed by the Engineer-in-Charge. each 5,725.30 15.00 85,879.50 Encardio-Rite quotation rate
8 F108 Portable readout unit for V.W. type sensors as per directed by the Engineer in Charge each 85,879.50 1.00 85,879.50 Encardio-Rite quotation rate
9 F109 Charges for permanent posting of Engineer/representative Month 82,725.00 3.60 297,810.00 Encardio-Rite quotation rate
10 F110 Charges for deputation of Engineer/representative for less than one month Man/day 27,575.00 1.00 27,575.00 Encardio-Rite quotation rate
TOTAL 2,291,453.02
S. no. Item No. Items Qty Number Unit Length Width Heigth Partial
Total Qty
SCHEDULE F, Monitoring of excavations/ construction, tunnel 1
1 F101 Convergence Anchors or Groutable Anchors as per approved drawings, technical specifications
and directed by the Engineer-in-Charge. 66.00
MS-I (as per drawing tunnel/2.10) Unit 14.00 3.00 1.00 42.00
MS-II (as per drawing tunnel/2.10) Unit 4.00 3.00 1.00 12.00
MSR-I (as per drawing tunnel/2.10) Unit
MSR-II (as per drawing tunnel/2.10) Unit 1.00 3.00 1.00 3.00
Cross passages (as per drawing tunnel/2.10) Unit 3.00 3.00 1.00 9.00
2 F102
Tape Extensometer : To measure the small change in distance between two refrence points as
per approved drawings, technical specification and directed by the Engineer-in-Charge.
Unit 1.00 1.00 1.00 1.00 1.00
3 F103 Shotcrete-concrete stress cell rectangular Type , Range : 5.0MPa ,200X300mm as per
Unit
approved drawings, technical specification and directed by the Engineer-in-Charge. 15.00
MS-I (as per drawing tunnel/2.10) Unit
MS-II (as per drawing tunnel/2.10) Unit 4.00 3.00 1.00 12.00
MSR-I (as per drawing tunnel/2.10) Unit
MSR-II (as per drawing tunnel/2.10) Unit 1.00 3.00 1.00 3.00
Cross passages (as per drawing tunnel/2.10) Unit
4 F104 Multi point Borehole Extensometer for 5m, 10m 1nd 15m , Range 0-50mm as per approved Unit
drawings, technical specification and directed by the Engineer-in-Charge. 15.00
MS-I (as per drawing tunnel/2.10) Unit
MS-II (as per drawing tunnel/2.10) Unit 4.00 3.00 1.00 12.00
MSR-I (as per drawing tunnel/2.10) Unit
MSR-II (as per drawing tunnel/2.10) Unit 1.00 3.00 1.00 3.00
Cross passages (as per drawing tunnel/2.10) Unit
5 F105 Vibrating wire Type Piezometer, Range : 0.5MPa as per approved drawings, technical Unit
specification and directed by the Engineer-in-Charge. 10.00
MS-I (as per drawing tunnel/2.10) Unit
MS-II (as per drawing tunnel/2.10) Unit 4.00 2.00 1.00 8.00
MSR-I (as per drawing tunnel/2.10) Unit
MSR-II (as per drawing tunnel/2.10) Unit 1.00 2.00 1.00 2.00
Cross passages (as per drawing tunnel/2.10) Unit
6 F106 10-position junction cum switch boxes for taking readings as per approved drawings, technical
specification and directed by the Engineer-in-Charge. Unit 2.00 1.00 1.00 2.00 2.00
7 F107 Junction cum Switch box for Multipoint Bore hole 3:1 as per approved drawings, technical
specification and directed by the Engineer-in-Charge. Unit 15.00 1.00 1.00 1.00 15.00
8 F108 Portable readout unit for V.W. type sensors as per directed by the Engineer in Charge Unit 1.00 1.00 1.00 1.00 1.00
9 F109 Charges for permanent posting of Engineer/representative Month 24.00 0.15 1.00 3.60 3.60
10 F110 Charges for deputation of Engineer/representative for less than one month Man/day 1.00 1.00 1.00 1.00 1.00
INDEX

BoQ_TUNNEL no.1

S.No SCHEDULE Item description Cost in Rs.

1 A Excavation 164,731,847
B1 Support system 58,118,375
2
B2 Shotcrete and concrete works 96,123,672
3 C Drainage and miscellaneous works 21,225,081
4 D Anciliary work 4,644,253
5 E Supply of Steel and Cement 46,166,558
6 F Monitoring 2,291,453
Total Amount Rs. 393,301,239
Rate per Rm (Rs.) 388,254