Professional Documents
Culture Documents
Description of item
Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate
SCHEDULE A EXCAVATION, TUNNEL 1
1 A1002 Earthwork in cutting in formation, trolley refuges, side drains, yard
drains, catch water drains, etc. including leading usable cut spoils up
to 200 M and making formation in filling using the cut spoils, site
clearances, setting out and demarcation, disposing off surplus
unusable cut spoils as per directions of the engineer, and top and
side dressing to provide final formation as per designed profile. The
rate shall not include cutting of trees with girth above 60 CM and
compaction, which shall be paid separately.
A1021 Excavation in Rock Class I (as per drawing tunnel/2.4.1, 1 of 5) cum 1.00 233.00 56.05 1.00 13,059.65 14,365.62
10% increase cum 0.10 13,059.65 1.00 1.00 1,305.97
A1022 Excavation in Rock Class II (as per drawing tunnel/2.4.1, 2 of 5) cum 1.00 174.00 56.47 1.00 9,825.78 10,808.36
10% increase cum 0.10 9,825.78 1.00 1.00 982.58
A1023 Excavation in Rock Class III (as per drawing tunnel/2.4.1, 3 of 5) cum 1.00 295.00 56.89 1.00 16,782.55 18,460.81
10% increase cum 0.10 16,782.55 1.00 1.00 1,678.26
A1024 Excavation in Rock Class IV (as per drawing tunnel/2.4.1, 4 of 5) cum 1.00 143.00 57.95 1.00 8,286.85 9,115.54
10% increase cum 0.10 8,286.85 1.00 1.00 828.69
A1025 Excavation in Rock Class V and Recesses cum 6,738.66
Excavation in Rock Class V (as per drawing tunnel/2.4.1, 5 of 5) cum 1.00 70.00 58.59 1.00 4,101.30
Recesses (as per drawing tunnel/2.4.4, 2 of 2) cum 1.00 25.00 80.99 1.00 2,024.75
10% increase cum 0.10 6,126.05 1.00 1.00 612.61
A1027 Trolley refuges I & II, Cross passages I &II and M&E Rooms I & II cum 761.41
Trolley refuges I (as per drawing tunnel/2.4.2, 1 of 3) cum 1.00 10.50 15.63 1.00 164.12
Trolley refuges II (as per drawing tunnel/2.4.2, 2 of 3) cum 1.00 10.50 16.95 1.00 177.98
Cross passages I (as per drawing tunnel/2.4.3, 1 of 4) cum 1.00 13.80 10.05 1.00 138.69
Cross passages II (as per drawing tunnel/2.4.3, 2 of 4) cum 1.00 13.80 11.10 1.00 153.18
M&E Rooms I (as per drawing tunnel/2.4.5, 1 of 2) cum 1.00 2.35 11.82 1.00 27.78
M&E Rooms II (as per drawing tunnel/2.4.5, 2 of 2) cum 1.00 2.35 12.96 1.00 30.46
S.No Item no. Description of item
Unit Number Length Width Heigth Partial Total Qty
SCHEDULE A EXCAVATION, TUNNEL 1
10% increase cum 0.10 692.19 1.00 1.00 69.22
S.No Item no. Description of item
Unit Number Length Width Heigth Partial Total Qty
SCHEDULE A EXCAVATION, TUNNEL 1
3 A103 Extra for tunnel excavation due to excessive water inflow
A1031 Water inflow more than 50 I/sec cum 32,087.77
Sections III, IV, V and V* 29,170.70 1.00 1.00 1.00 29,170.70
10% increase cum 0.10 29,170.70 1.00 1.00 2,917.07
4 A104 Extra for transportation of spoils over 2 km from the portal / shaft
head but up to a lead of 20 km cum/km 0.70 15.00 108,691.79 1.00 1,141,263.78 1,141,263.78
5 A105 Earthwork in filling in formation including cut & covers, portals, trolley
refuges, etc using contractor's earth of approved quality procured
from outside railway land including site clearances, setting out and
demarcation, benching, initial compaction of subsoil after leveling the
surface after site clearance, spreading loose earth in 30 cm layers
using grader up to extra width of 50 cm beyond designed profile,
compaction using vibratory compactors so as to achieve minimum in
situ dry density of 98% of MDD, top and side dressing and removal of
extra earth from sides to provide final formation as per designed
profile and directed by the Engineer-in-Charge. . The rate shall not
include compaction which shall be paid separately.
cum 9,955.00
Portal 1 cum 6,410.00 1.00 1.00 1.00 6,410.00
Portal 2 cum 2,640.00 1.00 1.00 1.00 2,640.00
10% increase Cum 0.10 9,050.00 1.00 1.00 905.00
6 1005 Mechanical compaction of earth and blanket materials in layers of 30
cm in loose state using vibratory compactors so as to achieve
minimum in situ dry density of 98% of maximum dry density as
directed by the Engineer-in-Charge. cum 9,955.00 1.00 1.00 1.00 9,955.00 9,955.00
7 1008 Cutting down trees and uprooting of roots including transporting the
wood to nearby railway store or forest godown as directed by the
Engineer-in-Charge.
Note: Clearance of trees with girth less than 60 cm and their
clearance is covered under item No. A101. Girth will be measured at
a height of 1 m above the ground level.
1008 a Girth above 60 cm and up to 90 cm each 40.00 1.00 1.00 1.00 40.00 40.00
1008 b Girth above 90 cm and up to 180 cm each 20.00 1.00 1.00 1.00 20.00 20.00
1008 c Girth above 180 cm and up to 270 cm each 10.00 1.00 1.00 1.00 10.00 10.00
1008 d Girth above 270 cm each 10.00 1.00 1.00 1.00 10.00 10.00
S.No Item no. Description of item
SCHEDULE B SUPPORT SYSTEM, TUNNEL 1 Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate
SCHEDULE B1 ROCK BOLTS AND OTHER STEEL SUPPORTS ETC.
1 B101 Supply, drilling and installation of Swellex type rockbolts, Fy>=140 KN (tunnel
support), Bolt diameter 36 mm, as per approved drawings and technical
specifications and as directed by Engineer-in-Charge. The rate shall include
costs of all materials, labour, equipment, etc required for the complete job
Tunnel 1
Excavation
Total Excavation Section (m2) Excavation Excavation
Length(m)/Unit Unit lenght(m) Length (m)-I Length (m) II Section (m2) I Section (m3) I Section (m3) II
II
Trolley Refuges(m) 3.5 6 21.0 10.5 10.5 15.63 16.95 164.115 177.975
Cross passages(m) 9.20 3.00 27.6 13.80 13.80 10.05 11.10 138.69 153.18
ME ROOMS 4.70 1.00 4.7 2.35 2.35 11.82 12.96 27.78 30.46
Recesses for Construction 25.00 1.00 25.0 25.00 80.99 2024.75
Recesses for counterweight 4.00 0.00 0.0 0.00 80.99 0.00
Tunnel 1
SC RMR % Length (m) Section (m) Rockbolts (u) el Rockbolts (u/m) Lattice girders (m) Lattice girders (kg/m lattice girder) Lattice girders (kg/m tunnel) SC RMR
SC-I >=70 233 56.05 9 2.5 3.60 SC-I >=70
SC-II 55-69 174 56.47 13 2 6.50 SC-II 55-69
SC-III 45-54 295 56.89 13 1.5 8.67 SC-III 45-54
SC-IV 35-44 143.00 57.95 14 1.5 9.33 13.8 10.1 139.4 SC-IV 35-44
SC-V 70 58.59 20.83 12.6 262.5 SC-V
<=35 <=35
SC-V* 0 59.77 20.83 12.6 262.5 SC-V*
TR I 10.5 TR I 15.63 4.5 1.5 3.00 TR I
REFUGES REFUGES
TR II 10.5 TR II 16.95 6.78 10.1 68.5 TR II
CP I 13.80 CP I 10.05 3.5 2 1.75 CP I
CP CP
CP II 13.8 CP II 11.10 5.63 10.1 56.9 CP II
MER I 2.35 MER I 11.82 3.5 2 1.75 MER I
MER MER
MER II 2.35 MER II 12.96 6.02 10.1 60.8 MER II
RECESSES 25.00 80.99 14 1 14.00 22.39 10.1 226.1 RECESSES
NOTA: EL RC EST EN SC-IV, AS QUE LO HEMOS RESTADO Medium perimeter (tunnel) 20.8
Slab/invert 6.0
26.8
Sprayed sealing (m) Sprayed concrete (m) Total
0.61 0.61
0.62 0.41 1.03
0.62 0.82 1.44
0.62 1.85 2.47
0.62 2.47 3.09
0.63 2.49 3.12
0.49 0.49
0.31 1.012 1.322
0.41 0.41
0.25 0.84 1.09
0.43 0.43
0.27 0.89 1.16
0.67 2.68 3.35
S.No Item no. Description of item
Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate
SCHEDULE E SUPPLY OF STEEL AND CEMENT, TUNNEL 1
1 E101 Supply of 43/53 grade cement conforming to relevant IS specifications and
using the same to work as per RVNLs approved mix design as per RVNLs
prescribed rates of consumption, including all lead lift, labour, loading,
unloading, ascent, descent, crossing of Railway line(s), royalty, taxes, transport
(contractors own), tools and plant complete. Bag 275.00 92,306.00 25,384,150.00 RVNL
2 E102 Supply of steel reinforcement of various diameters and grade Fe500 from
approved manufacturers at various sites including all transportation and freight
charges and all taxes, duties, etc. with contractors men, material, tools & plants,
equipments, machineries, testing, all lead & lifts, loading, unloading , as
directed by Engineer-in-Charge. MT 56,000.00 237.57 13,304,016.15 RVNL
3 E104 Extra for supply and mixing of double end hooked loose steel fibers of circular
cross section having diameter 0.75mm and aspect ratio equal to 49 confirming
to EC-certificate of conformity as per EN 14889 and Tensile Strength more than
1100 MPa and ultimate Strain less than 4% as per specifications and as
directed by Engineer-in-Charge.
E1041 KONKAN, Tunnel T-5 from km 42/900 to 48/940 (May
Fibers in shotcrete MT 111,681.00 66.96 7,478,391.67 2010)
Total 46,166,557.81
S.No Item no. Description of item
Unit Number Length Width Heigth Partial Total Qty
SCHEDULE E SUPPLY OF STEEL AND CEMENT, TUNNEL 1
1 E101 Supply of 43/53 grade cement conforming to relevant IS specifications and using the
same to work as per RVNLs approved mix design as per RVNLs prescribed rates of
consumption, including all lead lift, labour, loading, unloading, ascent, descent,
crossing of Railway line(s), royalty, taxes, transport (contractors own), tools and
plant complete. 92,305.23
Shotcrete M-25 (with SFRS) Bag 300.00 2,232.07 0.02 13,392.42
Shotcrete M-25 (without SFRS)
Sprayed concrete in face in SC IV, V and V* (30 mm thickness) Bag 300.00 185.32 0.02 1,111.94
Shotcrete in slope stabilization (50 mm thickness) Bag 300.00 333.47 0.02 2,000.79
Shotcrete for slopes protection (100 mm thickness) Bag 300.00 18.11 0.02 108.66
Concrete M30 Bag 300.00 8,111.90 0.02 48,671.37
Concrete M25 Bag 300.00 1,002.87 0.02 6,017.22
Concrete M20 Bag 250.00 2,498.57 0.02 12,492.87
Cement concrete by pumping Bag 50.00 5,463.60 0.02 5,463.60
Increase 10% cement concrete by pumping Bag 0.1 5,463.60 1.00 1.00 546.36
Masonry wall Bag 250.00 500.00 0.02 2,500.00
2 E102 Supply of steel reinforcement of various diameters and grade Fe500 from approved
manufacturers at various sites including all transportation and freight charges and all
taxes, duties, etc. with contractors men, material, tools & plants, equipments,
machineries, testing, all lead & lifts, loading, unloading , as directed by Engineer-in-
Charge. 237.57
Lattice girders MT 1.00 52.47 1.00 52.47
Steel reinforcement MT 1.00 185.10 1.00 185.10
3 E104 Extra for supply and mixing of double end hooked loose steel fibers of circular cross
section having diameter 0.75mm and aspect ratio equal to 49 confirming to EC-
certificate of conformity as per EN 14889 and Tensile Strength more than 1100 MPa
and ultimate Strain less than 4% as per specifications and as directed by Engineer-
in-Charge.
E1041 Fibers in shotcrete MT 30.00 2,232.07 0.001 66.96 66.96
S. no. Item No. Item description
Unit Rate (Rs.) Quantity Amount (Rs.) Reference for rate
BoQ_TUNNEL no.1
1 A Excavation 164,731,847
B1 Support system 58,118,375
2
B2 Shotcrete and concrete works 96,123,672
3 C Drainage and miscellaneous works 21,225,081
4 D Anciliary work 4,644,253
5 E Supply of Steel and Cement 46,166,558
6 F Monitoring 2,291,453
Total Amount Rs. 393,301,239
Rate per Rm (Rs.) 388,254