ASPHALT SURFACED ROADS AND PARKING LOTS

CONDITION SURVEY DATA SHEET FOR SAMPLE UNIT

BRANCH: Parit Raja DATE: 16/5/2017


SURVEYED BY: SAMPLE UNIT: 01
SECTION: Jalan Parit Sempadan Laut SAMPLE AREA: 66.5m 3.5m
01. Alligator Cracking (m2) 06. Depression (m2) 11. Patching & Utility 16. Shoving (m2)
02. Bleeding (m2) 07. Edge Cracking (m) Cut Patching ((m2) 17. Slippage Cracking
03. Block Cracking (m2) 08. Joint Reflection 12. Polished (m2)
04. Bumps and Sags (m) Cracking (m) Aggregate (m2) 18. Swell (m2)
05. Corrugation (m2) 09. Lane/Shoulder Drop 13. Potholes (no.) 19. Weathering/
Off (m) 14. Railroad Crossing Ravelling (m2)
10. Longitudinal & (m2)
Transverse Cracking 15. Rutting (m2)
(m)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SURVEY % VALUE
0.7M 7
10M 52.
4
ASPHALT SURFACED ROADS AND PARKING LOTS
CONDITION SURVEY DATA SHEET FOR SAMPLE UNIT

BRANCH: Parit Raja DATE: 16/5/2017


SURVEYED BY: SAMPLE UNIT: 02
SECTION: Jalan Parit Sempadan Laut SAMPLE AREA: 66.5m 3.5m
01. Alligator Cracking (m2) 06. Depression (m2) 11. Patching & Utility 16. Shoving (m2)
02. Bleeding (m2) 07. Edge Cracking (m) Cut Patching ((m2) 17. Slippage Cracking
03. Block Cracking (m2) 08. Joint Reflection 12. Polished (m2)
04. Bumps and Sags (m) Cracking (m) Aggregate (m2) 18. Swell (m2)
05. Corrugation (m2) 09. Lane/Shoulder Drop 13. Potholes (no.) 19. Weathering/
Off (m) 14. Railroad Crossing Ravelling (m2)
10. Longitudinal & (m2)
Transverse Cracking 15. Rutting (m2)
(m)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SURVEY % VALUE
0.2L 570
0.9L 34
11L 66.2
4
ASPHALT SURFACED ROADS AND PARKING LOTS
CONDITION SURVEY DATA SHEET FOR SAMPLE UNIT

BRANCH: Parit Raja DATE: 16/5/2017


SURVEYED BY: SAMPLE UNIT: 03
SECTION: Jalan Parit Sempadan Laut SAMPLE AREA: 66.5m 3.5m
01. Alligator Cracking (m2) 06. Depression (m2) 11. Patching & Utility 16. Shoving (m2)
02. Bleeding (m2) 07. Edge Cracking (m) Cut Patching ((m2) 17. Slippage Cracking
03. Block Cracking (m2) 08. Joint Reflection 12. Polished (m2)
04. Bumps and Sags (m) Cracking (m) Aggregate (m2) 18. Swell (m2)
2
05. Corrugation (m ) 09. Lane/Shoulder Drop 13. Potholes (no.) 19. Weathering/
Off (m) 14. Railroad Crossing Ravelling (m2)
10. Longitudinal & (m2)
Transverse Cracking 15. Rutting (m2)
(m)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SURVEY % VALUE
13L 2
06M 2.4
8
09M 5.9
ASPHALT SURFACED ROADS AND PARKING LOTS
CONDITION SURVEY DATA SHEET FOR SAMPLE UNIT

BRANCH: Parit Raja DATE: 16/5/2017


SURVEYED BY: SAMPLE UNIT: 04
SECTION: Jalan Parit Sempadan Laut SAMPLE AREA: 66.5m 3.5m
01. Alligator Cracking (m2) 06. Depression (m2) 11. Patching & Utility 16. Shoving (m2)
02. Bleeding (m2) 07. Edge Cracking (m) Cut Patching ((m2) 17. Slippage Cracking
03. Block Cracking (m2) 08. Joint Reflection 12. Polished (m2)
04. Bumps and Sags (m) Cracking (m) Aggregate (m2) 18. Swell (m2)
05. Corrugation (m2) 09. Lane/Shoulder Drop 13. Potholes (no.) 19. Weathering/
Off (m) 14. Railroad Crossing Ravelling (m2)
10. Longitudinal & (m2)
Transverse Cracking 15. Rutting (m2)
(m)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SURVEY % VALUE
11L 70.1 106.2
8 4
10M 32.2
09M 2.61
12L 0.71
ASPHALT SURFACED ROADS AND PARKING LOTS
CONDITION SURVEY DATA SHEET FOR SAMPLE UNIT

BRANCH: Parit Raja DATE: 16/5/2017


SURVEYED BY: SAMPLE UNIT: 05
SECTION: Jalan Parit Sempadan Laut SAMPLE AREA: 66.5m 3.5m
01. Alligator Cracking (m2) 06. Depression (m2) 11. Patching & Utility 16. Shoving (m2)
02. Bleeding (m2) 07. Edge Cracking (m) Cut Patching ((m2) 17. Slippage Cracking
03. Block Cracking (m2) 08. Joint Reflection 12. Polished (m2)
04. Bumps and Sags (m) Cracking (m) Aggregate (m2) 18. Swell (m2)
05. Corrugation (m2) 09. Lane/Shoulder Drop 13. Potholes (no.) 19. Weathering/
Off (m) 14. Railroad Crossing Ravelling (m2)
10. Longitudinal & (m2)
Transverse Cracking 15. Rutting (m2)
(m)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SURVEY % VALUE
10M 10.7
11M 42.2 48.6
4 4
19M 4.46
13L 2
09L 1.1