You are on page 1of 135

ANNEX 6.

1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS


NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
D560 603,358 9,802,722 1,396 - 0 1416 20
D556 604,729 9,804,978 1,422 - 0 1442 20
D555 584,501 9,800,060 1,184 - 0 1202.6 18.6
D554 584,410 9,800,453 1,183 - 0 1203.6 20.6
D536 584,961 9,800,803 1,196 - 0 1205.14 9.14
D528 587,924 9,804,100 1,216 - 0 1280.41 64.41
D552 609,671 9,815,405 1,335 - 0 1355 20
D551 609,665 9,815,402 1,335 - 0 1446.84 111.84
D550 608,624 9,813,434 1,434 - 0 1454 20
D549 618,477 9,804,189 1,431 - 0 1468.32 37.32
D548 618,861 9,803,956 1,452 - 0 1473.26 21.26
D547 619,074 9,803,983 1,464 - 0 1475.63 11.63
D546 619,204 9,804,097 1,470 - 0 1477.54 7.54
D545 627,177 9,801,982 1,391 - 0 1404.51 13.51
D544 627,177 9,801,982 1,391 - 0 1393 2
D543 608,061 9,807,438 1,512 - 0 1526.11 14.11
D542 608,362 9,807,369 1,503 - 0 1526.92 23.92
D541 608,642 9,807,289 1,510 - 0 1527.68 17.68
D540 608,821 9,807,352 1,511 - 0 1528.17 17.17
D539 609,048 9,807,378 1,508 - 0 1528.77 20.77
D537 609,143 9,815,086 1,353 - 0 1448.27 95.27
D535 608,627 9,813,430 1,434 - 0 1517.21 83.21
D534 608,103 9,814,572 1,389 - 0 1451.01 62.01
D526 610,559 9,806,939 1,433 - 0 1525.98 92.98
PS-IS 595,645 9,803,459 1,327 (9) -9 1411.63 84.63
D533 600,981 9,803,956 1,385 - 0 1392.58 7.58
D532 599,350 9,804,898 1,365 - 0 1388.05 23.05
br10-1 600,971 9,803,958 1,385 - 0 1396.85 11.85
D531 599,638 9,804,784 1,366 - 0 1389.49 23.49
D530 599,971 9,804,496 1,375 - 0 1391.54 16.54
D529 600,227 9,804,217 1,388 - 0 1393.3 5.3
D527 600,364 9,804,004 1,391 - 0 1394.48 3.49
KN7. 619,208 9,805,540 1,437 - 0 1489.56 52.56
D274. 608,310 9,793,995 1,359 - 0 1426 67
D474. 609,363 9,800,802 1,312 - 0 1420.79 108.79
D355. 617,495 9,808,694 1,380 - 0 1398.81 18.81
D524 585,558 9,809,819 1,204 - 0 1245.54 41.54
RM2 577,783 9,812,772 1,120 - 0 1220.93 100.93
DP242 615,534 9,806,124 1,414 0 0.4 1519.82 105.82
D523 610,442 9,808,748 1,463 - 0 1533.07 70.07
PS-3 607,022 9,803,731 1,503 (91) -91 1583.84 80.84
KB-5 604,351 9,803,850 1,426 - 0 1517.36 91.36
KB-4 600,979 9,803,974 1,385 - 0 1526.62 141.62
D522 619,321 9,810,467 1,284 - 0 1379.65 95.65

1 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
D521 616,182 9,816,408 1,243 - 0 1352.64 109.64
D520 616,526 9,815,643 1,239 - 0 1362.02 123.02
D519 619,340 9,804,222 1,467 - 0 1479.59 12.59
D516 595,637 9,803,453 1,327 (3) -2.7 1377.24 50.24
D517 569,813 9,807,121 1,150 - 0 1208.34 58.34
D515 586,901 9,806,209 1,221 - 0 1277.27 56.27
D514 587,895 9,807,169 1,199 - 0 1281.54 82.54
D513 587,499 9,806,761 1,193 - 0 1278.47 85.47
D512 588,489 9,807,520 1,223 - 0 1285.15 62.15
D511 588,633 9,807,663 1,224 - 0 1285.9 61.9
D510 585,960 9,810,344 1,177 - 0 1227.91 50.91
D509 586,353 9,809,299 1,203 - 0 1228.11 25.11
D508 585,172 9,809,797 1,195 - 0 1229.45 34.45
D507 604,750 9,804,982 1,422 - 0 1500.73 78.73
D506 606,113 9,805,616 1,421 - 0 1500.86 79.86
D505 608,094 9,805,264 1,472 0 0.4 1497.66 25.66
D504 607,951 9,805,306 1,460 0 0.4 1498.89 38.89
D503 607,581 9,805,298 1,450 - 0 1503.2 53.2
D502 608,124 9,805,413 1,472 - 0 1499.67 27.67
D501 606,949 9,805,405 1,450 - 0 1503.28 53.28
D500 607,638 9,805,286 1,452 - 0 1502.9 50.9
D499 607,364 9,805,587 1,428 - 0 1501.95 73.95
D498 607,374 9,805,359 1,447 - 0 1502.56 55.56
D496 606,857 9,804,647 1,481 - 0 1506.23 25.23
D495 607,721 9,804,291 1,462 - 0 1504.71 42.71
D494 607,154 9,804,429 1,475 - 0 1506.5 31.5
D493 606,821 9,804,034 1,473 - 0 1508.33 35.33
D492 606,335 9,804,156 1,464 - 0 1507.47 43.47
D491 606,677 9,803,749 1,454 - 0 1508.59 54.59
D490 601,669 9,803,945 1,392 - 0 1483.74 91.74
D489 602,481 9,803,937 1,363 - 0 1488.55 125.55
D488 603,141 9,803,913 1,387 - 0 1490.5 103.5
D487 603,008 9,804,339 1,402 - 0 1487.92 85.92
D486 603,021 9,804,785 1,365 - 0 1434.4 69.4
D485 604,707 9,802,547 1,447 - 0 1499.76 52.76
D484 604,110 9,803,198 1,373 - 0 1487.91 114.91
D483 604,501 9,803,066 1,395 - 0 1498.77 103.77
D482 604,905 9,803,115 1,403 - 0 1500.64 97.64
D481 605,424 9,803,261 1,415 - 0 1503.17 88.17
D480 606,373 9,803,718 1,441 - 0 1508.24 67.24
D479 607,260 9,802,049 1,357 - 0 1497.25 140.25
D478 606,595 9,800,716 1,328 - 0 1395.98 67.98
D477 606,835 9,801,946 1,368 - 0 1403.21 35.21
D476 606,850 9,802,197 1,386 - 0 1500.76 114.76

2 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
D475 606,905 9,802,542 1,383 - 0 1502.88 119.88
D474 609,353 9,800,799 1,312 - 0 1475.39 163.39
D473 609,863 9,801,226 1,338 - 0 1365.8 27.8
D472 607,712 9,803,911 1,433 - 0 1504.74 71.74
D471 607,660 9,803,452 1,448 - 0 1504.76 56.76
D470 608,056 9,807,385 1,512 - 0 1525.92 13.92
D469 607,650 9,806,604 1,469 - 0 1499.23 30.23
D468 610,744 9,806,321 1,447 - 0 1524.28 77.28
D467 611,156 9,806,067 1,442 - 0 1521.75 79.75
D466 610,172 9,806,491 1,478 - 0 1523.24 45.24
D465 609,698 9,806,311 1,486 - 0 1522.43 36.43
D462 607,833 9,804,543 1,473 - 0 1500.14 27.14
D461 608,240 9,804,579 1,468 - 0 1497.62 29.62
D460 607,841 9,804,635 1,477 - 0 1501.39 24.39
D459 607,961 9,804,533 1,463 - 0 1498.39 35.39
D458 608,188 9,804,480 1,455 - 0 1496.66 41.66
D457 608,865 9,804,346 1,412 - 0 1493.75 81.75
D456 609,201 9,804,118 1,398 - 0 1430.34 32.34
D455 609,781 9,803,638 1,394 - 0 1426.84 32.84
D454 611,042 9,803,575 1,366 - 0 1422.08 56.08
D453 612,071 9,803,554 1,347 - 0 1420.59 73.59
D452 613,945 9,807,044 1,426 - 0 1527.1 101.1
D451 613,735 9,805,010 1,365 - 0 1446.45 81.45
D450 613,709 9,805,483 1,373 - 0 1447.17 74.17
D449 613,798 9,805,989 1,400 - 0 1521.18 121.18
D448 613,899 9,806,330 1,414 - 0 1525.53 111.53
D447 615,769 9,803,962 1,395 - 0 1505.53 110.53
D446 627,525 9,805,851 1,270 - 0 1362.71 92.71
D445 627,433 9,805,617 1,276 - 0 1365.54 89.54
D444 627,305 9,805,197 1,290 - 0 1368.26 78.26
D443 627,210 9,804,634 1,307 - 0 1373.65 66.65
D442 625,530 9,801,457 1,396 - 0 1425.04 29.04
D441 623,664 9,801,223 1,419 - 0 1438.64 19.64
D440 627,537 9,802,951 1,339 - 0 1387.46 48.46
D439 626,856 9,801,869 1,388 - 0 1408.52 20.52
D438 626,162 9,801,691 1,383 - 0 1418.06 35.06
D437 625,704 9,801,440 1,396 - 0 1423.07 27.07
D436 625,526 9,801,545 1,397 - 0 1425.26 28.26
D435 625,642 9,801,698 1,398 - 0 1425.33 27.33
D434 625,540 9,801,820 1,393 - 0 1425.36 32.36
D433 624,811 9,801,702 1,396 - 0 1429.77 33.77
D432 624,424 9,801,622 1,405 - 0 1432.36 27.36
D431 623,987 9,801,447 1,422 - 0 1435.57 13.57
D430 623,408 9,800,326 1,412 - 0 1441.93 29.93

3 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
D429 623,059 9,800,546 1,408 - 0 1444.5 36.5
D428 622,848 9,800,237 1,402 - 0 1442.7 40.7
D427 623,091 9,801,199 1,400 - 0 1441.5 41.5
D426 623,050 9,801,007 1,402 - 0 1444.46 42.46
D425 622,864 9,800,945 1,398 - 0 1446.42 48.42
D424 622,539 9,800,994 1,390 - 0 1447.7 57.7
D423 622,160 9,801,767 1,388 - 0 1451.64 63.64
D421 608,051 9,805,459 1,464 - 0 1500.13 36.13
D420 607,717 9,805,586 1,437 - 0 1502.05 65.05
D419 607,892 9,805,519 1,451 - 0 1500.76 49.76
D418 608,028 9,805,850 1,456 - 0 1500.53 44.53
D417 607,838 9,805,929 1,443 - 0 1500.68 57.68
D416 606,830 9,807,180 1,497 - 0 1523.96 26.96
D415 607,976 9,806,530 1,452 - 0 1499.73 47.73
D414 607,565 9,807,193 1,517 - 0 1525.03 8.03
D412 609,460 9,812,060 1,478 - 0 1520.98 42.98
D411 612,265 9,807,749 1,491 - 0 1533.82 42.82
D410 612,847 9,808,633 1,501 - 0 1538.17 37.17
D409 612,033 9,808,300 1,499 - 0 1538.97 39.97
D408 610,892 9,815,598 1,268 - 0 1348.22 80.22
D407 611,715 9,815,990 1,256 - 0 1339.57 83.57
D404 608,071 9,807,342 1,513 - 0 1525.86 12.86
D403 608,065 9,807,767 1,503 - 0 1525.63 22.63
D402 609,280 9,807,814 1,498 - 0 1530.33 32.33
D401 610,568 9,809,189 1,466 - 0 1535.09 69.09
D400 609,521 9,808,314 1,489 - 0 1531.49 42.49
D399 609,699 9,808,667 1,489 - 0 1532.7 43.7
D398 609,811 9,808,945 1,493 - 0 1533.12 40.12
D397 609,613 9,809,380 1,487 - 0 1532.6 45.6
D396 609,925 9,809,535 1,505 - 0 1532.97 27.97
D395 609,524 9,809,762 1,482 - 0 1529.22 47.22
D394 609,790 9,810,401 1,480 - 0 1529.86 49.86
D393 609,721 9,810,888 1,463 - 0 1526.14 63.14
D392 609,652 9,811,300 1,466 - 0 1523.85 57.85
D391 609,626 9,811,497 1,472 - 0 1523 51
D390 610,159 9,815,533 1,299 - 0 1353.82 54.82
D389 612,091 9,817,656 1,230 - 0 1332.84 102.84
D388 612,006 9,817,370 1,233 - 0 1333.29 100.29
D387 611,979 9,816,636 1,248 - 0 1337.17 89.17
D386 611,781 9,816,126 1,254 - 0 1339.18 85.18
D385 611,604 9,815,616 1,261 - 0 1338.18 77.18
D384 611,513 9,815,240 1,269 - 0 1336.16 67.16
D383 610,953 9,814,081 1,287 - 0 1334.13 47.13
D380 612,234 9,809,212 1,510 - 0 1539.09 29.09

4 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
D379 612,601 9,809,513 1,524 - 0 1539.01 15.01
D378 612,301 9,809,574 1,512 - 0 1537.62 25.62
D377 612,650 9,809,668 1,522 - 0 1537.55 15.55
D376 613,401 9,808,075 1,447 - 0 1533.69 86.69
D375 614,236 9,810,038 1,490 - 0 1522.43 32.43
D374 614,262 9,809,987 1,491 - 0 1522.72 31.72
D373 614,845 9,808,083 1,444 - 0 1529.33 85.33
D372 613,960 9,807,793 1,415 - 0 1530.82 115.82
D371 615,531 9,806,059 1,419 - 0 1520.64 101.64
D370 616,561 9,805,971 1,434 - 0 1516.49 82.49
D369 618,169 9,810,134 1,321 - 0 1389.37 68.37
D368 621,781 9,805,992 1,355 - 0 1466.21 111.21
D367 622,553 9,806,346 1,339 - 0 1462.77 123.77
D365 620,903 9,804,508 1,408 - 0 1466.91 58.91
D364 620,566 9,805,194 1,417 - 0 1471.76 54.76
D363 621,658 9,811,804 1,257 - 0 1368.63 111.63
D362 623,306 9,810,713 1,294 0 0.4 1353.92 59.92
D361 622,512 9,811,153 1,276 - 0 1360.46 84.46
D360 620,947 9,810,679 1,297 - 0 1373.03 76.03
D359 620,119 9,810,605 1,311 - 0 1376.02 65.02
D358 618,704 9,811,071 1,286 - 0 1382.52 96.52
D356 616,003 9,813,850 1,293 - 0 1381.47 88.47
D355 617,501 9,808,691 1,380 - 0 1497.05 117.05
D354 618,243 9,806,319 1,461 - 0 1507.81 46.81
D353 620,419 9,807,196 1,433 0 0.4 1466.89 33.89
D352 619,841 9,805,578 1,435 - 0 1472.67 37.67
D351 620,812 9,805,493 1,399 - 0 1470.74 71.74
D350 619,999 9,805,183 1,449 - 0 1473.97 24.97
D349 619,935 9,805,017 1,451 - 0 1475.04 24.04
D348 620,167 9,804,748 1,439 - 0 1473.44 34.44
D347 620,224 9,804,684 1,438 - 0 1472.8 34.8
D346 620,504 9,804,346 1,432 - 0 1469.58 37.58
D345 620,954 9,804,092 1,409 - 0 1465.03 56.03
D344 620,768 9,804,015 1,418 - 0 1466.51 48.51
D343 620,915 9,803,830 1,409 - 0 1464.84 55.84
D342 620,929 9,803,686 1,408 - 0 1463.88 55.88
D341 621,808 9,802,687 1,365 - 0 1456.09 91.09
D340 621,631 9,802,875 1,366 - 0 1457.25 91.25
D339 621,421 9,803,145 1,384 - 0 1459.34 75.34
D338 621,043 9,803,184 1,405 - 0 1458.35 53.35
D335 619,996 9,804,946 1,447 - 0 1475.42 28.42
D334 619,861 9,804,887 1,454 - 0 1475.98 21.98
D333 620,535 9,803,456 1,436 0 0.4 1459.24 23.24
D332 620,654 9,803,234 1,433 0 0.4 1460.63 27.63

5 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
D330 619,926 9,801,614 1,387 - 0 1445.49 58.49
D329 619,188 9,801,881 1,406 - 0 1451.78 45.78
D328 618,171 9,803,780 1,430 - 0 1462.72 32.72
D327 618,224 9,803,960 1,427 - 0 1464.59 37.59
D326 618,095 9,803,499 1,427 - 0 1460.11 33.11
D325 618,030 9,802,896 1,424 - 0 1455.34 31.34
D324 617,845 9,801,567 1,408 - 0 1447.89 39.89
D323 617,686 9,801,331 1,402 - 0 1444.54 42.54
D322 612,788 9,801,536 1,346 - 0 1367.05 21.05
D321 612,119 9,800,564 1,349 - 0 1372.83 23.83
D320 611,138 9,800,368 1,347 - 0 1368.59 21.59
D319 611,231 9,800,135 1,345 - 0 1368.03 23.03
D318 611,165 9,799,933 1,339 - 0 1367.47 28.47
D317 609,401 9,797,832 1,322 - 0 1467.61 145.61
D316 608,559 9,799,461 1,307 - 0 1476.93 169.93
D315 609,749 9,797,109 1,344 - 0 1463.6 119.6
D314 614,605 9,794,494 1,402 - 0 1427.28 25.28
D313 614,648 9,794,121 1,393 - 0 1427.83 34.83
D312 614,409 9,793,907 1,394 - 0 1428.5 34.5
D311 615,192 9,793,697 1,378 - 0 1425.09 47.09
D310 614,479 9,793,437 1,376 - 0 1427.94 51.94
D309 613,860 9,793,575 1,380 - 0 1429.71 49.71
D308 613,622 9,794,111 1,393 - 0 1437.21 44.21
D307 612,926 9,794,456 1,369 - 0 1433.11 64.11
D306 613,163 9,795,175 1,398 - 0 1440.18 42.18
D305 612,723 9,795,326 1,361 - 0 1387.92 26.92
D304 613,121 9,796,025 1,342 - 0 1382.31 40.31
D303 609,142 9,791,592 1,387 - 0 1397.26 10.26
D302 610,368 9,792,825 1,356 - 0 1406.68 50.68
D301 610,141 9,793,866 1,376 - 0 1445.27 69.27
D300 609,980 9,793,785 1,374 - 0 1444.28 70.28
D299 610,924 9,793,946 1,381 - 0 1447.97 66.97
D298 610,671 9,793,836 1,379 - 0 1410.43 31.43
D297 610,533 9,794,319 1,381 - 0 1447 66
D296 610,905 9,794,272 1,381 - 0 1449.23 68.23
D295 611,165 9,794,708 1,376 - 0 1450.59 74.59
D294 609,583 9,794,981 1,389 - 0 1440.9 51.9
D293 609,558 9,794,779 1,384 - 0 1441.69 57.69
D292 607,089 9,790,167 1,328 - 0 1363.27 35.27
D291 606,749 9,789,686 1,308 - 0 1371.03 63.03
D290 603,299 9,788,785 1,277 - 0 1297 20
D289 603,125 9,789,369 1,282 - 0 1371.09 89.09
D288 605,877 9,788,210 1,296 - 0 1374.56 78.56
D287 605,015 9,788,030 1,272 - 0 1377.57 105.58

6 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
D286 598,460 9,790,147 1,223 - 0 1287.8 64.8
D285 598,794 9,790,611 1,239 - 0 1288.7 49.7
D284 599,956 9,790,227 1,241 - 0 1295.18 54.18
D283 601,155 9,791,149 1,291 - 0 1371.31 80.31
D282 600,841 9,789,442 1,257 - 0 1301.94 44.94
D281 601,476 9,790,040 1,269 - 0 1305.12 36.12
D280 602,871 9,790,675 1,294 - 0 1380.86 86.86
D279 603,663 9,790,234 1,295 - 0 1382.5 87.5
D278 604,077 9,790,993 1,320 - 0 1384.06 64.06
D277 604,967 9,791,101 1,337 - 0 1386.41 49.41
D276 605,455 9,791,257 1,346 - 0 1387.72 41.72
D275 606,078 9,796,015 1,346 - 0 1393.26 47.26
D274 608,310 9,793,995 1,359 - 0 1434.69 75.69
D273 607,836 9,794,137 1,361 - 0 1410.45 49.45
D272 604,969 9,793,287 1,343 - 0 1395.58 52.58
D271 604,114 9,792,788 1,325 - 0 1390.41 65.41
D270 605,532 9,791,244 1,348 - 0 1387.95 39.95
D269 605,697 9,793,135 1,358 - 0 1397.5 39.5
D268 606,623 9,793,697 1,385 - 0 1408.28 23.28
D266 607,104 9,793,959 1,381 - 0 1412.76 31.76
D265 606,239 9,794,237 1,366 - 0 1406.09 40.09
D264 606,661 9,794,275 1,370 - 0 1409.83 39.83
D263 606,477 9,794,259 1,368 - 0 1408.06 40.06
D261 604,927 9,794,310 1,375 - 0 1401.15 26.15
D260 602,815 9,798,150 1,260 - 0 1361.3 101.3
D259 604,894 9,794,981 1,363 - 0 1395.04 32.04
D258 604,642 9,794,720 1,381 - 0 1395.56 14.56
D257 603,348 9,796,855 1,319 - 0 1353.96 34.96
D256 601,984 9,799,397 1,254 - 0 1369.38 115.38
D255 601,365 9,800,316 1,275 - 0 1373.36 98.36
D254 600,826 9,800,631 1,308 - 0 1377.17 69.17
D253 600,180 9,800,657 1,317 - 0 1372.37 55.37
D252 600,482 9,801,549 1,350 - 0 1381.41 31.41
D251 600,134 9,801,058 1,344 - 0 1378.22 34.22
D250 600,201 9,801,718 1,338 - 0 1379.75 41.75
D249 600,712 9,802,215 1,346 - 0 1384.43 38.43
D248 596,824 9,809,917 1,259 - 0 1342.39 83.39
D247 596,862 9,810,893 1,252 - 0 1345 93
D246 597,813 9,813,017 1,279 - 0 1352.3 73.3
D245 599,554 9,818,057 1,338 - 0 1371.74 33.74
D244 598,728 9,816,735 1,314 - 0 1366.46 52.46
D243 598,141 9,816,573 1,307 - 0 1363.41 56.41
D241 605,124 9,805,572 1,386 - 0 1493.8 107.8
D240 603,226 9,805,420 1,357 - 0 1435.39 78.39

7 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
D239 605,209 9,805,919 1,382 - 0 1491.63 109.63
D238 604,484 9,806,286 1,397 - 0 1486.46 89.46
D237 603,492 9,806,392 1,381 - 0 1475.15 94.15
D236 602,904 9,806,555 1,393 - 0 1471.82 78.82
D235 602,382 9,805,772 1,333 - 0 1434.06 101.06
D233 602,311 9,806,722 1,359 - 0 1468.09 109.09
D232 602,457 9,806,997 1,386 - 0 1468.55 82.55
D231 602,317 9,807,142 1,383 - 0 1468.26 85.26
D228 600,088 9,807,326 1,301 - 0 1323.44 22.44
D227 599,555 9,808,134 1,290 - 0 1332.36 42.36
D226 599,329 9,808,220 1,294 - 0 1332.99 38.99
D225 598,834 9,808,410 1,294 - 0 1335.07 41.07
D224 598,661 9,809,189 1,296 - 0 1334.3 38.3
D223 598,309 9,808,797 1,277 - 0 1335.05 58.05
D222 598,193 9,808,663 1,268 - 0 1336.01 68.01
D221 597,847 9,808,790 1,261 - 0 1336.87 75.87
D220 597,527 9,809,217 1,277 - 0 1338.21 61.21
D219 597,355 9,809,139 1,268 - 0 1339.07 71.07
D218 597,045 9,809,021 1,258 - 0 1339.68 81.68
D217 596,990 9,809,007 1,257 - 0 1339.79 82.79
D216 596,814 9,808,797 1,255 - 0 1317.38 62.38
D215 596,746 9,808,946 1,256 - 0 1316.45 60.45
D214 596,494 9,808,909 1,248 - 0 1314.97 66.97
D213 596,785 9,808,956 1,257 - 0 1316.72 59.72
D212 599,425 9,804,972 1,367 - 0 1387.68 20.68
D211 599,149 9,804,996 1,364 - 0 1387.45 23.45
D210 598,237 9,805,312 1,314 - 0 1385.35 71.35
D209 598,057 9,805,254 1,302 - 0 1384.07 82.07
D208 597,546 9,805,194 1,278 - 0 1320.42 42.42
D207 596,984 9,805,082 1,262 - 0 1317.74 55.74
D206 596,492 9,805,075 1,247 - 0 1325.74 78.74
D205 586,772 9,814,575 1,152 - 0 1202.66 50.66
D204 587,650 9,814,640 1,156 - 0 1207.49 51.49
D202 590,265 9,815,224 1,215 - 0 1283.73 68.73
D200 593,761 9,814,599 1,263 - 0 1293.02 30.02
D199 597,433 9,812,579 1,271 - 0 1350.34 79.34
D198 596,916 9,812,506 1,261 - 0 1293.93 32.93
D197 595,059 9,812,084 1,240 - 0 1300.02 60.02
D196 595,738 9,812,282 1,240 - 0 1297.14 57.14
D195 592,117 9,818,370 1,257 - 0 1279.56 22.56
D194 589,325 9,818,176 1,194 - 0 1264.58 70.58
D193 589,221 9,818,070 1,195 - 0 1266.46 71.46
D192 589,132 9,817,956 1,189 - 0 1267.24 78.24
D191 590,069 9,817,731 1,220 - 0 1272.26 52.26

8 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
D190 591,523 9,817,674 1,245 - 0 1279.99 34.99
D189 591,738 9,817,394 1,223 - 0 1281.27 58.27
D188 592,757 9,815,975 1,247 - 0 1291.23 44.23
D187 588,197 9,814,878 1,169 - 0 1204.36 35.36
D186 587,914 9,815,074 1,166 - 0 1202.49 36.49
D185 588,920 9,815,077 1,196 - 0 1281.74 85.74
D184 591,400 9,815,543 1,206 - 0 1285.49 79.49
D183 592,301 9,815,771 1,217 - 0 1290.63 73.63
D182 592,456 9,815,923 1,221 - 0 1291.4 70.4
D181 592,555 9,815,753 1,225 - 0 1291.76 66.76
D180 592,918 9,814,815 1,253 - 0 1294.66 41.66
D179 592,983 9,814,685 1,257 - 0 1294.83 37.83
D178 593,004 9,814,638 1,259 - 0 1294.91 35.91
D177 593,202 9,814,350 1,254 - 0 1295.59 41.59
D176 593,936 9,813,312 1,202 - 0 1298.8 96.8
D175 591,950 9,812,502 1,186 - 0 1293.32 107.32
D174 594,084 9,812,152 1,237 - 0 1300.9 63.9
D173 594,161 9,812,168 1,238 - 0 1301.27 63.27
D172 587,078 9,810,926 1,174 - 0 1220.68 46.68
D171 587,009 9,810,204 1,168 - 0 1224.68 56.68
D170 588,291 9,810,105 1,196 - 0 1218.41 22.41
D169 586,344 9,810,041 1,189 - 0 1229.49 40.49
D168 587,324 9,810,241 1,184 - 0 1223.22 39.22
D167 587,589 9,810,241 1,195 - 0 1221.56 26.56
D166 588,014 9,810,197 1,199 - 0 1219.49 20.49
D165 589,565 9,810,178 1,191 - 0 1279.1 88.1
D164 590,236 9,810,132 1,190 - 0 1280.09 90.09
D163 591,301 9,810,208 1,210 - 0 1285.71 75.71
D162 592,663 9,810,021 1,216 - 0 1290.73 74.73
D161 593,173 9,809,976 1,202 - 0 1293.82 91.82
D160 593,917 9,809,353 1,212 - 0 1303.55 91.55
D159 595,244 9,809,055 1,244 - 0 1310.31 66.31
D158 595,773 9,807,316 1,227 - 0 1317.37 90.37
D157 597,527 9,807,148 1,260 - 0 1312.71 52.71
D156 597,027 9,807,324 1,254 - 0 1315.78 61.78
D155 596,803 9,807,075 1,245 - 0 1319.48 74.48
D154 596,515 9,805,744 1,246 - 0 1323.47 77.47
D153 596,510 9,805,669 1,246 - 0 1323.68 77.68
D152 596,034 9,805,637 1,234 - 0 1320.33 86.33
D151 595,846 9,805,849 1,230 - 0 1320.73 90.73
D150 595,807 9,805,899 1,229 - 0 1321.06 92.06
D149 595,698 9,805,212 1,247 - 0 1324.26 77.26
D148 595,863 9,805,166 1,245 - 0 1324.58 79.58
D147 595,150 9,805,911 1,232 - 0 1317.17 85.17

9 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
D146 594,730 9,805,083 1,238 - 0 1317.87 79.87
D145 595,559 9,805,328 1,245 - 0 1323.7 78.7
D144 594,870 9,805,122 1,243 - 0 1319.94 76.94
D143 595,065 9,805,246 1,250 - 0 1320.37 70.37
D142 595,038 9,804,834 1,247 - 0 1320.7 73.7
D141 594,957 9,804,913 1,245 - 0 1319.98 74.98
D140 595,453 9,804,916 1,255 - 0 1323.83 68.83
D139 595,960 9,804,864 1,258 - 0 1327.03 69.03
D138 596,085 9,804,808 1,260 - 0 1327.42 67.42
D137 596,291 9,804,125 1,296 - 0 1327.86 31.86
D136 595,939 9,804,122 1,290 - 0 1329.41 39.41
D135 595,389 9,801,148 1,236 - 0 1364.74 128.74
D134 595,447 9,801,788 1,250 - 0 1365.66 115.66
D133 595,911 9,803,347 1,328 - 0 1374.13 46.13
D132 595,992 9,803,647 1,316 - 0 1370.22 54.22
D131 594,567 9,804,504 1,247 - 0 1317 70
D130 594,187 9,804,836 1,242 - 0 1314.19 72.19
D129 594,025 9,805,210 1,236 - 0 1310.63 74.63
D128 592,716 9,805,699 1,218 - 0 1308.16 90.16
D127 592,420 9,805,039 1,229 - 0 1306.04 77.04
D126 592,630 9,804,532 1,235 - 0 1306.54 71.54
D125 592,454 9,804,592 1,234 - 0 1305.43 71.43
D124 592,586 9,804,539 1,234 - 0 1306.27 72.27
D123 591,362 9,804,055 1,240 - 0 1296.08 56.08
D122 591,863 9,804,956 1,228 - 0 1303.02 75.02
D121 592,174 9,805,191 1,225 - 0 1305.77 80.77
D120 591,354 9,805,117 1,225 - 0 1303.67 78.67
D119 590,797 9,805,298 1,217 - 0 1291.55 74.55
D118 591,139 9,804,711 1,228 - 0 1298.22 70.22
D117 590,576 9,804,523 1,228 - 0 1295.4 67.4
D116 588,732 9,804,183 1,216 - 0 1284.77 68.77
D115 582,976 9,801,999 1,176 - 0 1195.71 19.71
D114 581,783 9,801,426 1,151 - 0 1186.9 35.9
D113 583,329 9,802,221 1,178 - 0 1199.93 21.93
D112 581,175 9,796,743 1,137 - 0 1154.95 17.95
D111 582,795 9,798,283 1,141 - 0 1176.18 35.18
D110 583,556 9,799,307 1,148 - 0 1192.67 44.67
D109 584,410 9,799,417 1,168 - 0 1197.22 29.22
D108 584,750 9,799,915 1,190 - 0 1201.9 11.9
D106 584,886 9,801,471 1,184 - 0 1206.77 22.77
D105 584,694 9,801,828 1,191 - 0 1208.67 17.67
D104 584,609 9,801,739 1,192 - 0 1207.69 15.69
D103 585,103 9,801,888 1,181 - 0 1208.63 27.63
D102 584,855 9,801,927 1,190 - 0 1210.17 20.17

10 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
D101 586,350 9,803,475 1,200 - 0 1271.33 71.33
D100 585,634 9,803,399 1,194 - 0 1267.54 73.54
D99 584,582 9,805,508 1,222 - 0 1261.38 39.38
D98 584,933 9,804,712 1,212 - 0 1263.43 51.43
D97 583,905 9,806,378 1,207 - 0 1256.59 49.59
D96 583,394 9,806,451 1,224 - 0 1254.76 30.76
D95 583,614 9,806,131 1,217 - 0 1255.92 38.92
D94 583,201 9,806,107 1,228 - 0 1254.11 26.11
D93 582,801 9,806,198 1,225 - 0 1253.17 28.17
D92 582,288 9,806,349 1,226 - 0 1252.6 26.6
D91 581,425 9,806,566 1,215 - 0 1249.31 34.31
D90 578,798 9,806,099 1,196 - 0 1231.87 35.87
D89 580,947 9,806,306 1,218 - 0 1244.95 26.95
D88 579,802 9,806,431 1,188 - 0 1236.45 48.45
D87 579,376 9,806,360 1,194 - 0 1233.85 39.85
D86 578,955 9,806,259 1,203 - 0 1232.17 29.17
D85 578,951 9,806,204 1,202 - 0 1232.19 30.19
D84 578,969 9,806,127 1,199 - 0 1232.41 33.41
D83 578,964 9,806,312 1,204 - 0 1232.19 28.19
D82 578,184 9,806,196 1,191 - 0 1230.54 39.54
D81 578,091 9,806,237 1,195 - 0 1230.39 35.39
D80 577,873 9,806,337 1,200 - 0 1229.81 29.81
D79 577,593 9,806,477 1,201 - 0 1228.92 27.92
D78 577,466 9,806,760 1,197 - 0 1227.67 30.67
D77 574,069 9,804,486 1,141 - 0 1203.55 62.55
D76 574,098 9,806,261 1,179 - 0 1209.76 30.76
D75 572,074 9,805,797 1,142 - 0 1195.77 53.77
D74 572,893 9,805,550 1,126 - 0 1200.45 74.45
D73 573,688 9,805,521 1,165 - 0 1204.78 39.78
D72 574,417 9,805,582 1,164 - 0 1208.49 44.49
D71 573,891 9,803,282 1,123 - 0 1200.18 77.18
D70 573,935 9,804,105 1,140 - 0 1201.46 61.46
D69 573,670 9,805,270 1,164 - 0 1204.81 40.81
D68 573,898 9,805,228 1,163 - 0 1205.65 42.65
D67 574,169 9,804,860 1,143 - 0 1204.87 61.87
D66 574,270 9,805,170 1,153 - 0 1206.41 53.41
D65 574,521 9,805,935 1,172 - 0 1210.53 38.53
D64 574,591 9,806,284 1,168 - 0 1212.98 44.98
D63 574,682 9,806,747 1,176 - 0 1215.21 39.21
D62 575,115 9,806,709 1,185 - 0 1214.07 29.07
D61 574,897 9,807,203 1,189 - 0 1216.33 27.33
D60 575,087 9,808,848 1,149 - 0 1216.15 67.15
D59 574,566 9,808,167 1,182 - 0 1219.13 37.13
D58 574,854 9,808,370 1,173 - 0 1218 45

11 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
D57 574,911 9,808,055 1,186 - 0 1218.17 32.17
D56 574,851 9,808,078 1,185 - 0 1218.42 33.42
D55 574,656 9,807,962 1,182 - 0 1218.31 36.31
D54 574,628 9,808,155 1,183 - 0 1218.94 35.94
D53 574,786 9,808,231 1,180 - 0 1218.33 38.33
D52 574,646 9,808,361 1,176 - 0 1218.38 42.38
D51 574,829 9,808,321 1,175 - 0 1218.17 43.17
D50 574,071 9,808,192 1,171 - 0 1220.98 49.98
D49 573,312 9,808,215 1,173 - 0 1224.07 51.07
D48 572,903 9,808,223 1,180 - 0 1225.8 45.8
D47 572,547 9,808,273 1,181 - 0 1227.53 46.53
D46 572,160 9,808,484 1,179 - 0 1229.75 50.75
D45 571,937 9,808,894 1,191 - 0 1230.68 39.68
D44 571,882 9,809,052 1,195 - 0 1231.05 36.05
D43 570,787 9,810,197 1,203 - 0 1225.53 22.53
D42 567,140 9,810,650 1,146 - 0 1202.43 56.43
D41 566,821 9,810,925 1,153 - 0 1201 48
D40 565,655 9,812,345 1,145 - 0 1188.26 43.26
D39 566,409 9,811,217 1,155 - 0 1197.87 42.87
D38 566,042 9,811,214 1,159 - 0 1190.28 31.28
D37 566,120 9,811,441 1,157 - 0 1194.17 37.17
D36 564,002 9,811,346 1,141 - 0 1183.82 42.82
D35 565,928 9,812,015 1,145 - 0 1189.37 44.37
D34 561,023 9,813,546 1,140 - 0 1165.39 25.39
D33 561,725 9,813,498 1,147 - 0 1170.24 23.24
D32 562,045 9,813,564 1,146 - 0 1172 26
D31 562,131 9,813,551 1,146 - 0 1172.39 26.39
D30 562,482 9,813,470 1,142 - 0 1172.97 30.97
D29 563,011 9,813,089 1,128 - 0 1174.97 46.97
D28 562,821 9,813,254 1,125 - 0 1174.68 49.68
D27 562,961 9,813,230 1,124 - 0 1175.12 51.12
D26 563,100 9,813,209 1,123 - 0 1175.96 52.96
D25 563,642 9,813,358 1,117 - 0 1176.5 59.5
D24 564,251 9,813,063 1,132 - 0 1182.24 50.24
D23 564,758 9,812,814 1,131 - 0 1184.09 53.09
D22 566,466 9,812,965 1,136 - 0 1186.3 50.3
D21 566,474 9,812,937 1,137 - 0 1186.66 49.66
D20 566,586 9,812,689 1,138 - 0 1192.06 54.06
D19 566,160 9,812,515 1,150 - 0 1189.58 39.58
D18 568,256 9,813,007 1,153 - 0 1202.54 49.54
D17 569,309 9,812,840 1,167 - 0 1207.79 40.79
D16 569,680 9,812,927 1,163 - 0 1210.4 47.4
D15 570,014 9,812,679 1,167 - 0 1212.77 45.77
D14 570,265 9,812,855 1,170 - 0 1210.04 40.04

12 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
D13 570,605 9,812,893 1,162 - 0 1209.37 47.37
D12 571,385 9,812,906 1,136 - 0 1212.31 76.31
D11 575,877 9,810,621 1,153 - 0 1207.57 54.57
D10 578,123 9,813,436 1,123 - 0 1210.52 87.52
D9 572,173 9,813,409 1,126 - 0 1186.21 60.21
D8 572,886 9,813,415 1,123 - 0 1188.1 65.1
D7 574,369 9,813,637 1,121 - 0 1194.88 73.88
D6 575,970 9,813,993 1,139 - 0 1201.46 62.46
D5 577,426 9,813,494 1,132 - 0 1206.61 74.61
D4 577,623 9,812,541 1,146 - 0 1211.92 65.92
D3 578,763 9,814,267 1,120 - 0 1261.96 141.96
D2 578,627 9,812,644 1,153 - 0 1206.8 53.8
D1 578,661 9,814,065 1,120 - 0 1208.47 88.47
DP1 620,520 9,803,451 1,445 0 0.4 1459.03 14.03
DP2 620,890 9,803,726 1,427 0 0.4 1463.18 36.18
DP3 620,362 9,804,271 1,437 0 0.4 1467.43 30.43
DP4 620,611 9,803,216 1,448 0 0.4 1460.04 12.04
DP5 620,874 9,803,796 1,432 0 0.4 1464.16 32.16
DP6 620,653 9,803,963 1,425 0 0.4 1464.92 39.92
DP7 621,450 9,803,183 1,395 0 0.4 1458.73 63.73
DP8 621,078 9,803,152 1,419 0 0.4 1457.83 38.83
DP9 621,219 9,803,018 1,409 1 0.8 1448.98 39.98
DP10 620,324 9,804,795 1,446 0 0.4 1470.91 24.91
DP11 620,143 9,804,727 1,454 0 0.4 1473.02 19.02
DP12 619,356 9,804,230 1,467 0 0.4 1479.36 12.36
DP13 624,388 9,806,697 1,348 1 0.8 1452.55 104.55
DP14 622,517 9,806,801 1,378 0 0.4 1456.84 78.84
DP15 621,321 9,806,613 1,401 1 0.8 1460.84 59.84
DP16 620,971 9,804,115 1,426 0 0.4 1464.66 38.66
DP17 621,114 9,803,804 1,415 0 0.4 1462.31 47.31
DP18 620,919 9,805,479 1,411 0 0.4 1470.45 59.45
DP19 620,661 9,805,064 1,427 0 0.4 1470.45 43.45
DP20 607,869 9,798,243 1,317 1 0.8 1328.66 11.66
DP21 609,586 9,797,167 1,353 0 0.4 1393.11 40.11
DP22 609,036 9,797,012 1,357 0 0.4 1384.71 27.71
DP23 607,186 9,793,960 1,379 0 0.4 1411.72 32.72
DP24 610,355 9,794,633 1,371 0 0.4 1445.21 74.21
DP25 610,600 9,794,352 1,375 0 0.4 1446.06 71.06
DP26 610,130 9,793,887 1,379 0 0.4 1444.95 65.95
DP27 609,740 9,794,903 1,385 0 0.4 1438.58 53.58
DP28 609,974 9,794,268 1,372 0 0.4 1441.43 69.43
DP29 609,251 9,794,806 1,387 0 0.4 1437.73 50.73
DP30 609,515 9,790,337 1,345 1 0.8 1390.2 45.2
DP31 610,880 9,791,935 1,341 0 0.4 1393.34 52.34

13 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP32 609,994 9,793,764 1,374 0 0.4 1443.96 69.96
DP33 610,674 9,793,868 1,377 0 0.4 1410.04 33.04
DP34 610,836 9,794,520 1,381 0 0.4 1445.64 64.64
DP35 611,445 9,794,919 1,375 0 0.4 1445.51 70.51
DP36 611,027 9,793,935 1,378 0 0.4 1446.35 68.35
DP37 611,650 9,794,380 1,376 0 0.4 1445.82 69.82
DP38 613,700 9,805,945 1,421 0 0.4 1519.74 98.74
DP39 612,857 9,805,926 1,423 0 0.4 1434.68 11.68
DP40 613,807 9,806,418 1,447 0 0.4 1523.84 76.84
DP41 613,582 9,805,072 1,386 0 0.4 1444.11 58.11
DP42 612,478 9,808,710 1,532 0 0.4 1539.69 7.69
DP43 612,338 9,808,233 1,515 0 0.4 1539.16 24.16
DP44 612,089 9,808,348 1,526 0 0.4 1538.04 12.04
DP45 613,409 9,808,132 1,455 0 0.4 1532.96 77.96
DP46 612,837 9,808,637 1,515 0 0.4 1538.03 23.03
DP47 611,534 9,808,450 1,499 0 0.4 1537.31 38.31
DP48 611,322 9,807,707 1,460 0 0.4 1531.99 71.99
DP49 612,277 9,807,775 1,503 0 0.4 1533.46 30.46
DP50 612,888 9,807,280 1,511 0 0.4 1532.43 21.43
DP51 612,289 9,807,913 1,519 0 0.4 1531.34 12.34
DP52 613,978 9,807,028 1,444 0 0.4 1526.63 82.63
DP53 614,677 9,807,716 1,435 0 0.4 1523.97 88.97
DP58 612,270 9,809,581 1,512 0 0.4 1537.23 25.23
DP59 612,521 9,809,524 1,521 0 0.4 1537.99 16.99
DP60 612,621 9,809,940 1,516 0 0.4 1534.05 18.05
DP61 612,231 9,809,245 1,528 0 0.4 1538.67 10.67
DP62 614,217 9,810,015 1,505 0 0.4 1522.02 17.02
DP63 613,407 9,809,728 1,512 0 0.4 1536.03 24.03
DP64 614,666 9,809,261 1,507 0 0.4 1525.92 18.92
DP65 614,295 9,809,990 1,505 0 0.4 1522.31 17.31
DP66 614,842 9,810,249 1,494 0 0.4 1513.78 19.78
DP67 611,007 9,803,467 1,363 0 0.4 1421.46 58.46
DP68 607,951 9,804,505 1,461 0 0.4 1498.34 37.34
DP69 609,778 9,803,345 1,386 0 0.4 1423.42 37.42
DP70 611,421 9,803,095 1,347 0 0.4 1413.4 66.4
DP71 607,406 9,803,247 1,446 0 0.4 1505.54 59.54
DP72 607,721 9,804,298 1,462 0 0.4 1504.62 42.62
DP73 606,880 9,803,442 1,419 0 0.4 1503.32 84.32
DP74 608,070 9,803,405 1,420 0 0.4 1497.63 77.63
DP75 606,351 9,804,147 1,466 0 0.4 1507.23 41.23
DP76 607,370 9,805,338 1,447 0 0.4 1502.53 55.53
DP77 606,107 9,805,642 1,422 0 0.4 1500.53 78.53
DP78 607,871 9,807,804 1,506 0 0.4 1523.11 17.11
DP79 606,844 9,804,781 1,485 0 0.4 1505.41 20.41

14 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP80 607,133 9,804,461 1,475 0 0.4 1506.03 31.03
DP81 605,617 9,805,047 1,428 0 0.4 1498.24 70.24
DP82 609,762 9,803,550 1,393 0 0.4 1426.37 33.37
DP83 610,030 9,805,989 1,509 0 0.4 1519.82 10.82
DP84 608,081 9,804,982 1,490 0 0.4 1501.35 11.35
DP85 610,152 9,806,450 1,483 0 0.4 1522.65 39.65
DP86 607,885 9,804,645 1,472 0 0.4 1500.69 28.69
DP87 611,195 9,806,121 1,446 0 0.4 1520.89 74.89
DP88 609,221 9,801,515 1,338 0 0.4 1356.7 18.7
DP89 606,676 9,803,744 1,448 0 0.4 1508.54 60.54
DP90 606,016 9,804,292 1,481 0 0.4 1506.83 25.83
DP91 606,797 9,804,061 1,472 0 0.4 1507.87 35.87
DP92 608,143 9,805,421 1,469 0 0.4 1499.41 30.41
DP93 609,265 9,807,836 1,496 0 0.4 1529.99 33.99
DP94 607,868 9,804,930 1,484 0 0.4 1502.15 18.15
DP95 608,157 9,805,802 1,460 0 0.4 1500.2 40.2
DP96 608,202 9,805,066 1,477 0 0.4 1499.33 22.33
DP97 608,097 9,807,342 1,514 0 0.4 1525.82 11.82
DP98 609,628 9,808,230 1,491 0 0.4 1529.78 38.78
DP99 608,927 9,806,514 1,513 0 0.4 1527.5 14.5
DP100 607,641 9,805,295 1,443 0 0.4 1502.88 59.88
DP101 606,013 9,806,935 1,485 0 0.4 1512.94 27.94
DP102 607,660 9,806,502 1,459 0 0.4 1497.9 38.9
DP103 606,852 9,805,679 1,432 0 0.4 1500.79 68.79
DP104 607,384 9,805,577 1,423 0 0.4 1501.92 78.92
DP105 607,551 9,806,927 1,509 0 0.4 1521.61 12.61
DP106 606,844 9,804,645 1,488 0 0.4 1506.06 18.06
DP107 606,956 9,805,414 1,454 0 0.4 1503.14 49.14
DP108 606,277 9,799,845 1,310 0 0.4 1384 74
DP109 605,688 9,802,865 1,447 0 0.4 1497.05 50.05
DP110 606,635 9,802,202 1,389 0 0.4 1403.29 14.29
DP111 606,871 9,801,896 1,376 0 0.4 1402.38 26.38
DP112 606,394 9,803,666 1,444 0 0.4 1508.16 64.16
DP113 605,880 9,801,067 1,370 0 0.4 1385.41 15.41
DP114 604,477 9,806,323 1,427 0 0.4 1485.96 58.96
DP115 603,358 9,802,722 1,419 0 0.4 1477.92 58.92
DP116 602,627 9,802,430 1,375 1 0.8 1411.77 36.77
DP117 602,513 9,799,752 1,287 0 0.4 1360.63 73.63
DP118 602,185 9,805,074 1,354 0 0.4 1433.09 79.09
DP119 605,010 9,805,003 1,443 0 0.4 1502 59
DP120 602,451 9,806,594 1,392 0 0.4 1465.68 73.68
DP121 603,572 9,806,480 1,414 0 0.4 1473.62 59.62
DP122 602,349 9,807,161 1,409 0 0.4 1467.78 58.78
DP123 604,784 9,802,534 1,471 0 0.4 1498.76 27.76

15 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP124 604,164 9,802,888 1,406 0 0.4 1491.4 85.4
DP125 603,153 9,803,962 1,416 0 0.4 1489.87 73.87
DP126 603,244 9,804,170 1,432 0 0.4 1486.44 54.44
DP127 604,590 9,803,685 1,434 0 0.4 1496.19 62.19
DP128 603,032 9,804,370 1,429 0 0.4 1487.41 58.41
DP129 602,382 9,805,859 1,353 0 0.4 1432.97 79.97
DP130 602,455 9,804,473 1,424 0 0.4 1484.9 60.9
DP131 601,670 9,803,970 1,415 0 0.4 1483.42 68.42
DP132 602,483 9,803,948 1,389 0 0.4 1488.41 99.41
DP140 563,093 9,813,187 1,126 0 0.4 1175.66 49.66
DP139 564,261 9,813,127 1,132 0 0.4 1181.41 49.41
DP138 563,518 9,813,333 1,126 0 0.4 1174.88 48.88
DP137 563,713 9,813,152 1,128 0 0.4 1180.28 52.28
DP136 563,112 9,813,083 1,128 0 0.4 1173.68 45.68
DP135 565,347 9,812,737 1,148 0 0.4 1183.68 35.68
DP134 565,645 9,812,407 1,146 0 0.4 1187.46 41.46
DP133 564,814 9,812,907 1,136 0 0.4 1182.73 46.73
DP141 567,793 9,813,672 1,137 1 0.8 1184.9 47.9
DP142 567,987 9,812,989 1,124 0 0.4 1201.01 77.01
DP144 562,048 9,813,548 1,147 0 0.4 1171.8 24.8
DP143 561,724 9,813,522 1,149 0 0.4 1169.94 20.94
DP145 561,001 9,813,529 1,139 0 0.4 1165.05 26.05
DP146 562,210 9,812,877 1,159 0 0.4 1172.01 13.01
DP147 566,062 9,813,176 1,140 1 0.8 1177.06 37.06
DP148 566,452 9,812,929 1,139 0 0.4 1186.37 47.37
DP149 566,131 9,812,684 1,152 0 0.4 1187.42 35.42
DP150 566,464 9,813,078 1,134 0 0.4 1184.53 50.53
DP178 565,278 9,811,704 1,148 0 0.4 1187.37 39.37
DP177 565,560 9,812,188 1,146 0 0.4 1188.14 42.14
DP176 566,136 9,811,457 1,156 0 0.4 1193.88 37.88
DP175 566,396 9,811,197 1,155 0 0.4 1197.55 42.55
DP174 565,627 9,810,310 1,125 0 0.4 1174.58 49.58
DP173 566,022 9,811,211 1,160 0 0.4 1190.01 30.01
DP172 565,942 9,811,973 1,145 0 0.4 1188.81 43.81
DP171 565,666 9,812,302 1,145 0 0.4 1187.86 42.86
DP170 565,870 9,809,577 1,121 0 0.4 1171.6 50.6
DP169 566,641 9,809,734 1,141 0 0.4 1181.72 40.72
DP168 566,811 9,810,912 1,152 0 0.4 1200.8 48.8
DP167 567,170 9,810,674 1,147 0 0.4 1201.95 54.95
DP166 568,445 9,809,435 1,123 0 0.4 1196.68 73.68
DP165 567,803 9,810,141 1,134 0 0.4 1205.77 71.77
DP164 568,687 9,811,209 1,162 0 0.4 1213.37 51.37
DP163 568,793 9,810,646 1,149 0 0.4 1212.73 63.73
DP162 563,905 9,811,075 1,136 0 0.4 1168.65 32.65

16 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP161 563,945 9,811,514 1,138 0 0.4 1181.42 43.42
DP160 567,239 9,808,728 1,145 0 0.4 1177.54 32.54
DP159 567,556 9,808,338 1,135 0 0.4 1171.17 36.17
DP158 562,675 9,813,113 1,135 0 0.4 1173.54 38.54
DP157 562,937 9,813,073 1,129 0 0.4 1173.87 44.87
DP156 562,960 9,813,250 1,128 0 0.4 1174.74 46.74
DP155 562,842 9,813,293 1,130 0 0.4 1174.11 44.11
DP154 562,811 9,813,479 1,127 0 0.4 1172.01 45.01
DP153 562,165 9,813,699 1,142 0 0.4 1170.48 28.48
DP152 562,483 9,813,506 1,140 0 0.4 1172.52 32.52
DP151 562,712 9,813,602 1,128 0 0.4 1171.11 43.11
DP179 598,339 9,819,313 1,367 0 0.4 1373.24 6.24
DP180 597,759 9,819,618 1,355 0 0.4 1372.28 17.28
DP181 599,212 9,817,554 1,360 0 0.4 1368.5 8.5
DP182 599,028 9,816,326 1,310 0 0.4 1365.6 55.6
DP183 598,136 9,815,856 1,301 0 0.4 1358.28 57.28
DP184 598,273 9,815,877 1,290 0 0.4 1358.35 68.35
DP185 597,977 9,816,671 1,298 0 0.4 1360.94 62.94
DP186 598,163 9,816,608 1,304 0 0.4 1362.88 58.88
DP187 598,645 9,816,412 1,312 0 0.4 1362.26 50.26
DP188 599,642 9,818,577 1,365 0 0.4 1370.84 5.84
DP189 598,165 9,815,777 1,298 0 0.4 1359.36 61.36
DP219 584,529 9,801,710 1,192 0 0.4 1206.61 14.61
DP218 586,390 9,803,123 1,199 0 0.4 1266.89 67.89
DP217 585,089 9,802,082 1,184 0 0.4 1205.91 21.91
DP216 584,411 9,799,383 1,167 0 0.4 1196.86 29.86
DP215 582,353 9,797,130 1,139 0 0.4 1162.54 23.54
DP214 580,271 9,797,474 1,136 0 0.4 1153.24 17.24
DP213 582,687 9,800,500 1,150 0 0.4 1193.64 43.64
DP212 582,927 9,801,166 1,164 0 0.4 1194.68 30.68
DP211 582,493 9,802,309 1,182 0 0.4 1194.18 12.18
DP210 583,585 9,801,533 1,170 0 0.4 1196.1 26.1
DP209 583,313 9,802,202 1,178 0 0.4 1199.61 21.61
DP208 583,182 9,801,960 1,178 0 0.4 1193.08 15.08
DP207 581,309 9,800,663 1,143 1 0.8 1180.2 37.2
DP206 584,753 9,799,840 1,187 0 0.4 1201.01 14.01
DP205 581,249 9,796,889 1,138 0 0.4 1152.8 14.8
DP204 583,616 9,799,120 1,148 0 0.4 1190.08 42.08
DP203 583,788 9,799,299 1,152 0 0.4 1193.64 41.64
DP202 583,441 9,799,482 1,148 0 0.4 1191.36 43.36
DP201 581,508 9,801,685 1,158 0 0.4 1181.77 23.77
DP200 581,580 9,801,172 1,149 0 0.4 1183.27 34.27
DP199 589,238 9,807,234 1,224 0 0.4 1285.31 61.31
DP198 589,817 9,807,247 1,225 0 0.4 1292.12 67.12

17 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP197 588,329 9,807,017 1,224 0 0.4 1284.38 60.37
DP196 588,317 9,807,934 1,225 0 0.4 1284.62 59.62
DP195 588,502 9,807,674 1,225 0 0.4 1285.19 60.19
DP194 587,151 9,806,887 1,203 0 0.4 1273.75 70.75
DP193 586,188 9,805,621 1,234 0 0.4 1264.87 30.87
DP192 588,058 9,808,469 1,217 0 0.4 1281.21 64.21
DP191 588,357 9,808,260 1,222 0 0.4 1281.73 59.73
DP190 588,537 9,808,149 1,220 0 0.4 1282.82 62.82
DP220 595,944 9,807,575 1,253 0 0.4 1310.34 57.34
DP221 595,200 9,807,472 1,248 0 0.4 1309.76 61.76
DP222 596,252 9,806,782 1,252 0 0.4 1318.78 66.78
DP223 595,278 9,805,534 1,253 0 0.4 1316.76 63.76
DP224 594,497 9,805,847 1,250 0 0.4 1314.72 64.72
DP225 595,154 9,805,888 1,248 0 0.4 1316.87 68.87
DP226 595,557 9,805,742 1,255 0 0.4 1320.71 65.71
DP227 594,579 9,804,457 1,257 0 0.4 1316.74 59.74
DP228 594,948 9,804,926 1,252 0 0.4 1319.79 67.79
DP229 594,774 9,805,547 1,254 0 0.4 1317.29 63.29
DP230 594,733 9,805,086 1,251 0 0.4 1317.86 66.86
DP231 595,035 9,805,206 1,264 0 0.4 1319.66 55.66
DP232 594,863 9,805,116 1,257 0 0.4 1319.82 62.82
DP233 596,300 9,806,220 1,254 0 0.4 1318.5 64.5
DP234 594,156 9,805,105 1,257 0 0.4 1310.65 53.65
DP235 594,029 9,805,232 1,255 0 0.4 1310.35 55.35
DP236 594,178 9,804,746 1,263 0 0.4 1313.05 50.05
DP237 592,844 9,807,704 1,225 1 0.8 1300.69 75.69
DP238 615,524 9,804,701 1,404 0 0.4 1494.23 90.23
DP239 615,365 9,803,840 1,415 0 0.4 1500.2 85.2
DP240 616,849 9,806,180 1,470 0 0.4 1512.37 42.37
DP241 616,564 9,806,015 1,453 0 0.4 1515.94 62.94
DP243 619,247 9,807,211 1,469 1 0.8 1480.41 11.41
DP245 620,382 9,807,128 1,448 0 0.4 1465.91 17.91
DP246 619,872 9,805,547 1,452 0 0.4 1472.14 20.14
DP247 619,315 9,805,553 1,453 0 0.4 1503.92 50.92
DP248 619,988 9,805,069 1,468 0 0.4 1474.1 6.1
DP249 620,049 9,805,319 1,464 0 0.4 1472.15 8.15
DP250 618,366 9,806,030 1,462 0 0.4 1508.39 46.39
DP251 617,681 9,806,567 1,491 0 0.4 1505.2 14.2
DP252 618,442 9,806,474 1,488 0 0.4 1504.89 16.89
DP267 570,016 9,812,664 1,166 0 0.4 1212.57 46.57
DP266 569,686 9,812,966 1,161 0 0.4 1209.89 48.89
DP265 569,322 9,812,872 1,166 0 0.4 1207.34 41.34
DP264 572,000 9,813,628 1,128 0 0.4 1183.03 55.03
DP263 571,933 9,814,253 1,128 1 0.8 1179.62 51.62

18 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP262 571,063 9,812,965 1,145 0 0.4 1210.19 65.19
DP261 571,447 9,812,824 1,135 0 0.4 1211.01 76.01
DP260 570,219 9,813,193 1,165 0 0.4 1207.66 42.66
DP259 570,109 9,813,607 1,162 0 0.4 1206 44
DP258 569,687 9,814,425 1,152 0 0.4 1203.25 51.25
DP257 569,957 9,814,112 1,165 0 0.4 1204.54 39.54
DP256 569,225 9,814,259 1,160 0 0.4 1202.12 42.12
DP255 570,268 9,812,827 1,170 0 0.4 1209.7 39.7
DP254 570,607 9,812,882 1,162 0 0.4 1209.23 47.23
DP253 570,558 9,812,701 1,165 0 0.4 1214.56 49.56
DP268 616,204 9,816,415 1,266 0 0.4 1352.34 86.34
DP269 616,328 9,815,277 1,267 0 0.4 1367.82 100.82
DP270 615,840 9,814,685 1,263 0 0.4 1375.38 112.38
DP273 618,103 9,813,599 1,294 1 0.8 1369.58 75.58
DP274 616,569 9,815,644 1,262 0 0.4 1361.47 99.47
DP275 616,047 9,813,857 1,300 0 0.4 1380.9 80.9
DP276 616,768 9,811,879 1,325 0 0.4 1388.23 63.23
DP277 616,319 9,812,960 1,316 0 0.4 1385.67 69.67
DP278 614,315 9,815,452 1,276 1 0.8 1365.06 89.06
DP301 578,647 9,812,659 1,150 0 0.4 1206.45 56.45
DP300 579,203 9,812,958 1,124 0 0.4 1197.38 73.38
DP299 578,914 9,812,454 1,142 0 0.4 1203.92 61.92
DP298 578,851 9,812,913 1,133 0 0.4 1206.11 73.11
DP297 578,629 9,814,088 1,120 0 0.4 1207.98 87.98
DP296 579,143 9,814,919 1,120 0 0.4 1206.96 86.96
DP295 577,832 9,813,166 1,144 0 0.4 1211.97 67.97
DP294 578,094 9,813,382 1,125 0 0.4 1209.76 84.76
DP293 578,382 9,811,743 1,134 0 0.4 1197.99 63.99
DP292 577,665 9,812,562 1,150 0 0.4 1211.36 61.36
DP291 578,726 9,812,250 1,148 0 0.4 1202.58 54.58
DP290 578,367 9,812,792 1,147 0 0.4 1207.89 60.89
DP289 578,310 9,813,818 1,118 0 0.4 1207.94 89.94
DP288 578,662 9,813,520 1,120 0 0.4 1203.79 83.79
DP287 580,720 9,813,577 1,125 0 0.4 1193.59 68.59
DP286 582,494 9,814,613 1,131 0 0.4 1190.64 59.64
DP285 574,360 9,813,774 1,122 0 0.4 1195.45 73.45
DP284 574,257 9,813,485 1,122 0 0.4 1193.51 71.51
DP283 573,857 9,813,388 1,122 0 0.4 1191.77 69.77
DP282 573,602 9,813,461 1,123 0 0.4 1189.46 66.46
DP281 573,862 9,813,655 1,120 0 0.4 1192.13 72.13
DP280 573,304 9,813,405 1,126 0 0.4 1187.92 61.92
DP279 572,891 9,813,396 1,122 0 0.4 1188.07 66.07
DP302 606,862 9,791,279 1,353 1 0.8 1358.07 5.07
DP303 604,511 9,787,257 1,266 0 0.4 1365.37 99.37

19 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP304 605,919 9,787,838 1,298 0 0.4 1369.6 71.6
DP305 605,790 9,789,491 1,348 0 0.4 1378.21 30.21
DP306 604,536 9,789,596 1,316 0 0.4 1375.04 59.04
DP307 605,205 9,789,293 1,338 0 0.4 1379.57 41.57
DP308 606,300 9,788,795 1,314 0 0.4 1375.63 61.63
DP309 602,547 9,788,284 1,241 1 0.8 1290.69 49.69
DP310 602,864 9,789,259 1,277 0 0.4 1367.49 90.49
DP311 603,462 9,788,330 1,256 0 0.4 1290.2 34.2
DP312 600,703 9,789,454 1,250 0 0.4 1300.13 50.13
DP356 591,832 9,804,953 1,228 0 0.4 1302.61 74.61
DP355 591,123 9,804,865 1,227 0 0.4 1296.26 69.26
DP354 592,739 9,805,626 1,219 0 0.4 1307.17 88.17
DP353 592,588 9,804,521 1,234 0 0.4 1306.05 72.05
DP352 592,468 9,804,591 1,234 0 0.4 1305.26 71.26
DP351 592,441 9,805,039 1,229 0 0.4 1305.77 76.77
DP350 592,186 9,805,134 1,226 0 0.4 1305.04 79.04
DP349 591,346 9,805,201 1,222 0 0.4 1302.61 80.61
DP348 587,106 9,802,403 1,180 1 0.8 1189.8 9.8
DP347 591,282 9,804,052 1,239 0 0.4 1295.07 56.07
DP346 590,937 9,805,277 1,218 0 0.4 1289.77 71.77
DP345 588,690 9,804,002 1,215 0 0.4 1281.9 66.9
DP344 590,492 9,804,526 1,227 0 0.4 1294.33 67.33
DP343 592,646 9,804,653 1,235 0 0.4 1304.99 69.99
DP342 586,342 9,802,149 1,179 0 0.4 1194.21 15.21
DP341 584,832 9,809,067 1,184 0 0.4 1226.2 42.2
DP340 584,999 9,809,393 1,178 0 0.4 1226.73 48.73
DP339 585,153 9,809,721 1,193 0 0.4 1228.61 35.61
DP338 585,540 9,809,587 1,202 0 0.4 1229.8 27.8
DP337 586,508 9,809,071 1,194 0 0.4 1226.83 32.83
DP336 586,369 9,809,329 1,201 0 0.4 1227.68 26.68
DP335 585,765 9,809,706 1,201 0 0.4 1230.31 29.31
DP334 585,905 9,809,334 1,206 0 0.4 1227.82 21.82
DP333 586,358 9,810,002 1,190 0 0.4 1228.97 38.97
DP332 586,704 9,809,919 1,180 0 0.4 1223.44 43.44
DP331 585,594 9,810,128 1,200 0 0.4 1227.21 27.21
DP330 585,873 9,810,622 1,174 0 0.4 1224.23 50.23
DP329 575,020 9,808,322 1,171 0 0.4 1215.79 44.79
DP328 575,058 9,808,862 1,149 0 0.4 1215.74 66.74
DP327 574,654 9,808,393 1,174 0 0.4 1217.96 43.96
DP326 575,295 9,807,731 1,197 0 0.4 1212.48 15.48
DP325 574,665 9,808,270 1,178 0 0.4 1216.71 38.71
DP324 574,867 9,808,109 1,183 0 0.4 1217.96 34.96
DP323 574,757 9,808,117 1,184 0 0.4 1218.56 34.56
DP322 574,930 9,808,098 1,184 0 0.4 1217.58 33.58

20 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP321 574,617 9,808,126 1,183 0 0.4 1218.55 35.55
DP320 574,588 9,807,975 1,181 0 0.4 1217.43 36.43
DP319 574,072 9,808,170 1,171 0 0.4 1220.71 49.71
DP318 606,994 9,790,574 1,316 0 0.4 1361.79 45.79
DP317 603,804 9,791,119 1,299 0 0.4 1380.15 81.15
DP316 605,452 9,791,290 1,320 0 0.4 1387.3 67.3
DP315 607,480 9,789,551 1,267 0 0.4 1366.01 99.01
DP314 601,549 9,789,634 1,247 0 0.4 1299.35 52.35
DP313 602,637 9,790,543 1,252 0 0.4 1312.86 60.86
DP357 625,639 9,801,730 1,417 0 0.4 1424.93 7.93
DP358 624,803 9,801,810 1,411 0 0.4 1427.89 16.89
DP359 625,542 9,803,057 1,358 0 0.4 1407.81 49.81
DP360 625,316 9,801,837 1,405 0 0.4 1422.16 17.16
DP361 624,333 9,801,146 1,399 0 0.4 1428.42 29.42
DP362 624,400 9,801,701 1,420 0 0.4 1431.3 11.3
DP363 623,734 9,801,526 1,422 0 0.4 1434.16 12.16
DP364 623,832 9,801,600 1,429 0 0.4 1434.18 5.18
DP365 622,869 9,800,749 1,416 0 0.4 1445.97 29.97
DP366 623,422 9,800,377 1,423 0 0.4 1441.26 18.26
DP367 622,897 9,800,256 1,419 0 0.4 1442.04 23.04
DP368 622,952 9,800,472 1,422 0 0.4 1442.86 20.86
DP369 622,495 9,800,595 1,401 0 0.4 1444 43
DP370 626,145 9,801,446 1,399 0 0.4 1413.36 14.36
DP371 625,647 9,801,538 1,415 0 0.4 1423.74 8.74
DP372 625,062 9,801,259 1,400 1 0.8 1408.47 8.47
DP373 625,302 9,801,196 1,401 0 0.4 1420.11 19.11
DP374 625,702 9,801,388 1,412 0 0.4 1422.41 10.41
DP375 623,104 9,800,907 1,420 0 0.4 1443.01 23.01
DP376 623,730 9,801,245 1,431 0 0.4 1437.75 6.75
DP377 622,574 9,801,048 1,407 0 0.4 1446.89 39.89
DP378 622,854 9,801,022 1,412 0 0.4 1445.43 33.43
DP379 623,718 9,800,782 1,426 0 0.4 1435.59 9.59
DP380 623,113 9,801,212 1,422 0 0.4 1441.18 19.18
DP402 617,614 9,809,303 1,330 0 0.4 1395.36 65.36
DP401 618,407 9,809,934 1,315 0 0.4 1385.8 70.8
DP400 574,861 9,804,857 1,135 0 0.4 1199.24 64.24
DP399 574,023 9,804,484 1,142 0 0.4 1202.96 60.96
DP398 573,885 9,804,110 1,140 0 0.4 1200.66 60.66
DP397 574,330 9,805,149 1,150 0 0.4 1205.61 55.61
DP396 573,841 9,803,270 1,123 0 0.4 1199.52 76.52
DP395 574,902 9,807,110 1,189 0 0.4 1215.14 26.14
DP394 574,576 9,804,974 1,139 0 0.4 1200.99 61.99
DP393 575,671 9,807,140 1,205 0 0.4 1214.68 9.68
DP392 574,651 9,806,745 1,175 0 0.4 1214.83 39.83

21 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP391 575,090 9,806,732 1,185 0 0.4 1213.64 28.64
DP390 571,407 9,805,747 1,121 1 0.8 1164.38 43.38
DP389 573,702 9,805,595 1,170 0 0.4 1205.06 35.06
DP388 574,062 9,804,914 1,148 0 0.4 1203.36 55.36
DP387 573,658 9,805,246 1,163 0 0.4 1204.48 41.48
DP386 574,057 9,806,107 1,187 0 0.4 1207.76 20.76
DP385 573,883 9,806,176 1,186 0 0.4 1207.99 21.99
DP384 573,899 9,805,245 1,164 0 0.4 1205.43 41.43
DP383 574,386 9,805,592 1,165 0 0.4 1208.06 43.06
DP382 574,454 9,805,955 1,174 0 0.4 1209.66 35.66
DP381 574,661 9,806,266 1,166 0 0.4 1212.09 46.09
DP403 617,560 9,810,665 1,310 0 0.4 1391.67 81.67
DP406 620,264 9,810,571 1,294 0 0.4 1374.08 80.08
DP405 618,245 9,810,182 1,295 0 0.4 1388.2 93.2
DP404 619,313 9,812,264 1,227 1 0.8 1278.35 51.35
DP407 619,353 9,810,428 1,307 0 0.4 1379.02 72.02
DP408 624,860 9,810,226 1,332 1 0.8 1344.38 12.38
DP409 621,049 9,810,728 1,273 0 0.4 1372.63 99.63
DP410 622,995 9,809,627 1,341 1 0.8 1347.83 6.83
DP411 620,811 9,812,916 1,264 1 0.8 1360.89 96.89
DP412 622,643 9,811,323 1,284 0 0.4 1357.64 73.64
DP413 623,281 9,810,919 1,304 0 0.4 1355.92 51.92
DP414 618,678 9,811,151 1,284 0 0.4 1381.45 97.45
DP415 618,238 9,810,624 1,300 0 0.4 1384.06 84.06
DP416 615,894 9,808,390 1,470 0 0.4 1512.31 42.31
DP417 583,206 9,806,136 1,227 0 0.4 1253.69 26.69
DP418 582,794 9,806,252 1,225 0 0.4 1252.46 27.46
DP419 583,596 9,806,152 1,229 0 0.4 1255.56 26.56
DP420 584,892 9,804,703 1,230 0 0.4 1262.9 32.9
DP421 584,554 9,805,493 1,213 0 0.4 1260.96 47.96
DP422 583,889 9,806,361 1,224 0 0.4 1256.3 32.3
DP423 582,883 9,806,562 1,223 0 0.4 1253.53 30.53
DP424 583,392 9,806,461 1,227 0 0.4 1254.63 27.63
DP425 582,071 9,806,516 1,217 0 0.4 1247.56 30.56
DP426 581,414 9,806,565 1,230 0 0.4 1249.17 19.17
DP427 581,987 9,807,958 1,188 0 0.4 1235.06 47.06
DP428 581,333 9,809,526 1,169 1 0.8 1226.23 57.23
DP429 580,919 9,806,119 1,218 0 0.4 1242.66 24.66
DP430 582,092 9,806,154 1,230 0 0.4 1251.18 21.18
DP431 581,728 9,806,253 1,227 0 0.4 1250.68 23.68
DP432 582,290 9,806,270 1,226 0 0.4 1251.61 25.61
DP433 629,998 9,804,303 1,304 1 0.8 1361.65 57.65
DP434 628,996 9,807,070 1,278 1 0.8 1322.94 44.94
DP435 627,609 9,805,866 1,289 0 0.4 1361.78 72.78

22 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP436 628,084 9,805,002 1,298 1 0.8 1368.58 70.58
DP437 627,811 9,806,371 1,280 0 0.4 1348.37 68.37
DP438 627,376 9,803,691 1,347 0 0.4 1381.23 34.23
DP439 627,273 9,804,383 1,344 0 0.4 1375.65 31.65
DP440 628,922 9,803,156 1,362 0 0.4 1370.76 8.76
DP441 627,534 9,802,817 1,360 0 0.4 1388.77 28.77
DP442 627,122 9,805,237 1,303 0 0.4 1365.89 62.89
DP443 627,316 9,805,666 1,288 0 0.4 1363.93 75.93
DP444 627,917 9,802,416 1,368 0 0.4 1381.56 13.56
DP445 626,868 9,802,084 1,387 0 0.4 1405.76 18.76
DP446 626,866 9,801,673 1,378 0 0.4 1405.89 27.89
DP447 627,510 9,808,001 1,263 1 0.8 1328.37 65.37
DP448 626,496 9,807,070 1,308 1 0.8 1330.68 22.68
DP449 612,402 9,816,967 1,268 0 0.4 1329.57 61.57
DP450 611,815 9,816,105 1,270 0 0.4 1338.67 68.67
DP451 612,350 9,817,884 1,261 0 0.4 1328.39 67.39
DP452 610,434 9,808,745 1,486 0 0.4 1532.96 46.96
DP453 609,985 9,809,529 1,520 0 0.4 1532.21 12.21
DP454 610,558 9,809,206 1,487 0 0.4 1534.85 47.85
DP455 609,900 9,808,933 1,521 0 0.4 1531.99 10.99
DP456 609,641 9,810,374 1,485 0 0.4 1527.94 42.94
DP457 609,541 9,809,791 1,494 0 0.4 1528.81 34.81
DP458 609,675 9,810,879 1,472 0 0.4 1525.55 53.55
DP459 611,749 9,806,113 1,415 0 0.4 1514.04 99.04
DP460 612,222 9,803,964 1,371 0 0.4 1415.03 44.03
DP461 609,309 9,811,629 1,480 0 0.4 1518.35 38.35
DP462 609,835 9,811,335 1,491 0 0.4 1521.49 30.49
DP463 609,601 9,811,057 1,474 0 0.4 1523.79 49.79
DP464 609,515 9,812,080 1,491 0 0.4 1520.24 29.24
DP465 609,605 9,809,408 1,503 0 0.4 1532.24 29.24
DP466 609,543 9,808,736 1,500 0 0.4 1530.54 30.54
DP467 612,213 9,815,224 1,310 0 0.4 1333.85 23.85
DP468 610,594 9,814,199 1,317 0 0.4 1331.99 14.99
DP469 611,659 9,815,095 1,298 0 0.4 1333.07 35.07
DP470 609,989 9,810,437 1,502 0 0.4 1527.31 25.31
DP471 610,260 9,815,758 1,320 0 0.4 1350.64 30.64
DP472 611,370 9,817,797 1,246 0 0.4 1322.76 76.76
DP473 600,758 9,800,288 1,312 0 0.4 1372.26 60.26
DP474 599,949 9,800,363 1,316 0 0.4 1366.62 50.62
DP475 599,186 9,800,936 1,289 1 0.8 1301.07 12.07
DP476 600,235 9,801,217 1,358 0 0.4 1378.92 20.92
DP477 600,259 9,801,747 1,351 0 0.4 1378.94 27.94
DP478 600,093 9,801,088 1,364 0 0.4 1377.56 13.56
DP479 599,138 9,802,641 1,339 0 0.4 1366.1 27.1

23 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP480 600,224 9,802,868 1,368 0 0.4 1373.93 5.93
DP481 600,949 9,803,141 1,366 0 0.4 1388.69 22.69
DP482 600,886 9,801,349 1,340 0 0.4 1379.57 39.57
DP483 601,698 9,800,419 1,302 0 0.4 1368.71 66.71
DP484 600,579 9,801,514 1,364 0 0.4 1380.11 16.11
DP517 597,011 9,809,142 1,253 0 0.4 1337.96 84.96
DP516 597,396 9,809,021 1,267 0 0.4 1337.51 70.51
DP515 599,629 9,807,728 1,283 0 0.4 1326.67 43.67
DP514 599,326 9,808,195 1,292 0 0.4 1332.67 40.67
DP513 596,502 9,808,776 1,249 0 0.4 1313.4 64.4
DP512 596,988 9,809,036 1,256 0 0.4 1339.43 83.43
DP511 596,700 9,808,799 1,253 0 0.4 1314.43 61.42
DP510 596,496 9,808,894 1,249 0 0.4 1314.89 65.89
DP509 599,707 9,808,489 1,323 0 0.4 1330.15 7.15
DP508 599,378 9,809,697 1,322 0 0.4 1332.93 10.93
DP507 595,265 9,809,026 1,244 0 0.4 1309.86 65.86
DP506 600,068 9,807,299 1,299 0 0.4 1322.99 23.99
DP505 600,520 9,806,862 1,296 0 0.4 1315.27 19.27
DP504 597,010 9,810,898 1,261 0 0.4 1343.13 82.13
DP503 596,964 9,809,932 1,268 0 0.4 1340.61 72.61
DP502 598,683 9,808,153 1,278 0 0.4 1331.33 53.33
DP501 596,782 9,808,932 1,257 0 0.4 1316.42 59.42
DP500 597,095 9,808,747 1,255 0 0.4 1313.51 58.51
DP499 598,381 9,808,757 1,282 0 0.4 1334.01 52.01
DP498 570,421 9,806,981 1,126 0 0.4 1200.38 74.38
DP497 571,827 9,809,257 1,202 0 0.4 1230.63 28.63
DP496 570,194 9,806,572 1,126 0 0.4 1199.45 73.45
DP495 569,607 9,807,498 1,150 0 0.4 1210.58 60.58
DP494 571,097 9,807,312 1,144 1 0.8 1221.15 77.15
DP493 570,314 9,808,368 1,154 0 0.4 1225.53 71.53
DP492 570,804 9,810,212 1,203 0 0.4 1225.24 22.24
DP491 571,488 9,809,558 1,202 0 0.4 1229.52 27.52
DP490 571,908 9,808,879 1,191 0 0.4 1230.3 39.3
DP489 572,033 9,809,188 1,199 0 0.4 1228.5 29.5
DP488 572,149 9,808,473 1,180 0 0.4 1229.57 49.57
DP487 572,539 9,808,253 1,181 0 0.4 1227.27 46.27
DP486 572,902 9,808,196 1,179 0 0.4 1225.46 46.46
DP485 573,313 9,808,191 1,174 0 0.4 1223.79 49.79
DP518 595,352 9,801,820 1,268 0 0.4 1364.38 96.38
DP519 595,522 9,801,100 1,246 0 0.4 1362.73 116.73
DP520 595,871 9,805,873 1,245 0 0.4 1320.3 75.3
DP521 596,424 9,805,739 1,260 0 0.4 1322.32 62.32
DP522 596,480 9,805,947 1,260 0 0.4 1322.25 62.25
DP523 596,113 9,805,734 1,252 0 0.4 1318.75 66.75

24 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP524 595,854 9,805,174 1,263 0 0.4 1324.43 61.43
DP525 595,749 9,805,277 1,263 0 0.4 1324.15 61.15
DP526 595,980 9,804,929 1,267 0 0.4 1326.19 59.19
DP527 595,288 9,805,113 1,263 0 0.4 1321.63 58.63
DP528 595,032 9,804,840 1,259 0 0.4 1320.65 61.65
DP529 595,173 9,804,925 1,263 0 0.4 1321.47 58.47
DP530 595,157 9,804,779 1,262 0 0.4 1320.02 58.02
DP531 595,340 9,804,632 1,273 0 0.4 1317 44
DP532 595,448 9,804,912 1,269 0 0.4 1323.75 54.75
DP533 596,064 9,804,695 1,283 0 0.4 1325.94 42.94
DP534 595,853 9,804,518 1,289 0 0.4 1326.99 37.99
DP535 595,940 9,804,111 1,305 0 0.4 1329.27 24.27
DP536 595,663 9,805,656 1,253 0 0.4 1321.15 68.15
DP537 595,549 9,805,320 1,262 0 0.4 1323.54 61.54
DP538 594,648 9,804,343 1,262 0 0.4 1315.01 53.01
DP548 576,127 9,813,557 1,137 0 0.4 1198.13 61.13
DP547 576,283 9,813,851 1,122 0 0.4 1201.28 79.28
DP546 576,407 9,810,470 1,132 0 0.4 1200.61 68.61
DP545 576,696 9,812,401 1,144 0 0.4 1204.83 60.83
DP544 576,392 9,812,777 1,147 0 0.4 1203.22 56.22
DP543 575,950 9,813,860 1,145 0 0.4 1201.43 56.43
DP542 575,444 9,814,086 1,138 0 0.4 1200.54 62.54
DP541 577,076 9,813,665 1,125 0 0.4 1204.89 79.89
DP540 576,616 9,813,514 1,131 0 0.4 1200.44 69.44
DP539 577,407 9,813,492 1,132 0 0.4 1206.37 74.37
DP549 607,856 9,794,242 1,354 0 0.4 1409.1 55.1
DP550 605,856 9,797,058 1,325 0 0.4 1387.26 62.26
DP551 606,252 9,793,648 1,370 0 0.4 1403.41 33.41
DP552 605,185 9,792,442 1,358 0 0.4 1389.03 31.03
DP553 605,943 9,793,098 1,390 0 0.4 1395.86 5.86
DP554 606,261 9,794,055 1,375 0 0.4 1403.78 28.78
DP555 606,476 9,794,235 1,374 0 0.4 1407.77 33.77
DP556 606,412 9,795,033 1,354 0 0.4 1398.93 44.93
DP557 606,647 9,794,336 1,369 0 0.4 1409.01 40.01
DP558 605,513 9,797,545 1,306 0 0.4 1379.57 73.57
DP559 597,999 9,790,471 1,220 0 0.4 1280.53 60.53
DP560 598,599 9,790,778 1,245 0 0.4 1285.49 40.49
DP561 602,932 9,792,281 1,315 1 0.8 1383.6 68.6
DP562 601,154 9,791,187 1,295 0 0.4 1370.61 75.61
DP563 601,383 9,791,219 1,293 0 0.4 1367.4 74.4
DP564 603,127 9,796,827 1,327 1 0.8 1343.95 16.95
DP565 603,735 9,794,705 1,360 0 0.4 1390.65 30.65
DP566 604,797 9,795,022 1,369 0 0.4 1393.69 24.69
DP567 603,152 9,794,128 1,346 0 0.4 1378.51 32.51

25 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP568 605,638 9,794,226 1,367 0 0.4 1402.65 35.65
DP569 604,866 9,794,258 1,383 0 0.4 1400.05 17.05
DP570 589,506 9,810,278 1,212 0 0.4 1277.63 65.63
DP571 587,328 9,810,218 1,198 0 0.4 1222.92 24.92
DP572 585,857 9,812,265 1,177 0 0.4 1216.75 39.75
DP573 587,899 9,812,086 1,181 0 0.4 1216.74 35.74
DP574 586,964 9,811,142 1,183 0 0.4 1219.32 36.32
DP575 588,302 9,810,138 1,199 0 0.4 1218.21 19.21
DP576 588,431 9,810,611 1,199 0 0.4 1218.12 19.12
DP577 587,703 9,810,442 1,199 0 0.4 1221.19 22.19
DP578 590,301 9,809,631 1,211 0 0.4 1273.7 62.7
DP579 591,306 9,810,252 1,209 0 0.4 1285.15 76.15
DP580 593,187 9,810,375 1,235 0 0.4 1288.8 53.8
DP581 592,652 9,810,065 1,213 0 0.4 1290.16 77.16
DP582 588,028 9,810,276 1,186 0 0.4 1219.37 33.37
DP583 613,925 9,802,480 1,368 0 0.4 1477.9 109.9
DP584 614,544 9,802,540 1,387 0 0.4 1488.77 101.77
DP585 610,666 9,799,714 1,338 0 0.4 1361.07 23.07
DP586 611,071 9,799,920 1,346 0 0.4 1366.27 20.27
DP587 611,044 9,800,343 1,361 0 0.4 1367.29 6.29
DP588 611,493 9,800,163 1,359 0 0.4 1364.58 5.58
DP589 612,119 9,800,579 1,363 0 0.4 1372.62 9.62
DP590 611,428 9,800,353 1,358 0 0.4 1369.92 11.92
DP591 612,575 9,800,795 1,361 0 0.4 1375.04 14.04
DP592 610,971 9,798,237 1,334 0 0.4 1363.5 29.5
DP593 611,442 9,798,066 1,337 0 0.4 1357.11 20.11
DP594 614,653 9,800,519 1,367 0 0.4 1380.02 13.02
DP595 613,151 9,800,642 1,365 0 0.4 1376 11
DP596 613,573 9,800,427 1,357 0 0.4 1367.37 10.37
DP597 615,314 9,800,765 1,354 0 0.4 1373.08 19.08
DP598 612,372 9,801,987 1,343 0 0.4 1357.42 14.42
DP599 612,765 9,801,521 1,356 0 0.4 1366.7 10.7
DP604 596,570 9,805,664 1,248 0 0.4 1322.92 74.92
DP603 596,747 9,806,505 1,243 0 0.4 1319.86 76.86
DP602 598,067 9,807,148 1,263 0 0.4 1305.78 42.78
DP601 596,155 9,803,321 1,346 0 0.4 1371.03 25.03
DP600 596,230 9,803,588 1,327 0 0.4 1367.12 40.12
DP605 597,079 9,807,273 1,271 0 0.4 1314.87 43.87
DP606 597,579 9,807,068 1,276 0 0.4 1311.51 35.51
DP607 599,138 9,804,896 1,363 0 0.4 1386.88 23.88
DP608 597,398 9,805,107 1,289 0 0.4 1319.44 30.44
DP609 598,178 9,805,085 1,329 0 0.4 1381.45 52.45
DP610 597,388 9,804,750 1,290 0 0.4 1319.25 29.25
DP611 598,221 9,805,335 1,332 0 0.4 1384.99 52.99

26 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP612 599,670 9,805,458 1,353 0 0.4 1384.59 31.59
DP613 599,655 9,805,450 1,355 0 0.4 1384.79 29.79
DP614 599,478 9,804,954 1,369 0 0.4 1386.91 17.91
DP615 597,565 9,805,276 1,302 0 0.4 1320.3 18.3
DP620 596,982 9,805,066 1,262 0 0.4 1317.52 55.52
DP619 596,917 9,805,429 1,258 0 0.4 1323.04 65.04
DP618 596,842 9,805,875 1,247 0 0.4 1319.04 72.04
DP617 596,499 9,805,093 1,247 0 0.4 1325.5 78.5
DP616 596,290 9,804,116 1,295 0 0.4 1327.74 32.74
DP621 592,512 9,819,001 1,239 0 0.4 1268.8 29.8
DP622 592,266 9,815,793 1,243 0 0.4 1290.1 47.1
DP623 589,136 9,818,277 1,211 0 0.4 1263.18 52.18
DP624 591,029 9,818,509 1,246 0 0.4 1278.55 32.55
DP625 594,159 9,812,195 1,236 0 0.4 1300.93 64.93
DP626 597,563 9,815,735 1,295 0 0.4 1354.52 59.52
DP627 591,389 9,815,507 1,214 0 0.4 1285.01 71.01
DP628 591,553 9,814,206 1,209 0 0.4 1275.91 66.91
DP629 590,406 9,813,192 1,208 0 0.4 1270.18 62.18
DP630 587,907 9,815,141 1,168 0 0.4 1201.63 33.63
DP631 587,475 9,815,523 1,162 0 0.4 1194.43 32.43
DP632 585,783 9,814,778 1,156 0 0.4 1189.85 33.85
DP633 588,918 9,815,117 1,199 0 0.4 1281.24 82.24
DP634 595,072 9,812,053 1,247 0 0.4 1299.6 52.6
DP635 592,642 9,814,755 1,245 0 0.4 1290.5 45.5
DP636 592,670 9,816,047 1,271 0 0.4 1291.07 20.07
DP637 592,849 9,816,075 1,273 0 0.4 1291.02 18.02
DP638 589,380 9,818,124 1,213 0 0.4 1263.61 50.61
DP639 596,648 9,812,474 1,259 0 0.4 1294.49 35.49
DP640 597,798 9,813,022 1,282 0 0.4 1352.09 70.09
DP641 597,431 9,812,754 1,273 0 0.4 1350.09 77.09
DP642 596,911 9,812,532 1,263 0 0.4 1293.89 30.89
DP643 592,775 9,813,890 1,240 0 0.4 1291.88 51.88
DP644 594,265 9,814,863 1,263 0 0.4 1289.88 26.88
DP645 592,983 9,814,623 1,265 0 0.4 1294.88 29.88
DP646 595,535 9,814,039 1,252 0 0.4 1275.64 23.64
DP647 594,083 9,812,199 1,234 0 0.4 1300.33 66.33
DP648 595,728 9,812,342 1,252 0 0.4 1296.37 44.37
DP649 597,990 9,814,868 1,291 0 0.4 1359.3 68.3
DP650 597,841 9,815,500 1,295 0 0.4 1356.37 61.37
DP651 593,159 9,814,707 1,264 0 0.4 1293.91 29.91
DP652 618,024 9,802,443 1,437 0 0.4 1452.13 15.13
DP653 619,187 9,801,907 1,422 0 0.4 1451.46 29.46
DP654 618,617 9,802,235 1,429 0 0.4 1445.49 16.49
DP655 618,317 9,802,376 1,427 0 0.4 1448.33 21.33

27 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP656 615,782 9,803,212 1,410 0 0.4 1496.11 86.11
DP657 618,151 9,803,485 1,445 0 0.4 1459.37 14.37
DP658 618,544 9,803,505 1,439 0 0.4 1456.74 17.74
DP659 617,874 9,802,973 1,433 0 0.4 1453.13 20.13
DP660 618,122 9,804,016 1,439 0 0.4 1463.1 24.1
DP661 617,863 9,801,053 1,419 0 0.4 1439.68 20.68
DP662 617,912 9,801,587 1,427 0 0.4 1446.99 19.99
DP663 618,284 9,801,087 1,411 0 0.4 1439.64 28.64
DP664 619,343 9,801,166 1,395 0 0.4 1443.42 48.42
DP665 619,953 9,801,664 1,404 0 0.4 1444.74 40.74
DP666 617,581 9,801,531 1,424 0 0.4 1441.67 17.67
DP667 617,721 9,801,327 1,417 0 0.4 1444.09 27.09
DP668 617,569 9,802,427 1,433 0 0.4 1443.88 10.88
DP669 616,641 9,800,644 1,382 0 0.4 1428.35 46.35
DP670 616,029 9,799,760 1,364 1 0.8 1422.14 58.14
DP671 577,749 9,806,593 1,206 0 0.4 1228.5 22.5
DP672 577,976 9,806,508 1,207 0 0.4 1228.11 21.11
DP673 579,079 9,806,139 1,200 0 0.4 1232.58 32.58
DP674 578,777 9,806,044 1,208 0 0.4 1231.33 23.33
DP675 579,812 9,806,405 1,209 0 0.4 1236.09 27.09
DP676 578,920 9,806,258 1,203 0 0.4 1231.7 28.7
DP677 578,987 9,806,206 1,210 0 0.4 1231.73 21.73
DP678 577,855 9,806,312 1,210 0 0.4 1229.41 19.41
DP679 577,581 9,806,454 1,206 0 0.4 1228.88 22.88
DP680 578,163 9,806,173 1,202 0 0.4 1230.15 28.15
DP681 578,095 9,805,381 1,184 1 0.8 1214.15 30.15
DP682 577,916 9,806,059 1,202 0 0.4 1229.16 27.16
DP683 577,839 9,805,902 1,199 0 0.4 1226.78 27.78
DP684 577,432 9,806,699 1,203 0 0.4 1227.3 24.3
DP685 577,714 9,806,512 1,203 0 0.4 1228.84 25.84
DP686 578,092 9,806,251 1,207 0 0.4 1230.21 23.21
DP687 579,367 9,806,409 1,197 0 0.4 1233.21 36.21
DP688 578,836 9,806,389 1,210 0 0.4 1231.5 21.5
DP689 579,090 9,806,913 1,205 0 0.4 1226.18 21.18
DP690 579,959 9,806,719 1,212 0 0.4 1235.01 23.01
DP691 578,975 9,806,451 1,207 0 0.4 1231.65 24.65
DP692 578,399 9,806,215 1,210 0 0.4 1230.07 20.07
DP693 613,576 9,794,074 1,393 0 0.4 1436.47 43.47
DP694 612,979 9,794,473 1,372 0 0.4 1432.4 60.4
DP695 613,389 9,795,359 1,392 0 0.4 1435.72 43.72
DP696 613,075 9,794,962 1,394 0 0.4 1439.87 45.87
DP697 613,171 9,794,661 1,393 0 0.4 1438.97 45.97
DP698 614,456 9,794,613 1,399 0 0.4 1424.81 25.81
DP699 612,722 9,794,883 1,365 0 0.4 1440.46 75.46

28 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
DP700 614,837 9,793,450 1,374 0 0.4 1426.07 52.07
DP701 614,504 9,793,877 1,379 0 0.4 1427.24 48.24
DP702 615,507 9,794,111 1,356 0 0.4 1417.88 61.88
DP703 612,750 9,795,328 1,365 0 0.4 1387.56 22.56
DP704 613,166 9,796,148 1,336 0 0.4 1380.55 44.55
TRT9 613,144 9,794,227 1,375 0 0.36 1431.44 56.44
TRT8 613,130 9,794,760 1,390 0 0.28 1439.37 49.37
TRT7 612,825 9,794,628 1,366 0 0.39 1435.31 69.31
TRT6 613,095 9,795,003 1,395 0 0.44 1439.55 44.55
TRT5 613,025 9,794,996 1,389 0 0.2 1440.63 51.63
TRT4 613,345 9,796,105 1,340 0 0.27 1380.82 40.82
TRT3 612,922 9,795,837 1,347 0 0.33 1383.34 36.34
TRT2 612,657 9,795,409 1,355 0 0.35 1387.38 32.38
TRT1 612,710 9,795,001 1,369 0 0.32 1441.57 72.57
TR9 615,881 9,800,868 1,364 0 0.08 1436.35 72.35
TR8 616,389 9,800,999 1,368 0 0.41 1436.39 68.39
TR7 617,284 9,801,240 1,391 1 0.9 1438.37 47.37
TR6 617,875 9,801,465 1,407 1 1.09 1447.54 40.54
TR5 618,326 9,801,719 1,407 1 0.66 1450.27 43.27
TR4 618,888 9,801,863 1,408 1 0.73 1451.49 43.49
TR3 619,677 9,802,014 1,406 1 0.59 1452.34 46.34
TR2 619,951 9,802,112 1,405 1 0.66 1452.87 47.87
TR13 619,909 9,801,368 1,379 1 0.96 1443.7 64.7
TR12 619,204 9,801,354 1,386 1 1.23 1447.73 61.73
TR11 617,887 9,802,092 1,424 0 0.35 1449.96 25.96
TR10 618,448 9,801,032 1,391 1 0.9 1438.54 47.54
TR1 620,451 9,802,296 1,402 1 0.84 1453.97 51.97
TG9 577,976 9,806,273 1,197 0 0.34 1230.23 33.23
TG8 577,831 9,806,246 1,196 0 0.13 1229.64 33.64
TG7 577,491 9,806,327 1,194 0 0.14 1228.77 34.77
TG6 577,198 9,806,505 1,192 0 0.4 1228.27 36.27
TG5 577,703 9,806,430 1,200 0 0.26 1229.26 29.26
TG4 577,517 9,806,528 1,202 0 0.15 1228.6 26.6
TG3 577,600 9,806,685 1,197 0 0.16 1228 31
TG27 581,088 9,806,276 1,216 0 0.24 1246.05 30.05
TG26 580,541 9,806,307 1,206 0 0.29 1241.91 35.91
TG25 579,995 9,806,508 1,191 1 0.57 1237.77 46.77
TG24 578,919 9,806,948 1,192 1 0.66 1228.49 36.49
TG23 578,854 9,806,794 1,198 0 0.29 1230.02 32.02
TG22 578,842 9,806,567 1,200 0 0.24 1231.03 31.03
TG21 578,859 9,806,294 1,201 0 0.24 1231.88 30.88
TG20 578,973 9,806,439 1,203 0 0.27 1231.81 28.81
TG2 577,313 9,806,869 1,197 1 0.5 1227.26 30.26
TG19 579,274 9,806,348 1,198 0 0.45 1233.26 35.26

29 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
TG18 579,205 9,806,184 1,196 0 0.19 1232.85 36.85
TG17 579,049 9,805,742 1,182 0 0.36 1226.83 44.83
TG16 578,714 9,805,899 1,188 0 0.41 1230.72 42.72
TG15 578,934 9,806,126 1,199 0 0.27 1232.28 33.28
TG14 578,534 9,806,080 1,192 0 0.34 1230.98 38.98
TG13 578,401 9,806,148 1,189 0 0.45 1230.92 41.92
TG12 577,855 9,805,930 1,185 0 0.16 1227.16 42.16
TG11 577,949 9,806,061 1,189 0 0.15 1229.57 40.57
TG10 577,952 9,806,209 1,196 0 0.08 1230.11 34.11
TG1 577,317 9,806,677 1,199 1 0.5 1228.05 29.05
SG9 598,206 9,814,406 1,274 2 1.74 1358.62 84.62
SG8 598,100 9,814,030 1,266 2 2.02 1357.59 91.59
SG7 598,003 9,813,673 1,248 2 1.94 1356.78 108.78
SG6 597,903 9,813,323 1,273 2 1.61 1354.1 81.1
SG5 597,833 9,813,080 1,279 2 2.12 1352.55 73.55
SG4 597,575 9,812,589 1,270 2 1.63 1350.54 80.54
SG3 597,464 9,812,409 1,262 1 1 1350.02 88.02
SG21 594,538 9,811,780 1,224 1 0.92 1303.68 79.68
SG20 594,218 9,812,419 1,232 1 0.79 1301.58 69.58
SG2 597,320 9,812,191 1,249 1 1.34 1349.49 100.49
SG19 594,140 9,812,638 1,222 0 0.2 1300.89 78.89
SG18 595,125 9,812,100 1,239 3 2.91 1299.35 60.35
SG17 594,710 9,812,097 1,238 2 1.51 1301.28 63.28
SG16 593,199 9,812,197 1,220 0 0.46 1295.21 75.21
SG15 593,803 9,812,169 1,228 1 0.9 1298.84 70.84
SG14 594,406 9,812,112 1,235 1 0.56 1302.83 67.83
SG13 594,348 9,812,215 1,236 1 0.82 1302.47 66.47
SG12 596,857 9,812,498 1,260 3 2.77 1294.01 34.01
SG11 598,493 9,812,715 1,281 2 1.55 1339.16 58.16
SG10 598,319 9,814,770 1,275 1 1.08 1359.79 84.79
SG1 597,085 9,811,809 1,229 1 0.71 1347.88 118.88
RY7 587,393 9,810,919 1,186 0 0.4 1218.52 32.52
RY6 587,268 9,810,522 1,183 1 1.02 1219.15 36.15
RY5 587,278 9,810,240 1,181 1 0.83 1223.38 42.38
RY4 588,990 9,810,030 1,184 1 1.09 1211.49 27.49
RY3 588,549 9,810,050 1,191 2 2.37 1215.54 24.54
RY2 588,126 9,810,160 1,199 4 3.87 1218.97 19.97
RY1 587,423 9,810,251 1,188 2 2.23 1222.42 34.42
RM-2-2 576,156 9,811,133 1,127 - 0 1250.03 123.03
RM2. 577,778 9,812,776 1,120 - 0 1255.71 135.71
RM1. 578,768 9,814,277 1,120 0 0.23 1397.08 277.08
RK9 612,368 9,801,960 1,330 1 1.16 1357.76 27.76
RK8 612,700 9,801,783 1,339 1 0.94 1365.38 26.38
RK7 612,625 9,801,433 1,346 1 0.95 1361.93 15.93

30 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
RK6 612,920 9,801,329 1,351 1 0.56 1369.1 18.1
RK5 612,855 9,801,154 1,352 1 1.28 1371.21 19.21
RK4 612,594 9,800,772 1,350 2 1.62 1375.43 25.43
RK3 613,184 9,800,894 1,359 4 3.59 1377.31 18.31
RK26 610,698 9,800,245 1,336 1 1.17 1356.91 20.91
RK25 610,990 9,800,164 1,344 1 0.85 1360.14 16.14
RK24 611,265 9,800,236 1,347 1 0.53 1368.38 21.38
RK23 611,676 9,799,912 1,337 0 0.27 1363.84 26.84
RK22 611,142 9,799,827 1,336 1 1.18 1367.24 31.24
RK21 611,149 9,799,547 1,325 0 0.31 1365 40
RK20 609,844 9,799,392 1,312 1 0.89 1355.55 43.55
RK2. 613,626 9,800,948 1,366 - 0 1379.23 13.23
RK19 610,981 9,800,594 1,338 1 1.34 1367.73 29.73
RK18 611,304 9,800,349 1,348 0 0.32 1369.38 21.38
RK17 611,419 9,801,115 1,347 0 0.39 1368.6 21.6
RK16 611,706 9,800,917 1,362 0 0.47 1369.71 7.71
RK15 611,768 9,800,734 1,354 1 0.75 1370.09 16.09
RK14 611,477 9,800,690 1,348 1 0.63 1369.21 21.21
RK13 611,443 9,800,343 1,350 1 0.6 1370.15 20.15
RK12 611,786 9,800,426 1,346 1 1.1 1371.24 25.24
RK11 612,363 9,800,677 1,350 1 0.96 1374.1 24.1
RK10 611,905 9,801,970 1,322 1 0.98 1354.23 32.23
RK1.1 613,845 9,800,909 1,367 3 2.72 1380.21 13.21
RK1 615,174 9,800,828 1,364 1 1.03 1375.02 11.02
R1.5 590,607 9,806,553 1,211 - 0 1349.76 138.76
R1.4 585,563 9,809,797 1,204 - 0 1366.44 162.44
R1.3 583,086 9,810,389 1,161 - 0 1375.15 214.15
R1.2 579,476 9,811,935 1,140 - 0 1388.44 248.44
R1.1 579,144 9,814,016 1,119 - 0 1395.55 276.55
PS-BT 595,648 9,803,458 1,327 (242) -242 1541.93 214.93
NYS9 605,916 9,793,837 1,367 2 1.75 1401.42 34.42
NYS8 605,187 9,793,949 1,361 1 1.22 1400.4 39.4
NYS7 605,011 9,794,259 1,371 1 0.78 1401.4 30.4
NYS6 605,735 9,794,223 1,366 0 0.35 1402.89 36.89
NYS5 605,938 9,794,220 1,366 1 0.9 1403.72 37.72
NYS4 606,428 9,794,256 1,368 2 1.59 1407.62 39.62
NYS3 606,589 9,794,270 1,370 1 1.36 1409.11 39.11
NYS2 607,042 9,794,296 1,367 1 1.27 1411.15 44.15
NYS1 607,135 9,794,289 1,366 1 0.74 1411.49 45.49
NY9 576,586 9,813,588 1,130 1 1.01 1201.43 71.43
NY8 576,764 9,813,718 1,122 0 0.47 1203.97 81.97
NY7 575,419 9,813,340 1,147 0 0.1 1194.45 47.45
NY6 575,525 9,813,402 1,151 0 0.31 1194.79 43.79
NY5 575,374 9,813,269 1,138 0 0.47 1192.89 54.89

31 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
NY4 575,770 9,813,585 1,154 1 0.53 1196.68 42.68
NY3 576,012 9,813,795 1,140 1 0.86 1201.48 61.48
NY2 576,239 9,813,884 1,122 1 0.66 1201.96 79.96
NY13 576,736 9,812,036 1,123 1 0.62 1206.82 83.82
NY12 576,510 9,812,576 1,153 2 1.89 1203.63 50.63
NY11 576,176 9,813,200 1,153 2 1.89 1202.57 49.57
NY10 577,040 9,813,437 1,137 2 1.81 1201.06 64.06
NY1 575,249 9,813,956 1,138 1 1.38 1200.17 62.17
MZ9 609,434 9,809,872 1,474 0 0.23 1528.61 54.61
MZ8 610,845 9,808,137 1,439 1 0.5 1531.33 92.33
MZ7 610,508 9,808,628 1,459 0 0.2 1532.7 73.7
MZ6 610,248 9,809,105 1,481 0 0.38 1534.4 53.4
MZ5 609,281 9,809,305 1,464 0 0.22 1531.21 67.21
MZ4 609,802 9,809,457 1,498 0 0.16 1533.26 35.26
MZ3 609,886 9,809,334 1,499 0 0.16 1533.79 34.79
MZ2 609,617 9,808,498 1,489 1 0.61 1532.03 43.03
MZ16 610,614 9,808,408 1,451 0 0.1 1532.11 81.11
MZ15 610,447 9,807,988 1,477 0 0.37 1531.36 54.36
MZ14 610,017 9,807,525 1,471 1 0.7 1528.1 57.1
MZ13 609,505 9,811,959 1,480 0 0.44 1521.3 41.3
MZ12 609,700 9,811,013 1,464 0 0.43 1525.29 61.29
MZ11 609,812 9,810,141 1,493 0 0.42 1530.7 37.7
MZ10 609,060 9,810,428 1,445 1 0.5 1527.15 82.15
MZ1 609,195 9,807,670 1,498 1 0.63 1530.05 32.05
MY9 582,556 9,806,585 1,212 0 0.19 1252.14 40.14
MY8 582,281 9,806,678 1,212 0 0.43 1251.43 39.43
MY7 581,908 9,806,657 1,213 0 0.25 1250.25 37.25
MY6 581,846 9,806,303 1,225 0 0.27 1251.41 26.41
MY5 581,858 9,806,555 1,217 0 0.3 1250.36 33.36
MY4 581,663 9,806,540 1,214 0 0.3 1249.86 35.86
MY33 581,623 9,806,323 1,228 0 0.21 1250.5 22.5
MY32 581,608 9,806,152 1,225 1 0.53 1250.33 25.33
MY31 581,767 9,806,157 1,223 0 0.08 1250.4 27.4
MY30 581,784 9,806,130 1,222 0 0.28 1250.42 28.42
MY3 581,728 9,806,295 1,227 0 0.13 1251.21 24.21
MY29 581,948 9,806,138 1,219 0 0.32 1250.88 31.88
MY28 582,168 9,806,149 1,220 0 0.19 1251.31 31.31
MY27 582,191 9,806,110 1,219 0 0.37 1251.41 32.41
MY26 582,634 9,806,152 1,218 0 0.49 1252.94 34.94
MY25 582,940 9,806,203 1,231 1 0.59 1253.41 22.41
MY24 583,267 9,806,095 1,226 1 0.73 1254.32 28.32
MY23 583,580 9,806,100 1,218 1 0.65 1255.66 37.66
MY22 583,713 9,806,274 1,215 0 0.31 1257.05 42.05
MY21 584,136 9,806,050 1,207 0 0.25 1259.8 52.8

32 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
MY20 583,929 9,806,178 1,209 0 0.3 1258.2 49.2
MY2 581,423 9,806,580 1,213 0 0.25 1249.34 36.34
MY19 584,049 9,806,310 1,203 0 0.34 1257.29 54.29
MY18 583,616 9,806,449 1,214 0 0.34 1255.47 41.47
MY17 583,593 9,806,294 1,218 0 0.26 1256.65 38.65
MY16 583,247 9,806,285 1,232 0 0.39 1255.55 23.55
MY15 583,199 9,806,474 1,226 1 0.51 1254.24 28.24
MY14 582,924 9,806,396 1,230 0 0.36 1254.49 24.49
MY13 582,887 9,806,558 1,223 1 0.5 1253.6 30.6
MY12 582,554 9,806,359 1,223 0 0.42 1253.37 30.37
MY11 582,217 9,806,345 1,226 1 0.57 1252.41 26.41
MY10 582,563 9,806,521 1,216 0 0.25 1252.33 36.33
MY1 581,429 9,806,438 1,224 0 0.24 1249.13 25.13
MT8 619,794 9,810,503 1,314 1 1.28 1377.45 63.45
MT7 619,427 9,810,502 1,312 1 1.37 1379.91 67.91
MT6 619,016 9,810,273 1,319 1 1.08 1376.38 57.38
MT5 618,558 9,810,651 1,301 0 0.43 1384.11 83.11
MT4 618,524 9,810,546 1,305 0 0.42 1384.41 79.41
MT3 618,234 9,810,662 1,303 1 0.63 1383.93 80.93
MT2 618,323 9,810,364 1,313 2 1.63 1386.35 73.35
MT1 618,113 9,810,009 1,325 2 1.75 1390.02 65.02
MRW9 627,735 9,807,028 1,245 1 0.76 1350.09 105.09
MRW8 627,642 9,806,580 1,258 1 0.91 1358.25 100.25
MRW7 627,607 9,806,075 1,265 1 1.16 1361.21 96.21
MRW6 627,723 9,806,391 1,263 1 0.69 1349.51 86.51
MRW5 627,487 9,805,738 1,273 1 1.45 1363.79 90.79
MRW4 627,344 9,805,338 1,285 3 3.29 1366.96 81.96
MRW3 627,200 9,804,347 1,319 3 2.98 1376.67 57.67
MRW2 627,458 9,803,483 1,330 2 2.15 1382.79 52.79
MRW1 627,461 9,802,689 1,354 3 2.65 1390.35 36.35
MR9 570,058 9,810,649 1,192 0 0.29 1221.53 29.53
MR8 569,237 9,811,187 1,159 0 0.43 1217.05 58.05
MR7 567,410 9,811,135 1,160 0 0.16 1205.1 45.1
MR6 568,020 9,811,065 1,172 0 0.45 1208.88 36.88
MR5 567,997 9,810,803 1,160 0 0.23 1208.08 48.08
MR4 568,036 9,810,408 1,144 1 0.6 1207.59 63.59
MR3 568,148 9,810,107 1,137 0 0.25 1207.76 70.76
MR2 568,269 9,809,699 1,125 1 0.91 1200.88 75.88
MR15 571,787 9,809,203 1,202 1 0.99 1231.45 29.45
MR14 570,400 9,810,413 1,193 0 0.17 1223.48 30.48
MR13 572,801 9,808,220 1,180 2 1.83 1226.25 46.25
MR12 572,044 9,808,667 1,182 1 1.35 1230.14 48.14
MR11 571,550 9,809,473 1,206 0 0.48 1229.95 23.95
MR10 570,748 9,810,239 1,202 0 0.32 1225.29 23.29

33 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
MR1 567,963 9,810,020 1,135 1 0.53 1206.63 71.63
MN9 573,919 9,806,316 1,181 0 0.15 1208.67 27.67
MN8 574,268 9,806,216 1,176 0 0.2 1211.1 35.1
MN7 574,403 9,806,165 1,176 0 0.16 1211.91 35.91
MN6 574,547 9,806,048 1,172 0 0.34 1211.27 39.27
MN5 574,611 9,806,389 1,167 0 0.38 1213.84 46.84
MN4 574,668 9,806,675 1,173 0 0.48 1214.9 41.9
MN3 575,268 9,806,793 1,192 1 0.52 1214.07 22.07
MN2 575,470 9,807,188 1,203 1 0.61 1215 12
MN19 574,756 9,804,888 1,135 1 0.6 1199.42 64.42
MN17 574,125 9,805,793 1,188 1 0.61 1209.25 21.25
MN16 574,086 9,804,576 1,142 1 0.63 1203.88 61.88
MN15 574,255 9,805,115 1,151 1 0.66 1206.18 55.18
MN14 573,957 9,805,209 1,160 0 0.43 1206.18 46.18
MN13 573,627 9,805,277 1,161 0 0.25 1204.78 43.78
MN12 573,712 9,805,594 1,166 0 0.29 1205.18 39.18
MN11 573,813 9,805,978 1,192 0 0.31 1207.31 15.31
MN10 573,762 9,806,327 1,180 0 0.12 1208.45 28.45
MN1 574,690 9,807,159 1,183 0 0.48 1217.07 34.07
MLN90 605,536 9,792,777 1,357 - 0 1395.52 38.52
MLN80 607,848 9,800,882 1,341 - 0 1485.14 144.14
MLN7 570,692 9,810,734 1,193 - 0 1223.38 30.38
MLN6 570,664 9,811,243 1,192 - 0 1221.43 29.43
MLN5 570,656 9,811,790 1,177 - 0 1219.33 42.33
MLN4 570,524 9,812,254 1,169 - 0 1217.49 48.49
MLN3 567,062 9,812,894 1,125 - 0 1195.23 70.23
MLN21 589,745 9,804,352 1,220 - 0 1290.39 70.39
MLN16. 614,585 9,800,826 1,375 3 3.43 1384.02 9.02
MK9 595,322 9,809,135 1,246 1 0.56 1311.09 65.09
MK8 595,218 9,809,601 1,234 0 0.46 1309.74 75.74
MK7 595,136 9,810,079 1,211 0 0.21 1308.42 97.42
MK6 595,065 9,810,422 1,216 0 0.34 1307.48 91.48
MK5 595,360 9,808,966 1,243 1 0.67 1311.72 68.72
MK4 596,163 9,808,882 1,250 1 1.31 1313.55 63.55
MK3 597,599 9,809,265 1,282 1 1.4 1336.94 54.94
MK2 596,836 9,808,969 1,257 1 1.36 1317.12 60.12
MK11 594,895 9,808,838 1,228 0 0.31 1308.17 80.17
MK10 595,421 9,808,699 1,238 1 1.42 1312.54 74.54
MK1 596,808 9,808,705 1,249 1 1.36 1317.54 68.54
MG9 623,188 9,801,068 1,405 0 0.4 1442.96 37.96
MG8 622,698 9,800,950 1,395 0 0.24 1447 52
MG7 622,253 9,800,412 1,381 1 0.51 1441.58 60.58
MG6 622,367 9,800,583 1,384 0 0.1 1445.66 61.66
MG5 622,418 9,800,689 1,385 0 0.14 1446.62 61.62

34 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
MG4 622,488 9,800,876 1,388 0 0.15 1447.27 59.27
MG32 626,486 9,801,706 1,377 1 1.28 1413.67 36.67
MG31 625,842 9,801,339 1,393 1 1.11 1417.92 24.92
MG30 623,118 9,800,480 1,410 0 0.33 1443.62 33.62
MG3 622,500 9,801,026 1,388 0 0.12 1447.91 59.91
MG29 623,305 9,800,759 1,407 0 0.42 1440.89 33.89
MG28 623,597 9,800,436 1,408 0 0.47 1433.57 25.57
MG27 623,039 9,799,966 1,400 1 0.67 1437.93 37.93
MG26 622,568 9,800,037 1,388 1 0.53 1436.6 48.6
MG25 622,724 9,800,374 1,399 0 0.37 1444.43 45.43
MG24 623,471 9,800,276 1,410 0 0.39 1440.95 30.95
MG23 622,883 9,800,713 1,400 0 0.3 1445.85 45.85
MG22 627,199 9,801,955 1,391 1 0.76 1392.88 1.88
MG21 625,455 9,803,037 1,356 1 0.92 1409.01 53.01
MG20 626,321 9,800,916 1,376 1 0.71 1415.18 39.18
MG2 621,935 9,801,283 1,413 0 0.24 1446.18 33.18
MG-2 578,493 9,814,434 1,119 (435) -435 1398.14 279.14
MG19 625,531 9,801,695 1,398 2 1.53 1425.75 27.75
MG18 625,026 9,800,787 1,379 1 1.18 1420.02 41.02
MG17 624,741 9,801,683 1,397 2 1.66 1430.19 33.19
MG16 624,422 9,800,497 1,390 0 0.44 1424.99 34.99
MG15 624,216 9,800,748 1,399 1 0.69 1429.91 30.91
MG14 624,010 9,801,075 1,412 1 0.75 1433.72 21.72
MG13 623,815 9,801,398 1,424 1 0.85 1436.86 12.86
MG12 623,555 9,801,264 1,417 1 0.51 1439.29 22.29
MG11 622,614 9,801,606 1,368 0 0.2 1436.22 68.22
MG10 622,859 9,801,349 1,387 0 0.47 1437.54 50.54
MG1 622,386 9,801,115 1,389 0 0.22 1448.54 59.54
MG-1 578,489 9,814,423 1,119 (108) -108 1263.07 144.07
MB9 600,862 9,801,323 1,333 1 0.78 1380.02 47.02
MB8 599,856 9,800,832 1,322 0 0.39 1336.09 14.09
MB7 600,047 9,800,902 1,336 0 0.38 1376.18 40.18
MB6 600,329 9,800,722 1,320 1 0.67 1375.37 55.37
MB5 600,562 9,800,872 1,328 1 0.78 1378.59 50.59
MB4 600,219 9,801,220 1,345 1 0.7 1379.12 34.12
MB3 599,989 9,801,445 1,331 1 0.6 1377.8 46.8
MB2 599,545 9,801,938 1,309 0 0.45 1373.66 64.66
MB13 599,745 9,801,731 1,309 0 0.46 1377.75 68.75
MB12 600,043 9,801,893 1,328 0 0.32 1378.78 50.78
MB11 600,634 9,801,869 1,341 0 0.45 1382.89 41.89
MB10 600,497 9,801,602 1,350 1 0.69 1381.66 31.66
MB1 599,295 9,802,463 1,343 1 0.53 1369.65 26.65
KZ9 591,381 9,803,943 1,235 1 1.07 1294.95 59.95
KZ8 590,502 9,804,309 1,240 0 0.39 1294.52 54.52

35 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
KZ7 591,331 9,804,278 1,240 0 0.43 1298.84 58.84
KZ6 591,885 9,804,519 1,240 1 0.55 1302.2 62.2
KZ5 592,452 9,804,560 1,233 1 0.84 1305.48 72.48
KZ4 592,441 9,804,887 1,237 2 1.98 1305.44 68.44
KZ3 592,406 9,805,201 1,234 2 1.51 1306.94 72.94
KZ23 590,227 9,804,353 1,226 - 0 1293 67
KZ22 591,522 9,805,151 1,224 - 0 1303.92 79.92
KZ21 592,998 9,804,526 1,238 - 0 1308.78 70.78
KZ20 591,864 9,804,794 1,230 0 0.36 1302.1 72.1
KZ2 592,554 9,805,203 1,234 2 1.54 1307.26 73.26
KZ19 590,813 9,804,904 1,223 - 0 1296.53 73.53
KZ18 590,597 9,804,614 1,226 - 0 1295.79 69.79
KZ17 590,866 9,804,631 1,228 - 0 1296.93 68.93
KZ16 591,026 9,804,146 1,235 - 0 1297.2 62.2
KZ15 592,902 9,804,963 1,225 0 0.35 1309.12 84.12
KZ14 593,486 9,804,544 1,238 2 1.52 1311.74 73.74
KZ13 591,849 9,805,509 1,231 2 1.85 1305.61 74.61
KZ12 591,854 9,805,174 1,223 0 0.42 1304.4 81.4
KZ11 591,420 9,803,715 1,226 1 0.59 1294.27 68.27
KZ10 591,560 9,803,754 1,228 2 1.65 1292.67 64.67
KZ1 592,121 9,805,567 1,230 1 0.94 1306.47 76.47
KY9 584,818 9,809,811 1,186 1 0.61 1227.32 41.32
KY8 586,474 9,809,222 1,197 0 0.42 1227.75 30.75
KY7 586,243 9,808,895 1,201 0 0.33 1224.26 23.26
KY6 586,588 9,809,160 1,192 0 0.42 1227.04 35.04
KY5 586,686 9,810,150 1,175 1 0.91 1226.81 51.81
KY4 586,118 9,809,984 1,190 1 1.19 1229.94 39.94
KY3 586,250 9,809,373 1,205 1 1.26 1228.59 23.59
KY2 585,593 9,809,830 1,204 2 1.8 1231.22 27.22
KY1 584,240 9,809,870 1,180 0 0.25 1224.18 44.18
KW9 578,065 9,812,855 1,145 1 0.77 1209.58 64.58
KW8 578,519 9,812,753 1,150 1 0.76 1207.64 57.64
KW7 578,740 9,812,990 1,133 0 0.49 1206.76 73.76
KW6 578,883 9,812,670 1,142 0 0.33 1206.45 64.45
KW5 578,985 9,812,725 1,138 1 0.62 1205.35 67.35
KW43 577,824 9,812,211 1,146 2 1.63 1204.12 58.12
KW41 578,599 9,814,194 1,117 0 0.35 1208 91
KW40 578,712 9,814,146 1,120 0 0.16 1208.28 88.28
KW4 578,690 9,812,558 1,152 1 0.66 1205.78 53.78
KW39 578,829 9,814,084 1,121 0 0.29 1205.13 84.13
KW38 578,998 9,813,984 1,121 0 0.38 1202.95 81.95
KW37 578,656 9,813,812 1,121 0 0.33 1204.81 83.81
KW36 578,807 9,813,721 1,121 1 0.66 1202.95 81.95
KW35 578,510 9,813,841 1,120 0 0.33 1209.13 89.13

36 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
KW34 578,396 9,813,902 1,119 0 0.36 1207.9 88.9
KW33 578,121 9,813,600 1,119 0 0.45 1208.83 89.83
KW32 578,241 9,813,434 1,120 0 0.26 1210.56 90.56
KW31 577,624 9,813,626 1,122 0 0.06 1209.02 87.02
KW30 577,704 9,813,522 1,128 0 0.28 1210.16 82.16
KW3 578,855 9,812,346 1,144 1 1.39 1203.49 59.49
KW29 577,675 9,813,431 1,135 0 0.15 1210.4 75.4
KW28 577,742 9,813,268 1,144 0 0.35 1210.58 66.58
KW27 577,657 9,813,079 1,157 0 0.21 1212.31 55.31
KW26 577,737 9,812,892 1,152 0 0.28 1213.87 61.87
KW25 577,848 9,812,857 1,149 0 0.36 1214.61 65.61
KW24 579,294 9,812,877 1,124 1 0.58 1197.33 73.33
KW23 579,045 9,813,240 1,121 1 0.64 1197.95 76.95
KW22 578,924 9,813,100 1,125 0 0.48 1198.34 73.34
KW21 578,571 9,813,460 1,120 1 0.56 1204.69 84.69
KW20 578,533 9,813,297 1,120 0 0.39 1202.3 82.3
KW2 578,335 9,811,981 1,146 2 2.18 1201.06 55.06
KW19 578,211 9,813,390 1,122 0 0.18 1210.83 88.83
KW18 578,349 9,813,239 1,122 0 0.32 1210.51 88.51
KW17 578,109 9,813,236 1,130 0 0.24 1211.42 81.42
KW16 578,070 9,813,175 1,134 0 0.14 1211.71 77.71
KW15 577,980 9,813,042 1,141 0 0.14 1212.87 71.87
KW14 577,940 9,812,983 1,144 0 0.15 1213.41 69.41
KW13 578,452 9,812,993 1,135 0 0.28 1208.74 73.74
KW12 578,094 9,813,127 1,135 0 0.14 1211.33 76.33
KW11 578,450 9,812,933 1,139 0 0.27 1209.21 70.21
KW10 578,087 9,813,002 1,137 0 0.19 1210.47 73.47
KW1. 577,787 9,812,773 1,151 - 0 1215.42 64.42
KW1 577,584 9,812,600 1,150 1 0.58 1213.77 63.77
KU9 616,495 9,813,864 1,304 0 0.31 1378.21 74.21
KU8 616,023 9,813,688 1,304 0 0.3 1381.9 77.9
KU7 615,953 9,816,800 1,246 1 0.79 1350.31 104.31
KU6 616,502 9,815,851 1,253 1 1.03 1359.65 106.65
KU5 616,371 9,815,255 1,267 1 0.6 1368.43 101.43
KU4 615,994 9,814,489 1,269 0 0.5 1376.89 107.89
KU3 615,792 9,814,674 1,260 0 0.11 1375.33 115.33
KU2 616,090 9,814,682 1,262 0 0.4 1375.95 113.95
KU10 616,252 9,813,828 1,308 1 0.54 1380.17 72.17
KU1 616,052 9,813,570 1,306 0 0.42 1382.44 76.44
KT9 605,879 9,789,441 1,330 0 0.42 1378.93 48.93
KT8 606,153 9,789,264 1,330 1 1.07 1377.4 47.4
KT7 606,307 9,788,941 1,314 3 2.63 1376.4 62.4
KT6 605,809 9,789,410 1,331 1 1.11 1379.24 48.24
KT5 603,991 9,789,568 1,302 1 1.48 1376.76 74.76

37 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
KT4 604,650 9,789,589 1,313 1 1.1 1376.44 63.44
KT3 604,757 9,789,538 1,313 1 0.53 1378.42 65.42
KT2 605,224 9,789,339 1,327 1 0.93 1380.2 53.2
KT16 604,866 9,788,964 1,302 1 1.29 1375.38 73.38
KT15 604,942 9,789,237 1,319 3 2.85 1378.98 59.98
KT14 604,991 9,789,452 1,322 1 1.42 1379.79 57.79
KT13 605,164 9,788,640 1,298 2 2.23 1378.49 80.49
KT12 605,206 9,789,072 1,319 1 1.4 1379.21 60.21
KT11 606,060 9,789,587 1,332 1 0.53 1377.1 45.1
KT10 606,327 9,789,643 1,324 1 0.76 1373.71 49.71
KT1 605,252 9,789,398 1,326 1 0.83 1380.59 54.59
KT.9 582,967 9,802,100 1,177 1 1.28 1196.1 19.1
KT.8 582,392 9,802,280 1,183 1 0.99 1193.36 10.36
KT.7 582,581 9,802,349 1,182 1 1.08 1195.57 13.57
KT.6 582,641 9,802,457 1,183 2 1.84 1195.75 12.75
KT.5 582,990 9,802,364 1,176 1 1.28 1197.2 21.2
KT.4 583,171 9,802,293 1,177 2 1.7 1198.44 21.44
KT.3 583,375 9,802,175 1,178 1 0.71 1200.54 22.54
KT.2 583,401 9,802,164 1,179 1 0.82 1200.82 21.83
KT.10 583,220 9,802,003 1,174 1 0.76 1193.17 19.17
KR9 573,678 9,813,325 1,124 0 0.05 1191.67 67.67
KR8 573,794 9,813,349 1,122 0 0.07 1191.7 69.7
KR7 573,513 9,813,555 1,122 0 0.07 1190.53 68.53
KR6 573,598 9,813,442 1,123 0 0.05 1189.49 66.49
KR5 573,152 9,813,352 1,125 0 0.16 1187.68 62.68
KR4 573,122 9,813,471 1,123 0 0.08 1188.98 65.98
KR3 572,650 9,813,251 1,123 0 0.16 1187.38 64.38
KR2 572,568 9,813,409 1,122 0 0.06 1187.36 65.36
KR16 574,308 9,813,418 1,121 0 0.17 1193.58 72.58
KR15 573,956 9,813,115 1,123 0 0.14 1192.25 69.25
KR14 574,647 9,813,683 1,120 0 0.17 1197.34 77.34
KR13 574,052 9,813,562 1,122 0 0.25 1192.62 70.62
KR12 573,748 9,813,482 1,122 0 0.05 1191.36 69.36
KR11 573,710 9,813,606 1,122 0 0.08 1191.37 69.37
KR10 573,553 9,813,212 1,142 0 0.1 1191.65 49.65
KR1 572,319 9,813,424 1,125 0 0.34 1186.75 61.75
KN9 618,214 9,806,463 1,470 0 0.47 1507.45 37.45
KN8 618,205 9,806,178 1,452 0 0.38 1508.5 56.5
KN7 619,208 9,805,540 1,437 0 0.39 1505.35 68.35
KN6 618,279 9,805,366 1,446 0 0.36 1503.72 57.72
KN5 617,665 9,806,527 1,471 0 0.45 1505.74 34.74
KN4 618,302 9,805,947 1,447 0 0.46 1509.72 62.72
KN3 617,813 9,806,032 1,443 0 0.42 1511.57 68.57
KN2 616,832 9,805,947 1,442 1 0.91 1515.41 73.41

38 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
KN10 618,258 9,806,703 1,495 0 0.49 1505.21 10.21
KN1 615,818 9,806,030 1,418 1 0.68 1519.47 101.47
KK9 575,685 9,810,207 1,147 1 0.52 1208.23 61.23
KK8 575,297 9,807,653 1,197 0 0.31 1211.86 14.86
KK7 575,123 9,807,972 1,190 1 0.88 1213.9 23.9
KK6 574,951 9,808,573 1,160 1 1.31 1217.43 57.43
KK5 574,578 9,808,794 1,164 1 0.5 1217.44 53.44
KK4 574,557 9,808,313 1,175 1 0.51 1218.61 43.61
KK3 574,277 9,808,328 1,171 0 0.15 1219.47 48.47
KK2 574,734 9,808,120 1,185 1 0.63 1218.6 33.6
KK12 573,811 9,808,192 1,167 0 0.42 1222.02 55.02
KK11 574,618 9,807,889 1,177 0 0.31 1218.19 41.19
KK10 575,309 9,809,328 1,141 1 0.72 1214.71 73.71
KK1 574,296 9,808,191 1,176 0 0.34 1220.11 44.11
KI94 595,936 9,806,829 1,230 0 0.32 1319.15 89.15
KI93 596,216 9,806,777 1,235 1 0.68 1319.24 84.24
KI92 596,489 9,806,692 1,237 0 0.25 1320.56 83.56
KI91 594,648 9,805,851 1,233 1 0.59 1315.18 82.18
KI90 593,989 9,805,779 1,226 0 0.41 1313.48 87.48
KI9 594,721 9,805,091 1,238 0 0.21 1317.8 79.8
KI89 593,610 9,804,945 1,240 2 2.33 1310.63 70.63
KI88 593,914 9,803,981 1,245 1 1.37 1300.87 55.87
KI87 594,390 9,804,091 1,251 1 0.91 1308.75 57.75
KI86 594,809 9,804,111 1,252 1 0.63 1310.87 58.87
KI85 595,086 9,803,830 1,272 1 0.67 1308.25 36.25
KI84 595,410 9,803,974 1,278 0 0.24 1306.36 28.36
KI83 596,587 9,806,390 1,234 0 0.26 1321.94 87.94
KI82 596,991 9,806,453 1,249 1 1.37 1321.21 72.21
KI81 597,332 9,806,332 1,254 1 1.41 1273.89 19.89
KI80 597,853 9,805,859 1,281 1 1.26 1374.41 93.41
KI8 594,933 9,804,889 1,244 0 0.24 1319.73 75.73
KI79 597,711 9,805,224 1,285 1 1 1382.29 97.29
KI78 596,905 9,805,444 1,258 2 2.01 1323.29 65.29
KI77 597,346 9,805,192 1,272 1 1.47 1320.71 48.71
KI76 597,078 9,804,802 1,265 2 2.42 1324.55 59.55
KI75 596,351 9,804,975 1,247 1 0.57 1327.05 80.05
KI74 594,914 9,805,584 1,241 0 0.27 1318.34 77.34
KI73 594,988 9,805,577 1,242 0 0.1 1318.26 76.26
KI72 595,024 9,805,517 1,244 0 0.06 1318.22 74.22
KI71 595,033 9,805,494 1,245 0 0.12 1318.25 73.25
KI70 595,252 9,805,488 1,244 0 0.13 1317.89 73.89
KI7 594,768 9,804,666 1,244 0 0.38 1318.28 74.28
KI69 595,338 9,805,480 1,245 0 0.11 1317.88 72.88
KI68 595,225 9,805,394 1,248 0 0.15 1317.94 69.94

39 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
KI67 595,336 9,805,354 1,248 0 0.19 1322.67 74.67
KI66 595,421 9,805,449 1,244 0 0.15 1323.25 79.25
KI65 595,548 9,805,335 1,245 0 0.3 1323.66 78.66
KI64 595,474 9,805,019 1,252 0 0.36 1324.18 72.18
KI63 595,831 9,804,960 1,257 0 0.4 1326.59 69.59
KI62 595,827 9,805,116 1,247 0 0.28 1324.8 77.8
KI61 595,926 9,805,043 1,249 0 0.33 1325.28 76.28
KI60 595,948 9,805,301 1,241 0 0.25 1324.48 83.48
KI6 594,080 9,804,507 1,248 1 1.04 1314.68 66.68
KI59 596,240 9,805,227 1,242 0 0.33 1325.37 83.37
KI58 596,118 9,805,400 1,238 0 0.33 1324.48 86.48
KI57 595,989 9,805,516 1,234 0 0.31 1323.83 89.83
KI56 595,851 9,805,432 1,238 0 0.19 1323.31 85.31
KI55 595,671 9,805,459 1,241 0 0.23 1322.78 81.78
KI54 595,818 9,805,653 1,233 0 0.29 1321.87 88.87
KI53 595,152 9,805,708 1,238 0 0.37 1317.59 79.59
KI52 595,225 9,805,919 1,231 0 0.47 1317.52 86.52
KI51 595,461 9,805,731 1,237 0 0.32 1318.28 81.28
KI50 595,558 9,805,944 1,229 0 0.4 1319.28 90.28
KI5 594,403 9,804,800 1,242 1 0.52 1315.74 73.74
KI49 595,623 9,805,688 1,236 0 0.24 1321.79 85.79
KI48 595,783 9,805,868 1,229 0 0.23 1321.08 92.08
KI47 595,865 9,805,972 1,229 1 0.65 1321.06 92.06
KI46 596,123 9,806,271 1,230 1 0.96 1321.08 91.08
KI45 596,382 9,806,558 1,233 0 0.4 1320.78 87.78
KI44 596,000 9,806,616 1,232 0 0.46 1319.91 87.91
KI43 595,965 9,806,735 1,233 0 0.16 1319.48 86.48
KI42 596,653 9,807,106 1,241 1 0.79 1321.17 80.17
KI41 596,631 9,806,829 1,235 1 0.71 1321.41 86.41
KI40 596,599 9,806,520 1,238 0 0.39 1321.74 83.74
KI4 594,562 9,804,958 1,238 0 0.33 1316.29 78.29
KI39 596,567 9,806,237 1,234 1 0.56 1322.27 88.27
KI38 596,531 9,805,914 1,244 1 1.19 1323.01 79.01
KI37 596,306 9,805,739 1,242 1 0.83 1323.24 81.24
KI36 596,446 9,805,288 1,243 1 0.78 1325.16 82.16
KI35 596,386 9,805,064 1,245 0 0.4 1326.41 81.41
KI34 596,292 9,804,727 1,258 1 1.12 1328.05 70.05
KI33 596,168 9,804,341 1,278 1 0.59 1329.28 51.28
KI32 596,404 9,804,103 1,296 1 0.94 1327.05 31.05
KI31 596,128 9,804,133 1,291 0 0.37 1330.06 39.06
KI30 596,031 9,803,852 1,306 1 0.5 1331.24 25.24
KI3 594,160 9,805,176 1,236 1 1.11 1311.54 75.54
KI29 595,886 9,804,143 1,289 0 0.42 1329.25 40.25
KI28 595,632 9,804,112 1,278 0 0.34 1326.84 48.84

40 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
KI27 595,918 9,804,486 1,277 0 0.46 1327.43 50.43
KI26 595,719 9,804,315 1,277 0 0.35 1327.56 50.56
KI25 595,756 9,804,633 1,271 0 0.42 1326.11 55.11
KI24 595,553 9,804,525 1,268 1 0.53 1325.7 57.7
KI23 595,506 9,804,853 1,257 0 0.31 1324.27 67.27
KI22 595,384 9,804,722 1,258 1 0.5 1323.96 65.96
KI21 595,261 9,805,038 1,251 0 0.23 1322.69 71.69
KI20 595,140 9,804,919 1,250 0 0.22 1321.91 71.91
KI2 593,614 9,805,318 1,231 1 1.13 1308.19 77.19
KI19 595,001 9,804,783 1,246 0 0.25 1320.35 74.35
KI18 594,311 9,805,419 1,231 1 0.59 1315.83 84.83
KI17 594,525 9,805,473 1,235 0 0.46 1316.5 81.5
KI16 594,764 9,805,394 1,242 0 0.19 1318.68 76.68
KI15 594,819 9,805,459 1,242 0 0.16 1318.84 76.84
KI14 594,916 9,805,377 1,246 0 0.22 1319.28 73.28
KI13 595,179 9,805,161 1,250 0 0.27 1321.28 71.28
KI12 594,844 9,805,149 1,242 0 0.26 1319.73 77.73
KI11 595,032 9,804,994 1,247 0 0.18 1320.7 73.7
KI10 594,616 9,805,206 1,236 0 0.35 1318.06 82.06
KI1 593,097 9,805,280 1,229 7 6.85 1306.3 77.3
KG7 590,148 9,806,867 1,212 1 0.9 1297.71 85.71
KG6 589,730 9,807,149 1,227 2 2.09 1293.79 66.79
KG5 589,061 9,807,581 1,226 2 1.59 1290.23 64.23
KG4 588,712 9,807,806 1,220 1 0.89 1286.54 66.54
KG3 588,529 9,807,915 1,225 1 1.11 1285.89 60.89
KG2 588,192 9,808,139 1,223 1 1.08 1279.75 56.75
KG1 587,790 9,808,399 1,209 0 0.35 1274.9 65.9
KB9 570,520 9,812,883 1,165 1 0.59 1209.16 44.16
KB8 570,111 9,812,812 1,169 0 0.17 1210.97 41.97
KB7 570,039 9,813,197 1,163 0 0.5 1209.13 46.13
KB6 570,052 9,812,911 1,169 0 0.25 1211.33 42.33
KB5 569,921 9,812,804 1,166 1 0.58 1212.14 46.14
KB4 569,409 9,813,000 1,162 1 0.62 1208.82 46.82
KB3 569,347 9,812,831 1,167 0 0.48 1208.03 41.03
KB25 570,886 9,812,734 1,156 0 0.5 1213.48 57.48
KB24 567,568 9,813,376 1,131 0 0.44 1191.71 60.71
KB23 567,784 9,812,902 1,137 1 0.77 1199.62 62.62
KB22 571,109 9,812,750 1,149 1 0.54 1212.9 63.9
KB21 570,060 9,812,307 1,155 1 0.5 1212.28 57.28
KB20 570,292 9,812,684 1,168 1 0.54 1215.61 47.61
KB2 569,078 9,812,907 1,167 1 1.13 1206.38 39.38
K-B-2 596,856 9,804,099 1,295 - 0 1537.93 242.93
KB19 570,059 9,812,676 1,166 0 0.31 1213.11 47.11
KB18 571,483 9,812,968 1,131 1 0.76 1211.65 80.65

41 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
KB17 571,081 9,812,952 1,146 0 0.34 1210.47 64.47
KB16 569,467 9,814,509 1,148 0 0.41 1202.58 54.58
KB15 569,540 9,814,418 1,152 1 1.02 1202.77 50.77
KB14 569,784 9,814,343 1,159 1 0.96 1203.87 44.87
KB13 569,975 9,813,985 1,164 0 0.14 1204.9 40.9
KB12 570,101 9,813,598 1,162 1 0.7 1206.15 44.15
KB11 570,196 9,813,218 1,166 0 0.43 1208.1 42.1
KB10 570,534 9,813,214 1,155 1 1.07 1208.11 53.11
KB1 567,996 9,812,949 1,149 1 0.5 1201.53 52.53
J-83 606,547 9,803,783 1,446 - 0 1509.13 63.13
J-64 577,429 9,813,343 1,146 0 0.4 1206.4 60.39
J-63 577,409 9,813,663 1,123 - 0 1207.5 84.5
J-6 562,765 9,813,420 1,131 - 0 1173.26 42.26
J-529 596,404 9,805,134 1,244 - 0 1325.99 81.99
J-515 607,325 9,804,748 1,478 - 0 1505.22 27.22
J-484 574,679 9,813,733 1,119 - 0 1199.51 80.51
J-45 577,050 9,813,681 1,125 - 0 1205.32 80.32
J-419 595,247 9,805,243 1,251 - 0 1322.06 71.06
J-404 596,503 9,805,575 1,246 - 0 1323.95 77.95
J-339 578,435 9,813,095 1,129 - 0 1208.96 79.96
J-3 578,993 9,806,315 1,204 - 0 1232.28 28.28
J-24 577,206 9,813,448 1,136 0 0.4 1206.37 70.37
J-23 577,283 9,813,669 1,124 - 0 1206.72 82.72
J-100 600,288 9,801,163 1,345 - 0 1379.69 34.69
IS9 599,376 9,817,582 1,345 0 0.11 1370.59 25.59
IS8 599,285 9,817,273 1,331 0 0.21 1369.88 38.88
IS7 599,204 9,817,019 1,319 0 0.15 1369.3 50.3
IS6 599,100 9,816,710 1,308 0 0.04 1368.41 60.41
IS5 599,007 9,816,432 1,299 0 0.14 1366.96 67.96
IS4 598,904 9,816,122 1,289 - 0 1365.41 76.41
IS35 600,071 9,816,189 1,311 1 0.86 1353.38 42.38
IS34 599,755 9,814,718 1,320 1 0.94 1351.37 31.37
IS33 599,935 9,815,541 1,300 0 0.23 1357.32 57.32
IS32 599,575 9,815,667 1,322 0 0.01 1360.95 38.95
IS31 599,338 9,815,001 1,307 0 0.27 1356.57 49.57
IS30 598,979 9,815,034 1,291 0 0.33 1355.76 64.76
IS3 598,782 9,815,770 1,282 0 0.19 1363.65 81.65
IS29 599,246 9,815,754 1,280 0 0.31 1362.72 82.72
IS28 597,685 9,815,458 1,292 0 0.25 1357.25 65.25
IS27 597,928 9,815,336 1,302 0 0.13 1358.7 56.7
IS26 598,031 9,815,072 1,301 0 0.12 1358.67 57.67
IS25 598,117 9,815,234 1,300 0 0.15 1358.7 58.7
IS24 598,213 9,815,388 1,293 0 0.06 1358.83 65.83
IS23 598,285 9,815,519 1,289 0 0.07 1358.98 69.98

42 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
IS22 598,299 9,815,797 1,289 0 0.11 1359.39 70.39
IS21 597,987 9,815,829 1,296 0 0.18 1360.95 64.95
IS20 598,067 9,816,011 1,295 0 0.17 1361.74 66.74
IS2 598,665 9,815,525 1,277 0 0.21 1362.68 85.68
IS19 598,166 9,816,239 1,297 0 0.14 1362.88 65.88
IS18 598,273 9,816,483 1,300 0 0.22 1364.25 64.25
IS17 598,347 9,816,670 1,306 0 0.22 1364.75 58.75
IS16 598,416 9,816,856 1,314 0 0.17 1365.31 51.31
IS15 598,507 9,816,864 1,321 0 0.12 1365.59 44.59
IS14 598,545 9,816,802 1,320 0 0.02 1365.82 45.82
IS13 598,889 9,816,686 1,317 0 0.09 1367.13 50.13
IS12 598,948 9,816,857 1,312 0 0.11 1367.88 55.88
IS11 599,123 9,816,774 1,318 0 0.09 1368.74 50.74
IS1 598,474 9,815,138 1,273 0 0.26 1361.17 88.17
BTK9 621,191 9,803,450 1,397 1 0.76 1461.7 64.7
BTK8 620,968 9,803,758 1,405 0 0.36 1464.21 59.21
BTK7 621,065 9,803,940 1,402 0 0.29 1464.3 62.3
BTK6 621,209 9,804,188 1,399 0 0.45 1464.44 65.44
BTK5 620,764 9,804,373 1,418 0 0.27 1466.04 48.04
BTK4 621,025 9,804,683 1,398 0 0.21 1466.49 68.49
BTK3 620,658 9,804,160 1,423 0 0.39 1467.81 44.81
BTK2 620,260 9,804,641 1,437 0 0.37 1472.38 35.38
BTK1 619,803 9,805,176 1,449 1 0.78 1474.28 25.28
BT99 607,870 9,804,847 1,486 1 0.99 1501.77 15.77
BT98 607,626 9,805,010 1,473 0 0.17 1503.51 30.51
BT97 607,318 9,805,494 1,436 0 0.09 1502.39 66.39
BT96 607,298 9,805,440 1,441 0 0.04 1502.58 61.58
BT95 607,521 9,805,429 1,439 0 0.02 1502.46 63.46
BT94 607,529 9,805,445 1,437 0 0.03 1502.46 65.46
BT93 607,571 9,805,530 1,432 0 0.09 1502.3 70.3
BT92 607,679 9,805,494 1,437 0 0.06 1502.31 65.31
BT91 607,637 9,805,406 1,442 0 0.08 1502.61 60.61
BT90 607,496 9,805,381 1,447 0 0.03 1502.51 55.51
BT9 606,091 9,805,418 1,436 0 0.32 1501.52 65.52
BT89 607,473 9,805,329 1,447 0 0.07 1502.52 55.52
BT88 607,272 9,805,393 1,445 0 0.04 1502.9 57.9
BT87 607,222 9,805,349 1,450 0 0.07 1503.28 53.28
BT86 607,244 9,805,342 1,450 0 0.06 1503.22 53.22
BT85 607,540 9,805,224 1,456 0 0.07 1503.91 47.91
BT84 607,043 9,805,256 1,462 1 0.58 1503.59 41.59
BT83 607,163 9,805,202 1,465 0 0.17 1503.43 38.43
BT82 607,467 9,805,057 1,469 0 0.14 1504.44 35.44
BT81 606,327 9,804,577 1,482 0 0.18 1506.43 24.43
BT80 607,046 9,804,861 1,483 0 0.17 1504.92 21.92

43 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
BT8 606,070 9,805,285 1,442 0 0.45 1501.95 59.95
BT79 606,946 9,804,897 1,485 0 0.08 1504.45 19.45
BT78 606,854 9,805,469 1,443 0 0.2 1503.27 60.27
BT77 607,383 9,805,621 1,425 0 0.29 1501.91 76.91
BT76 607,000 9,805,583 1,435 0 0.17 1501.42 66.42
BT75 607,137 9,805,751 1,419 0 0.4 1501.34 82.34
BT74 606,685 9,805,844 1,408 0 0.24 1501.04 93.04
BT73 606,838 9,805,665 1,429 0 0.17 1501.04 72.04
BT72 606,635 9,805,685 1,420 0 0.08 1501.05 81.05
BT71 606,743 9,803,729 1,457 0 0.31 1508.36 51.36
BT70 607,073 9,803,532 1,448 1 0.61 1507.27 59.27
BT7 606,117 9,804,832 1,459 0 0.29 1503.75 44.75
BT69 606,881 9,803,181 1,408 0 0.31 1506.71 98.71
BT68 607,146 9,803,178 1,426 0 0.46 1506.7 80.7
BT67 607,532 9,803,314 1,448 1 1.24 1505.12 57.12
BT66 606,926 9,802,970 1,401 0 0.36 1504.49 103.49
BT65 606,799 9,802,956 1,398 0 0.39 1506.88 108.88
BT64 606,608 9,803,397 1,422 1 0.56 1508.01 86.01
BT63 606,776 9,804,913 1,487 0 0.09 1504.18 17.18
BT62 606,783 9,805,086 1,481 0 0.32 1503.86 22.86
BT61 606,995 9,805,033 1,479 0 0.14 1504.11 25.11
BT60 607,397 9,804,924 1,478 0 0.24 1504.76 26.76
BT6 605,422 9,805,035 1,416 1 0.7 1497.45 81.45
BT59 607,475 9,804,472 1,478 0 0.13 1504.93 26.93
BT58 607,403 9,804,612 1,481 2 2.09 1504.78 23.78
BT57 607,288 9,804,600 1,479 0 0.19 1505.76 26.76
BT56 606,639 9,803,901 1,459 0 0.28 1508.8 49.8
BT55 607,006 9,804,000 1,489 0 0.27 1507.18 18.18
BT54 607,148 9,804,064 1,484 0 0.19 1506.58 22.58
BT53 607,346 9,804,050 1,472 0 0.17 1505.55 33.55
BT52 607,442 9,803,989 1,461 0 0.34 1505.11 44.11
BT51 607,599 9,804,303 1,469 0 0.2 1504.84 35.84
BT50 607,430 9,804,334 1,477 0 0.04 1504.95 27.95
BT5 605,931 9,805,037 1,438 0 0.38 1501.22 63.22
BT49 607,419 9,804,308 1,477 0 0.08 1505 28
BT48 607,339 9,804,341 1,479 0 0.07 1505.19 26.19
BT47 607,240 9,804,393 1,478 0 0.06 1506.03 28.02
BT46 607,220 9,804,343 1,479 0 0.09 1506.28 27.28
BT45 607,120 9,804,389 1,474 0 0.2 1506.69 32.69
BT44 606,954 9,804,152 1,476 0 0.28 1507.97 31.97
BT43 606,967 9,804,743 1,481 0 0.16 1505.17 24.17
BT42 606,710 9,804,801 1,487 0 0.19 1505.73 18.73
BT41 606,867 9,804,597 1,479 0 0.23 1506.25 27.25
BT40 605,993 9,804,801 1,456 0 0.1 1504.66 48.66

44 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
BT4 605,944 9,804,835 1,451 0 0.23 1504.51 53.51
BT39 606,136 9,804,708 1,468 0 0.16 1505.98 37.98
BT38 605,818 9,804,480 1,459 0 0.4 1505.75 46.75
BT37 605,902 9,804,423 1,466 1 0.51 1506.11 40.11
BT36 606,024 9,804,288 1,476 0 0.26 1506.94 30.94
BT35 606,068 9,804,296 1,476 0 0.06 1507.07 31.07
BT34 606,163 9,804,445 1,478 0 0.12 1506.83 28.83
BT33 606,399 9,804,530 1,483 0 0.1 1506.61 23.61
BT32 606,485 9,804,475 1,481 0 0.11 1506.77 25.77
BT31 606,580 9,804,413 1,475 0 0.1 1507.16 32.16
BT30 606,249 9,804,396 1,479 0 0.09 1506.97 27.97
BT3 605,171 9,805,003 1,414 1 0.83 1502.27 88.27
BT29 606,180 9,804,221 1,474 0 0.11 1507.33 33.33
BT28 606,403 9,804,269 1,468 0 0.17 1507.25 39.25
BT27 606,326 9,804,139 1,463 0 0.12 1507.51 44.51
BT26 606,645 9,804,379 1,470 0 0.24 1507.32 37.32
BT25 606,516 9,803,750 1,446 0 0.32 1508.94 62.94
BT24 606,364 9,803,924 1,448 0 0.25 1508.56 60.56
BT23 606,246 9,804,009 1,459 0 0.14 1508.41 49.41
BT22 606,040 9,804,009 1,470 0 0.2 1508.08 38.08
BT21 605,902 9,804,087 1,486 0 0.1 1507.59 21.59
BT2 604,468 9,804,938 1,413 1 0.61 1440.72 27.72
BT18 605,841 9,804,021 1,486 0 0.09 1507.59 21.59
BT17 606,645 9,805,527 1,437 0 0.34 1501.54 64.54
BT16 606,534 9,805,667 1,420 0 0.21 1500.85 80.85
BT15 606,495 9,805,817 1,406 0 0.29 1499.75 93.75
BT13 605,646 9,805,648 1,400 0 0.4 1497.01 97.01
BT12 606,013 9,805,724 1,409 0 0.13 1500.44 91.44
BT11 605,555 9,805,477 1,408 1 0.72 1498.84 90.84
BT10 606,040 9,805,604 1,422 0 0.24 1500.99 78.99
BT1 603,867 9,805,163 1,385 1 0.83 1438.99 53.99
BS9 610,484 9,794,405 1,379 0 0.38 1446.5 67.5
BS8 609,604 9,795,151 1,391 0 0.31 1439.53 48.53
BS7 609,555 9,794,886 1,386 0 0.47 1441.32 55.32
BS6 609,746 9,794,525 1,378 1 0.68 1442.56 64.56
BS5 610,169 9,794,394 1,377 1 0.75 1444.77 67.77
BS4 610,381 9,794,593 1,379 0 0.14 1445.56 66.56
BS3 610,350 9,794,641 1,379 1 0.57 1444.98 65.98
BS23 611,583 9,794,391 1,376 2 1.58 1446.79 70.79
BS22 611,227 9,793,424 1,368 1 0.88 1444.26 76.26
BS21 610,084 9,793,833 1,375 1 0.74 1444.93 69.93
BS20 610,150 9,793,780 1,376 0 0.22 1445.28 69.28
BS2 611,151 9,795,177 1,368 2 1.94 1451.06 83.06
BS19 610,319 9,793,616 1,375 1 0.71 1408.91 33.91

45 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
BS18 610,602 9,793,794 1,378 1 0.72 1410.3 32.3
BS17 610,910 9,793,972 1,381 1 0.9 1448.1 67.1
BS16 610,427 9,794,031 1,379 0 0.39 1446.94 67.94
BS15 610,544 9,793,929 1,381 0 0.21 1447.13 66.13
BS14 610,854 9,794,080 1,382 0 0.29 1448.79 66.79
BS13 610,811 9,794,156 1,383 0 0.2 1449 66
BS12 610,624 9,794,150 1,383 0 0.22 1448.13 65.13
BS11 610,771 9,794,238 1,382 1 0.62 1449.19 67.19
BS10 610,548 9,794,707 1,378 1 1.01 1451.41 73.41
BS1 610,369 9,795,227 1,368 1 1.4 1453.8 85.8
BR9 601,326 9,803,954 1,388 1 1.25 1482.12 94.12
BR8 601,803 9,803,942 1,387 1 1.18 1484.41 97.41
BR7 602,169 9,803,939 1,368 1 0.98 1486.53 118.53
BR6 602,567 9,803,936 1,362 1 0.85 1489.14 127.14
BR5 602,635 9,804,137 1,375 1 0.9 1486.49 111.49
BR4 602,435 9,804,465 1,402 0 0.22 1485.16 83.16
BR3 602,718 9,804,405 1,393 1 0.61 1486.12 93.12
BR2 602,941 9,804,415 1,395 0 0.23 1487.4 92.4
BR16 604,347 9,803,839 1,426 - 0 1495.02 69.02
BR15 603,684 9,803,885 1,404 1 1.38 1492.44 88.44
BR14 603,508 9,804,104 1,414 1 0.81 1473.17 59.17
BR13 603,236 9,804,180 1,408 1 0.96 1486.61 78.61
BR12 602,952 9,804,370 1,397 1 0.62 1488.02 91.02
BR11 603,024 9,803,920 1,384 1 1.19 1490.1 106.1
BR10 600,982 9,803,957 1,385 0 0.43 1480.76 95.76
BR1 602,978 9,804,633 1,381 0 0.23 1487.29 106.29
BM9 562,570 9,813,043 1,138 1 0.66 1173.41 35.41
BM8 562,460 9,812,895 1,131 1 0.6 1172.49 41.49
BM7 562,067 9,813,015 1,138 1 0.84 1171.66 33.66
BM6 562,044 9,813,407 1,144 1 1.05 1172.21 28.21
BM5 561,885 9,813,489 1,145 1 0.63 1170.6 25.6
BM4 561,648 9,813,498 1,147 0 0.36 1170.11 23.11
BM3 561,464 9,813,426 1,145 1 0.59 1169.04 24.04
BM22 562,630 9,813,616 1,132 1 0.51 1172.15 40.15
BM21 562,666 9,813,429 1,135 0 0.27 1173.41 38.41
BM20 562,672 9,813,274 1,136 1 0.53 1174.24 38.24
BM2 561,127 9,813,475 1,139 1 0.88 1166.21 27.21
BM19 562,413 9,813,294 1,147 1 0.86 1173.21 26.21
BM18 564,735 9,813,484 1,134 1 1.1 1176.68 42.68
BM17 564,595 9,812,926 1,131 4 3.77 1183.28 52.28
BM16 563,440 9,813,458 1,123 1 1.11 1174.2 51.2
BM15 563,740 9,813,120 1,128 2 2.16 1180.83 52.83
BM14 562,877 9,813,566 1,124 1 0.69 1171.2 47.2
BM13 562,728 9,813,817 1,121 1 0.5 1170.55 49.55

46 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
BM12 562,572 9,813,450 1,138 0 0.43 1173.15 35.15
BM11 563,014 9,813,221 1,128 1 1.15 1175.33 47.33
BM10 562,994 9,812,970 1,125 1 0.92 1174.77 49.77
BM1 560,836 9,813,747 1,145 1 0.5 1164.79 19.79
B-M-1 610,221 9,805,788 1,502 - 0 1563.15 61.15
BK9 563,873 9,811,096 1,138 1 0.51 1169.29 31.29
BK8 563,862 9,811,310 1,131 0 0.46 1181.8 50.8
BK7 564,360 9,811,438 1,138 1 0.64 1184.97 46.97
BK6 565,046 9,811,612 1,144 1 0.8 1186.53 42.53
BK5 565,832 9,811,968 1,145 0 0.48 1189.95 44.95
BK4 565,666 9,811,883 1,147 0 0.27 1189.11 42.11
BK3 565,711 9,812,322 1,145 0 0.45 1188.49 43.49
BK22 566,364 9,812,114 1,132 0 0.4 1188.72 56.72
BK21 566,436 9,810,088 1,135 0 0.21 1182.84 47.84
BK20 566,717 9,809,582 1,136 0 0.4 1181.43 45.43
BK2 565,470 9,812,424 1,139 1 0.67 1187.53 48.53
BK19 566,977 9,809,178 1,147 1 0.66 1178.97 31.97
BK18 567,293 9,808,644 1,134 1 0.84 1176.38 42.38
BK17 566,442 9,812,617 1,131 3 2.89 1191.56 60.56
BK16 567,306 9,810,477 1,123 1 0.85 1203.29 80.29
BK15 566,304 9,810,377 1,128 2 1.66 1183.81 55.81
BK14 566,121 9,810,913 1,124 1 0.53 1187.75 63.75
BK13 566,590 9,811,095 1,121 0 0.24 1200.09 79.09
BK12 565,941 9,811,391 1,138 0 0.33 1192.15 54.15
BK11 566,097 9,811,462 1,128 1 0.88 1193.85 65.85
BK10 564,246 9,811,916 1,125 1 0.71 1166.76 41.76
BK1 565,262 9,812,534 1,145 0 0.14 1186.5 41.5
BG8 612,875 9,809,818 1,518 0 0.17 1536.88 18.88
BG7 612,683 9,809,620 1,524 0 0.12 1537.65 13.65
BG6 612,330 9,809,672 1,511 0 0.32 1537.54 26.54
BG5 612,543 9,809,386 1,525 0 0.09 1539.35 14.35
BG4 612,291 9,809,389 1,514 0 0.11 1538.35 24.35
BG3 612,460 9,809,188 1,520 0 0.13 1539.62 19.62
BG29 613,878 9,806,197 1,405 1 1.22 1523.64 118.64
BG28 613,963 9,806,704 1,426 0 0.49 1526.24 100.24
BG27 614,250 9,807,386 1,398 0 0.23 1528.65 130.65
BG26 612,049 9,808,627 1,524 0 0.2 1538.39 14.39
BG25 611,663 9,809,235 1,476 0 0.17 1538.12 62.12
BG24 614,350 9,807,281 1,392 0 0.21 1528.06 136.06
BG23 613,774 9,807,927 1,427 0 0.47 1531.85 104.85
BG22 611,500 9,808,465 1,487 0 0.19 1537.79 50.79
BG21 611,866 9,808,358 1,499 0 0.15 1538.57 39.57
BG20 612,305 9,808,211 1,505 0 0.11 1539.65 34.65
BG2 611,856 9,809,220 1,486 0 0.19 1538.41 52.41

47 of 135
ANNEX 6.1 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
NODES RESULTS AT PEAK HOUR
Easting Northing Elevation Base Demand Head Pressure
Demand
Node ID m m m LPS LPS m m
BG19 611,597 9,807,938 1,460 0 0.35 1536.68 76.68
BG18 612,083 9,807,815 1,477 0 0.25 1534.29 57.29
BG17 612,972 9,807,000 1,467 1 0.55 1531.52 64.52
BG16 612,843 9,807,374 1,497 0 0.22 1532.58 35.58
BG15 612,744 9,807,692 1,496 0 0.17 1533.73 37.73
BG14 612,830 9,807,918 1,482 0 0.3 1536.77 54.77
BG13 612,464 9,808,143 1,504 0 0.1 1538.84 34.84
BG12 612,566 9,808,383 1,503 0 0.13 1538.46 35.46
BG11 612,876 9,808,726 1,501 0 0.24 1538.19 37.19
BG10 612,875 9,808,941 1,500 0 0.15 1538.45 38.45
BG1 611,233 9,808,766 1,471 0 0.21 1537.09 66.09
BG09. 612,320 9,808,570 1,530 0 0.14 1538.77 8.77
D558 608,865 9,804,346 1,412 - 0 1432 20
D518 608,559 9,799,460 1,307 - 0 1337 30
D562 609,401 9,797,832 1,322 - 0 1372 50
D563 609,748 9,797,109 1,344 - 0 1394 50
D476. 606,850 9,802,197 1,386 - 0 1406 20
TR1. 612,710 9,795,002 1,369 - 0 1389 20
BS17. 610,908 9,793,971 1,381 - 0 1411 30
D280. 602,870 9,790,674 1,294 - 0 1314 20
D290. 603,299 9,788,785 1,277 - 0 1364.18 87.18
1 585,633 9,803,398 1,194 - 0 1214 20
D358. 618,705 9,811,073 1,286 - 0 1306 20
D449. 613,798 9,805,988 1,400 - 0 1450 50
Tank ST6 598,573 9,819,067 1,372 #N/A -27.46 1375 3
Tank BPT4 617,309 9,808,799 1,395 #N/A 0 1398 3
Tank ST8 612,510 9,808,887 1,539 #N/A -63.14 1542 3
Tank ST7 607,015 9,803,821 1,506 #N/A 47.26 1510 4
Tank BPT6 627,177 9,801,982 1,391 #N/A -2.39 1393 2
Tank BPT5 619,419 9,804,164 1,477 #N/A -2.67 1480 3
Tank BPT2 614,405 9,800,600 1,385 #N/A -2.63 1386 1
Tank BPT3 607,363 9,793,441 1,412 #N/A 10.45 1415 3
Tank BPT-1 600,475 9,804,006 1,393 #N/A -6.26 1395 2
Tank ST2 571,398 9,809,194 1,230 #N/A -56.78 1233 3
Tank ST5 595,612 9,803,274 1,374 #N/A 1.1 1376 2
Tank ST4 595,642 9,803,459 1,330 #N/A 195.69 1333 3
Tank ST3 585,264 9,810,850 1234 #N/A 12.8 1236 2
Tank ST1 578,267 9,812,518 1215 #N/A 0.83 1218 3

48 of 135
ANNEX 6.2 MUGANGO KIABAKARI HYDRAULIC ANALYSIS RESULTS
PIPE RESULTSRESULTS
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
RISING MAIN

MUGANGO TO KYATUNGWE AND KIABAKARI TANKS


MG-2-RM1. 317.227 600 DN 600 GRP PN 30 435 1.54 3.34
RM1.-R1.1 457.871 600 DN 600 GRP PN 30 434.77 1.54 3.34
R1.1-R1.2 2129.59 600 DN 600 GRP PN 30 434.77 1.54 3.34
R1.2-R1.3 3977.74 600 DN 600 GRP PN 25 434.77 1.54 3.34
R1.3-DP338 2610.13 600 DN 600 GRP PN 25 434.77 1.54 3.34
D524-ST3 1073.59 200 250 HDPE PN 12 41 1.31 8.88
DP338-R1.5 5997.68 600 DN 600 GRP PN 20 393.77 1.39 2.78
R1.5-ST4 7120.87 600 DN 600 GRP PN 20 393.77 1.39 2.78

MUGANGO TO KONG AND MWIRINGO TANKS


RM1.-KW1. 1787.3 350 DN 350 GRP PN 20 108 1.12 3.5
MG-1-RM1. 315.29 350 DN 350 GRP PN 20 108 1.12 3.5
RM2.2-ST2 7042.23 300 DN 300 GRP PN 20 59 0.83 2.42
RM2-RM-2.2 2348.23 300 DN 300 GRP PN 20 59 0.83 2.42
RM2-ST1 704 250 DN 250 GRP PN 20 49 1 4.17

KIABAKARI TO BUTIAMA TANK


PS-BT 1457.88 500 DN 500 GRP PN 25 242 1.23 2.74
KB2-KB4 4125.56 500 DN 500 GRP PN 25 242 1.23 2.74
KB-4-KB-5 3377.69 500 DN 500 GRP PN 20 242 1.23 2.74
KB-5-ST7 2682.06 500 DN 500 GRP PN 20 242 1.23 2.74

KIABAKARI TO ISABA TANK


PSIS-ST6 16839.18 150 180 HDPE PN 16 9 0.51 2.18

BUTIAMA TO BUMANGI TANK


PS-3-B-M-1 3835.72 300 DN 300 GRP PN 10 91 1.29 5.4
B-M-1-ST8 3918.46 300 DN 300 GRP PN 20 91 1.29 5.4

DISTRIBUTION NETWORK
D255-D256 1116.28 63 75 HDPE PN 10 1.2 0.38 3.56
D255-DP483 368.523 32 40 HDPE PN 16 0.4 0.5 12.63
D254-D255 626.629 63 75 HDPE PN 10 1.6 0.51 6.07
D254-DP473 388.505 32 40 HDPE PN 10 0.4 0.5 12.63
MB5-D254 360.941 75 90 HDPE PN 10 2 0.45 3.93
D253-DP474 455.364 32 40 HDPE PN 10 0.4 0.5 12.63
D253-MB8 382.82 32 40 HDPE PN 10 1.19 1.48 94.78
MB6-D253 162.604 50 63 HDPE PN 10 1.59 0.81 18.45
MB8-DP475 768.002 32 40 HDPE PN 12 0.8 0.99 45.6
D251-MB7 178.478 32 40 HDPE PN 10 0.38 0.47 11.44
D251-DP478 51.723 32 40 HDPE PN 10 0.4 0.5 12.63

50 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
MB4-D251 183.094 50 63 HDPE PN 10 0.78 0.4 4.94
MB4-MB3 322.523 50 63 HDPE PN 10 0.7 0.36 4.1
MB4-DP476 16.1342 32 40 HDPE PN 10 0.4 0.5 12.63
D252-MB10 54.9239 100 110 HDPE PN 10 -4.63 0.59 4.58
J-100-D252 443.014 100 110 HDPE PN 10 -4.23 0.54 3.88
D252-DP484 102.38 32 40 HDPE PN 10 0.4 0.5 12.63
D250-MB12 234.159 75 90 HDPE PN 10 2.05 0.46 4.12
D250-DP477 64.2976 32 40 HDPE PN 10 0.4 0.5 12.63
MB10-D250 333.07 75 90 HDPE PN 10 2.45 0.56 5.73
D249-MB11 369.739 150 180 HDPE PN 10 12.8 0.72 4.18
DP481-D249 963.427 150 180 HDPE PN 10 13.2 0.75 4.42
BR10-DP481 833.61 150 180 HDPE PN 10 13.6 0.77 4.67
D249-DP480 831.59 32 40 HDPE PN 10 0.4 0.5 12.63
MB1-DP479 280.711 32 40 HDPE PN 10 0.4 0.5 12.63
D247-SG1 966.232 125 160 HDPE PN 16 -6.6 0.54 2.98
D247-DP504 147.892 32 40 HDPE PN 16 0.4 0.5 12.63
D248-D247 980.571 125 160 HDPE PN 16 -6.2 0.51 2.65
D248-DP503 141.407 32 40 HDPE PN 12 0.4 0.5 12.63
SG5-D246 65.9134 150 180 HDPE PN 10 12.09 0.68 3.76
D246-DP640 16.1851 32 40 HDPE PN 10 0.4 0.5 12.63
DP179-DP180 665.48 50 63 HDPE PN 10 0.4 0.2 1.44
D245-DP188 623.257 50 63 HDPE PN 10 0.4 0.2 1.44
IS9-DP181 165.268 32 40 HDPE PN 10 0.4 0.5 12.63
IS5-DP182 107.676 32 40 HDPE PN 10 0.4 0.5 12.63
D243-DP185 195.439 32 40 HDPE PN 10 0.4 0.5 12.63
D243-DP186 41.8641 32 40 HDPE PN 10 0.4 0.5 12.63
IS18-D243 161.664 50 63 HDPE PN 10 0.8 0.41 5.19
D244-DP187 332.963 32 40 HDPE PN 10 0.4 0.5 12.63
D244-IS14 194.199 100 110 HDPE PN 10 3.87 0.49 3.29
IS13-D244 169.928 100 110 HDPE PN 10 4.27 0.54 3.95
IS21-DP626 508.879 32 40 HDPE PN 10 0.4 0.5 12.63
IS21-DP650 362.237 32 40 HDPE PN 10 0.4 0.5 12.63
DP189-IS27 518.818 50 63 HDPE PN 10 0.38 0.19 1.28
DP189-IS21 192.387 50 63 HDPE PN 10 -1.03 0.52 8.25
DP189-DP183 85.7055 32 40 HDPE PN 10 0.4 0.5 12.63
IS22-DP189 138.522 50 63 HDPE PN 10 0.15 0.08 0.23
IS22-DP184 82.4449 32 40 HDPE PN 10 0.4 0.5 12.63
IS27-IS28 273.591 32 40 HDPE PN 10 0.25 0.31 5.27
IS1-SG10 399.219 200 250 HDPE PN 12 24.55 0.78 3.44
SG10-DP649 345.747 50 63 HDPE PN 12 0.4 0.2 1.44
D241-D239 358.093 63 75 HDPE PN 10 1.6 0.51 6.07
BT13-D241 527.37 63 75 HDPE PN 10 1.6 0.51 6.07
D238-D239 851.562 63 75 HDPE PN 10 -1.6 0.51 6.07
D238-DP114 39.0258 32 40 HDPE PN 12 0.4 0.5 12.63
D237-D238 1029.27 50 63 HDPE PN 16 -1.2 0.61 10.99
D237-DP121 120.495 32 40 HDPE PN 16 0.4 0.5 12.63

51 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D236-D237 641.688 50 63 HDPE PN 16 -0.8 0.41 5.19
D232-D236 630.622 50 63 HDPE PN 12 -0.8 0.41 5.19
D232-D233 319.17 50 63 HDPE PN 16 0.4 0.2 1.44
D231-D232 203.361 50 63 HDPE PN 16 -0.4 0.2 1.44
D233-DP120 190.546 32 40 HDPE PN 16 0.4 0.5 12.63
D235-DP129 86.5128 32 40 HDPE PN 10 0.4 0.5 12.63
D240-D235 922.651 50 63 HDPE PN 10 0.4 0.2 1.44
BT1-D240 694.916 50 63 HDPE PN 10 0.8 0.41 5.19
D231-DP122 37.8457 32 40 HDPE PN 16 0.4 0.5 12.63
D227-DP509 403.93 38 40 HDPE PN 10 0.4 0.35 5.47
D228-DP505 647.47 32 40 HDPE PN 10 0.4 0.5 12.63
D228-DP506 35.6509 32 40 HDPE PN 10 0.4 0.5 12.63
DP515-D228 621.828 50 63 HDPE PN 10 0.8 0.41 5.19
D227-DP515 518.147 50 63 HDPE PN 10 1.2 0.61 10.99
D226-D227 242.159 75 90 HDPE PN 10 1.6 0.36 2.6
D226-DP514 25.2745 32 40 HDPE PN 10 0.4 0.5 12.63
D225-D226 529.367 75 90 HDPE PN 10 2 0.45 3.93
D225-DP502 296.043 32 40 HDPE PN 10 0.4 0.5 12.63
D222-D225 692.164 100 110 HDPE PN 10 2.4 0.31 1.36
D224-DP508 947.84 50 63 HDPE PN 10 0.4 0.2 1.44
D223-D224 528.009 50 63 HDPE PN 10 0.4 0.2 1.44
D223-DP499 82.9649 32 40 HDPE PN 10 0.4 0.5 12.63
D222-D223 184.049 50 63 HDPE PN 12 0.8 0.41 5.19
D221-D222 374.466 100 110 HDPE PN 10 3.2 0.41 2.31
D220-D221 578.704 100 110 HDPE PN 10 3.2 0.41 2.31
D220-MK3 86.41 50 63 HDPE PN 10 1.4 0.72 14.71
D219-D220 190.694 100 110 HDPE PN 10 4.6 0.59 4.53
D219-DP516 123.742 32 40 HDPE PN 12 0.4 0.5 12.63
D218-D219 337.461 125 140 HDPE PN 10 5 0.41 1.78
D218-DP517 135.964 32 40 HDPE PN 16 0.4 0.5 12.63
D217-D218 57.3724 125 140 HDPE PN 10 5.4 0.44 2.06
D217-DP512 28.8694 32 40 HDPE PN 12 0.4 0.5 12.64
D216-DP500 306.44 32 40 HDPE PN 10 0.4 0.5 12.63
MK1-D216 92.0911 150 180 HDPE PN 10 7.82 0.44 1.68
MK2-D216 173.69 150 180 HDPE PN 10 -7.42 0.42 1.52
D215-DP511 160.221 32 40 HDPE PN 10 0.4 0.5 12.63
D215-D214 254.578 100 110 HDPE PN 10 5.26 0.67 5.8
D213-D215 40.4879 100 110 HDPE PN 10 5.66 0.72 6.65
DP510-DP513 118.337 32 40 HDPE PN 10 0.4 0.5 12.63
D214-MK4 331.306 100 110 HDPE PN 10 4.46 0.57 4.28
D214-DP510 15.177 50 63 HDPE PN 10 0.8 0.41 5.19
D213-DP501 23.89 32 40 HDPE PN 10 0.4 0.5 12.63
MK2-D213 53.03 100 110 HDPE PN 10 6.06 0.77 7.54
DP613-DP612 16.31 32 40 HDPE PN 10 0.4 0.5 12.63
D212-DP613 555.953 50 63 HDPE PN 10 0.8 0.41 5.19
D212-DP614 61.08 32 40 HDPE PN 10 0.4 0.5 12.63

52 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D211-DP607 105.17 38 40 HDPE PN 10 0.4 0.35 5.47
D210-D211 989.945 100 110 HDPE PN 10 -3.06 0.39 2.13
D210-DP611 28.4813 32 40 HDPE PN 10 0.4 0.5 12.63
D209-D210 190.762 75 90 HDPE PN 10 -2.66 0.6 6.68
D209-DP609 207.527 32 40 HDPE PN 10 0.4 0.5 12.63
KI79-D209 361.131 75 90 HDPE PN 12 -2.26 0.51 4.94
D208-DP615 84.427 50 63 HDPE PN 10 0.4 0.2 1.44
KI77-D208 200.738 50 63 HDPE PN 10 0.4 0.2 1.44
KI77-DP608 100.342 32 40 HDPE PN 10 0.4 0.5 12.63
KI78-DP619 19.2963 32 40 HDPE PN 10 0.4 0.5 12.63
D207-DP620 16.7456 32 40 HDPE PN 10 0.4 0.5 12.64
KI36-D207 587.564 32 40 HDPE PN 10 0.4 0.5 12.63
D206-KI76 649.64 100 110 HDPE PN 10 2.82 0.36 1.82
D206-DP617 19.0092 32 40 HDPE PN 10 0.4 0.5 12.63
J-529-D206 107.792 100 110 HDPE PN 10 3.22 0.41 2.33
KI76-DP610 420.081 32 40 HDPE PN 10 0.4 0.5 12.63
D193-DP623 259.418 32 40 HDPE PN 16 0.4 0.5 12.63
D186-DP631 638.036 32 40 HDPE PN 10 0.4 0.5 12.63
D186-DP630 67.8409 32 40 HDPE PN 10 0.4 0.5 12.63
D187-D186 360.957 50 63 HDPE PN 10 0.8 0.41 5.19
D194-DP638 76.3413 32 40 HDPE PN 16 0.4 0.5 12.63
D193-D194 148.839 32 40 HDPE PN 16 0.4 0.5 12.63
D192-D193 151.801 50 63 HDPE PN 16 0.8 0.41 5.19
D191-D192 967.874 50 63 HDPE PN 16 0.8 0.41 5.19
D190-D191 1489.51 50 63 HDPE PN 12 0.8 0.41 5.19
D190-DP624 997.722 50 63 HDPE PN 10 0.4 0.2 1.44
D195-DP621 851.935 32 40 HDPE PN 10 0.4 0.5 12.63
D189-D195 1188.32 50 63 HDPE PN 10 0.4 0.2 1.44
D189-D190 359.963 63 75 HDPE PN 10 1.2 0.38 3.57
D182-D189 1668.43 63 75 HDPE PN 10 1.6 0.51 6.07
D205-DP632 1014.06 32 40 HDPE PN 10 0.4 0.5 12.63
D204-D205 884.723 38 40 HDPE PN 10 0.4 0.35 5.47
D187-D204 604.174 50 63 HDPE PN 10 -0.8 0.41 5.19
D185-DP633 40.21 32 40 HDPE PN 16 0.4 0.5 12.63
D202-D185 1382.34 50 63 HDPE PN 16 0.4 0.2 1.44
D184-D202 1222.96 50 63 HDPE PN 12 0.4 0.2 1.44
D184-DP627 37.9523 32 40 HDPE PN 12 0.4 0.5 12.63
D183-D184 990.953 50 63 HDPE PN 12 0.8 0.41 5.19
D183-DP622 41.5997 32 40 HDPE PN 12 0.4 0.5 12.63
D182-D183 217.976 63 75 HDPE PN 10 1.2 0.38 3.56
D181-D182 197.505 100 110 HDPE PN 10 2.8 0.36 1.8
DP643-DP628 1264.89 32 40 HDPE PN 12 0.4 0.5 12.63
D188-DP637 150.707 50 63 HDPE PN 10 0.4 0.2 1.44
D188-DP636 113.643 50 63 HDPE PN 10 0.4 0.2 1.44
D181-D188 312.156 63 75 HDPE PN 10 0.8 0.26 1.68
D180-D181 1008.96 100 110 HDPE PN 10 3.6 0.46 2.87

53 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D176-DP646 1833.66 32 40 HDPE PN 12 0.4 0.5 12.63
D175-DP629 1831.52 32 40 HDPE PN 16 0.4 0.5 12.63
SG16-D175 1319.85 50 63 HDPE PN 16 0.4 0.2 1.44
D180-DP635 328.966 32 40 HDPE PN 10 0.4 0.5 12.63
DP651-D200 618.07 50 63 HDPE PN 10 0.4 0.2 1.44
D179-DP651 177.35 50 63 HDPE PN 10 0.8 0.41 5.19
D179-D180 145.58 125 140 HDPE PN 10 4 0.33 1.18
D178-D179 51.56 125 140 HDPE PN 10 4.8 0.39 1.65
D178-DP645 26.3388 50 63 HDPE PN 10 0.4 0.2 1.44
D177-D178 353.569 125 140 HDPE PN 10 5.2 0.42 1.91
D177-DP643 714.862 50 63 HDPE PN 10 0.8 0.41 5.19
D176-D177 1285.01 125 140 HDPE PN 10 6 0.49 2.5
SG19-D176 744.531 125 140 HDPE PN 10 6.4 0.52 2.81
D174-SG15 282.685 63 75 HDPE PN 10 1.77 0.57 7.3
D174-DP647 45.391 32 40 HDPE PN 10 0.4 0.5 12.63
D173-D174 79.5046 75 90 HDPE PN 10 2.17 0.49 4.56
D173-DP625 26.3353 32 40 HDPE PN 10 0.4 0.5 12.63
SG13-D173 193.224 75 90 HDPE PN 10 2.57 0.58 6.24
D197-SG17 351.872 125 140 HDPE PN 10 -7.29 0.59 3.58
D197-DP634 33.5848 32 40 HDPE PN 10 0.4 0.5 12.63
SG18-D197 71.0999 100 110 HDPE PN 10 -6.89 0.88 9.55
D196-SG18 638.381 100 110 HDPE PN 10 -3.97 0.51 3.45
D196-DP648 60.8336 32 40 HDPE PN 10 0.4 0.5 12.63
DP639-D196 934.374 100 110 HDPE PN 10 -3.57 0.46 2.84
SG12-DP639 210.617 100 110 HDPE PN 10 -3.17 0.4 2.28
D198-SG12 58.1249 50 63 HDPE PN 10 -0.4 0.2 1.44
D198-DP642 27.9961 50 63 HDPE PN 10 0.4 0.2 1.44
D199-DP641 175.46 50 63 HDPE PN 12 0.4 0.2 1.44
D172-DP573 1517.13 75 90 HDPE PN 10 1.6 0.36 2.6
D172-DP574 261.771 50 63 HDPE PN 10 0.8 0.41 5.19
D171-D172 726.082 75 90 HDPE PN 10 2.4 0.54 5.5
DP574-DP572 1792.33 50 63 HDPE PN 10 0.4 0.2 1.44
D171-RY5 270.954 150 180 HDPE PN 10 13.8 0.78 4.8
KY5-D171 329.375 150 180 HDPE PN 10 16.2 0.92 6.46
D167-DP577 256.339 50 63 HDPE PN 10 0.4 0.2 1.44
RY2-DP576 593.963 50 63 HDPE PN 10 0.4 0.2 1.44
D168-RY5 45.9477 150 180 HDPE PN 10 -11.55 0.65 3.45
D168-DP571 23.684 32 40 HDPE PN 10 0.4 0.5 12.63
RY1-D168 101.191 125 140 HDPE PN 10 -11.15 0.91 7.86
D167-RY1 166.441 125 140 HDPE PN 10 -8.92 0.73 5.2
D166-D167 432.294 125 140 HDPE PN 10 -8.52 0.69 4.78
D166-DP582 81.4609 50 63 HDPE PN 10 0.4 0.2 1.44
RY2-D166 117.834 125 140 HDPE PN 10 -8.12 0.66 4.37
D170-RY2 174.352 100 110 HDPE PN 10 -3.85 0.49 3.26
D170-DP575 35.6104 38 40 HDPE PN 10 0.4 0.35 5.47
RY3-D170 264.932 75 90 HDPE PN 10 -3.45 0.78 10.8

54 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D165-DP570 116.634 32 40 HDPE PN 16 0.4 0.5 12.63
D164-D165 688.201 50 63 HDPE PN 16 0.4 0.2 1.44
D164-DP578 505.84 32 40 HDPE PN 16 0.4 0.5 12.63
D163-D164 1084.29 50 63 HDPE PN 16 0.8 0.41 5.19
D163-DP579 44.3013 32 40 HDPE PN 12 0.4 0.5 12.63
D162-D163 1406.46 63 75 HDPE PN 10 1.2 0.38 3.56
D162-DP581 45.2111 32 40 HDPE PN 12 0.4 0.5 12.63
D161-D162 509.597 63 75 HDPE PN 10 1.6 0.51 6.07
D161-DP580 397.971 32 40 HDPE PN 12 0.4 0.5 12.63
D160-D161 1059.79 63 75 HDPE PN 10 2 0.64 9.18
MK11-D160 1174.54 75 90 HDPE PN 12 2 0.45 3.93
D159-MK11 417.479 75 90 HDPE PN 10 2.31 0.52 5.14
D159-DP507 35.7569 32 40 HDPE PN 10 0.4 0.5 12.63
MK9-D159 112.628 75 90 HDPE PN 10 2.71 0.61 6.9
MK5-MK9 173.89 200 225 HDPE PN 10 25.33 0.81 3.64
D158-MK10 1433.46 200 225 HDPE PN 10 24.27 0.77 3.36
D158-DP221 602.458 32 40 HDPE PN 10 0.4 0.5 12.63
KI94-D158 514.141 200 225 HDPE PN 10 24.67 0.79 3.47
D157-DP602 549.074 32 40 HDPE PN 10 0.4 0.5 12.63
D157-DP606 95.122 32 40 HDPE PN 10 0.4 0.5 12.63
D156-D157 591.916 50 63 HDPE PN 10 0.8 0.41 5.19
D156-DP605 72.6299 32 40 HDPE PN 10 0.4 0.5 12.63
D155-D156 336.08 50 63 HDPE PN 10 1.2 0.61 10.99
KI42-D155 154.315 50 63 HDPE PN 10 1.2 0.61 10.99
KI42-DP220 857.339 32 40 HDPE PN 10 0.4 0.5 12.63
KI93-DP222 36.11 32 40 HDPE PN 10 0.4 0.5 12.63
KI40-DP603 148.641 32 40 HDPE PN 10 0.4 0.5 12.63
KI46-DP233 204.336 32 40 HDPE PN 10 0.4 0.5 12.63
KI49-DP226 85.6985 32 40 HDPE PN 10 0.4 0.5 12.63
KI49-DP536 50.8656 32 40 HDPE PN 10 0.4 0.5 12.63
KI66-KI49 311.902 100 110 HDPE PN 10 4.69 0.6 4.68
KI38-DP522 60.1432 32 40 HDPE PN 10 0.4 0.5 12.63
KI38-DP618 313.991 32 40 HDPE PN 10 0.4 0.5 12.63
D154-KI38 171.842 200 225 HDPE PN 10 21.57 0.69 2.7
J-404-D153 93.95 200 225 HDPE PN 10 22.37 0.71 2.89
D153-D154 75.5998 200 225 HDPE PN 10 21.97 0.7 2.8
D154-DP521 90.8414 32 40 HDPE PN 10 0.4 0.5 12.63
D153-DP604 60.2149 32 40 HDPE PN 10 0.4 0.5 12.63
D152-DP523 124.648 32 40 HDPE PN 10 0.4 0.5 12.63
D151-D152 283.254 50 63 HDPE PN 10 0.4 0.2 1.44
D150-KI47 94.7055 100 110 HDPE PN 10 0.42 0.05 0.05
D151-DP520 34.2769 32 40 HDPE PN 10 0.4 0.5 12.63
D150-D151 63.7153 50 63 HDPE PN 10 0.8 0.41 5.19
KI48-D150 38.7745 100 110 HDPE PN 10 1.22 0.15 0.38
D149-DP537 182.333 150 180 HDPE PN 10 10.94 0.62 3.13
D149-DP525 82.7194 50 63 HDPE PN 10 0.4 0.2 1.44

55 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
KI62-D149 161.104 150 180 HDPE PN 10 11.34 0.64 3.34
DP524-KI62 61.5958 50 63 HDPE PN 10 -0.66 0.34 3.62
DP524-DP524 11.9834 32 40 HDPE PN 10 0.4 0.5 12.63
KI60-DP524 159.341 50 63 HDPE PN 10 -0.26 0.13 0.64
DP224-KI90 512.38 100 110 HDPE PN 10 3.29 0.42 2.41
KI91-DP224 154.922 100 110 HDPE PN 10 3.69 0.47 2.99
D147-KI91 505.653 100 110 HDPE PN 10 4.27 0.54 3.93
D147-DP225 23.7452 32 40 HDPE PN 10 0.4 0.5 12.63
KI52-D147 77.3181 100 110 HDPE PN 10 4.67 0.59 4.64
KI11-KI20 135.81 200 225 HDPE PN 10 -40.96 1.3 8.87
DP537-DP537 12.4906 32 40 HDPE PN 10 0.4 0.5 12.63
KI65-DP537 13.08 150 180 HDPE PN 16 -10.54 0.6 2.91
KI69-DP223 88.4569 32 40 HDPE PN 10 0.4 0.5 12.63
KI15-DP229 122.272 32 40 HDPE PN 10 0.4 0.5 12.63
DP530-DP531 239.28 32 40 HDPE PN 10 0.4 0.5 12.63
KI8-KI9 281.171 150 180 HDPE PN 10 16.42 0.93 6.63
KI9-KI9 11.6412 150 180 HDPE PN 10 16.02 0.91 6.33
KI9-DP230 4.72241 50 63 HDPE PN 10 0.4 0.2 1.45
DP232-KI12 37.817 32 40 HDPE PN 10 0.26 0.33 5.75
DP232-DP232 9.75541 32 40 HDPE PN 10 0.4 0.5 12.63
KI11-DP232 207.384 50 63 HDPE PN 10 0.66 0.34 3.65
D143-KI14 198.71 100 110 HDPE PN 10 5.11 0.65 5.5
D143-DP231 56.7107 32 40 HDPE PN 10 0.4 0.5 12.63
KI13-D143 143.11 100 110 HDPE PN 10 5.51 0.7 6.32
KI11-D141 109.832 300 DN 300 GRP PN 10 101.3 1.43 6.58
D141-KI8 34.0869 300 DN 300 GRP PN 10 106.12 1.5 7.17
D141-DP228 15.1334 32 40 HDPE PN 10 0.4 0.5 12.64
DP528-D141 116.798 100 110 HDPE PN 10 5.22 0.66 5.72
DP528-DP530 131.615 50 63 HDPE PN 10 0.8 0.41 5.19
DP528-KI19 63.6501 32 40 HDPE PN 10 0.25 0.32 5.46
DP528-DP528 8.32823 100 110 HDPE PN 10 5.62 0.72 6.56
KI20-DP528 133.605 100 110 HDPE PN 10 6.68 0.85 9.01
KI20-DP529 34.2683 32 40 HDPE PN 10 0.4 0.5 12.63
KI21-DP527 83.9674 32 40 HDPE PN 10 0.4 0.5 12.63
DP532-KI21 228.513 150 180 HDPE PN 10 14.11 0.8 5
KI23-DP532 82.7458 150 180 HDPE PN 10 14.51 0.82 5.27
DP532-DP532 6.45142 32 40 HDPE PN 10 0.4 0.5 12.64
D139-KI63 162.926 300 DN 300 GRP PN 10 63.28 0.9 2.75
D139-DP526 67.2047 32 40 HDPE PN 10 0.4 0.5 12.63
D138-D139 138.359 300 DN 300 GRP PN 10 63.68 0.9 2.79
D138-DP533 117.527 32 40 HDPE PN 10 0.4 0.5 12.63
KI34-D138 222.64 300 DN 300 GRP PN 10 64.08 0.91 2.82
DP534-KI25 151.67 150 180 HDPE PN 10 15.24 0.86 5.77
KI27-DP534 72.878 150 180 HDPE PN 10 15.64 0.89 6.05
D136-KI31 190.471 100 110 HDPE PN 10 -3.95 0.5 3.42
KI29-D136 58.9837 100 110 HDPE PN 10 -3.55 0.45 2.81

56 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D136-DP535 10.9258 32 40 HDPE PN 10 0.4 0.5 12.64
KI31-DP616 163.684 50 63 HDPE PN 10 1.34 0.68 13.47
DP616-KI32 115.184 50 63 HDPE PN 10 0.94 0.48 6.99
DP616-DP616 9.17651 32 40 HDPE PN 10 0.4 0.5 12.63
D132-DP600 244.935 32 40 HDPE PN 10 0.4 0.5 12.63
D132-D133 310.158 32 40 HDPE PN 10 -0.4 0.5 12.63
D133-DP601 245.737 32 40 HDPE PN 10 0.4 0.5 12.63
D133-D134 1633.12 50 63 HDPE PN 12 0.8 0.41 5.19
D134-DP518 101.272 32 40 HDPE PN 12 0.4 0.5 12.63
D134-D135 642.578 50 63 HDPE PN 16 0.4 0.2 1.44
D135-DP519 159.42 32 40 HDPE PN 16 0.4 0.5 12.63
DP227-DP538 137.184 32 40 HDPE PN 10 0.4 0.5 12.63
D131-DP227 49.5302 50 63 HDPE PN 10 0.8 0.41 5.19
D131-KI6 494.273 300 DN 300 GRP PN 10 84.46 1.19 4.7
KI7-D131 267.826 300 DN 300 GRP PN 10 85.26 1.21 4.78
D130-DP236 89.9743 32 40 HDPE PN 10 0.4 0.5 12.63
D130-KI89 587.228 100 110 HDPE PN 10 5.39 0.69 6.06
KI5-D130 224.04 100 110 HDPE PN 10 5.79 0.74 6.92
D129-KI3 139.361 100 110 HDPE PN 10 -5.63 0.72 6.57
KI2-D129 425.387 100 110 HDPE PN 10 -5.23 0.67 5.73
KI3-DP234 71.0911 32 40 HDPE PN 10 0.4 0.5 12.63
D129-DP235 22.1604 32 40 HDPE PN 10 0.4 0.5 12.63
D128-KI90 1282.05 75 90 HDPE PN 12 -2.08 0.47 4.15
D128-DP354 78.3156 32 40 HDPE PN 12 0.4 0.5 12.63
KZ1-D128 610.098 75 90 HDPE PN 12 -1.68 0.38 2.77
KZ22-D120 177.151 50 63 HDPE PN 10 0.4 0.2 1.44
D119-DP346 140.814 32 40 HDPE PN 12 0.4 0.5 12.63
KZ19-D119 394.092 32 40 HDPE PN 12 0.4 0.5 12.63
D125-KZ4 297.323 50 63 HDPE PN 10 -0.01 0 0.02
D125-DP352 13.5127 32 40 HDPE PN 10 0.4 0.5 12.63
KZ5-D125 32.1088 50 63 HDPE PN 10 0.39 0.2 1.39
D127-KZ3 166.135 75 90 HDPE PN 10 -2.39 0.54 5.44
KZ4-D127 153.969 75 90 HDPE PN 10 -1.99 0.45 3.87
D127-DP351 20.9564 32 40 HDPE PN 10 0.4 0.5 12.63
D126-KZ21 372.192 250 DN 250 GRP PN 10 -59.82 1.22 6.03
D126-DP343 122.575 32 40 HDPE PN 10 0.4 0.5 12.63
D124-D126 44.3877 250 DN 250 GRP PN 10 -59.42 1.21 5.96
D124-DP353 17.5015 32 40 HDPE PN 10 0.4 0.5 12.63
KZ5-D124 135.126 250 DN 250 GRP PN 10 -59.02 1.2 5.88
D123-KZ9 112.84 75 90 HDPE PN 10 3.31 0.75 9.96
KZ7-D123 224.751 75 90 HDPE PN 10 3.71 0.84 12.31
D123-DP347 79.2455 32 40 HDPE PN 10 0.4 0.5 12.63
D121-KZ12 320.724 100 110 HDPE PN 10 4.45 0.57 4.26
D121-DP350 57.2908 32 40 HDPE PN 10 0.4 0.5 12.63
KZ3-D121 234.664 100 110 HDPE PN 10 4.85 0.62 4.99
D122-DP356 32.1499 32 40 HDPE PN 10 0.4 0.5 12.63

57 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
KZ20-D122 165.275 100 110 HDPE PN 10 -5.15 0.66 5.57
KZ12-D122 216.615 100 110 HDPE PN 10 5.55 0.71 6.4
D118-KZ17 284.809 100 110 HDPE PN 10 4.6 0.59 4.52
D118-DP355 155.193 32 40 HDPE PN 10 0.4 0.5 12.63
KZ20-D118 733.772 100 110 HDPE PN 10 5 0.64 5.28
D117-DP344 85.0454 32 40 HDPE PN 10 0.4 0.5 12.63
KZ18-D117 92.7943 100 110 HDPE PN 10 4.44 0.56 4.23
KZ8-D117 248.27 100 110 HDPE PN 10 -4.04 0.51 3.55
KZ8-KZ23 282.75 250 DN 250 GRP PN 10 56.29 1.15 5.39
D116-DP345 226.943 32 40 HDPE PN 12 0.4 0.5 12.63
MLN21-D116 1043.13 250 DN 250 GRP PN 20 56.29 1.15 5.39
DP210-DP212 804.547 50 63 HDPE PN 10 0.45 0.23 1.76
DP200-DP207 590.34 50 63 HDPE PN 10 0.8 0.41 5.19
D114-DP200 330.265 50 63 HDPE PN 10 1.2 0.61 10.99
D114-DP201 405.849 32 40 HDPE PN 10 0.4 0.5 12.63
D115-D114 1451.65 63 75 HDPE PN 10 1.6 0.51 6.07
D115-DP212 906.501 50 63 HDPE PN 10 0.35 0.18 1.14
KT.9-D115 104.034 75 90 HDPE PN 10 1.95 0.44 3.76
DP211-KT.8 106.674 50 63 HDPE PN 10 0.99 0.5 7.68
KT.7-DP211 96.7079 50 63 HDPE PN 10 1.39 0.71 14.4
KT.6-KT.7 124.405 100 110 HDPE PN 10 2.47 0.31 1.43
KT.2-DP210 820.819 50 63 HDPE PN 10 0.85 0.43 5.76
DP212-DP213 721.572 50 63 HDPE PN 10 0.4 0.2 1.44
KT.10-DP208 57.28 50 63 HDPE PN 10 0.4 0.2 1.44
KT.9-KT.10 286.68 50 63 HDPE PN 10 1.16 0.59 10.24
D113-KT.4 173.902 125 140 HDPE PN 10 11.67 0.95 8.56
D113-DP209 25.613 32 40 HDPE PN 10 0.4 0.5 12.63
KT.3-D113 66.4464 125 140 HDPE PN 10 12.07 0.98 9.11
KT.2-KT.3 28.4177 125 140 HDPE PN 10 12.78 1.04 10.13
D112-DP214 1194.03 50 63 HDPE PN 10 0.4 0.2 1.44
D112-DP205 170.224 32 40 HDPE PN 10 0.4 0.5 12.63
DP215-D112 1462.36 50 63 HDPE PN 10 0.8 0.41 5.19
D111-DP215 1241.69 50 63 HDPE PN 10 1.2 0.61 10.99
DP202-D111 1380.81 50 63 HDPE PN 10 1.2 0.61 10.99
D110-DP204 204.542 32 40 HDPE PN 10 0.4 0.5 12.63
DP202-D110 215.641 63 75 HDPE PN 10 -1.6 0.51 6.07
DP203-D110 246.691 75 90 HDPE PN 10 2 0.45 3.93
D109-DP203 651.342 75 90 HDPE PN 10 2.4 0.54 5.5
D109-DP216 28.6308 32 40 HDPE PN 10 0.4 0.5 12.63
D108-D109 638.505 75 90 HDPE PN 10 2.8 0.63 7.32
D108-DP206 70.6438 32 40 HDPE PN 10 0.4 0.5 12.63
D104-D106 397.788 100 110 HDPE PN 10 3.2 0.41 2.31
D104-DP219 85.0063 32 40 HDPE PN 10 0.4 0.5 12.63
D105-D104 124.237 150 180 HDPE PN 10 18.05 1.02 7.89
D102-D105 190.327 150 180 HDPE PN 10 18.05 1.02 7.89
DP342-DP348 851.383 50 63 HDPE PN 10 0.8 0.41 5.19

58 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D103-DP342 1312.13 50 63 HDPE PN 10 1.2 0.61 10.99
D103-DP217 215.602 32 40 HDPE PN 10 0.4 0.5 12.63
D102-D103 252.927 63 75 HDPE PN 10 1.6 0.51 6.07
D100-D102 1683.62 200 225 HDPE PN 10 19.65 0.63 2.28
D101-DP218 352.13 32 40 HDPE PN 16 0.4 0.5 12.63
D101-D100 722.279 250 DN 250 GRP PN 20 55.49 1.13 5.25
D100-D98 1761.66 250 DN 250 GRP PN 20 35.84 0.73 2.34
MY21-D99 704.986 250 DN 250 GRP PN 20 -35.04 0.71 2.24
DP427-DP428 1701.46 50 63 HDPE PN 16 0.8 0.41 5.19
D99-D98 897.299 250 DN 250 GRP PN 20 -35.44 0.72 2.29
D99-DP421 32.6733 32 40 HDPE PN 12 0.4 0.5 12.63
D98-DP420 41.9739 32 40 HDPE PN 12 0.4 0.5 12.63
D97-MY19 157.794 100 110 HDPE PN 10 -4.55 0.58 4.42
MY18-D97 299.648 100 110 HDPE PN 10 -4.15 0.53 3.73
D97-DP422 23.3729 32 40 HDPE PN 12 0.4 0.5 12.63
DP424-MY18 224.91 100 110 HDPE PN 10 -3.8 0.48 3.18
MY15-D96 200.55 100 110 HDPE PN 10 -3.4 0.43 2.59
D96-DP424 10.33 32 40 HDPE PN 10 0.4 0.5 12.64
D95-MY22 177.783 100 110 HDPE PN 10 -5.52 0.7 6.34
MY23-D95 46.6552 100 110 HDPE PN 10 -5.12 0.65 5.52
D95-DP419 28.213 32 40 HDPE PN 12 0.4 0.5 12.63
D94-MY24 67.48 100 110 HDPE PN 10 -3.74 0.48 3.08
MY25-D94 280.937 100 110 HDPE PN 10 -3.34 0.43 2.5
D94-DP417 33.6127 32 40 HDPE PN 10 0.4 0.5 12.63
D93-MY25 136.793 100 110 HDPE PN 10 -2.75 0.35 1.74
D93-DP418 56.3569 32 40 HDPE PN 10 0.4 0.5 12.63
MY26-D93 173.482 100 110 HDPE PN 10 -2.35 0.3 1.3
D92-MY12 266.214 200 225 HDPE PN 10 -22.35 0.71 2.89
MY11-D92 70.9047 200 225 HDPE PN 10 -21.95 0.7 2.79
D92-DP432 78.6752 32 40 HDPE PN 10 0.4 0.5 12.63
DP430-MY28 76.77 75 90 HDPE PN 12 -1.29 0.29 1.74
MY29-DP430 145.71 63 75 HDPE PN 10 -0.89 0.29 2.05
MY3-DP431 42.1943 32 40 HDPE PN 10 0.4 0.5 12.63
MY33-MY3 110.02 150 180 HDPE PN 10 -16.19 0.92 6.46
D91-MY2 14.6438 100 110 HDPE PN 10 -2.82 0.36 1.82
D91-DP426 10.8858 32 40 HDPE PN 12 0.4 0.5 12.63
MY1-D91 129 100 110 HDPE PN 10 -2.42 0.31 1.37
D89-DP429 180.807 32 40 HDPE PN 12 0.4 0.5 12.63
DP683-DP681 639.838 38 40 HDPE PN 16 0.8 0.71 19.74
TG25-DP690 218.294 32 40 HDPE PN 16 0.4 0.5 12.63
D88-TG25 210.461 150 180 HDPE PN 16 -15.95 0.9 6.28
D88-DP675 28.1534 32 40 HDPE PN 16 0.4 0.5 12.63
D87-D88 434.454 150 180 HDPE PN 16 -15.55 0.88 5.99
D87-DP687 50.1749 32 40 HDPE PN 16 0.4 0.5 12.63
TG19-D87 102.923 150 180 HDPE PN 16 -15.15 0.86 5.71
DP673-TG18 137.55 100 125 HDPE PN 16 -2.95 0.38 1.98

59 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
TG24-DP689 182.304 32 40 HDPE PN 16 0.4 0.5 12.63
DP688-TG22 179.574 75 90 HDPE PN 16 1.59 0.36 2.57
TG21-DP688 98.702 75 90 HDPE PN 12 1.99 0.45 3.9
TG20-DP691 12.4059 32 40 HDPE PN 12 0.4 0.5 12.63
D83-TG21 104.951 150 180 HDPE PN 12 10.66 0.6 2.98
J-3-D83 28.1763 150 180 HDPE PN 12 10.88 0.62 3.09
D86-D83 53.7779 50 63 HDPE PN 12 -0.22 0.11 0.48
D86-DP676 36.8965 32 40 HDPE PN 12 0.4 0.5 12.63
D85-D86 56.3527 50 63 HDPE PN 12 0.18 0.09 0.32
D85-DP677 35.8968 32 40 HDPE PN 12 0.4 0.5 12.63
D84-D85 80.7264 50 63 HDPE PN 16 0.58 0.29 2.84
D84-DP673 110.64 100 125 HDPE PN 16 -2.55 0.32 1.51
TG15-D84 36.2347 75 90 HDPE PN 16 -1.97 0.45 3.82
D90-TG15 138.909 75 90 HDPE PN 16 -1.7 0.38 2.91
TG14-D90 266.143 50 63 HDPE PN 16 -0.63 0.32 3.34
DP674-D90 61.547 50 63 HDPE PN 16 -1.07 0.54 8.88
TG16-DP674 163.283 50 63 HDPE PN 16 -0.67 0.34 3.73
TG14-TG16 259.365 32 40 HDPE PN 16 0.1 0.13 1.03
DP671-DP672 272.149 50 63 HDPE PN 12 0.4 0.2 1.44
TG13-DP692 67.7686 32 40 HDPE PN 16 0.4 0.5 12.63
D82-TG13 228.984 150 180 HDPE PN 16 -7.78 0.44 1.66
TG12-DP683 34.3089 50 63 HDPE PN 16 1.2 0.61 10.99
TG11-DP682 32.6221 32 40 HDPE PN 16 0.4 0.5 12.63
TG10-TG11 150.081 75 90 HDPE PN 16 1.92 0.43 3.63
D82-DP680 30.738 32 40 HDPE PN 16 0.4 0.5 12.63
D81-D82 102.37 150 180 HDPE PN 16 -7.38 0.42 1.51
D81-DP686 14.1947 32 40 HDPE PN 16 0.4 0.5 12.63
TG9-D81 120.336 150 180 HDPE PN 16 -6.98 0.39 1.36
D80-TG9 120.858 100 125 HDPE PN 16 -3.97 0.51 3.45
D80-DP678 31.2937 32 40 HDPE PN 16 0.4 0.5 12.63
D80-TG5 194.239 100 125 HDPE PN 16 3.57 0.46 2.83
D79-TG4 91.4378 50 63 HDPE PN 12 0.65 0.33 3.54
D79-DP679 26.3583 50 63 HDPE PN 12 0.4 0.2 1.44
TG5-D79 120.785 63 75 HDPE PN 10 1.05 0.34 2.79
D78-TG2 189.245 50 63 HDPE PN 16 0.5 0.25 2.17
D78-DP684 67.9553 38 40 HDPE PN 16 0.4 0.35 5.47
TG3-D78 154.738 63 75 HDPE PN 10 0.9 0.29 2.09
DP671-TG3 176.069 63 75 HDPE PN 10 1.06 0.34 2.85
DP685-DP671 99.66 75 90 HDPE PN 12 1.86 0.42 3.44
TG5-DP685 84.61 75 90 HDPE PN 16 2.26 0.51 4.94
DP394-MN19 200.636 50 63 HDPE PN 10 1 0.51 7.83
MN15-DP394 355.349 50 63 HDPE PN 10 1.4 0.71 14.6
MN19-DP400 126.793 50 63 HDPE PN 10 0.4 0.2 1.44
D71-DP396 51.7788 32 40 HDPE PN 12 0.4 0.5 12.63
D70-D71 889.771 50 63 HDPE PN 12 0.4 0.2 1.44
D70-DP398 63.2243 32 40 HDPE PN 10 0.4 0.5 12.63

60 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D77-D70 404.242 50 63 HDPE PN 10 0.8 0.41 5.19
D77-DP399 46.7945 32 40 HDPE PN 10 0.4 0.5 12.63
MN16-D77 91.1019 63 75 HDPE PN 10 1.2 0.38 3.56
D67-MN16 297.14 75 90 HDPE PN 10 1.83 0.42 3.35
D67-DP388 119.647 32 40 HDPE PN 10 0.4 0.5 12.63
MN15-D67 271.687 75 90 HDPE PN 10 2.23 0.51 4.82
D76-MN9 188.744 75 90 HDPE PN 10 2.47 0.56 5.82
D76-DP386 158.946 32 40 HDPE PN 10 0.4 0.5 12.63
MN8-D76 174.396 75 90 HDPE PN 10 2.87 0.65 7.68
MN12-MN11 399.785 63 75 HDPE PN 10 -1.49 0.48 5.31
D75-DP390 688.59 32 40 HDPE PN 12 0.8 0.99 45.6
D74-D75 901.216 50 63 HDPE PN 12 0.8 0.41 5.19
D73-D74 836.215 50 63 HDPE PN 12 0.8 0.41 5.19
MN13-D73 253.114 50 63 HDPE PN 10 0 0 0
D73-MN12 76.6761 50 63 HDPE PN 10 -0.8 0.41 5.21
MN12-MN12 10.0223 32 40 HDPE PN 10 0.4 0.5 12.63
D69-MN13 43.508 50 63 HDPE PN 10 0.25 0.13 0.61
D69-DP387 26.0271 32 40 HDPE PN 10 0.4 0.5 12.63
D68-D69 235.453 50 63 HDPE PN 10 0.65 0.33 3.55
D68-DP384 16.9103 32 40 HDPE PN 10 0.4 0.5 12.63
MN14-D68 61.8297 50 63 HDPE PN 10 1.05 0.54 8.61
D66-MN15 55.4213 100 110 HDPE PN 10 4.33 0.55 4.05
D66-DP397 63.237 32 40 HDPE PN 10 0.4 0.5 12.63
D72-D66 437.064 100 110 HDPE PN 10 4.73 0.6 4.77
D72-DP383 34.1631 32 40 HDPE PN 10 0.4 0.5 12.63
D65-D72 368.599 100 110 HDPE PN 10 5.13 0.65 5.54
D65-DP382 69.6359 32 40 HDPE PN 10 0.4 0.5 12.63
MN6-D65 115.454 100 110 HDPE PN 10 5.53 0.7 6.37
D64-MN6 240.554 100 110 HDPE PN 10 5.87 0.75 7.11
D64-DP381 70.7795 32 40 HDPE PN 10 0.4 0.5 12.63
MN5-D64 106.748 100 110 HDPE PN 10 6.27 0.8 8.03
D62-MN3 176.537 50 63 HDPE PN 10 0.04 0.02 0.02
D62-DP391 34.041 32 40 HDPE PN 10 0.4 0.5 12.63
MN4-D62 492.098 50 63 HDPE PN 10 0.44 0.22 1.69
D63-DP392 30.4041 32 40 HDPE PN 10 0.4 0.5 12.63
D63-MN4 73.5641 150 180 HDPE PN 10 12.85 0.73 4.21
MN1-D63 417.887 150 180 HDPE PN 10 13.25 0.75 4.45
D61-MN2 583.873 75 90 HDPE PN 10 1.49 0.34 2.27
D61-DP395 94.0205 32 40 HDPE PN 10 0.4 0.5 12.63
MN1-D61 211.443 75 90 HDPE PN 10 1.89 0.43 3.53
MN2-DP393 223.837 50 63 HDPE PN 10 0.4 0.2 1.44
KK7-DP326 340.565 50 63 HDPE PN 10 0.71 0.36 4.18
DP326-KK8 77.5069 32 40 HDPE PN 10 0.31 0.39 7.97
D60-KK10 529.515 75 90 HDPE PN 10 1.64 0.37 2.72
KK6-D60 314.545 75 90 HDPE PN 10 2.04 0.46 4.07
D58-KK6 227.644 100 110 HDPE PN 10 3.32 0.42 2.47

61 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D60-DP328 32.5689 32 40 HDPE PN 10 0.4 0.5 12.63
D55-KK11 82.51 200 225 HDPE PN 10 15.93 0.51 1.54
D55-DP320 70.1356 32 40 HDPE PN 10 0.4 0.5 12.63
KK2-D55 176.761 200 225 HDPE PN 10 16.33 0.52 1.61
D57-KK7 229.12 50 63 HDPE PN 10 1.6 0.81 18.62
D57-DP322 46.7971 32 40 HDPE PN 10 0.4 0.5 12.63
D56-D57 64.8268 75 90 HDPE PN 10 2 0.45 3.91
D56-DP324 36.0628 32 40 HDPE PN 10 0.4 0.5 12.63
DP323-D56 102.462 100 110 HDPE PN 10 2.4 0.3 1.35
D58-DP329 174.497 32 40 HDPE PN 10 0.4 0.5 12.63
D51-D58 55.7888 100 110 HDPE PN 10 3.72 0.47 3.05
KK4-D52 104.354 75 90 HDPE PN 10 1.44 0.33 2.13
D52-DP327 33.9075 32 40 HDPE PN 10 0.4 0.5 12.63
D51-D52 187.581 75 90 HDPE PN 10 -1.04 0.23 1.16
D53-D51 99.9854 100 110 HDPE PN 10 2.68 0.34 1.66
D53-DP325 128.417 32 40 HDPE PN 10 0.4 0.5 12.63
KK2-D53 124.194 100 110 HDPE PN 10 3.08 0.39 2.15
KK2-DP323 22.4592 100 110 HDPE PN 10 2.8 0.36 1.8
D54-KK2 112.035 200 225 HDPE PN 10 22.84 0.73 3.01
D54-DP321 30.1964 32 40 HDPE PN 10 0.4 0.5 12.63
D59-D54 63.3184 200 225 HDPE PN 10 23.24 0.74 3.1
D59-KK4 151.458 75 90 HDPE PN 10 1.87 0.42 3.48
KK1-D59 271.868 200 225 HDPE PN 10 25.11 0.8 3.58
D50-KK1 225.677 200 225 HDPE PN 10 26.2 0.83 3.88
D50-DP319 21.845 32 40 HDPE PN 10 0.4 0.5 12.63
KK12-D50 260.932 200 225 HDPE PN 10 26.6 0.85 3.99
D49-KK12 499.984 200 225 HDPE PN 10 27.02 0.86 4.1
D49-DP485 22.5488 32 40 HDPE PN 10 0.4 0.5 12.63
D48-D49 410.106 200 225 HDPE PN 10 27.42 0.87 4.22
D48-DP486 26.9907 32 40 HDPE PN 10 0.4 0.5 12.63
MR13-D48 101.976 200 225 HDPE PN 10 27.82 0.89 4.33
D47-MR13 264.151 200 225 HDPE PN 10 29.65 0.94 4.87
D47-DP487 20.7356 32 40 HDPE PN 10 0.4 0.5 12.63
D46-D47 443.553 200 225 HDPE PN 10 30.05 0.96 5
MR12-D46 218.195 250 DN 250 GRP PN 10 31.25 0.64 1.81
D46-DP488 16.1424 50 63 HDPE PN 10 1.2 0.61 10.99
D45-MR12 250.521 250 DN 250 GRP PN 10 34.2 0.7 2.14
D44-D45 167.987 250 DN 250 GRP PN 10 34.6 0.7 2.19
MR15-D44 180.075 250 DN 250 GRP PN 10 35 0.71 2.23
D45-DP490 30.5172 32 40 HDPE PN 10 0.4 0.5 12.63
D44-DP489 201.903 32 40 HDPE PN 10 0.4 0.5 12.63
MR15-DP497 65.3688 32 40 HDPE PN 10 0.4 0.5 12.63
MR11-DP491 102.117 300 DN 300 GRP PN 10 78.91 1.12 4.14
D43-DP491 973.194 300 DN 300 GRP PN 10 -78.51 1.11 4.11
D43-DP492 22.4119 32 40 HDPE PN 10 0.4 0.5 12.63
MR10-D43 57.4768 300 DN 300 GRP PN 10 -78.11 1.11 4.07

62 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
MR8-DP164 552.768 200 225 HDPE PN 10 35.08 1.12 6.66
MR6-DP164 688.3 200 225 HDPE PN 10 -34.68 1.1 6.52
DP163-MR8 702.589 150 180 HDPE PN 10 -15.77 0.89 6.15
MR3-DP163 847.948 150 180 HDPE PN 10 -15.37 0.87 5.86
MR2-DP166 332.261 32 40 HDPE PN 12 0.4 0.5 12.63
DP165-MR1 197.695 150 180 HDPE PN 10 -13.05 0.74 4.33
BK16-DP165 606.207 150 180 HDPE PN 12 -12.65 0.72 4.09
D42-BK16 239.941 150 180 HDPE PN 12 -11.8 0.67 3.59
D42-DP167 38.3247 32 40 HDPE PN 10 0.4 0.5 12.63
D41-D42 424.58 150 180 HDPE PN 10 -11.4 0.64 3.37
D41-DP168 16.3084 32 40 HDPE PN 10 0.4 0.5 12.63
BK13-D41 288.391 150 180 HDPE PN 12 -11 0.62 3.15
D39-BK13 217.582 200 250 HDPE PN 12 -44.23 1.41 10.22
D40-BK2 201.617 200 225 HDPE PN 10 25.26 0.8 3.62
D40-DP134 63.1607 32 40 HDPE PN 10 0.4 0.5 12.63
BK3-D40 61.6516 200 225 HDPE PN 10 25.66 0.82 3.73
BK18-DP159 411.887 32 40 HDPE PN 10 0.4 0.5 12.63
DP160-BK18 99.1697 50 63 HDPE PN 10 1.24 0.63 11.71
BK19-DP160 526.559 75 90 HDPE PN 10 1.64 0.37 2.73
BK20-BK19 482.666 75 90 HDPE PN 10 2.3 0.52 5.1
DP169-BK20 170.317 100 110 HDPE PN 10 2.7 0.34 1.69
DP169-DP170 801.263 32 40 HDPE PN 12 0.4 0.5 12.63
BK21-DP169 410.621 100 110 HDPE PN 10 3.5 0.45 2.73
BK15-DP174 730.643 32 40 HDPE PN 12 0.4 0.5 12.63
BK15-BK21 318.345 100 110 HDPE PN 10 3.71 0.47 3.04
D38-BK14 312.253 100 110 HDPE PN 10 6.29 0.8 8.08
D38-DP173 21.2792 32 40 HDPE PN 10 0.4 0.5 12.63
BK12-D38 206.797 100 110 HDPE PN 10 6.69 0.85 9.06
D39-DP175 25.1371 32 40 HDPE PN 10 0.4 0.5 12.63
D37-D39 368.202 200 225 HDPE PN 10 -43.83 1.4 10.05
D37-DP176 23.0044 32 40 HDPE PN 10 0.4 0.5 12.63
BK11-D37 31.5585 200 250 HDPE PN 12 -43.43 1.38 9.88
BK9-DP162 50.7515 32 40 HDPE PN 10 0.4 0.5 12.63
D36-BK8 144.844 50 63 HDPE PN 10 1.36 0.69 13.91
D36-DP161 190.217 32 40 HDPE PN 10 0.4 0.5 12.63
BK7-D36 371.736 75 90 HDPE PN 10 1.76 0.4 3.11
DP178-BK6 249.932 100 110 HDPE PN 10 3.91 0.5 3.35
BK4-DP178 434.469 100 110 HDPE PN 10 4.31 0.55 4.01
D35-DP172 44.8612 32 40 HDPE PN 10 0.4 0.5 12.63
BK5-D35 110.508 50 63 HDPE PN 10 0.8 0.41 5.19
D35-BK22 451.206 50 63 HDPE PN 10 0.4 0.2 1.44
D34-BM1 278.73 50 63 HDPE PN 10 0.5 0.25 2.17
D34-DP145 27.006 32 40 HDPE PN 10 0.4 0.5 12.63
BM2-D34 126.864 50 63 HDPE PN 10 0.9 0.46 6.45
DP146-BM7 208.227 50 63 HDPE PN 10 0.44 0.22 1.72
BM8-DP146 257.72 63 75 HDPE PN 10 0.84 0.27 1.84

63 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
BM5-D33 162.169 100 110 HDPE PN 10 3.12 0.4 2.21
D33-BM4 77.3386 100 110 HDPE PN 10 2.72 0.35 1.71
D33-DP143 23.7952 32 40 HDPE PN 10 0.4 0.5 12.63
D32-BM5 182.924 63 75 HDPE PN 10 1.81 0.58 7.61
D31-D32 84.4076 75 90 HDPE PN 10 2.21 0.5 4.71
D30-D31 362.264 100 110 HDPE PN 10 2.61 0.33 1.58
BM12-D30 90.9227 100 110 HDPE PN 10 3.01 0.38 2.06
D32-DP144 15.7208 32 40 HDPE PN 10 0.4 0.5 12.63
D31-DP153 151.597 32 40 HDPE PN 10 0.4 0.5 12.63
D30-DP152 35.5798 32 40 HDPE PN 10 0.4 0.5 12.63
BM22-DP151 82.3932 32 40 HDPE PN 12 0.4 0.5 12.63
J-6-DP154 98.9411 32 40 HDPE PN 12 0.4 0.5 12.63
DP158-BM9 129.465 50 63 HDPE PN 10 0.33 0.17 0.98
BM20-DP158 162.024 50 63 HDPE PN 10 0.73 0.37 4.33
D28-BM20 150.825 150 180 HDPE PN 12 10.52 0.6 2.9
D28-DP155 45.0988 32 40 HDPE PN 12 0.4 0.5 12.63
D27-D28 141.947 150 180 HDPE PN 12 10.92 0.62 3.11
D29-BM10 120.715 100 110 HDPE PN 10 2.7 0.34 1.68
BM11-D29 132.461 100 110 HDPE PN 10 3.5 0.45 2.72
D27-DP156 20.4259 50 63 HDPE PN 12 1.59 0.81 18.5
BM11-D27 54.1765 150 180 HDPE PN 12 12.51 0.71 4
D26-BM11 86.5646 150 180 HDPE PN 12 17.16 0.97 7.19
D26-DP140 23.4762 32 40 HDPE PN 12 0.4 0.5 12.63
D29-DP157 87.2095 32 40 HDPE PN 12 0.4 0.5 12.63
D29-DP136 102.554 32 40 HDPE PN 12 0.4 0.5 12.63
BM15-D26 649.168 150 180 HDPE PN 12 17.56 0.99 7.5
BM15-D25 256.596 50 63 HDPE PN 12 1.51 0.77 16.87
D25-BM16 240.26 50 63 HDPE PN 12 1.11 0.57 9.55
D25-DP138 127.825 32 40 HDPE PN 12 0.4 0.5 12.63
BM15-DP137 43.0003 32 40 HDPE PN 12 0.4 0.5 12.63
D24-BM15 519.767 200 250 HDPE PN 12 21.63 0.69 2.72
D24-DP139 66.0223 32 40 HDPE PN 10 0.4 0.5 12.63
BM17-D24 371.632 200 225 HDPE PN 10 22.03 0.7 2.81
D23-BM17 198.296 200 225 HDPE PN 10 26.9 0.86 4.07
D23-DP133 107.77 32 40 HDPE PN 10 0.4 0.5 12.63
BK1-D23 575.136 200 225 HDPE PN 10 27.3 0.87 4.18
BK2-BK1 237.915 200 225 HDPE PN 10 27.84 0.89 4.34
BK1-DP135 222.812 32 40 HDPE PN 10 0.4 0.5 12.63
DP177-BK4 327.245 100 110 HDPE PN 10 -3.66 0.47 2.97
BK2-DP177 253.238 100 110 HDPE PN 10 -3.26 0.42 2.39
BK3-DP171 49.7997 32 40 HDPE PN 10 0.4 0.5 12.63
D19-BK3 489.835 50 63 HDPE PN 10 0.51 0.26 2.23
D19-DP149 171.363 32 40 HDPE PN 10 0.4 0.5 12.63
BK17-D19 301.171 50 63 HDPE PN 10 0.91 0.46 6.55
D22-DP147 468.03 38 40 HDPE PN 10 0.8 0.71 19.74
D22-DP150 140.776 32 40 HDPE PN 10 0.4 0.5 12.63

64 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D21-D22 32.49 50 63 HDPE PN 10 1.2 0.61 10.99
D21-DP148 23.216 32 40 HDPE PN 10 0.4 0.5 12.63
D20-D21 288.587 50 63 HDPE PN 10 1.6 0.81 18.72
D20-BK17 160.199 100 110 HDPE PN 10 3.79 0.48 3.16
MLN3-D20 521.82 100 110 HDPE PN 10 5.39 0.69 6.07
D18-DP141 893.492 38 40 HDPE PN 10 0.8 0.71 19.74
KB2-D18 842.718 125 140 HDPE PN 10 8.31 0.68 4.56
KB1-D18 267.508 125 140 HDPE PN 10 -7.51 0.61 3.78
KB1-DP142 41.3826 32 40 HDPE PN 12 0.4 0.5 12.63
KB23-KB1 217.085 100 110 HDPE PN 10 -6.6 0.84 8.83
D16-KB4 281.53 100 110 HDPE PN 10 5.16 0.66 5.59
KB5-D16 272.029 100 110 HDPE PN 10 5.56 0.71 6.42
D15-DP267 15.5305 32 40 HDPE PN 10 0.4 0.5 12.63
D16-DP266 40.4827 32 40 HDPE PN 10 0.4 0.5 12.63
D17-KB2 243.453 125 140 HDPE PN 10 9.44 0.77 5.77
D17-DP265 35.9129 32 40 HDPE PN 10 0.4 0.5 12.63
KB3-D17 38.8543 125 140 HDPE PN 10 9.84 0.8 6.23
D15-KB3 684.607 100 110 HDPE PN 10 5.79 0.74 6.92
KB19-D15 44.2978 100 110 HDPE PN 10 6.19 0.79 7.83
KB19-KB5 190.705 150 180 HDPE PN 10 14.23 0.81 5.08
D14-KB8 160.052 63 75 HDPE PN 10 -1.57 0.5 5.86
D14-DP255 26.5621 32 40 HDPE PN 10 0.4 0.5 12.63
KB9-D14 257.703 63 75 HDPE PN 10 -1.17 0.38 3.4
D13-KB9 83.9559 50 63 HDPE PN 10 0.54 0.28 2.52
D13-DP254 11.1531 32 40 HDPE PN 10 0.4 0.5 12.63
KB17-D13 480.683 63 75 HDPE PN 10 0.94 0.3 2.28
DP253-KB20 266.624 100 110 HDPE PN 10 -4.28 0.54 3.95
KB25-DP253 328.188 100 110 HDPE PN 10 -3.88 0.49 3.3
KB17-DP262 21.592 32 40 HDPE PN 10 0.4 0.5 12.63
D12-KB22 319.596 100 110 HDPE PN 10 -2.85 0.36 1.86
KB18-D12 116.435 75 90 HDPE PN 10 -2.45 0.55 5.7
D12-DP261 102.845 32 40 HDPE PN 10 0.4 0.5 12.63
D11-DP546 551.487 32 40 HDPE PN 10 0.4 0.5 12.63
KK9-D11 459.637 50 63 HDPE PN 10 0.4 0.2 1.44
KW38-DP287 1804.76 50 63 HDPE PN 10 0.8 0.41 5.19
D10-KW31 533.602 150 180 HDPE PN 10 10.36 0.59 2.82
D10-DP294 60.2413 32 40 HDPE PN 10 0.4 0.5 12.63
KW19-D10 102.038 150 180 HDPE PN 10 10.76 0.61 3.03
DP264-DP263 656.88 50 63 HDPE PN 10 0.8 0.41 5.19
D9-DP264 290.189 50 63 HDPE PN 10 1.2 0.61 10.99
KR1-D9 150.819 63 75 HDPE PN 10 1.2 0.38 3.57
D8-DP279 19.0539 50 63 HDPE PN 10 0.4 0.2 1.44
D8-KR2 319.509 75 90 HDPE PN 10 1.51 0.34 2.32
KR4-D8 244.229 75 90 HDPE PN 10 1.91 0.43 3.59
KR7-KR4 399.023 75 90 HDPE PN 10 1.99 0.45 3.88
DP280-KR5 161.4 50 63 HDPE PN 10 0.41 0.21 1.48

65 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
KR6-DP280 297.77 50 63 HDPE PN 10 0.81 0.41 5.26
DP283-KR8 69.7232 50 63 HDPE PN 10 0.32 0.16 0.93
DP284-DP283 411.243 50 63 HDPE PN 10 0.72 0.37 4.24
D7-DP284 254.05 50 63 HDPE PN 10 0.82 0.42 5.41
KR16-DP284 83.3612 50 63 HDPE PN 10 0.3 0.15 0.84
D7-KR13 317.837 50 63 HDPE PN 10 0.95 0.48 7.11
KR14-D7 283.04 50 63 HDPE PN 10 1.06 0.54 8.68
DP285-D7 137.28 50 63 HDPE PN 10 0.71 0.36 4.16
KR6-DP282 18.6401 50 63 HDPE PN 10 0.4 0.2 1.44
DP281-KR11 159.55 75 90 HDPE PN 10 2.22 0.5 4.77
DP285-DP281 512.51 75 90 HDPE PN 10 2.62 0.59 6.48
J-484-DP285 325.04 75 90 HDPE PN 10 3.73 0.84 12.47
DP543-NY3 92.5513 50 63 HDPE PN 10 -0.24 0.12 0.57
D6-DP543 138.32 50 63 HDPE PN 10 0.16 0.08 0.26
DP542-NY1 244.744 150 180 HDPE PN 10 7.38 0.42 1.51
D6-DP542 555.406 150 180 HDPE PN 10 7.78 0.44 1.66
NY2-D6 285.722 150 180 HDPE PN 10 7.94 0.45 1.72
NY2-DP547 53.3161 32 40 HDPE PN 10 0.4 0.5 12.63
NY3-NY4 323.823 50 63 HDPE PN 10 1.41 0.72 14.82
DP295-KW28 140.67 32 40 HDPE PN 10 0.35 0.44 9.92
KW15-DP295 194.456 50 63 HDPE PN 10 0.75 0.38 4.61
KW16-KW12 54.3396 100 110 HDPE PN 10 5.88 0.75 7.13
D5-J-64 150.089 50 63 HDPE PN 10 0.4 0.2 1.44
D5-DP539 19.3538 32 40 HDPE PN 10 0.4 0.5 12.63
J-63-D5 171.935 50 63 HDPE PN 10 0.8 0.41 5.19
NY9-NY10 496.454 50 63 HDPE PN 10 0.28 0.14 0.75
J-45-DP541 33.9843 32 40 HDPE PN 10 0.4 0.5 12.63
NY3-DP548 265.498 32 40 HDPE PN 10 0.4 0.5 12.63
NY9-DP540 78.8418 32 40 HDPE PN 10 0.4 0.5 12.63
NY11-NY9 580.592 50 63 HDPE PN 10 0.47 0.24 1.96
DP544-NY11 491.265 100 110 HDPE PN 10 2.36 0.3 1.31
NY12-DP544 235.93 100 110 HDPE PN 10 2.76 0.35 1.76
DP545-NY12 258.741 100 110 HDPE PN 10 4.65 0.59 4.61
NY13-DP545 369.819 100 110 HDPE PN 10 5.05 0.64 5.38
KW1-NY13 1043.03 100 110 HDPE PN 10 5.67 0.72 6.67
KW1.-KW1 270.932 125 140 HDPE PN 10 9.73 0.79 6.11
D4-KW1 72.3977 63 75 HDPE PN 10 -3.47 1.11 25.54
D4-DP292 44.7899 32 40 HDPE PN 10 0.4 0.5 12.63
KW43-D4 383.258 63 75 HDPE PN 10 -3.07 0.99 20.36
KW2-KW43 610.69 63 75 HDPE PN 10 -1.44 0.46 5.01
KW2-DP293 242.655 32 40 HDPE PN 10 0.4 0.5 12.63
DP291-KW2 475.481 63 75 HDPE PN 10 1.13 0.36 3.2
KW3-DP291 162.409 63 75 HDPE PN 10 1.53 0.49 5.61
DP290-KW9 311.31 50 63 HDPE PN 10 -0.82 0.42 5.43
KW8-DP290 157.37 50 63 HDPE PN 10 -0.42 0.21 1.57
D2-DP301 27.3338 32 40 HDPE PN 10 0.4 0.5 12.63

66 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D2-KW8 153.342 63 75 HDPE PN 10 -1.51 0.49 5.48
KW4-D2 106.139 50 63 HDPE PN 10 -1.11 0.57 9.57
DP299-KW5 286.335 75 90 HDPE PN 10 -2.28 0.52 5.01
KW3-DP299 122.919 75 90 HDPE PN 10 -1.88 0.43 3.51
DP298-KW7 139.457 75 90 HDPE PN 10 -2.19 0.5 4.66
KW5-DP298 234.995 75 90 HDPE PN 10 -1.79 0.41 3.21
DP300-KW22 323.347 50 63 HDPE PN 10 -0.59 0.3 2.97
KW24-DP300 120.998 50 63 HDPE PN 10 -0.19 0.1 0.37
DP288-KW36 248.639 50 63 HDPE PN 10 0.63 0.32 3.37
KW21-DP288 107.968 50 63 HDPE PN 10 1.03 0.53 8.34
DP289-KW34 120.738 50 63 HDPE PN 10 0.19 0.1 0.38
KW33-DP289 295.864 50 63 HDPE PN 10 0.59 0.3 2.99
KW40-DP296 919.007 50 63 HDPE PN 10 0.4 0.2 1.44
D1-DP297 38.322 32 40 HDPE PN 10 0.4 0.5 12.63
D420-D417 361.522 50 63 HDPE PN 10 0.67 0.34 3.78
BT92-D420 102.133 75 90 HDPE PN 10 1.6 0.36 2.6
KI8-KI7 277.741 300 DN 300 GRP PN 10 89.46 1.27 5.23
KZ2-KZ1 566.33 200 225 HDPE PN 10 15.03 0.48 1.39
KT.5-KT.9 265.405 100 110 HDPE PN 10 4.39 0.56 4.14
KI89-KZ15 707.691 100 110 HDPE PN 10 3.06 0.39 2.13
BG27-BG24 144.957 350 DN 350 GRP PN 20 117.31 1.22 4.08
KZ13-KZ1 278.115 100 110 HDPE PN 10 -3.77 0.48 3.11
J-419-KI67 143.017 100 110 HDPE PN 10 -4.44 0.56 4.23
KI13-J-419 105.518 250 DN 250 GRP PN 10 -66.96 1.36 7.43
BT60-BT82 150.588 150 180 HDPE PN 10 8.9 0.5 2.13
BT83-BT87 157.541 100 110 HDPE PN 10 1.99 0.25 0.95
BT61-BT84 227.051 100 110 HDPE PN 10 3.18 0.4 2.28
MRW7-MRW6 336.669 38 40 HDPE PN 16 1.09 0.96 34.74
MG22-MRW1 791.03 200 225 HDPE PN 10 23.63 0.75 3.2
MG23-MG25 374.962 75 90 HDPE PN 10 1.96 0.44 3.8
MG4-MG5 199.866 63 75 HDPE PN 10 1.15 0.37 3.27
MG1-MG3 145.044 250 DN 250 GRP PN 10 50.24 1.02 4.36
MG1-MG2 483.763 32 40 HDPE PN 10 0.24 0.3 4.87
MT4-MT5 110.291 75 90 HDPE PN 10 1.63 0.37 2.7
MT2-MT4 271.731 125 140 HDPE PN 10 10.58 0.86 7.14
BTK4-D365 212.222 63 75 HDPE PN 10 -0.88 0.28 1.99
BTK7-BTK6 287.766 50 63 HDPE PN 10 -0.22 0.11 0.49
BTK8-BTK9 381.055 250 DN 250 GRP PN 10 62.66 1.28 6.57
BTK8-BTK7 205.235 50 63 HDPE PN 10 -0.22 0.11 0.47
BT57-J-515 154.952 150 180 HDPE PN 10 11.59 0.66 3.48
D419-D420 189.24 50 63 HDPE PN 10 -0.93 0.47 6.79
BT99-DP94 82.8 100 110 HDPE PN 10 -4.59 0.58 4.51
BT98-DP94 259.368 100 110 HDPE PN 10 4.99 0.64 5.26
BT99-D460 214.05 100 110 HDPE PN 10 2.8 0.36 1.8
D460-D462 90.1956 50 63 HDPE PN 10 1.36 0.69 13.79
MZ3-MZ4 149.052 75 90 HDPE PN 10 1.91 0.43 3.59

67 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
MZ7-MZ16 243.513 100 110 HDPE PN 10 3.27 0.42 2.41
BG15-BG14 269.003 50 63 HDPE PN 10 -1.22 0.62 11.31
BG20-BG13 173.04 350 DN 350 GRP PN 10 126.54 1.32 4.69
BG3-BG5 214.71 100 110 HDPE PN 10 2.31 0.29 1.27
BG25-BG2 193.333 100 110 HDPE PN 10 -2.51 0.32 1.47
BS4-BS5 302.769 100 125 HDPE PN 16 3.41 0.43 2.6
KT9-KT8 353.33 100 110 HDPE PN 10 4.5 0.57 4.34
KT6-KT9 75.8132 125 140 HDPE PN 10 7.81 0.64 4.06
KT15-KT16 284.462 50 63 HDPE PN 10 1.29 0.66 12.64
KT3-KT5 772.565 100 110 HDPE PN 10 3.08 0.39 2.15
KT14-KT15 219.571 100 110 HDPE PN 10 4.14 0.53 3.72
KT1-KT2 65.3607 100 110 HDPE PN 10 5.35 0.68 5.99
KT3-KT4 118.602 50 63 HDPE PN 12 1.5 0.77 16.68
NYS5-NYS6 202.498 100 110 HDPE PN 10 4.35 0.55 4.08
NYS1-NYS2 93.14 250 DN 250 GRP PN 10 45.4 0.92 3.62
BS12-BS16 230.366 250 DN 250 GRP PN 20 54.99 1.12 5.16
BS11-BS12 171.488 250 DN 250 GRP PN 20 60.52 1.23 6.16
BS20-BS21 85.1835 100 125 HDPE PN 16 4.32 0.55 4.02
BS14-BS17 121.895 100 125 HDPE PN 16 5.22 0.66 5.71
BS13-BS14 87.3212 200 250 HDPE PN 16 19.98 0.64 2.35
BS11-BS13 90.1454 200 250 HDPE PN 16 18.93 0.6 2.12
BS10-BS11 520.327 300 DN 300 GRP PN 20 80.07 1.13 4.26
J-83-BT25 44.5968 400 DN 400 GRP PN 10 171.35 1.36 4.29
TR2-TR1 533.04 150 180 HDPE PN 10 -8.76 0.5 2.07
TR3-TR2 295.885 150 180 HDPE PN 10 -8.1 0.46 1.79
TR4-TR12 601.606 63 75 HDPE PN 10 1.63 0.52 6.26
TR6-TR5 524.805 75 90 HDPE PN 10 -2.33 0.53 5.22
TR9-TR8 524.619 50 63 HDPE PN 10 -0.08 0.04 0.08
RK1-TR9 708.193 50 63 HDPE PN 10 0 0 0
MLN16.-RK1 589.02 50 63 HDPE PN 10 1.43 0.73 15.28
RK9-RK10 464.635 50 63 HDPE PN 10 0.98 0.5 7.6
RK5-RK6 186.518 75 90 HDPE PN 10 3.54 0.8 11.32
RK15-RK16 193.357 50 63 HDPE PN 10 0.47 0.24 1.96
RK12-RK15 309.713 63 75 HDPE PN 10 1.23 0.39 3.71
RK13-RK12 352.208 150 180 HDPE PN 10 -10.88 0.62 3.09
RK25-RK26 306.269 50 63 HDPE PN 10 1.17 0.6 10.53
RK18-RK24 119.542 100 110 HDPE PN 10 6.4 0.81 8.34
BT65-D475 420.615 300 DN 300 GRP PN 20 123.47 1.75 9.5
BT47-BT57 211.704 75 90 HDPE PN 10 1.08 0.24 1.25
BT57-BT58 146.45 63 75 HDPE PN 10 1.69 0.54 6.7
BT50-BT59 145.492 50 63 HDPE PN 10 0.13 0.07 0.18
BT47-BT46 57.6826 75 90 HDPE PN 10 -2.11 0.48 4.33
BT46-BT54 288.16 75 90 HDPE PN 10 -0.99 0.22 1.06
BT49-BT50 28.1347 50 63 HDPE PN 10 0.43 0.22 1.63
BT24-BT25 230.66 200 225 HDPE PN 10 -16.48 0.52 1.64
BT31-BT26 73.6274 125 140 HDPE PN 10 -5.67 0.46 2.25

68 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
BT32-BT31 113.364 100 110 HDPE PN 10 -3.95 0.5 3.42
BT40-BT4 59.5893 150 180 HDPE PN 10 9.72 0.55 2.51
BT39-BT40 170.173 100 110 HDPE PN 10 6.16 0.78 7.76
BT34-BT30 99.2543 100 110 HDPE PN 10 -2.43 0.31 1.39
BT21-BT18 89.4867 50 63 HDPE PN 10 0.09 0.04 0.09
BT22-BT21 158.634 100 110 HDPE PN 10 3.72 0.47 3.05
BT72-BT17 157.383 50 63 HDPE PN 10 -0.61 0.31 3.13
J-515-BT80 300.571 100 110 HDPE PN 10 2.03 0.26 1
BT85-BT82 182.284 100 110 HDPE PN 10 -3.6 0.46 2.87
BT98-BT82 165.063 100 110 HDPE PN 10 -5.16 0.66 5.6
BT85-D503 84.0004 75 90 HDPE PN 10 3.03 0.69 8.48
D503-BT91 122.265 75 90 HDPE PN 10 2.23 0.5 4.81
BT89-BT90 56.9102 50 63 HDPE PN 10 0.14 0.07 0.2
BT90-BT95 53.91 50 63 HDPE PN 10 0.3 0.15 0.81
BT95-BT94 18.39 50 63 HDPE PN 10 0.09 0.04 0.09
BT91-BT94 114.667 50 63 HDPE PN 10 0.38 0.2 1.33
BT91-BT92 96.472 75 90 HDPE PN 10 1.77 0.4 3.13
BT77-BT93 208.551 50 63 HDPE PN 10 -0.46 0.23 1.85
BT10-BT12 123.58 75 90 HDPE PN 10 2.12 0.48 4.39
BT9-BT10 192.88 100 110 HDPE PN 10 3.53 0.45 2.77
BT9-BT17 570.615 50 63 HDPE PN 10 -0.06 0.03 0.03
BT4-BT7 172.809 100 110 HDPE PN 10 4.53 0.58 4.4
BT4-BT5 202.51 50 63 HDPE PN 10 1.48 0.75 16.23
BR5-BR6 212.089 50 63 HDPE PN 16 -1.28 0.65 12.46
BR3-BR5 280.778 50 63 HDPE PN 16 -0.38 0.2 1.33
BR2-BR3 222.672 50 63 HDPE PN 12 0.85 0.43 5.78
BR16-BR15 664.53 200 225 HDPE PN 10 26.26 0.84 3.89
IS33-IS35 662.057 50 63 HDPE PN 10 0.86 0.44 5.94
IS3-IS29 464.097 100 110 HDPE PN 10 2.96 0.38 2
IS25-IS26 188.236 50 63 HDPE PN 10 0.12 0.06 0.15
IS24-IS25 181.979 50 63 HDPE PN 10 0.27 0.14 0.72
IS23-IS24 149.272 50 63 HDPE PN 10 0.33 0.17 1.03
IS22-IS23 278.368 50 63 HDPE PN 10 0.41 0.21 1.49
IS3-IS22 483.709 50 63 HDPE PN 10 1.06 0.54 8.79
IS20-IS21 199.92 75 90 HDPE PN 10 2 0.45 3.94
IS19-IS20 247.718 75 90 HDPE PN 10 2.18 0.49 4.6
IS18-IS19 266.378 75 90 HDPE PN 10 2.31 0.52 5.14
IS17-IS18 201.191 100 110 HDPE PN 10 3.34 0.42 2.5
IS16-IS17 199.346 100 110 HDPE PN 10 3.56 0.45 2.81
IS15-IS16 91.0819 100 110 HDPE PN 10 3.73 0.47 3.06
IS14-IS15 72.0057 100 110 HDPE PN 10 3.85 0.49 3.26
IS8-IS9 322.016 250 DN 250 GRP PN 10 -34.75 0.71 2.21
IS7-IS8 266.638 250 DN 250 GRP PN 10 -34.54 0.7 2.18
IS11-IS7 257.1 250 DN 250 GRP PN 10 -34.39 0.7 2.16
IS6-IS11 68.0923 200 225 HDPE PN 10 -29.82 0.95 4.93
IS12-IS13 181.523 100 110 HDPE PN 10 4.37 0.56 4.11

69 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
IS5-IS6 294.283 200 225 HDPE PN 10 -29.77 0.95 4.91
IS4-IS5 326.71 200 225 HDPE PN 10 -29.24 0.93 4.75
IS3-IS4 371.428 200 225 HDPE PN 10 -29.24 0.93 4.75
IS2-IS3 272.198 200 225 HDPE PN 10 -25.02 0.8 3.56
SG8-SG9 390.751 200 250 HDPE PN 12 -21.33 0.68 2.65
SG7-SG8 369.953 200 250 HDPE PN 16 -19.31 0.61 2.2
SG6-SG7 364.126 150 180 HDPE PN 16 -17.37 0.98 7.35
SG5-SG6 252.889 150 180 HDPE PN 12 -15.76 0.89 6.14
SG5-SG11 755.365 50 63 HDPE PN 10 1.55 0.79 17.73
SG3-SG4 211.6 150 180 HDPE PN 12 -9.66 0.55 2.48
SG2-SG3 261.508 150 180 HDPE PN 16 -8.66 0.49 2.03
KI41-KI42 278.879 200 225 HDPE PN 10 11.57 0.37 0.85
KI40-KI41 310.636 200 225 HDPE PN 10 13.05 0.42 1.07
KI92-KI41 196.955 50 63 HDPE PN 10 -0.77 0.39 4.31
KI45-KI92 171.44 75 90 HDPE PN 10 1.09 0.25 1.26
KI46-KI45 385.762 75 90 HDPE PN 10 0.84 0.19 0.79
SG20-SG19 231.643 125 160 HDPE PN 16 6.6 0.54 2.97
SG13-SG20 242.744 125 140 HDPE PN 10 7.39 0.6 3.67
SG21-SG14 357.526 200 225 HDPE PN 10 20.14 0.64 2.38
MK7-MK6 351.683 200 250 HDPE PN 12 21.39 0.68 2.66
MK8-MK7 487.301 200 250 HDPE PN 12 21.6 0.69 2.71
MK9-MK8 478.64 200 225 HDPE PN 10 22.06 0.7 2.82
BR7-BR8 366.21 150 180 HDPE PN 16 15.26 0.86 5.78
MB13-MB3 377.01 50 63 HDPE PN 10 -0.11 0.06 0.13
KI67-KI66 127.475 100 125 HDPE PN 16 -4.62 0.59 4.57
KI49-KI48 241.123 100 110 HDPE PN 10 3.65 0.47 2.95
KI70-KI68 97.715 50 63 HDPE PN 10 -0.24 0.12 0.55
KI69-KI70 86.3713 50 63 HDPE PN 10 -0.11 0.06 0.13
KI51-KI69 279.517 50 63 HDPE PN 10 0.4 0.2 1.44
KI50-KI51 233.32 50 63 HDPE PN 10 0.72 0.37 4.27
KI11-KI13 223.274 300 DN 300 GRP PN 10 -61.18 0.87 2.59
KI75-KI61 435.014 150 180 HDPE PN 10 12.61 0.71 4.07
KI78-KI77 518.124 75 90 HDPE PN 10 2.27 0.51 4.98
J-404-KI78 423.18 125 140 HDPE PN 10 4.69 0.38 1.58
KI79-KI80 650.683 50 63 HDPE PN 12 1.26 0.64 12.12
KI82-KI81 361.89 32 40 HDPE PN 10 1.41 1.76 130.76
KI83-KI82 408.85 100 110 HDPE PN 10 2.79 0.35 1.79
KI44-KI43 124.085 200 225 HDPE PN 10 24.62 0.78 3.46
KI46-KI44 365.323 200 225 HDPE PN 10 23.61 0.75 3.2
KI37-KI46 563.73 200 225 HDPE PN 10 26.05 0.83 3.83
KI36-KI37 471.245 200 225 HDPE PN 10 26.88 0.86 4.06
KI40-KI45 220.121 75 90 HDPE PN 10 2.12 0.48 4.38
KI39-KI83 154.32 200 225 HDPE PN 10 19.01 0.61 2.14
KI38-KI39 324.034 200 225 HDPE PN 10 19.58 0.62 2.26
KI36-J-404 292.52 200 225 HDPE PN 10 27.06 0.86 4.11
J-529-KI36 160.492 250 DN 250 GRP PN 10 55.12 1.12 5.18

70 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
KI35-J-529 73.1788 250 DN 250 GRP PN 10 58.33 1.19 5.76
KI75-KI35 94.5704 250 DN 250 GRP PN 10 63.49 1.29 6.73
KI34-KI75 254.67 300 DN 300 GRP PN 10 76.67 1.08 3.93
KI33-KI34 405.86 400 DN 400 GRP PN 10 141.87 1.13 3.02
KI25-KI23 335.617 150 180 HDPE PN 10 14.82 0.84 5.48
KI31-KI33 211.704 400 DN 400 GRP PN 10 158.57 1.26 3.72
KI30-KI31 297.454 400 DN 400 GRP PN 10 164.23 1.31 3.97
KI29-KI30 329.59 200 225 HDPE PN 10 -33.34 1.06 6.06
KI47-KI46 395.292 75 90 HDPE PN 10 -0.23 0.05 0.06
KI16-KI15 85.9953 100 110 HDPE PN 10 -2.84 0.36 1.85
KI74-KI15 155.98 50 63 HDPE PN 10 -0.62 0.32 3.2
KI73-KI74 74.1805 50 63 HDPE PN 10 -0.34 0.18 1.06
KI71-KI72 25.7209 50 63 HDPE PN 10 0.37 0.19 1.26
KI10-KI16 239.633 75 90 HDPE PN 10 -1.59 0.36 2.58
KI9-KI4 212.437 150 180 HDPE PN 10 17.06 0.97 7.11
KI4-KI5 224.124 150 180 HDPE PN 10 9.6 0.54 2.45
KZ14-KZ15 718.496 200 225 HDPE PN 10 25.37 0.81 3.65
KZ12-KZ13 335.134 75 90 HDPE PN 10 -1.92 0.43 3.59
KT.5-KT.6 362.03 100 110 HDPE PN 10 4.31 0.55 4.01
KT.4-KT.5 193.964 125 140 HDPE PN 10 9.97 0.81 6.4
KI26-KI24 268.271 200 225 HDPE PN 10 35.8 1.14 6.91
KI29-KI26 240.086 200 225 HDPE PN 10 36.15 1.15 7.03
KG6-KG7 503.36 125 140 HDPE PN 10 -11.1 0.9 7.79
KG5-KG6 797.311 125 140 HDPE PN 10 -8.21 0.67 4.46
KG4-KG5 415.242 100 110 HDPE PN 10 -6.63 0.84 8.89
KG3-KG4 213.002 100 110 HDPE PN 10 -3.74 0.48 3.08
D473-DP88 720.626 32 40 HDPE PN 10 0.4 0.5 12.63
BT52-BT53 138.02 50 63 HDPE PN 10 -0.62 0.31 3.21
BT53-BT54 202.85 50 63 HDPE PN 10 -0.79 0.4 5.08
D471-D472 495.646 50 63 HDPE PN 10 0.06 0.03 0.05
BT67-D471 189.323 50 63 HDPE PN 10 0.46 0.24 1.89
D471-DP74 564.517 32 40 HDPE PN 10 0.4 0.5 12.63
D416-DP101 872.342 32 40 HDPE PN 10 0.4 0.5 12.63
D414-D416 746.96 50 63 HDPE PN 10 0.4 0.2 1.44
D470-D414 529.48 63 75 HDPE PN 10 0.8 0.26 1.68
DP105-D414 271.14 32 40 HDPE PN 10 -0.4 0.5 12.63
D403-DP78 198.893 32 40 HDPE PN 10 0.4 0.5 12.63
D404-DP97 25.6967 50 63 HDPE PN 10 0.4 0.2 1.44
D404-D470 46.15 50 63 HDPE PN 10 -0.4 0.2 1.44
D469-DP102 105.367 32 40 HDPE PN 10 0.4 0.5 12.63
D415-D469 349.187 50 63 HDPE PN 10 0.4 0.2 1.44
D467-DP459 610.266 32 40 HDPE PN 16 0.4 0.5 12.63
D467-DP87 68.118 32 40 HDPE PN 12 0.4 0.5 12.63
D468-D467 488.613 50 63 HDPE PN 12 0.8 0.41 5.19
D466-D468 620.284 63 75 HDPE PN 10 -0.8 0.26 1.68
D466-DP85 46.2131 32 40 HDPE PN 10 0.4 0.5 12.63

71 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D465-D466 561.1 50 63 HDPE PN 10 -0.4 0.2 1.44
D465-DP83 477.81 38 40 HDPE PN 10 0.4 0.35 5.47
D453-DP460 440.783 32 40 HDPE PN 10 0.4 0.5 12.63
D454-D453 1037.26 50 63 HDPE PN 10 0.4 0.2 1.44
DP67-DP70 637.917 32 40 HDPE PN 10 0.4 0.5 12.63
D454-DP67 120.621 50 63 HDPE PN 10 0.8 0.41 5.19
D455-D454 1334.41 63 75 HDPE PN 10 1.2 0.38 3.57
DP82-DP69 233.22 32 40 HDPE PN 10 0.4 0.5 12.63
D455-DP82 90.9182 50 63 HDPE PN 10 0.8 0.41 5.19
D456-D455 891.56 75 90 HDPE PN 10 2 0.45 3.93
D457-D456 422.19 75 90 HDPE PN 10 2 0.45 3.93
D458-D457 742.793 75 90 HDPE PN 10 2 0.45 3.93
D461-D458 112.423 50 63 HDPE PN 10 1.04 0.53 8.48
D459-D458 238.294 50 63 HDPE PN 10 0.96 0.49 7.22
D459-DP68 29.1822 50 63 HDPE PN 10 0.4 0.2 1.43
D462-D459 127.586 50 63 HDPE PN 10 1.36 0.69 13.79
DP86-D461 362.443 50 63 HDPE PN 10 1.04 0.53 8.48
D460-DP86 44.9099 50 63 HDPE PN 10 1.44 0.74 15.47
D451-DP41 184.979 32 40 HDPE PN 16 0.4 0.5 12.63
D450-D451 498.463 50 63 HDPE PN 16 0.4 0.2 1.44
D450-DP39 988.203 32 40 HDPE PN 16 0.4 0.5 12.63
D449-D450 546.29 50 63 HDPE PN 16 0.8 0.41 5.19
D449-DP38 113.58 32 40 HDPE PN 16 0.4 0.5 12.63
BG29-D449 223.95 50 63 HDPE PN 16 1.2 0.61 10.99
D448-BG29 144.821 63 75 HDPE PN 10 2.42 0.78 13.04
D448-DP40 133.658 32 40 HDPE PN 16 0.4 0.5 12.63
BG28-D448 390.8 100 125 HDPE PN 16 2.82 0.36 1.82
D452-BG28 348.34 100 110 HDPE PN 10 3.31 0.42 2.46
D452-DP52 36.87 32 40 HDPE PN 12 0.4 0.5 12.63
BG27-D452 512.87 100 125 HDPE PN 16 3.71 0.47 3.04
DP584-DP583 860.82 32 40 HDPE PN 16 0.4 0.5 12.63
DP656-DP584 1414.14 50 63 HDPE PN 16 0.8 0.41 5.19
D447-DP656 857.989 50 63 HDPE PN 16 1.2 0.61 10.99
D447-DP238 894.886 32 40 HDPE PN 16 0.4 0.5 12.63
D447-DP239 422.669 32 40 HDPE PN 16 0.4 0.5 12.63
KN2-D447 2514.36 75 90 HDPE PN 16 2 0.45 3.93
DP440-DP433 1756.67 50 63 HDPE PN 10 0.8 0.41 5.19
MRW9-DP447 1099.96 38 40 HDPE PN 16 0.8 0.71 19.74
DP435-DP434 1967.06 38 40 HDPE PN 12 0.8 0.71 19.74
D446-MRW7 237.234 100 125 HDPE PN 16 5.51 0.7 6.32
D446-DP435 84.4514 50 63 HDPE PN 16 1.2 0.61 10.99
MRW5-D446 119.538 100 125 HDPE PN 16 6.71 0.85 9.1
D445-MRW5 133.333 100 125 HDPE PN 16 8.16 1.04 13.07
D445-DP443 126.763 32 40 HDPE PN 12 0.4 0.5 12.63
MRW4-D445 296.569 125 140 HDPE PN 10 8.56 0.7 4.82
D444-MRW4 147.775 125 140 HDPE PN 10 11.85 0.97 8.8

72 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D444-DP442 187.864 32 40 HDPE PN 12 0.4 0.5 12.63
D443-D444 575.572 125 140 HDPE PN 10 12.25 1 9.35
D443-DP436 978.029 50 63 HDPE PN 10 0.8 0.41 5.19
MRW3-D443 287.262 125 140 HDPE PN 10 13.05 1.06 10.52
MRW3-DP439 80.6123 32 40 HDPE PN 10 0.4 0.5 12.63
DP438-MRW3 687.281 150 180 HDPE PN 10 16.43 0.93 6.63
MRW2-DP438 226.084 150 180 HDPE PN 10 16.83 0.95 6.93
D440-MRW2 539.115 150 180 HDPE PN 10 18.98 1.07 8.66
D440-DP440 1520.1 50 63 HDPE PN 10 1.2 0.61 10.99
D440-DP441 134.624 150 180 HDPE PN 10 -20.18 1.14 9.7
DP441-DP444 571.119 32 40 HDPE PN 10 0.4 0.5 12.63
MRW1-DP441 151.592 150 180 HDPE PN 10 20.98 1.19 10.43
D442-DP373 448.169 50 63 HDPE PN 10 1.2 0.61 10.99
D439-DP445 218.26 32 40 HDPE PN 10 0.4 0.5 12.63
D439-DP446 207.892 32 40 HDPE PN 12 0.4 0.5 12.63
D438-MG32 326.145 150 180 HDPE PN 12 24.08 1.36 13.46
D438-DP370 371.752 32 40 HDPE PN 10 0.4 0.5 12.63
D435-D438 524.115 150 180 HDPE PN 10 24.48 1.39 13.88
D437-MG31 217.497 50 63 HDPE PN 10 1.82 0.92 23.66
D437-DP374 52.1974 32 40 HDPE PN 10 0.4 0.5 12.63
D442-D437 177.22 63 75 HDPE PN 10 2.22 0.71 11.1
D436-D442 87.8603 100 110 HDPE PN 10 3.42 0.43 2.61
D436-DP371 120.562 32 40 HDPE PN 10 0.4 0.5 12.63
MG19-D436 151.641 100 110 HDPE PN 10 3.82 0.49 3.2
DP373-DP372 255.335 32 40 HDPE PN 10 0.8 0.99 45.6
D431-DP361 565.57 32 40 HDPE PN 10 0.4 0.5 12.63
MG21-DP359 94.6894 32 40 HDPE PN 16 0.4 0.5 12.63
D434-MG21 1242.64 50 63 HDPE PN 16 1.32 0.67 13.16
D435-DP357 32.3197 32 40 HDPE PN 10 0.4 0.5 12.63
MG19-D435 118.263 200 225 HDPE PN 10 24.88 0.79 3.52
MG19-D434 129.606 75 90 HDPE PN 10 1.72 0.39 2.98
D434-DP360 253.883 32 40 HDPE PN 10 0.4 0.5 12.63
D433-MG19 718.56 200 225 HDPE PN 10 31.95 1.02 5.6
D433-DP358 148.997 32 40 HDPE PN 10 0.4 0.5 12.63
MG17-D433 73.5254 200 225 HDPE PN 10 32.35 1.03 5.73
D432-MG17 322.996 200 225 HDPE PN 10 35.19 1.12 6.7
D432-DP362 83.2119 32 40 HDPE PN 10 0.4 0.5 12.63
D431-D432 469.649 200 225 HDPE PN 10 35.59 1.13 6.84
MG13-D431 181.127 200 225 HDPE PN 10 36.39 1.16 7.12
MG13-DP363 213.907 32 40 HDPE PN 10 0.4 0.5 12.63
D431-DP364 253.194 38 40 HDPE PN 10 0.4 0.35 5.47
D441-DP379 558.485 38 40 HDPE PN 10 0.4 0.35 5.47
D441-DP376 70.4914 32 40 HDPE PN 10 0.4 0.5 12.63
MG12-D441 125.815 50 63 HDPE PN 10 0.8 0.41 5.19
D430-DP366 53.0935 32 40 HDPE PN 10 0.4 0.5 12.63
D430-MG24 81.1 32 40 HDPE PN 10 0.39 0.49 12.16

73 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
MG30-D430 330.837 50 63 HDPE PN 10 0.79 0.4 5.09
MG23-D429 242.908 63 75 HDPE PN 10 1.53 0.49 5.57
MG30-D429 90.0134 50 63 HDPE PN 10 -1.13 0.57 9.77
D429-DP368 130.004 32 40 HDPE PN 10 0.4 0.5 12.63
DP365-MG23 39.0199 100 110 HDPE PN 10 3.79 0.48 3.15
MG8-DP365 269.119 100 110 HDPE PN 10 4.19 0.53 3.8
D428-MG27 333.019 38 40 HDPE PN 10 0.67 0.59 14.32
D428-DP367 52.2817 32 40 HDPE PN 10 0.4 0.5 12.63
MG25-D428 193.797 50 63 HDPE PN 10 1.07 0.55 8.93
MG6-DP369 131.056 32 40 HDPE PN 10 0.4 0.5 12.63
D427-MG10 279.17 38 40 HDPE PN 10 0.67 0.59 14.2
D427-DP380 25.7008 32 40 HDPE PN 10 0.4 0.5 12.64
MG9-D427 164.284 50 63 HDPE PN 10 1.07 0.54 8.88
D426-MG9 152.66 200 225 HDPE PN 10 43.19 1.37 9.78
D426-DP375 114.728 32 40 HDPE PN 10 0.4 0.5 12.63
D425-D426 197.397 200 225 HDPE PN 10 43.59 1.39 9.95
D425-DP378 78.3039 32 40 HDPE PN 10 0.4 0.5 12.63
MG8-D425 168.269 250 DN 250 GRP PN 10 43.99 0.9 3.41
D424-MG8 172.828 250 DN 250 GRP PN 10 48.42 0.99 4.08
D424-DP377 64.065 32 40 HDPE PN 10 0.4 0.5 12.63
MG3-D424 50.1653 250 DN 250 GRP PN 10 48.82 0.99 4.14
D341-D423 1001.15 250 DN 250 GRP PN 20 50.7 1.03 4.44
DP84-DP96 159.75 32 40 HDPE PN 10 0.4 0.5 12.63
BT99-DP84 250.97 63 75 HDPE PN 10 0.8 0.26 1.68
D402-MZ1 168.73 100 110 HDPE PN 10 2.63 0.33 1.6
D402-DP93 26.8033 32 40 HDPE PN 10 0.4 0.5 12.63
D400-D402 557.434 100 110 HDPE PN 10 3.03 0.39 2.08
MZ2-D400 206.088 100 110 HDPE PN 10 3.43 0.44 2.62
D400-DP98 135.477 32 40 HDPE PN 10 0.4 0.5 12.63
D399-MZ2 188.535 100 110 HDPE PN 10 4.03 0.51 3.55
D398-D399 300.309 125 140 HDPE PN 10 4.43 0.36 1.42
MZ3-D398 400.422 125 140 HDPE PN 10 4.83 0.39 1.67
D399-DP466 170.919 32 40 HDPE PN 10 0.4 0.5 12.63
D398-DP455 89.8255 32 40 HDPE PN 10 0.4 0.5 12.63
D412-DP464 58.69 32 40 HDPE PN 10 0.4 0.5 12.63
MZ13-D412 111.21 100 110 HDPE PN 10 3.6 0.46 2.87
D391-MZ13 477.502 100 110 HDPE PN 10 4.04 0.51 3.56
D391-DP461 368.174 32 40 HDPE PN 10 0.4 0.5 12.63
D392-D391 199.461 100 110 HDPE PN 10 4.44 0.57 4.24
D392-DP462 186.879 32 40 HDPE PN 10 0.4 0.5 12.63
MZ12-D392 290.864 100 110 HDPE PN 10 4.84 0.62 4.98
MZ12-DP463 118.855 32 40 HDPE PN 10 0.4 0.5 12.63
D393-MZ12 126.674 100 110 HDPE PN 10 5.68 0.72 6.68
D393-DP458 46.6158 32 40 HDPE PN 10 0.4 0.5 12.63
D394-D393 490.46 100 110 HDPE PN 10 6.08 0.77 7.58
D394-DP470 201.896 32 40 HDPE PN 10 0.4 0.5 12.63

74 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D394-DP456 151.686 32 40 HDPE PN 10 0.4 0.5 12.63
MZ11-D394 262.356 125 140 HDPE PN 10 6.88 0.56 3.21
D395-MZ9 141.695 50 63 HDPE PN 10 0.73 0.37 4.32
MZ4-D395 413.675 50 63 HDPE PN 10 1.13 0.57 9.75
D395-DP457 33.0826 32 40 HDPE PN 10 0.4 0.5 12.63
D397-DP465 28.0842 32 40 HDPE PN 10 0.4 0.5 12.63
D397-MZ5 340.056 32 40 HDPE PN 10 0.22 0.27 4.09
MZ4-D397 206.454 50 63 HDPE PN 10 0.62 0.31 3.21
D396-DP453 60.1077 32 40 HDPE PN 10 0.4 0.5 12.63
D396-MZ11 631.625 125 140 HDPE PN 10 7.3 0.59 3.59
MZ3-D396 208.886 125 140 HDPE PN 10 7.7 0.63 3.96
D401-DP454 19.4822 32 40 HDPE PN 10 0.4 0.5 12.64
D401-MZ6 330.453 200 225 HDPE PN 10 18.84 0.6 2.11
BG1-D401 909.96 200 225 HDPE PN 10 19.24 0.61 2.19
BG19-DP48 371.324 32 40 HDPE PN 10 0.4 0.5 12.63
BG18-DP51 233.135 32 40 HDPE PN 10 0.4 0.5 12.63
D411-BG18 194.816 50 63 HDPE PN 10 -0.53 0.27 2.41
D411-DP49 28.6263 32 40 HDPE PN 10 0.4 0.5 12.63
BG15-D411 508.161 50 63 HDPE PN 10 -0.13 0.07 0.18
D410-BG11 97.1093 50 63 HDPE PN 10 -0.13 0.07 0.18
BG12-D410 426.644 50 63 HDPE PN 10 0.27 0.14 0.69
D410-DP46 11.0731 32 40 HDPE PN 10 0.4 0.5 12.63
BG20-DP43 38.5884 32 40 HDPE PN 10 0.4 0.5 12.63
D409-BG20 288.015 200 225 HDPE PN 10 -19.99 0.64 2.35
D409-DP44 73.8873 32 40 HDPE PN 10 0.4 0.5 12.63
BG21-D409 179.47 200 225 HDPE PN 10 -19.59 0.62 2.26
BG22-DP47 37.3264 32 40 HDPE PN 10 0.4 0.5 12.63
D390-DP471 251.78 32 40 HDPE PN 10 0.4 0.5 12.63
D408-D390 765.706 75 90 HDPE PN 10 -2.8 0.63 7.32
D407-D408 1180.5 75 90 HDPE PN 10 -2.8 0.63 7.32
D407-D385 390.604 63 75 HDPE PN 10 1.2 0.38 3.56
D386-D407 150.735 75 90 HDPE PN 10 -1.6 0.36 2.6
D388-DP472 833.11 32 40 HDPE PN 12 0.4 0.5 12.63
D389-DP451 352.724 32 40 HDPE PN 12 0.4 0.5 12.63
D388-D389 309.492 50 63 HDPE PN 12 0.4 0.2 1.44
D387-D388 748.62 50 63 HDPE PN 12 0.8 0.41 5.19
D387-DP449 601.208 32 40 HDPE PN 10 0.4 0.5 12.63
D386-D387 564.092 63 75 HDPE PN 10 1.2 0.38 3.56
D386-DP450 40.61 32 40 HDPE PN 10 0.4 0.5 12.63
D385-DP467 790.884 38 40 HDPE PN 10 0.4 0.35 5.47
D384-D385 389.638 50 63 HDPE PN 10 -0.8 0.41 5.19
D384-DP469 244.647 32 40 HDPE PN 10 0.4 0.5 12.63
D383-D384 1414.87 50 63 HDPE PN 10 -0.4 0.2 1.44
D383-DP468 389.567 38 40 HDPE PN 10 0.4 0.35 5.47
D377-DP60 276.817 32 40 HDPE PN 10 0.4 0.5 12.63
D380-BG2 377.741 100 110 HDPE PN 10 2.81 0.36 1.81

75 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D380-DP61 33.5445 32 40 HDPE PN 10 0.4 0.5 12.63
BG3-D380 227.26 100 110 HDPE PN 10 3.21 0.41 2.32
D379-BG5 140.356 75 90 HDPE PN 10 -1.53 0.35 2.4
D379-DP59 80.88 32 40 HDPE PN 10 0.4 0.5 12.63
BG7-D379 138.203 50 63 HDPE PN 10 -1.13 0.58 9.87
D378-BG4 186.328 50 63 HDPE PN 10 -0.69 0.35 3.9
BG6-D378 103.286 50 63 HDPE PN 10 -0.29 0.15 0.77
BG5-BG4 252.355 50 63 HDPE PN 10 0.69 0.35 3.96
D378-DP58 30.5933 32 40 HDPE PN 10 0.4 0.5 12.63
D377-BG6 320.472 50 63 HDPE PN 10 0.04 0.02 0.02
BG7-D377 58.2334 50 63 HDPE PN 10 0.44 0.22 1.7
BG8-DP63 591.3 50 63 HDPE PN 10 0.4 0.2 1.44
D375-DP66 684.335 32 40 HDPE PN 10 0.4 0.5 12.63
D374-DP65 32.9016 32 40 HDPE PN 10 0.4 0.5 12.63
D375-DP62 32.4887 32 40 HDPE PN 10 0.4 0.5 12.63
D374-D375 57.6723 50 63 HDPE PN 10 0.8 0.41 5.19
DP64-D374 895.725 63 75 HDPE PN 10 1.2 0.38 3.56
D373-DP64 1314.84 75 90 HDPE PN 10 1.6 0.36 2.6
D373-DP416 1347.49 32 40 HDPE PN 10 0.4 0.5 12.63
D373-DP53 424.914 32 40 HDPE PN 12 0.4 0.5 12.63
D372-D373 1097.28 100 125 HDPE PN 16 2.4 0.31 1.36
D376-BG14 675.826 350 DN 350 GRP PN 10 -124.52 1.29 4.55
BG23-D376 406.591 350 DN 350 GRP PN 20 -124.12 1.29 4.53
D376-DP45 57.9291 32 40 HDPE PN 10 0.4 0.5 12.63
D371-BG24 1827.08 350 DN 350 GRP PN 20 -117.1 1.22 4.06
KN1-D371 288.95 350 DN 350 GRP PN 20 -116.7 1.21 4.04
D370-KN1 746.96 350 DN 350 GRP PN 20 -116.02 1.21 3.99
KN2-D370 272.673 350 DN 350 GRP PN 10 -115.62 1.2 3.97
D370-DP241 43.9006 32 40 HDPE PN 10 0.4 0.5 12.63
KN2-DP240 240.287 32 40 HDPE PN 10 0.4 0.5 12.63
KU4-DP278 2282.91 50 63 HDPE PN 16 0.8 0.41 5.19
DP270-KU3 48.9906 32 40 HDPE PN 16 0.11 0.14 1.16
KU2-DP270 250.563 50 63 HDPE PN 16 0.51 0.26 2.25
D356-KU4 652.154 100 125 HDPE PN 16 5.83 0.74 7.01
KU8-D356 163.328 125 140 HDPE PN 10 6.23 0.51 2.67
D356-DP275 44.6774 32 40 HDPE PN 12 0.4 0.5 12.63
KU10-DP273 2041.49 50 63 HDPE PN 12 0.8 0.41 5.19
D362-DP408 1840.12 50 63 HDPE PN 12 0.8 0.41 5.19
D362-DP410 1174.92 50 63 HDPE PN 12 0.8 0.41 5.19
DP413-D362 218.36 63 75 HDPE PN 10 2 0.64 9.18
D361-DP413 824.293 75 90 HDPE PN 16 2.4 0.54 5.5
D361-DP412 222.963 32 40 HDPE PN 16 0.4 0.5 12.63
D363-D361 1115.64 75 90 HDPE PN 16 2.8 0.63 7.32
D358-DP404 1400.7 38 40 HDPE PN 16 0.8 0.71 19.74
D358-DP414 85.06 32 40 HDPE PN 12 0.4 0.5 12.63
MT5-D358 445.93 63 75 HDPE PN 10 1.2 0.38 3.57

76 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D363-DP411 1492.95 50 63 HDPE PN 16 0.8 0.41 5.19
DP409-D363 1392.13 100 125 HDPE PN 16 3.6 0.46 2.87
D360-DP409 114.933 100 125 HDPE PN 16 4 0.51 3.49
D359-D360 856.988 100 110 HDPE PN 10 4 0.51 3.49
D359-DP406 154.148 32 40 HDPE PN 12 0.4 0.5 12.63
MT8-D359 343.19 100 110 HDPE PN 10 4.4 0.56 4.17
D369-MT2 279.328 125 140 HDPE PN 10 13.24 1.08 10.81
MT1-D369 137.517 150 180 HDPE PN 10 13.64 0.77 4.7
D369-DP405 92.8995 32 40 HDPE PN 12 0.4 0.5 12.63
MT1-DP401 333.59 32 40 HDPE PN 10 0.4 0.5 12.63
D353-DP15 1166.67 50 63 HDPE PN 10 0.8 0.41 5.19
D353-DP245 77.82 32 40 HDPE PN 10 0.4 0.5 12.63
D352-D353 2226.25 75 90 HDPE PN 10 1.6 0.36 2.6
D352-DP246 42.4984 32 40 HDPE PN 10 0.4 0.5 12.63
BTK1-D352 408.5 75 90 HDPE PN 10 2 0.45 3.93
D368-DP18 1189.52 63 75 HDPE PN 10 -1.2 0.38 3.57
D367-D368 967.279 63 75 HDPE PN 10 -1.2 0.38 3.56
D367-DP14 469.093 32 40 HDPE PN 16 0.4 0.5 12.63
DP13-D367 1969.81 50 63 HDPE PN 16 -0.8 0.41 5.19
MRW6-DP437 90.458 32 40 HDPE PN 16 0.4 0.5 12.63
MRW7-DP448 1546.19 38 40 HDPE PN 16 0.8 0.71 19.74
D351-DP18 111.435 75 90 HDPE PN 10 1.6 0.36 2.6
D364-D351 393.056 75 90 HDPE PN 10 1.6 0.36 2.6
DP19-D364 202.054 75 90 HDPE PN 10 -2.63 0.59 6.51
D365-DP19 738.101 75 90 HDPE PN 10 -2.23 0.5 4.8
BTK5-D365 194.624 63 75 HDPE PN 10 -1.35 0.43 4.45
D350-D364 570.888 100 110 HDPE PN 10 4.23 0.54 3.87
BTK1-D350 197.71 125 140 HDPE PN 10 4.63 0.38 1.54
D350-DP249 144.438 32 40 HDPE PN 10 0.4 0.5 12.63
KN7-DP247 113.11 32 40 HDPE PN 10 0.4 0.5 12.63
DP252-DP243 1240.12 38 40 HDPE PN 10 0.8 0.71 19.74
DP277-KU1 664.962 125 140 HDPE PN 10 8.6 0.7 4.86
DP276-DP277 1177.64 150 180 HDPE PN 10 9 0.51 2.18
KN5-D355 2276.17 200 250 HDPE PN 16 25.99 0.83 3.82
KN5-DP251 42.7214 32 40 HDPE PN 10 0.4 0.5 12.63
KN8-KN5 681.524 200 225 HDPE PN 10 26.84 0.85 4.05
D354-DP252 264.874 50 63 HDPE PN 10 1.2 0.61 10.99
KN4-DP250 105.626 32 40 HDPE PN 10 0.4 0.5 12.63
KN9-KN10 277.925 38 40 HDPE PN 10 0.49 0.44 8.07
D354-KN9 148.058 63 75 HDPE PN 10 0.96 0.31 2.37
KN8-D354 152.944 75 90 HDPE PN 10 2.16 0.49 4.54
D349-BTK1 206.18 125 140 HDPE PN 10 7.41 0.6 3.69
D335-D349 93.5643 125 140 HDPE PN 10 7.81 0.64 4.07
D349-DP248 74.2922 32 40 HDPE PN 10 0.4 0.5 12.63
D348-D335 262.594 250 DN 250 GRP PN 10 -67.57 1.38 7.56
D348-DP11 32.9297 32 40 HDPE PN 10 0.4 0.5 12.63

77 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D347-D348 85.2861 250 DN 250 GRP PN 10 -67.17 1.37 7.47
D347-DP10 149.746 32 40 HDPE PN 10 0.4 0.5 12.63
BTK2-D347 56.21 250 DN 250 GRP PN 10 -66.77 1.36 7.39
D346-BTK2 382.93 250 DN 250 GRP PN 10 -66.4 1.35 7.32
D346-DP3 170.03 32 40 HDPE PN 10 0.4 0.5 12.63
BTK3-D346 244.634 250 DN 250 GRP PN 10 -66 1.34 7.24
D345-BTK5 345.997 63 75 HDPE PN 10 -1.08 0.35 2.93
D345-DP16 29.3308 32 40 HDPE PN 10 0.4 0.5 12.63
BTK7-D345 189.737 50 63 HDPE PN 10 -0.68 0.35 3.83
BTK7-DP17 157.901 32 40 HDPE PN 10 0.4 0.5 12.63
D344-BTK3 181.493 250 DN 250 GRP PN 10 -65.61 1.34 7.16
D344-DP6 126.204 32 40 HDPE PN 10 0.4 0.5 12.63
D343-D344 236.691 250 DN 250 GRP PN 10 -65.21 1.33 7.08
D332-D342 535.798 63 75 HDPE PN 10 -1.6 0.51 6.07
BTK8-D342 82.1639 75 90 HDPE PN 10 2 0.45 3.93
BTK8-D343 90.2286 250 DN 250 GRP PN 10 -64.81 1.32 7
D343-DP5 53.3901 32 40 HDPE PN 10 0.4 0.5 12.63
D342-DP2 55.9054 32 40 HDPE PN 10 0.4 0.5 12.63
D339-BTK9 381.847 250 DN 250 GRP PN 10 -60.7 1.24 6.2
D339-DP7 47.5507 32 40 HDPE PN 10 0.4 0.5 12.63
D340-D339 341.551 250 DN 250 GRP PN 20 -60.3 1.23 6.12
D341-D340 260.866 250 DN 250 GRP PN 20 -50.7 1.03 4.44
DP8-DP9 194.177 32 40 HDPE PN 10 0.8 0.99 45.6
D338-DP8 47.3217 50 63 HDPE PN 10 1.2 0.61 10.99
BTK9-D338 304.676 50 63 HDPE PN 10 1.2 0.61 10.99
D333-D332 268.564 50 63 HDPE PN 10 -0.8 0.41 5.19
D335-D334 147.136 300 DN 300 GRP PN 10 -75.38 1.07 3.81
D333-DP1 16.1429 32 40 HDPE PN 10 0.4 0.5 12.63
D332-DP4 46.5405 32 40 HDPE PN 10 0.4 0.5 12.63
TR12-DP664 340.879 32 40 HDPE PN 10 0.4 0.5 12.63
D330-TR13 248.2 50 63 HDPE PN 12 0.96 0.49 7.21
D330-DP665 58.6979 32 40 HDPE PN 10 0.4 0.5 12.63
TR3-D330 497.496 50 63 HDPE PN 10 1.36 0.69 13.77
D329-TR3 520.288 150 180 HDPE PN 10 -6.15 0.35 1.07
D329-DP653 25.4876 32 40 HDPE PN 10 0.4 0.5 12.63
TR4-D329 300.846 150 180 HDPE PN 10 -5.75 0.33 0.95
TR4-DP654 475.079 32 40 HDPE PN 10 0.4 0.5 12.63
DP663-TR10 172.546 50 63 HDPE PN 10 0.9 0.46 6.42
TR6-DP663 621.385 50 63 HDPE PN 10 1.3 0.66 12.7
D327-DP660 117.92 32 40 HDPE PN 10 0.4 0.5 12.63
D328-D327 190.437 100 110 HDPE PN 10 -7 0.89 9.85
D328-DP658 473.027 32 40 HDPE PN 10 0.4 0.5 12.63
D326-D328 295.054 100 110 HDPE PN 10 -6.6 0.84 8.83
D326-DP657 58.5899 32 40 HDPE PN 10 0.4 0.5 12.63
D325-D326 606.858 100 110 HDPE PN 10 -6.2 0.79 7.86
D325-DP659 174.528 32 40 HDPE PN 10 0.4 0.5 12.63

78 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
DP652-D325 461.717 100 110 HDPE PN 10 -5.8 0.74 6.95
DP652-DP655 300.632 32 40 HDPE PN 10 0.4 0.5 12.63
TR11-DP652 410.289 100 110 HDPE PN 10 -5 0.64 5.28
TR11-DP668 481.357 32 40 HDPE PN 10 0.4 0.5 12.63
D324-TR11 532.444 100 110 HDPE PN 10 -4.25 0.54 3.9
TR6-D324 107.76 100 110 HDPE PN 10 -3.85 0.49 3.25
D324-DP662 70.5291 32 40 HDPE PN 10 0.4 0.5 12.63
D323-DP661 384.23 32 40 HDPE PN 10 0.4 0.5 12.63
D323-DP666 227.24 32 40 HDPE PN 10 0.4 0.5 12.63
D323-TR6 233.71 75 90 HDPE PN 10 -3.79 0.86 12.83
D323-DP667 35.19 32 40 HDPE PN 10 0.4 0.5 12.63
TR7-D323 415.53 63 75 HDPE PN 10 -2.59 0.83 14.83
DP669-DP670 1197.78 50 63 HDPE PN 12 0.8 0.41 5.19
TR7-DP669 911.684 50 63 HDPE PN 10 1.2 0.61 10.99
RK9-DP598 26.8958 32 40 HDPE PN 10 0.4 0.5 12.63
D322-RK8 263.275 75 90 HDPE PN 10 2.59 0.59 6.33
RK6-D322 248.152 75 90 HDPE PN 10 2.99 0.68 8.25
D322-DP599 27.6548 32 40 HDPE PN 10 0.4 0.5 12.63
RK1-DP597 154.315 32 40 HDPE PN 10 0.4 0.5 12.63
RK1.1-MLN16. 748.53 200 225 HDPE PN 10 -30.37 0.97 5.09
RK2.-RK1.1 228.706 200 225 HDPE PN 10 -27.64 0.88 4.28
DP595-DP596 683.089 32 40 HDPE PN 10 0.4 0.5 12.63
RK3-RK2. 447.839 200 225 HDPE PN 10 -27.64 0.88 4.28
RK3-DP595 253.589 50 63 HDPE PN 10 0.8 0.41 5.19
RK4-RK3 607.193 200 225 HDPE PN 10 -23.25 0.74 3.11
RK4-DP591 30.9048 32 40 HDPE PN 10 0.4 0.5 12.63
D321-RK11 270.356 150 180 HDPE PN 10 -13.61 0.77 4.68
D321-DP589 16.9067 32 40 HDPE PN 10 0.4 0.5 12.63
RK12-D321 360.155 150 180 HDPE PN 10 -13.21 0.75 4.43
RK13-DP590 18.2947 32 40 HDPE PN 10 0.4 0.5 12.63
D320-RK19 283.97 75 90 HDPE PN 10 1.74 0.39 3.02
D320-DP587 102.707 32 40 HDPE PN 10 0.4 0.5 12.63
RK18-D320 178.742 75 90 HDPE PN 10 2.14 0.48 4.43
D319-RK24 107.905 100 110 HDPE PN 10 -3.85 0.49 3.26
D319-DP588 273.136 32 40 HDPE PN 10 0.4 0.5 12.63
D319-D318 211.375 100 110 HDPE PN 10 3.45 0.44 2.66
D318-DP586 95.1303 32 40 HDPE PN 10 0.4 0.5 12.63
RK22-D318 108.584 100 110 HDPE PN 10 -3.05 0.39 2.11
DP585-RK20 882.37 50 63 HDPE PN 10 0.89 0.45 6.26
RK22-DP585 494.412 50 63 HDPE PN 10 1.29 0.65 12.48
MLN80-D316 1590.06 300 DN 300 GRP PN 20 88.87 1.26 5.16
D316-DP20 1607.27 50 63 HDPE PN 10 0.8 0.41 5.19
DP592-DP593 505.28 32 40 HDPE PN 10 0.4 0.5 12.63
D317-DP592 1639.8 50 63 HDPE PN 10 0.8 0.41 5.19
D317-D315 802.86 300 DN 300 GRP PN 20 87.27 1.23 4.99
D316-D317 1835.17 300 DN 300 GRP PN 20 88.07 1.25 5.08

79 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
BS1-D315 1994.7 300 DN 300 GRP PN 20 -86.47 1.22 4.91
DP21-DP22 664.459 32 40 HDPE PN 10 0.4 0.5 12.63
D315-DP21 172.45 50 63 HDPE PN 10 0.8 0.41 5.19
D300-D274 1717.6 250 DN 250 GRP PN 20 57.38 1.17 5.58
BS21-D300 115.676 250 DN 250 GRP PN 20 57.78 1.18 5.66
BS16-D301 329.669 250 DN 250 GRP PN 20 54.6 1.11 5.09
D301-BS21 66.3495 250 DN 250 GRP PN 20 54.2 1.1 5.02
D301-DP26 24.6325 32 40 HDPE PN 16 0.4 0.5 12.63
D300-DP32 24.9323 32 40 HDPE PN 16 0.4 0.5 12.63
D310-DP700 361.496 50 63 HDPE PN 16 0.8 0.41 5.19
D311-DP702 570.466 32 40 HDPE PN 16 0.4 0.5 12.63
DP700-D311 684.236 50 63 HDPE PN 16 0.4 0.2 1.44
D314-DP698 195.239 32 40 HDPE PN 12 0.4 0.5 12.63
D313-D314 381.875 50 63 HDPE PN 12 0.4 0.2 1.44
D312-D313 465.514 50 63 HDPE PN 12 0.4 0.2 1.44
D312-DP701 99.6201 32 40 HDPE PN 16 0.4 0.5 12.63
DP697-TRT8 106.509 75 90 HDPE PN 12 -1.95 0.44 3.76
D308-DP697 719.27 75 90 HDPE PN 12 -1.55 0.35 2.46
D308-DP693 58.6449 32 40 HDPE PN 12 0.4 0.5 12.63
D312-D308 853.639 50 63 HDPE PN 12 -1.15 0.59 10.2
TRT9-D307 320.494 50 63 HDPE PN 16 -0.8 0.41 5.22
D307-DP694 56.0665 32 40 HDPE PN 16 0.4 0.5 12.63
D307-TRT7 199.62 50 63 HDPE PN 16 -1.2 0.61 11.03
TRT7-DP699 276.278 50 63 HDPE PN 16 -1.6 0.81 18.65
TRT1-DP699 121.04 63 75 HDPE PN 10 2 0.64 9.15
TRT5-DP696 59.9515 32 40 HDPE PN 12 0.4 0.5 12.63
D306-DP695 352.961 32 40 HDPE PN 12 0.4 0.5 12.63
TRT5-D306 314.911 50 63 HDPE PN 12 0.4 0.2 1.44
D305-TRT2 121.595 63 75 HDPE PN 10 1.35 0.43 4.45
D305-DP703 27.797 32 40 HDPE PN 16 0.4 0.5 12.63
TRT1-D305 352.8 75 90 HDPE PN 16 1.75 0.4 3.07
D304-TRT4 238.614 32 40 HDPE PN 16 0.27 0.34 6.22
D304-DP704 139.063 32 40 HDPE PN 16 0.4 0.5 12.63
TRT3-D304 275.216 50 63 HDPE PN 16 0.67 0.34 3.76
D303-DP30 1360.63 50 63 HDPE PN 16 0.8 0.41 5.19
D302-D303 1816.88 50 63 HDPE PN 16 0.8 0.41 5.19
D302-DP31 1056.29 32 40 HDPE PN 16 0.4 0.5 12.63
BS18-D302 1015.18 63 75 HDPE PN 10 1.2 0.38 3.57
D298-BS18 79.9939 100 125 HDPE PN 16 2.63 0.34 1.61
BS17-D298 272.78 100 125 HDPE PN 16 3.03 0.39 2.09
D298-DP33 30.6256 32 40 HDPE PN 16 0.4 0.5 12.63
D299-BS22 603.036 50 63 HDPE PN 16 0.88 0.45 6.16
D299-DP36 128.635 32 40 HDPE PN 16 0.4 0.5 12.63
BS17-D299 30.8488 63 75 HDPE PN 10 1.28 0.41 4.01
D295-DP35 402.043 32 40 HDPE PN 16 0.4 0.5 12.63
BS23-DP37 77.3376 32 40 HDPE PN 16 0.4 0.5 12.63

80 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D296-DP34 284.016 32 40 HDPE PN 16 0.4 0.5 12.63
BS12-D297 193.092 100 125 HDPE PN 16 5.3 0.67 5.88
BS9-D297 98.2469 100 125 HDPE PN 16 -4.9 0.62 5.08
D297-DP25 74.5765 32 40 HDPE PN 16 0.4 0.5 12.63
BS5-DP28 264.707 32 40 HDPE PN 16 0.4 0.5 12.63
BS6-D293 341.357 75 90 HDPE PN 16 1.58 0.36 2.55
D293-DP29 313.732 32 40 HDPE PN 12 0.4 0.5 12.63
BS7-D293 107.469 63 75 HDPE PN 10 -1.18 0.38 3.47
D294-BS8 172.206 32 40 HDPE PN 12 0.31 0.39 8
BS7-D294 99.2415 50 63 HDPE PN 12 0.71 0.36 4.18
D294-DP27 184.011 32 40 HDPE PN 12 0.4 0.5 12.63
KT2-DP307 49.5292 32 40 HDPE PN 10 0.4 0.5 12.63
D286-DP559 575.581 32 40 HDPE PN 16 0.4 0.5 12.63
D285-D286 627.938 50 63 HDPE PN 16 0.4 0.2 1.44
D285-DP560 254.656 32 40 HDPE PN 16 0.4 0.5 12.63
D284-D285 1248.85 50 63 HDPE PN 16 0.8 0.41 5.19
D282-D284 1304.11 50 63 HDPE PN 16 0.8 0.41 5.19
D283-DP563 309.216 32 40 HDPE PN 16 0.4 0.5 12.63
D283-DP562 55.5355 32 40 HDPE PN 16 0.4 0.5 12.63
D280-D283 1841.6 50 63 HDPE PN 16 0.8 0.41 5.19
D282-DP312 143.773 32 40 HDPE PN 16 0.4 0.5 12.63
D281-D282 892.081 63 75 HDPE PN 10 1.2 0.38 3.57
D281-DP314 457.266 32 40 HDPE PN 16 0.4 0.5 12.63
DP313-D281 1274.39 63 75 HDPE PN 10 1.6 0.51 6.07
D280-DP313 289.02 75 90 HDPE PN 16 2 0.45 3.93
DP318-DP302 718.05 50 63 HDPE PN 12 0.8 0.41 5.19
D292-DP318 413.969 63 75 HDPE PN 10 1.2 0.38 3.57
DP315-D292 770.14 63 75 HDPE PN 10 1.2 0.38 3.57
D291-DP315 825.562 63 75 HDPE PN 10 1.6 0.51 6.07
KT10-D291 440.958 63 75 HDPE PN 10 1.6 0.51 6.07
KT6-DP305 81.681 32 40 HDPE PN 10 0.4 0.5 12.63
KT4-DP306 110.91 32 40 HDPE PN 12 0.4 0.5 12.63
D290-DP309 1216.71 50 63 HDPE PN 16 0.8 0.41 5.19
D290-DP311 538.299 32 40 HDPE PN 16 0.4 0.5 12.63
D289-D290 628.82 50 63 HDPE PN 16 1.2 0.61 10.99
D287-DP303 966.145 32 40 HDPE PN 16 0.4 0.5 12.63
KT13-D287 635.439 50 63 HDPE PN 16 0.4 0.2 1.44
D288-DP304 392.548 32 40 HDPE PN 16 0.4 0.5 12.63
DP308-D288 743.79 50 63 HDPE PN 16 0.4 0.2 1.44
KT7-DP308 149.242 50 63 HDPE PN 12 0.8 0.41 5.19
D289-DP310 285.035 32 40 HDPE PN 16 0.4 0.5 12.63
KT5-D289 934.408 63 75 HDPE PN 10 1.6 0.51 6.07
D279-D280 907.299 100 125 HDPE PN 16 2.8 0.36 1.8
D278-D279 867.431 100 125 HDPE PN 16 2.8 0.36 1.8
D278-DP317 309.821 32 40 HDPE PN 12 0.4 0.5 12.63
D277-D278 1016.7 100 110 HDPE PN 10 3.2 0.41 2.31

81 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D276-D277 568.944 100 110 HDPE PN 10 3.2 0.41 2.31
D276-DP316 33.7342 32 40 HDPE PN 10 0.4 0.5 12.63
D270-D276 78.7967 100 110 HDPE PN 10 3.6 0.46 2.87
MLN90-D270 1541.51 200 225 HDPE PN 10 29.78 0.95 4.91
DP550-DP558 608.673 32 40 HDPE PN 12 0.4 0.5 12.63
D275-DP550 1157.64 50 63 HDPE PN 10 0.8 0.41 5.19
DP556-D275 1093.49 50 63 HDPE PN 10 0.8 0.41 5.19
NYS4-DP556 789.963 50 63 HDPE PN 10 1.2 0.61 10.99
D271-DP561 1311.9 50 63 HDPE PN 12 0.8 0.41 5.19
D272-D271 996.578 50 63 HDPE PN 10 0.8 0.41 5.19
NYS9-D272 1126.89 50 63 HDPE PN 10 0.8 0.41 5.19
MLN90-DP552 513.98 32 40 HDPE PN 10 0.4 0.5 12.63
D269-DP553 299.838 38 40 HDPE PN 10 0.4 0.35 5.47
D269-MLN90 392.65 200 250 HDPE PN 16 30.18 0.96 5.04
NYS1-D273 721.99 50 63 HDPE PN 10 0.4 0.2 1.44
D273-DP549 106.792 32 40 HDPE PN 10 0.4 0.5 12.63
D266-NYS1 335.3 250 DN 250 GRP PN 10 46.53 0.95 3.79
D266-DP23 82.1089 32 40 HDPE PN 10 0.4 0.5 12.63
D268-DP551 385.901 32 40 HDPE PN 10 0.4 0.5 12.63
NYS3-D268 574.864 50 63 HDPE PN 10 0.4 0.2 1.44
D264-NYS2 383.21 250 DN 250 GRP PN 10 -44.13 0.9 3.43
D264-DP557 64.9448 32 40 HDPE PN 10 0.4 0.5 12.63
NYS3-D264 72.2767 200 225 HDPE PN 10 -43.73 1.39 10.01
D263-NYS3 112.9 200 225 HDPE PN 10 -41.96 1.34 9.27
D263-DP555 23.4774 32 40 HDPE PN 10 0.4 0.5 12.63
NYS4-D263 49.2134 200 225 HDPE PN 10 -41.56 1.32 9.11
D265-DP554 183.162 32 40 HDPE PN 10 0.4 0.5 12.63
D265-NYS5 301.794 200 225 HDPE PN 10 38.38 1.22 7.86
NYS4-D265 190.568 200 225 HDPE PN 10 38.78 1.23 8.01
DP568-NYS7 627.209 100 110 HDPE PN 10 2.95 0.38 1.99
NYS6-DP568 96.4099 100 110 HDPE PN 10 3.35 0.43 2.51
D261-D258 508.713 50 63 HDPE PN 10 1.2 0.61 10.99
D261-DP569 87.0548 32 40 HDPE PN 10 0.4 0.5 12.63
NYS7-D261 98.094 75 90 HDPE PN 10 1.6 0.36 2.6
D259-DP566 106.371 32 40 HDPE PN 10 0.4 0.5 12.63
D258-D259 364.45 50 63 HDPE PN 10 0.4 0.2 1.44
DP565-DP567 961.357 32 40 HDPE PN 10 0.4 0.5 12.63
D258-DP565 946.253 50 63 HDPE PN 10 0.8 0.41 5.19
D257-DP564 219.627 32 40 HDPE PN 10 0.8 0.99 45.6
D260-D257 1413.77 50 63 HDPE PN 16 0.8 0.41 5.19
D256-D260 1559.14 50 63 HDPE PN 16 0.8 0.41 5.19
D256-DP117 692.674 32 40 HDPE PN 16 0.4 0.5 12.63
KG2-KG3 403.424 50 63 HDPE PN 10 -1.43 0.73 15.21
KG1-KG2 479.46 32 40 HDPE PN 12 -0.35 0.44 10.11
KY8-KY6 129.79 50 63 HDPE PN 10 0.82 0.42 5.46
KY8-KY7 400.12 32 40 HDPE PN 10 0.33 0.41 8.73

82 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
RY3-RY4 441.948 50 63 HDPE PN 10 1.09 0.55 9.17
RY5-RY6 281.242 50 63 HDPE PN 10 1.42 0.72 15.04
KY2-KY4 547.181 200 225 HDPE PN 10 19.9 0.63 2.33
TG23-TG24 174.95 50 63 HDPE PN 16 1.06 0.54 8.77
TG22-TG23 228.389 63 75 HDPE PN 10 1.35 0.43 4.44
MN14-MN15 314.574 50 63 HDPE PN 10 -0.04 0.02 0.02
MN17-MN14 610.421 63 75 HDPE PN 10 1.45 0.46 5.04
MN9-MN10 157.651 32 40 HDPE PN 10 0.12 0.15 1.37
MN4-MN5 290.817 150 180 HDPE PN 10 11.93 0.68 3.67
TG4-TG1 250.118 50 63 HDPE PN 16 0.5 0.25 2.17
TG7-TG6 345.584 50 63 HDPE PN 16 0.4 0.2 1.44
TG8-TG7 353.397 50 63 HDPE PN 16 0.54 0.27 2.48
TG13-TG14 162.556 50 63 HDPE PN 16 -0.19 0.1 0.37
TG13-TG21 497.292 150 180 HDPE PN 16 -8.43 0.48 1.93
J-3-TG20 125.687 50 63 HDPE PN 12 0.67 0.34 3.78
TG19-J-3 283.8 150 180 HDPE PN 16 11.56 0.65 3.46
TG19-TG18 182.288 100 125 HDPE PN 16 3.14 0.4 2.23
MY1-MY33 225.553 150 180 HDPE PN 10 -15.66 0.89 6.07
MY31-MY30 30.8945 50 63 HDPE PN 10 -0.29 0.15 0.77
MY30-MY29 164.793 50 63 HDPE PN 12 -0.57 0.29 2.77
MY3-MY6 118.88 200 225 HDPE PN 10 -16.72 0.53 1.69
MY6-MY11 373.554 200 225 HDPE PN 10 -21.38 0.68 2.66
MY28-MY27 44.7123 75 90 HDPE PN 12 -1.48 0.33 2.24
MY27-MY26 449.503 75 90 HDPE PN 12 -1.85 0.42 3.41
MY12-MY14 375.054 200 225 HDPE PN 10 -22.77 0.72 2.99
MY16-MY17 346.113 200 250 HDPE PN 12 -23.52 0.75 3.17
MY24-MY23 313.267 100 110 HDPE PN 10 -4.47 0.57 4.29
MY20-MY21 244.167 200 250 HDPE PN 12 -34.8 1.11 6.55
MY19-MY20 179.352 100 110 HDPE PN 10 -4.88 0.62 5.05
MY10-MY13 326.479 75 90 HDPE PN 12 -1.99 0.45 3.89
MY9-MY10 64.4164 75 90 HDPE PN 12 -1.74 0.39 3.04
MY8-MY9 289.664 75 90 HDPE PN 12 -1.55 0.35 2.46
MY7-MY8 374.242 63 75 HDPE PN 10 -1.12 0.36 3.15
MY5-MY7 115.054 50 63 HDPE PN 12 0.33 0.17 0.99
MY4-MY5 197.979 100 110 HDPE PN 10 -3.36 0.43 2.53
KK10-KK9 957.036 50 63 HDPE PN 10 0.92 0.47 6.77
KK4-KK5 482.468 50 63 HDPE PN 10 0.53 0.27 2.42
KK3-KK4 280 50 63 HDPE PN 10 0.6 0.31 3.09
MR15-MR11 359.387 300 DN 300 GRP PN 10 79.39 1.12 4.19
BM7-BM6 395.481 50 63 HDPE PN 10 -0.39 0.2 1.4
BM9-BM8 185.081 63 75 HDPE PN 10 1.44 0.46 4.97
BM13-BM14 298.322 50 63 HDPE PN 12 -0.5 0.25 2.17
BM21-BM22 191.545 50 63 HDPE PN 10 0.91 0.46 6.57
BM21-J-6 99.4705 50 63 HDPE PN 10 0.4 0.2 1.44
BM12-BM21 96.0546 100 110 HDPE PN 10 -3.44 0.44 2.64
BM20-BM21 156.255 100 110 HDPE PN 10 5.02 0.64 5.32

83 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
BM10-BM9 433.221 75 90 HDPE PN 12 1.77 0.4 3.14
BM17-BM18 706.31 50 63 HDPE PN 10 1.1 0.56 9.36
BK8-BK9 217.608 32 40 HDPE PN 10 0.91 1.13 57.5
BK7-BK10 502.133 32 40 HDPE PN 12 0.71 0.88 36.27
BK6-BK7 710.483 100 110 HDPE PN 10 3.11 0.4 2.19
MR1-MR2 445.439 50 63 HDPE PN 12 1.31 0.67 12.91
BK14-BK15 574.135 100 110 HDPE PN 10 5.77 0.73 6.87
BK11-BK12 171.682 100 110 HDPE PN 10 7.03 0.89 9.91
MR3-MR1 204.93 150 180 HDPE PN 10 14.89 0.84 5.53
MR4-MR3 323.548 50 63 HDPE PN 10 -0.23 0.12 0.53
MR5-MR4 409.192 50 63 HDPE PN 10 0.37 0.19 1.22
MR7-BK13 821.306 200 250 HDPE PN 12 33.47 1.07 6.1
MR6-MR7 614.07 200 225 HDPE PN 10 33.64 1.07 6.16
KW4-KW3 269.732 50 63 HDPE PN 10 1.04 0.53 8.5
KW10-KW12 125.214 100 110 HDPE PN 10 -5.74 0.73 6.81
KW9-KW10 149.539 63 75 HDPE PN 10 -1.59 0.51 6
KW11-KW10 369.636 100 110 HDPE PN 10 -3.96 0.5 3.43
J-339-KW13 107.486 50 63 HDPE PN 10 0.48 0.25 2.04
KW30-KW31 135.372 100 110 HDPE PN 10 6.44 0.82 8.43
KW17-KW30 505.593 100 110 HDPE PN 10 3.34 0.42 2.5
KW29-KW30 95.3321 100 110 HDPE PN 10 3.38 0.43 2.55
KW16-KW29 475.304 100 110 HDPE PN 10 3.52 0.45 2.76
KW25-KW26 116.276 32 40 HDPE PN 10 0.28 0.34 6.35
KW25-KW14 156.087 200 225 HDPE PN 10 37.81 1.2 7.65
KW15-KW14 72.4246 200 225 HDPE PN 10 -37.45 1.19 7.51
KW16-KW15 160.485 200 225 HDPE PN 10 -36.56 1.16 7.19
KW35-KW32 487.716 100 110 HDPE PN 10 -3.64 0.46 2.93
KW20-KW22 444.613 50 63 HDPE PN 10 1.07 0.55 8.91
KW17-KW16 71.464 200 225 HDPE PN 10 -27.03 0.86 4.11
KW19-KW17 186.313 200 225 HDPE PN 10 -23.45 0.75 3.16
KW21-KW18 313.415 50 63 HDPE PN 10 -1.59 0.81 18.56
KW39-KW37 323.561 50 63 HDPE PN 10 0.33 0.17 1.01
KW40-KW39 131.559 50 63 HDPE PN 10 1.83 0.93 23.96
KW41-KW40 123.405 50 63 HDPE PN 10 -0.52 0.26 2.32
KW34-KW41 354.763 50 63 HDPE PN 10 -0.16 0.08 0.28
KW32-KW19 53.0787 100 110 HDPE PN 10 -4.94 0.63 5.16
KW32-KW33 204.896 50 63 HDPE PN 10 1.04 0.53 8.45
BM19-BM6 388.067 100 110 HDPE PN 10 3.39 0.43 2.57
BM20-BM19 264.021 100 110 HDPE PN 10 4.25 0.54 3.91
KB23-MLN3 721.95 100 110 HDPE PN 10 5.39 0.69 6.07
KB23-KB24 525.828 32 40 HDPE PN 10 0.44 0.55 15.04
MR14-MR9 425.363 250 DN 250 GRP PN 10 51.58 1.05 4.58
MR10-MR14 392.24 250 DN 250 GRP PN 10 51.75 1.05 4.61
MLN7-MR10 498.13 200 225 HDPE PN 10 -26.04 0.83 3.83
MLN6-MLN7 510.22 200 225 HDPE PN 10 -26.04 0.83 3.83
KB20-MLN4 488.48 200 225 HDPE PN 10 -26.04 0.83 3.83

84 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
KB6-KB5 188.054 125 140 HDPE PN 10 -8.1 0.66 4.35
KB8-KB6 116.127 75 90 HDPE PN 10 -1.74 0.39 3.04
KB12-KB13 407.383 100 110 HDPE PN 10 3.73 0.47 3.07
KB11-KB12 394.048 100 110 HDPE PN 10 4.82 0.61 4.94
KB7-KB6 287.383 100 110 HDPE PN 10 -6.1 0.78 7.64
KB11-KB7 158.046 100 110 HDPE PN 10 -5.61 0.71 6.52
KB10-KB11 344.027 50 63 HDPE PN 10 0.05 0.03 0.03
KB9-KB10 332.693 63 75 HDPE PN 10 1.12 0.36 3.15
KB22-KB25 223.924 100 110 HDPE PN 10 -3.38 0.43 2.56
KB18-KB17 413.475 75 90 HDPE PN 10 1.68 0.38 2.85
KR2-KR1 251.801 75 90 HDPE PN 10 1.54 0.35 2.41
KR3-KR2 178.547 50 63 HDPE PN 10 0.09 0.05 0.1
KR5-KR3 514.506 50 63 HDPE PN 10 0.25 0.13 0.59
KR11-KR7 204.445 75 90 HDPE PN 10 2.06 0.47 4.14
KR12-KR6 155.826 50 63 HDPE PN 10 1.26 0.64 12.04
KR13-KR12 316.115 50 63 HDPE PN 10 0.69 0.35 3.99
KR12-KR11 130.616 50 63 HDPE PN 10 -0.08 0.04 0.08
KR8-KR12 140.629 50 63 HDPE PN 10 0.53 0.27 2.41
KR9-KR10 212.512 50 63 HDPE PN 10 0.1 0.05 0.12
KR8-KR9 118.196 50 63 HDPE PN 10 0.15 0.08 0.24
KR15-KR8 325.352 50 63 HDPE PN 10 0.44 0.22 1.7
KR16-KR15 470.034 50 63 HDPE PN 10 0.58 0.29 2.81
J-484-KR14 60.5433 50 63 HDPE PN 10 2.27 1.16 35.77
NY1-J-484 650.274 150 180 HDPE PN 10 6 0.34 1.03
NY7-NY5 90.6758 32 40 HDPE PN 10 0.47 0.59 17.15
NY6-NY7 121.986 50 63 HDPE PN 10 0.57 0.29 2.79
J-45-NY8 288.325 150 180 HDPE PN 10 13.6 0.77 4.67
NY9-NY8 223.639 50 63 HDPE PN 10 -1.22 0.62 11.35
J-23-J-45 233.779 150 180 HDPE PN 10 15.53 0.88 5.98
KW31-J-63 221.108 150 180 HDPE PN 10 16.73 0.95 6.86
BM6-BM5 184.256 63 75 HDPE PN 10 1.95 0.62 8.73
BM4-BM3 199.197 75 90 HDPE PN 10 2.37 0.54 5.36
J-23-J-24 239.386 50 63 HDPE PN 10 0.4 0.2 1.44
KW1.-KW25 103.911 200 225 HDPE PN 10 38.45 1.22 7.89
KI6-KZ14 594.964 300 DN 300 GRP PN 10 86.7 1.23 4.93
KK11-MN1 748.008 200 225 HDPE PN 10 15.62 0.5 1.49
BT42-BT32 396.056 100 110 HDPE PN 10 -3.43 0.44 2.62
BT80-BT43 146.672 100 110 HDPE PN 10 -2.68 0.34 1.66
BT84-BT83 138.715 100 110 HDPE PN 10 2.15 0.27 1.11
MG15-MG16 325.522 32 40 HDPE PN 10 0.44 0.55 15.12
MG14-MG15 386.46 50 63 HDPE PN 10 1.13 0.58 9.86
MG5-MG6 120.591 50 63 HDPE PN 10 1.01 0.51 7.96
KU4-KU2 215.669 100 125 HDPE PN 16 4.53 0.58 4.39
KU1-KU8 121.436 125 140 HDPE PN 10 8.18 0.67 4.43
DP403-DP276 1458.42 150 180 HDPE PN 10 9.4 0.53 2.36
DP402-MT1 866.76 150 180 HDPE PN 10 15.79 0.89 6.16

85 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
KN4-KN8 254.575 200 225 HDPE PN 10 29.38 0.94 4.79
KN4-KN7 998.814 300 DN 300 GRP PN 10 81.3 1.15 4.38
KN4-KN6 584.433 32 40 HDPE PN 10 0.36 0.44 10.27
KN3-KN4 496.003 350 DN 350 GRP PN 10 111.89 1.16 3.73
BT61-BT79 145.578 100 110 HDPE PN 10 -3.25 0.41 2.38
D418-D417 204.047 50 63 HDPE PN 10 -0.27 0.14 0.71
D419-D418 359.446 50 63 HDPE PN 10 0.26 0.13 0.63
D421-DP95 373.903 50 63 HDPE PN 10 -0.13 0.07 0.18
BG12-BG13 263.3 50 63 HDPE PN 10 -0.4 0.2 1.42
BG10-BG11 214.476 50 63 HDPE PN 10 0.37 0.19 1.24
TRT2-TRT3 508.044 50 63 HDPE PN 16 1.01 0.51 7.94
D312-D310 484.175 50 63 HDPE PN 16 0.35 0.18 1.14
TRT5-TRT8 259.74 75 90 HDPE PN 12 2.24 0.51 4.83
TRT5-TRT6 70.3491 32 40 HDPE PN 12 0.44 0.55 15.26
TRT1-TRT5 315.03 100 125 HDPE PN 16 3.68 0.47 3
BS14-BS23 796.223 150 180 HDPE PN 16 9.73 0.55 2.51
BS5-BS6 447.692 75 90 HDPE PN 16 2.26 0.51 4.94
BS9-BS4 215.201 100 125 HDPE PN 16 4.52 0.58 4.37
KT8-KT7 379.54 100 110 HDPE PN 10 3.43 0.44 2.62
KT9-KT11 236.496 75 90 HDPE PN 10 2.89 0.65 7.75
KT14-KT3 249.198 100 110 HDPE PN 10 5.11 0.65 5.5
KT1-KT14 267.156 150 180 HDPE PN 10 10.67 0.6 2.98
NYS5-NYS9 383.611 200 225 HDPE PN 10 33.13 1.05 5.99
BS18-BS19 334.938 50 63 HDPE PN 16 0.71 0.36 4.16
BS1-BS10 550.004 300 DN 300 GRP PN 20 81.09 1.15 4.36
BS1-BS2 794.438 100 125 HDPE PN 16 3.99 0.51 3.46
BT56-J-83 151.413 200 225 HDPE PN 10 -19.1 0.61 2.16
TR5-TR4 597.653 100 110 HDPE PN 10 -2.99 0.38 2.04
TR8-TR7 926.814 50 63 HDPE PN 10 -0.5 0.25 2.14
RK4-RK5 469.013 100 110 HDPE PN 10 6.67 0.85 8.99
RK11-RK4 250.444 150 180 HDPE PN 10 -14.57 0.82 5.31
RK22-RK21 279.961 32 40 HDPE PN 10 0.31 0.39 8.01
RK22-RK23 543.1 32 40 HDPE PN 10 0.27 0.34 6.26
BT64-BT65 482.205 400 DN 400 GRP PN 20 123.86 0.99 2.35
BT48-BT58 283.246 50 63 HDPE PN 10 0.4 0.21 1.45
BT46-BT45 114.183 63 75 HDPE PN 10 -1.21 0.39 3.61
BT50-BT51 173.132 50 63 HDPE PN 10 0.26 0.13 0.65
BT31-BT41 340.461 75 90 HDPE PN 10 1.62 0.37 2.65
BT81-BT39 232.692 100 110 HDPE PN 10 2.9 0.37 1.93
BT33-BT81 85.6165 100 110 HDPE PN 10 3.08 0.39 2.16
BT32-BT33 101.577 50 63 HDPE PN 10 0.42 0.21 1.56
BT30-BT29 195.176 100 110 HDPE PN 10 -2.82 0.36 1.83
BT37-BT38 100.54 100 110 HDPE PN 10 4.06 0.52 3.59
BT36-BT21 235.786 100 110 HDPE PN 10 -3.53 0.45 2.77
BT35-BT36 44.5984 75 90 HDPE PN 10 1.7 0.39 2.92
BT29-BT35 134.4 100 110 HDPE PN 10 2.87 0.37 1.89

86 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
BT29-BT22 254.714 100 110 HDPE PN 10 -3.66 0.47 2.96
BT27-BT29 167.683 100 110 HDPE PN 10 2.14 0.27 1.1
BT27-BT23 152.181 100 110 HDPE PN 10 -5.3 0.68 5.89
BT24-BT23 146.223 200 225 HDPE PN 10 13.03 0.41 1.06
BT62-BT63 240.304 75 90 HDPE PN 10 -1.13 0.26 1.36
BT80-BT79 106.315 100 110 HDPE PN 10 4.54 0.58 4.42
J-515-BT60 190.791 150 180 HDPE PN 10 9.56 0.54 2.43
BT97-BT95 213.44 50 63 HDPE PN 10 -0.18 0.09 0.34
BT96-BT97 57.3919 50 63 HDPE PN 10 0.63 0.32 3.31
BT88-BT96 54.53 50 63 HDPE PN 10 0.86 0.44 5.94
BT86-BT88 57.4904 63 75 HDPE PN 10 1.51 0.48 5.46
BT87-BT86 22.7432 63 75 HDPE PN 10 1.07 0.34 2.89
BT94-BT93 95.47 50 63 HDPE PN 10 0.44 0.22 1.72
BT93-BT92 114.644 50 63 HDPE PN 10 -0.11 0.06 0.13
BT15-BT16 157.048 32 40 HDPE PN 10 -0.29 0.36 7.05
BT12-BT13 375.25 63 75 HDPE PN 10 2 0.64 9.16
BR1-BR2 221.008 50 63 HDPE PN 12 -0.23 0.12 0.53
BR2-BR12 47.9774 50 63 HDPE PN 12 -1.31 0.67 12.9
IS29-IS30 769.308 32 40 HDPE PN 10 0.33 0.42 9.04
IS32-IS31 707.116 32 40 HDPE PN 10 0.27 0.34 6.2
IS33-IS34 843.705 50 63 HDPE PN 10 0.94 0.48 7.05
IS29-IS32 340.923 75 90 HDPE PN 10 2.32 0.53 5.18
IS25-IS27 214.673 50 63 HDPE PN 10 0 0 0
IS11-IS12 201.141 100 110 HDPE PN 10 4.47 0.57 4.3
IS1-IS2 431.389 200 250 HDPE PN 12 -24.81 0.79 3.5
SG1-SG2 447.612 125 160 HDPE PN 16 -7.32 0.6 3.6
SG14-SG17 304.429 125 140 HDPE PN 10 8.8 0.72 5.07
SG14-SG13 117.534 150 180 HDPE PN 10 10.78 0.61 3.04
MK10-MK5 273.01 200 225 HDPE PN 10 22.85 0.73 3.01
MB11-MB10 304.644 125 140 HDPE PN 10 7.78 0.63 4.03
MB5-MB6 279.006 63 75 HDPE PN 10 2.26 0.73 11.52
MB4-J-100 89.8262 75 90 HDPE PN 10 -2.58 0.58 6.3
MB2-MB13 287.342 50 63 HDPE PN 10 -1.38 0.7 14.23
MB1-MB2 582.559 50 63 HDPE PN 10 -0.93 0.47 6.88
KI58-KI59 212.061 100 110 HDPE PN 10 -4.43 0.56 4.21
KI60-KI58 196.751 50 63 HDPE PN 10 0.01 0 0
KI65-KI66 170.62 150 180 HDPE PN 16 9.46 0.54 2.39
KI54-KI48 240.601 100 110 HDPE PN 10 3.87 0.49 3.28
KI55-KI54 243.477 100 110 HDPE PN 10 4.16 0.53 3.75
KI55-KI56 184.668 100 110 HDPE PN 10 -3.6 0.46 2.88
KI65-KI55 174.97 50 63 HDPE PN 16 0.79 0.4 5.01
KI61-KI62 122.964 150 180 HDPE PN 10 12.28 0.7 3.87
KI93-KI92 505.82 75 90 HDPE PN 10 -1.61 0.36 2.62
KI21-KI20 170.868 150 180 HDPE PN 10 13.48 0.76 4.6
KI29-KI28 261.278 32 40 HDPE PN 10 0.34 0.42 9.21
KI53-KI52 224.745 50 63 HDPE PN 10 0.19 0.1 0.3

87 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
KI72-KI73 70.9245 50 63 HDPE PN 10 -0.24 0.12 0.55
KI9-KI10 161.252 75 90 HDPE PN 10 -1.25 0.28 1.64
KI5-KI6 435.649 100 110 HDPE PN 10 3.29 0.42 2.43
KZ9-KZ11 232.316 50 63 HDPE PN 10 0.59 0.3 2.93
KZ9-KZ10 355.523 63 75 HDPE PN 10 1.65 0.53 6.43
KZ12-KZ22 332.796 50 63 HDPE PN 10 0.4 0.2 1.44
KZ6-KZ20 276.071 50 63 HDPE PN 10 0.21 0.11 0.36
KZ17-KZ18 269.81 100 110 HDPE PN 10 4.44 0.56 4.23
KZ17-KZ19 280.721 50 63 HDPE PN 10 0.4 0.2 1.44
KI86-KI87 424.835 75 90 HDPE PN 10 2.28 0.52 5.01
KI85-KI84 389.759 32 40 HDPE PN 10 0.24 0.3 4.83
KI86-KI85 402.255 50 63 HDPE PN 10 0.91 0.46 6.54
KI24-KI22 259.595 200 225 HDPE PN 10 35.27 1.12 6.72
KY9-KY1 580.82 32 40 HDPE PN 10 0.25 0.31 5.42
MN7-MN8 144.848 100 110 HDPE PN 10 5.13 0.65 5.54
MN5-MN7 329.804 100 110 HDPE PN 10 5.29 0.67 5.85
TG10-TG8 127.854 50 63 HDPE PN 16 0.66 0.34 3.68
TG11-TG12 173.446 50 63 HDPE PN 16 1.36 0.69 13.88
TG9-TG10 68.9005 100 125 HDPE PN 16 2.66 0.34 1.65
TG16-TG17 378.281 32 40 HDPE PN 16 0.36 0.44 10.27
MY1-TG27 398.941 150 180 HDPE PN 12 17.84 1.01 7.73
MY32-MY31 160.65 50 63 HDPE PN 10 -0.2 0.1 0.41
MY33-MY32 172.795 50 63 HDPE PN 10 0.32 0.17 0.97
MY17-MY22 122.269 200 250 HDPE PN 12 -23.78 0.76 3.24
MY2-MY4 246.45 100 110 HDPE PN 10 -3.06 0.39 2.13
KK1-KK3 137.323 50 63 HDPE PN 10 0.75 0.38 4.64
BK5-BK11 573.877 200 250 HDPE PN 12 -35.52 1.13 6.81
BK5-BK4 186.513 125 140 HDPE PN 10 8.25 0.67 4.5
BK3-BK5 380.857 200 225 HDPE PN 10 -26 0.83 3.82
KW6-KW5 115.116 50 63 HDPE PN 10 1.11 0.57 9.51
KW4-KW6 222.811 50 63 HDPE PN 10 -0.59 0.3 2.99
KW13-KW6 563.203 75 90 HDPE PN 10 2.04 0.46 4.06
J-339-KW7 323.995 75 90 HDPE PN 10 2.69 0.61 6.78
KW13-KW11 60.0834 63 75 HDPE PN 10 -1.83 0.59 7.83
KW18-J-339 168.669 75 90 HDPE PN 10 3.17 0.72 9.21
KW14-KW27 299.11 32 40 HDPE PN 10 0.21 0.26 3.67
KW18-KW20 192.269 50 63 HDPE PN 10 2.5 1.27 42.7
KW38-KW36 325.07 50 63 HDPE PN 10 0.02 0.01 0.01
KW39-KW38 196.18 50 63 HDPE PN 10 1.21 0.61 11.09
KB19-KB21 382.045 50 63 HDPE PN 10 0.5 0.25 2.17
MR9-MR8 989.098 250 DN 250 GRP PN 10 51.29 1.04 4.54
KB20-KB19 234.605 150 180 HDPE PN 10 21.22 1.2 10.66
KB15-KB16 122.232 50 63 HDPE PN 10 0.41 0.21 1.51
NY4-NY6 307.813 50 63 HDPE PN 10 0.88 0.45 6.16
NY2-NY3 245.57 100 110 HDPE PN 10 2.91 0.37 1.94
NY8-NY2 551.642 150 180 HDPE PN 10 11.91 0.67 3.65

88 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
J-63-J-23 125.655 150 180 HDPE PN 10 15.93 0.9 6.26
BPT16-BT2 264.55 75 90 HDPE PN 10 2.24 0.51 4.85
DP573-D204 2593.31 63 75 HDPE PN 10 1.2 0.38 3.57
D106-D536 702.84 100 110 HDPE PN 10 3.2 0.41 2.31
D555-D108 303.48 100 110 HDPE PN 10 3.2 0.41 2.31
D554-D555 431.21 100 110 HDPE PN 10 3.2 0.41 2.31
D536-D554 670.73 100 110 HDPE PN 10 3.2 0.41 2.31
D528-D101 1707.07 250 DN 250 GRP PN 20 55.89 1.14 5.32
D116-D528 819.37 250 DN 250 GRP PN 20 55.89 1.14 5.32
BPT9-D390 509.1 100 110 HDPE PN 10 3.2 0.41 2.31
D537-D551 617.71 100 110 HDPE PN 10 3.2 0.41 2.31
IS32-IS33 381.94 63 75 HDPE PN 10 2.04 0.65 9.51
MG13-MG14 382.88 63 75 HDPE PN 10 1.88 0.6 8.19
KU2-KU5 638.28 75 90 HDPE PN 16 3.62 0.82 11.78
KU10-KU9 249.83 32 40 HDPE PN 10 0.31 0.38 7.85
D527-D529 254.71 100 110 HDPE PN 10 4.66 0.59 4.64
SG4-D199 142.91 50 63 HDPE PN 12 0.4 0.2 1.44
D200-DP644 574.5 38 40 HDPE PN 10 0.4 0.35 5.47
D549-D327 341.66 100 110 HDPE PN 10 7.4 0.94 10.91
D548-D549 453.09 100 110 HDPE PN 10 7.4 0.94 10.91
D547-D548 216.56 100 110 HDPE PN 10 7.4 0.94 10.91
D546-D547 175.62 100 110 HDPE PN 10 7.4 0.94 10.91
BPT6-D546 225.1 100 110 HDPE PN 10 7.4 0.94 10.91
D544-BPT7 0.04 150 180 HDPE PN 10 22 1.24 11.16
D543-D403 339.13 50 63 HDPE PN 10 0.4 0.2 1.44
D470-D543 53.66 63 75 HDPE PN 10 -1.2 0.38 3.56
MZ1-D539 327.19 75 90 HDPE PN 10 2 0.45 3.93
D539-DP99 880.38 50 63 HDPE PN 10 0.4 0.2 1.44
D542-D543 309.25 75 90 HDPE PN 10 1.6 0.36 2.6
D541-D542 293.45 75 90 HDPE PN 10 1.6 0.36 2.6
D540-D541 190.65 75 90 HDPE PN 10 1.6 0.36 2.6
D539-D540 228.96 75 90 HDPE PN 10 1.6 0.36 2.6
D534-D537 1189.01 100 110 HDPE PN 10 3.2 0.41 2.31
BPT8-D534 1293.2 100 110 HDPE PN 10 3.2 0.41 2.31
D412-D535 1633.63 100 110 HDPE PN 10 3.2 0.41 2.31
D526-D468 654.52 75 90 HDPE PN 12 1.6 0.36 2.6
MZ14-D526 817.21 75 90 HDPE PN 12 1.6 0.36 2.6
SG10-SG9 381.94 200 250 HDPE PN 12 23.07 0.73 3.06
D248-D217 1107.66 125 140 HDPE PN 10 5.8 0.47 2.35
D246-SG4 496.44 150 180 HDPE PN 10 11.69 0.66 3.53
ST6-D245 1409.83 250 DN 250 GRP PN 10 35.66 0.73 2.31
ST6-DP179 339.64 50 63 HDPE PN 10 0.8 0.41 5.19
BR9-BR10 344.47 150 180 HDPE PN 12 12.43 0.7 3.95
BPT-1-D533 516.89 150 180 HDPE PN 10 13.6 0.77 4.67
D532-D211 224.32 100 110 HDPE PN 10 3.46 0.44 2.67
D532-D212 105.81 63 75 HDPE PN 10 1.2 0.38 3.57

89 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D531-D532 309.74 100 110 HDPE PN 10 4.66 0.59 4.64
D530-D531 442.03 100 110 HDPE PN 10 4.66 0.59 4.64
D529-D530 379.71 100 110 HDPE PN 10 4.66 0.59 4.64
BPT1-D527 111.02 100 110 HDPE PN 10 4.66 0.59 4.64
BR10-1-BPT-1 497.94 150 180 HDPE PN 10 12 0.68 3.71
BR8-D490 134.49 150 180 HDPE PN 12 14.08 0.8 4.98
ST8-BG20 721.98 400 DN 400 GRP PN 10 147.57 1.17 3.25
D1-KW40 96.14 100 110 HDPE PN 10 2.91 0.37 1.94
KW35-D1 270.16 100 110 HDPE PN 10 3.31 0.42 2.46
D417-D415 657.78 50 63 HDPE PN 10 0.4 0.2 1.44
BT78-BT17 218.9 50 63 HDPE PN 10 1.01 0.51 7.91
D371-DP242 64.7 32 40 HDPE PN 16 0.4 0.5 12.63
D523-MZ7 136.98 100 110 HDPE PN 10 3.47 0.44 2.68
MZ6-D523 406.11 100 110 HDPE PN 10 3.87 0.49 3.28
D523-DP452 8.66 32 40 HDPE PN 10 0.4 0.5 12.63
KB11-DP260 34.61 32 40 HDPE PN 10 0.4 0.5 12.63
MLN5-MLN6 546.5 200 225 HDPE PN 10 -26.04 0.83 3.83
MLN4-MLN5 482.44 200 225 HDPE PN 10 -26.04 0.83 3.83
DP24-BS3 9.65 32 40 HDPE PN 16 0.57 0.71 24.11
BS4-DP24 47.43 50 63 HDPE PN 16 0.97 0.49 7.37
KT11-KT10 272.82 63 75 HDPE PN 10 2.36 0.76 12.43
BT48-BT47 111.74 50 63 HDPE PN 10 -0.97 0.5 7.47
BT49-BT48 86.59 50 63 HDPE PN 10 -0.51 0.26 2.21
SG15-SG16 606.17 50 63 HDPE PN 12 0.86 0.44 5.98
KI43-KI94 98.37 200 225 HDPE PN 10 24.46 0.78 3.41
KI83-KI40 130.54 200 225 HDPE PN 10 15.96 0.51 1.55
KI194-KI93 284.17 75 90 HDPE PN 10 -0.53 0.12 0.32
KI14-KI15 126.25 100 110 HDPE PN 10 4.02 0.51 3.52
KZ2-KZ15 422.54 200 225 HDPE PN 10 -28.08 0.89 4.41
KI2-KI1 519.25 100 110 HDPE PN 10 4.09 0.52 3.64
KI1-KZ2 548.3 100 110 HDPE PN 10 -2.75 0.35 1.75
D120-DP349 83.8 32 40 HDPE PN 10 0.4 0.5 12.63
MR5-MR6 263.33 50 63 HDPE PN 10 -0.6 0.31 3.03
KB3-KB4 179.69 100 110 HDPE PN 10 -4.53 0.58 4.4
KB12-DP259 12.52 32 40 HDPE PN 10 0.4 0.5 12.63
D372-BG27 500.19 350 DN 350 GRP PN 20 121.25 1.26 4.33
BG23-D372 229.78 350 DN 350 GRP PN 20 123.65 1.29 4.49
BG14-BG13 444.32 350 DN 350 GRP PN 10 -126.04 1.31 4.66
BG15-BG16 335.08 63 75 HDPE PN 10 1.18 0.38 3.43
BG16-DP50 104.4 50 63 HDPE PN 10 0.4 0.2 1.44
BG16-BG17 407.21 50 63 HDPE PN 10 0.55 0.28 2.6
BG19-BG18 692.92 63 75 HDPE PN 10 1.18 0.38 3.45
BG7-BG8 277.24 50 63 HDPE PN 10 0.57 0.29 2.77
ST8-BG3 305.44 100 110 HDPE PN 10 6.17 0.79 7.8
ST8-DP42 182.63 32 40 HDPE PN 10 0.4 0.5 12.63
B-M-1-ST8 3918.46 300 DN 300 GRP PN 20 91 1.29 5.4

90 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
BG10-BG3 492.56 50 63 HDPE PN 10 -0.52 0.27 2.36
BG4-BG2 522.01 50 63 HDPE PN 10 -0.1 0.05 0.12
BG26-BG25 722.49 50 63 HDPE PN 10 0.19 0.1 0.37
BG09-BG26 286.6 50 63 HDPE PN 10 0.39 0.2 1.35
BG20-BG09 360.75 50 63 HDPE PN 10 0.53 0.27 2.43
BG21-BG19 513.41 75 90 HDPE PN 10 1.93 0.44 3.68
BG21-BG22 425.49 200 225 HDPE PN 10 17.51 0.56 1.84
BG1-BG22 405.87 200 225 HDPE PN 10 -16.92 0.54 1.72
BG1-BG25 693.48 100 110 HDPE PN 10 -2.53 0.32 1.49
MZ15-MZ14 642.17 75 90 HDPE PN 10 2.3 0.52 5.07
MZ16-MZ15 457.03 100 110 HDPE PN 10 2.67 0.34 1.65
MZ16-MZ8 362.63 50 63 HDPE PN 12 0.5 0.25 2.17
MZ6-MZ3 461.95 200 225 HDPE PN 10 14.6 0.46 1.31
MZ9-MZ10 674.63 50 63 HDPE PN 10 0.5 0.25 2.17
PS-3-B-M-1 3835.72 300 DN 300 GRP PN 10 91 1.29 5.4
ST7-J-83 473.72 500 DN 500 GRP PN 10 194.74 0.99 1.83
KI42-MK1 1611.89 150 180 HDPE PN 10 9.18 0.52 2.26
IS9-D245 507.42 250 DN 250 GRP PN 10 -35.26 0.72 2.27
MT8-MT7 367.12 100 110 HDPE PN 10 -5.68 0.72 6.68
D522-MT6 364.14 50 63 HDPE PN 12 1.08 0.55 9
MT7-D522 112.65 75 90 HDPE PN 12 1.48 0.33 2.24
D522-DP407 50.12 32 40 HDPE PN 12 0.4 0.5 12.63
MT4-MT7 942.89 125 140 HDPE PN 10 8.52 0.69 4.78
DP415-MT3 38.72 50 63 HDPE PN 10 0.63 0.32 3.36
MT2-DP415 275.39 50 63 HDPE PN 10 1.03 0.53 8.33
D521-KU7 454.85 50 63 HDPE PN 16 0.79 0.4 5.11
KU6-D521 644.35 50 63 HDPE PN 16 1.19 0.61 10.88
D521-DP268 23.25 32 40 HDPE PN 16 0.4 0.5 12.63
D520-KU6 213 63 75 HDPE PN 10 2.22 0.71 11.14
D520-DP274 43.41 32 40 HDPE PN 16 0.4 0.5 12.63
KU5-D520 423.38 63 75 HDPE PN 10 2.62 0.84 15.14
KU5-DP269 48.06 32 40 HDPE PN 16 0.4 0.5 12.63
KU8-KU10 269.56 63 75 HDPE PN 10 1.65 0.53 6.43
BPT4-DP402 692.05 200 225 HDPE PN 10 25.99 0.83 3.82
D355-BPT4 213.28 200 250 HDPE PN 16 25.99 0.83 3.82
MRW8-MRW9 458.6 50 63 HDPE PN 16 1.56 0.79 17.81
MRW7-MRW8 509.62 75 90 HDPE PN 16 2.47 0.56 5.8
BPT7-MG22 34.93 200 225 HDPE PN 10 24.39 0.78 3.4
D439-D545 352.32 150 180 HDPE PN 10 22 1.24 11.39
MG32-D439 423.25 150 180 HDPE PN 12 22.8 1.29 12.17
MG31-MG20 661.72 50 63 HDPE PN 12 0.71 0.36 4.14
MG17-MG18 948.9 50 63 HDPE PN 12 1.18 0.6 10.72
MG10-MG11 376.8 32 40 HDPE PN 12 0.2 0.25 3.49
MG12-MG13 293.27 200 225 HDPE PN 10 39.53 1.26 8.3
MG9-MG12 416.3 200 225 HDPE PN 10 40.84 1.3 8.82
MG29-MG28 435.92 32 40 HDPE PN 10 0.47 0.58 16.8

91 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
MG9-MG29 331.35 50 63 HDPE PN 10 0.88 0.45 6.24
MG25-MG26 373.42 32 40 HDPE PN 10 0.53 0.65 20.95
MG6-MG7 206.76 32 40 HDPE PN 12 0.51 0.63 19.74
MG3-MG4 154.85 63 75 HDPE PN 10 1.29 0.41 4.09
D423-MG1 698.82 250 DN 250 GRP PN 10 50.7 1.03 4.44
BTK6-BTK4 547.24 50 63 HDPE PN 10 -0.67 0.34 3.73
D519-D334 948.11 300 DN 300 GRP PN 10 75.38 1.07 3.81
D519-DP12 18.52 32 40 HDPE PN 10 0.4 0.5 12.63
BPT6-D519 106.87 300 DN 300 GRP PN 10 75.78 1.07 3.84
KN7-BPT6 2222.62 300 DN 300 GRP PN 10 80.51 1.14 4.3
TR1-D340 1336.78 150 180 HDPE PN 12 -9.6 0.54 2.45
MLN16-DP594 316.82 32 40 HDPE PN 10 0.4 0.5 12.63
BPT2-MLN16 288.65 200 225 HDPE PN 10 35.63 1.13 6.85
D474-BPT2 5854.99 200 250 HDPE PN 12 33 1.05 5.94
RK8-RK9 386.46 50 63 HDPE PN 10 1.65 0.84 19.73
RK5-RK7 378.49 50 63 HDPE PN 10 1.85 0.94 24.5
RK7-RK9 651.91 50 63 HDPE PN 10 0.9 0.46 6.41
RK14-RK17 431.96 50 63 HDPE PN 10 0.39 0.2 1.39
RK13-RK14 352.81 63 75 HDPE PN 10 1.03 0.33 2.67
RK18-RK13 149.88 125 140 HDPE PN 10 -8.85 0.72 5.13
RK24-RK25 286.55 50 63 HDPE PN 10 2.02 1.03 28.78
D309-D310 1002.71 50 63 HDPE PN 16 0.45 0.23 1.77
TRT9-D309 976.86 50 63 HDPE PN 16 0.45 0.23 1.77
BS23-TR1 1303.56 125 160 HDPE PN 16 7.75 0.63 4.01
D270-KT1 1901.38 200 225 HDPE PN 10 26.18 0.83 3.87
NYS9-D269 759.5 200 225 HDPE PN 10 30.58 0.97 5.16
BPT3-D266 583.15 250 DN 250 GRP PN 10 46.93 0.96 3.85
D274-BPT3 1970.07 250 DN 250 GRP PN 20 57.38 1.17 5.58
KT12-KT13 452.87 100 110 HDPE PN 10 2.63 0.33 1.6
KT2-KT12 278.47 100 110 HDPE PN 10 4.03 0.51 3.53
KT6-KT1 581.68 150 180 HDPE PN 10 -9.32 0.53 2.32
KI45-KI44 386.86 75 90 HDPE PN 10 1.48 0.33 2.24
KB15-DP256 447.58 50 63 HDPE PN 10 0.4 0.2 1.44
DP257-KB14 288.73 100 110 HDPE PN 10 3.19 0.41 2.3
KB13-DP257 128.53 100 110 HDPE PN 10 3.59 0.46 2.86
DP258-KB15 146.87 75 90 HDPE PN 10 1.83 0.41 3.33
KB14-DP258 128.38 75 90 HDPE PN 10 2.23 0.5 4.81
NYS8-NYS7 358.69 50 63 HDPE PN 10 -0.57 0.29 2.79
NYS6-NYS8 704.82 50 63 HDPE PN 10 0.65 0.33 3.53
BS15-BS14 346.35 100 125 HDPE PN 16 -4.75 0.6 4.79
BS20-BS15 421.92 100 125 HDPE PN 16 -4.54 0.58 4.41
D295-BS2 471.07 100 125 HDPE PN 16 -2.04 0.26 0.99
D296-D295 510.55 75 90 HDPE PN 16 -1.64 0.37 2.66
BS13-D296 149.28 75 90 HDPE PN 16 -1.24 0.28 1.56
RK19-D473 1343.84 50 63 HDPE PN 10 0.4 0.2 1.44
MLN80-D474 1640.76 200 250 HDPE PN 16 33 1.05 5.94

92 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D479-MLN80 1306.28 300 DN 300 GRP PN 20 121.87 1.72 9.27
BT55-BT44 164.1 75 90 HDPE PN 10 -2.24 0.51 4.84
BT55-BT54 156.11 75 90 HDPE PN 10 1.97 0.45 3.83
BT52-BT51 366.07 50 63 HDPE PN 10 0.28 0.14 0.73
BT60-BT61 418.7 50 63 HDPE PN 10 0.42 0.21 1.56
BT77-BT75 279 50 63 HDPE PN 10 0.48 0.25 2.04
BT90-BT96 206.29 50 63 HDPE PN 10 -0.19 0.1 0.36
BT85-BT86 320.99 50 63 HDPE PN 10 0.5 0.25 2.17
BT87-BT76 328.5 50 63 HDPE PN 10 0.84 0.43 5.69
BT76-BT75 222.01 50 63 HDPE PN 10 0.18 0.09 0.33
BT76-BT73 182.42 50 63 HDPE PN 10 0.49 0.25 2.07
BT74-BT73 237.41 50 63 HDPE PN 10 0.02 0.01 0.01
BT75-BT74 466.53 50 63 HDPE PN 10 0.26 0.13 0.65
BT8-BT7 461.93 100 110 HDPE PN 10 -4.24 0.54 3.9
BT10-BT11 502.5 50 63 HDPE PN 10 0.72 0.37 4.28
BT72-BT16 102.45 50 63 HDPE PN 10 0.47 0.24 1.9
BT73-BT72 206.13 50 63 HDPE PN 10 -0.06 0.03 0.05
BT62-BT78 406.67 75 90 HDPE PN 10 1.16 0.26 1.44
BT61-BT62 220.25 50 63 HDPE PN 10 0.35 0.18 1.13
BT79-BT63 172.13 75 90 HDPE PN 10 1.21 0.27 1.56
BT44-BT45 290.91 150 180 HDPE PN 10 13.2 0.75 4.42
BT26-BT44 385.06 100 110 HDPE PN 10 -2.71 0.34 1.69
BT69-BT66 216.36 32 40 HDPE PN 12 0.36 0.44 10.25
BT64-BT69 352.57 50 63 HDPE PN 10 0.67 0.34 3.69
DP71-BT67 143.45 75 90 HDPE PN 10 1.7 0.39 2.91
BT68-DP71 269.96 75 90 HDPE PN 10 2.1 0.48 4.31
BT70-BT68 368.57 100 110 HDPE PN 10 2.57 0.33 1.54
BT71-BT70 386.85 100 110 HDPE PN 10 3.58 0.46 2.84
BT25-BT64 387.13 400 DN 400 GRP PN 10 125.09 1 2.4
BT26-BT24 534.96 100 110 HDPE PN 10 -3.2 0.41 2.31
BT30-BT28 200.78 100 110 HDPE PN 10 -2.47 0.31 1.42
BT33-BT30 203.32 100 110 HDPE PN 10 -2.76 0.35 1.76
BT34-BT35 181.58 75 90 HDPE PN 10 -1.11 0.25 1.32
BT36-BT37 185.86 100 110 HDPE PN 10 4.57 0.58 4.47
BT23-BT22 206.25 150 180 HDPE PN 10 7.58 0.43 1.58
BT36-DP90 8.43 32 40 HDPE PN 10 0.4 0.5 12.64
BT39-BT34 328.09 100 110 HDPE PN 10 -3.41 0.43 2.6
BT40-BT38 368.07 100 110 HDPE PN 10 -3.66 0.47 2.97
BT4-BT3 832.26 100 110 HDPE PN 10 3.47 0.44 2.69
BT2-BT1 644.41 75 90 HDPE PN 10 1.63 0.37 2.68
BR16-DP127 299.84 200 225 HDPE PN 10 -26.26 0.84 3.89
BR13-BR14 286.71 32 40 HDPE PN 10 0.81 1.01 46.87
BR3-BR4 292.07 50 63 HDPE PN 12 0.62 0.32 3.28
BR4-DP130 20.71 32 40 HDPE PN 10 0.4 0.5 12.63
BR12-BR11 478.49 100 110 HDPE PN 10 -4.5 0.57 4.34
BR11-BR6 462.07 200 250 HDPE PN 16 18.78 0.6 2.09

93 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
MB9-MB11 641.28 100 110 HDPE PN 10 -4.57 0.58 4.47
MB5-MB9 557.22 100 110 HDPE PN 10 -3.39 0.43 2.57
MB9-DP482 35.68 32 40 HDPE PN 10 0.4 0.5 12.63
MB5-J100 400.6 75 90 HDPE PN 10 -1.65 0.37 2.75
MB12-MB13 342.37 75 90 HDPE PN 10 1.74 0.39 3.02
ST2-MR15 389.26 350 DN 350 GRP PN 10 115.78 1.2 3.98
ST5-D133 307.3 63 75 HDPE PN 10 1.6 0.51 6.07
KI590KI35 216.04 100 110 HDPE PN 10 -4.76 0.61 4.81
KI57-KI58 176.06 100 110 HDPE PN 10 -4.1 0.52 3.65
KI56-KI57 165.25 100 110 HDPE PN 10 -3.79 0.48 3.16
KI50-KI48 238.03 100 110 HDPE PN 10 -6.08 0.77 7.56
KI52-KI50 337.6 100 110 HDPE PN 10 -4.96 0.63 5.19
KI53-KI72 236.95 50 63 HDPE PN 10 -0.56 0.29 2.65
KI71-KI68 227.9 50 63 HDPE PN 10 0.39 0.2 1.36
KI14-KI71 166.92 50 63 HDPE PN 10 0.88 0.45 6.16
ST4-KI30 555.93 450 DN 450 GRP PN 10 198.08 1.25 3.16
KI33-KI27 289.3 150 180 HDPE PN 10 16.1 0.91 6.39
D516-ST5 180.75 75 90 HDPE PN 16 2.7 0.61 6.85
KZ1-KG7 2362.82 150 180 HDPE PN 12 12 0.68 3.71
KZ3-KZ2 153.53 150 180 HDPE PN 10 -8.75 0.5 2.06
KZ21-KZ14 490.8 250 DN 250 GRP PN 10 -59.82 1.22 6.03
KZ6-KZ5 580.52 250 DN 250 GRP PN 10 -57.78 1.18 5.66
KZ7-KZ6 607.81 250 DN 250 GRP PN 10 -57.02 1.16 5.52
KZ16-KZ7 341.98 250 DN 250 GRP PN 10 -52.88 1.08 4.8
KZ17-KZ16 513.63 50 63 HDPE PN 10 -0.23 0.12 0.52
KZ16-KZ8 563.16 250 DN 250 GRP PN 10 52.65 1.07 4.76
KZ23-MLN21 483.9 250 DN 250 GRP PN 20 56.29 1.15 5.39
KI20-KI22 313.46 200 225 HDPE PN 10 -34.77 1.11 6.55
KI64-J419 323.32 250 DN 250 GRP PN 10 62.53 1.27 6.55
KI63-KI64 363.84 250 DN 250 GRP PN 10 62.89 1.28 6.62
KI17-KI18 227.21 50 63 HDPE PN 10 0.59 0.3 2.94
KI16-KI17 253.19 50 63 HDPE PN 10 1.05 0.54 8.62
KI4-KI3 465.02 100 110 HDPE PN 10 7.14 0.91 10.2
KI7-KI86 569.03 75 90 HDPE PN 10 3.82 0.86 13.02
KI87-KI88 564.45 50 63 HDPE PN 10 1.37 0.7 13.96
KI90-DP237 2466.09 50 63 HDPE PN 10 0.8 0.41 5.19
MK5-MK4 817.08 100 110 HDPE PN 10 -3.15 0.4 2.24
MK6-SG21 1470.79 200 250 HDPE PN 12 21.06 0.67 2.59
ST3-KY2 1077.25 200 225 HDPE PN 10 28.2 0.9 4.44
RY6-RY7 432.22 50 63 HDPE PN 10 0.4 0.2 1.45
D104-KT.2 1312.29 150 180 HDPE PN 10 14.45 0.82 5.23
MY13-DP423 5.64 32 40 HDPE PN 10 0.4 0.5 12.63
MY15-MY13 332.61 100 110 HDPE PN 10 2.89 0.37 1.92
MY22-MY20 236.82 200 250 HDPE PN 12 -29.61 0.94 4.86
MY14-MY16 343.48 200 225 HDPE PN 10 -23.13 0.74 3.08
MY6-MY5 252.78 100 110 HDPE PN 10 4.39 0.56 4.15

94 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
TG26-TG25 590.99 150 180 HDPE PN 16 16.92 0.96 7
DP385-MN11 209.75 75 90 HDPE PN 10 1.8 0.41 3.23
MN9-DP385 144.98 75 90 HDPE PN 10 2.2 0.5 4.69
MN8-MN17 446.92 75 90 HDPE PN 10 2.06 0.47 4.14
MN3-MN2 466.6 50 63 HDPE PN 10 -0.48 0.24 2
KK6-KK5 445.17 50 63 HDPE PN 10 -0.03 0.02 0.01
DP488-DP494 1624.19 50 63 HDPE PN 10 0.8 0.41 5.19
D517-DP496 704.26 32 40 HDPE PN 12 0.4 0.5 12.63
D517-DP498 630.28 32 40 HDPE PN 12 0.4 0.5 12.63
DP495-D517 431.95 50 63 HDPE PN 10 0.8 0.41 5.19
DP493-DP495 1359.94 50 63 HDPE PN 10 1.2 0.61 10.99
MR12-DP493 1777.35 75 90 HDPE PN 10 1.6 0.36 2.6
BM3-BM2 382.85 63 75 HDPE PN 10 1.78 0.57 7.39
DP156-BM14 327.57 50 63 HDPE PN 12 1.19 0.61 10.82
KR14-KR16 440.85 50 63 HDPE PN 10 1.05 0.53 8.53
KW11-KW8 197.06 63 75 HDPE PN 10 1.85 0.59 7.96
KW20-KW23 522.85 50 63 HDPE PN 10 1.03 0.53 8.32
KW23-KW24 452.05 50 63 HDPE PN 10 0.39 0.2 1.36
J45-NY10 246.3 50 63 HDPE PN 10 1.53 0.78 17.28
KW19-KW18 204.75 150 180 HDPE PN 10 7.57 0.43 1.58
ST1-KW1 637.74 250 DN 250 GRP PN 10 48.17 0.98 4.04
D515-DP193 982.15 32 40 HDPE PN 10 0.4 0.5 12.63
D513-D515 834.856 50 63 HDPE PN 16 0.4 0.2 1.44
D513-DP194 373.636 32 40 HDPE PN 16 0.4 0.5 12.63
D514-D513 592.162 50 63 HDPE PN 16 0.8 0.41 5.19
D512-D514 696.38 50 63 HDPE PN 16 0.8 0.41 5.19
D511-DP195 136.415 50 63 HDPE PN 10 0.8 0.41 5.19
D512-DP197 542.629 50 63 HDPE PN 10 0.4 0.2 1.44
D511-D512 208.52 63 75 HDPE PN 10 1.2 0.38 3.57
KG4-D511 163.797 75 90 HDPE PN 12 2 0.45 3.93
KG6-DP198 132.629 32 40 HDPE PN 10 0.4 0.5 12.63
KG6-DP199 671.64 32 40 HDPE PN 10 0.4 0.5 12.63
DP195-DP196 399.122 50 63 HDPE PN 10 0.4 0.2 1.44
DP191-DP192 365.798 50 63 HDPE PN 12 0.4 0.2 1.44
DP190-DP191 209.732 50 63 HDPE PN 12 0.8 0.41 5.19
KG3-DP190 278.926 50 63 HDPE PN 12 1.2 0.61 10.99
KY5-DP332 266.518 32 40 HDPE PN 10 0.4 0.5 12.63
D510-DP330 291.322 32 40 HDPE PN 10 0.4 0.5 12.63
D510-DP331 483.722 50 63 HDPE PN 10 0.4 0.2 1.44
KY4-D510 392.452 50 63 HDPE PN 10 0.8 0.41 5.19
D169-KY5 360 150 180 HDPE PN 10 17.51 0.99 7.46
D169-DP333 41.55 32 40 HDPE PN 10 0.4 0.5 12.63
KY4-D169 233.95 200 225 HDPE PN 10 17.91 0.57 1.92
D509-KY8 143.92 75 90 HDPE PN 10 1.57 0.36 2.52
D509-DP336 34.1853 32 40 HDPE PN 10 0.4 0.5 12.63
KY3-D509 126.89 75 90 HDPE PN 10 1.97 0.45 3.83

95 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
KY6-DP337 144.725 50 63 HDPE PN 10 0.4 0.2 1.44
DP335-KY3 588.68 100 110 HDPE PN 10 3.63 0.46 2.91
KY3-DP334 542.32 50 63 HDPE PN 10 0.4 0.2 1.44
DP335-DP338 353.285 50 63 HDPE PN 10 0.4 0.2 1.44
KY2-DP335 214.662 100 110 HDPE PN 10 4.43 0.56 4.22
DP340-DP341 367.204 50 63 HDPE PN 10 0.4 0.2 1.44
DP339-DP340 362.224 50 63 HDPE PN 10 0.8 0.41 5.19
D508-DP339 76.7378 50 63 HDPE PN 10 1.2 0.61 10.99
D508-KY9 355.355 50 63 HDPE PN 10 0.86 0.44 5.99
KY2-D508 423.197 75 90 HDPE PN 10 2.06 0.47 4.17
KN2-KN3 1020.23 350 DN 350 GRP PN 10 112.31 1.17 3.76
D481-DP109 484.623 32 40 HDPE PN 10 0.4 0.5 12.63
D89-TG26 420.777 150 180 HDPE PN 12 17.2 0.97 7.22
TG27-D89 146.321 150 180 HDPE PN 12 17.6 1 7.54
D418-DP95 138.862 50 63 HDPE PN 10 0.53 0.27 2.43
MY7-DP427 1382.57 50 63 HDPE PN 16 1.2 0.61 10.99
MY5-DP425 221.762 32 40 HDPE PN 12 0.4 0.5 12.63
DP287-DP286 2058.38 50 63 HDPE PN 10 0.4 0.2 1.44
DP119-D507 262.17 75 90 HDPE PN 10 2.24 0.51 4.85
BT3-DP119 165.57 100 110 HDPE PN 10 2.64 0.34 1.62
D506-BT16 424.639 50 63 HDPE PN 10 0.04 0.02 0.02
D506-DP77 26.58 32 40 HDPE PN 10 0.4 0.5 12.63
BT10-D506 73.2 50 63 HDPE PN 10 0.44 0.22 1.72
D505-D502 159.686 32 40 HDPE PN 10 -0.4 0.5 12.63
D419-D421 169.421 50 63 HDPE PN 10 0.67 0.34 3.73
D502-DP92 20.5356 32 40 HDPE PN 10 0.4 0.5 12.63
D421-D502 87.845 50 63 HDPE PN 10 0.8 0.41 5.19
DP100-D504 317.58 32 40 HDPE PN 10 0.4 0.5 12.63
DP100-DP100 9.6428 50 63 HDPE PN 10 0.4 0.2 1.44
D503-DP100 58.4763 50 63 HDPE PN 10 0.8 0.41 5.19
BT97-D499 104.376 50 63 HDPE PN 10 0.72 0.37 4.25
D499-DP104 22.1462 50 63 HDPE PN 10 0.4 0.2 1.44
BT77-D499 38.7814 50 63 HDPE PN 10 -0.32 0.16 0.94
D498-BT89 103.043 50 63 HDPE PN 10 0.21 0.11 0.45
D498-DP76 21.7035 50 63 HDPE PN 10 0.4 0.2 1.44
BT88-D498 107.069 50 63 HDPE PN 10 0.61 0.31 3.17
BT73-DP103 19.6061 32 40 HDPE PN 10 0.4 0.5 12.63
BT78-DP107 116.669 50 63 HDPE PN 10 -0.04 0.02 0.02
DP107-DP107 11.1069 32 40 HDPE PN 10 0.4 0.5 12.62
BT84-DP107 178.53 50 63 HDPE PN 10 0.44 0.23 1.75
BT9-BT8 134.725 100 110 HDPE PN 10 -3.79 0.48 3.16
DP81-BT6 194.935 50 63 HDPE PN 10 0.7 0.36 4.07
BT5-DP81 317.155 50 63 HDPE PN 10 1.1 0.56 9.39
DP79-BT42 136.472 100 110 HDPE PN 10 -3.24 0.41 2.36
BT43-DP79 131.252 100 110 HDPE PN 10 -2.84 0.36 1.85
D496-BT41 53.4763 100 110 HDPE PN 10 -1.39 0.18 0.49

96 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
D496-DP106 13.142 32 40 HDPE PN 10 0.4 0.5 12.63
BT57-D496 442.578 75 90 HDPE PN 10 -0.99 0.22 1.06
D494-BT57 218.353 150 180 HDPE PN 10 11.4 0.65 3.37
D494-DP80 37.2135 32 40 HDPE PN 10 0.4 0.5 12.63
BT45-D494 52.8727 150 180 HDPE PN 10 11.8 0.67 3.59
DP72-BT51 123.467 50 63 HDPE PN 10 -0.34 0.17 1.04
DP72-DP72 7.68371 32 40 HDPE PN 10 0.4 0.5 12.63
D472-DP72 474.917 50 63 HDPE PN 10 0.06 0.03 0.05
D493-DP91 36.5586 32 40 HDPE PN 10 0.4 0.5 12.63
D493-BT44 176.736 200 225 HDPE PN 10 18.42 0.59 2.02
BT56-D493 225.312 200 225 HDPE PN 10 18.82 0.6 2.1
D492-BT28 132.034 100 110 HDPE PN 10 2.64 0.34 1.62
D492-DP75 18.4723 32 40 HDPE PN 10 0.4 0.5 12.63
BT27-D492 19.7704 100 110 HDPE PN 10 3.04 0.39 2.1
DP89-J-83 134.956 100 110 HDPE PN 10 -4.29 0.55 3.97
BT71-DP89 69.5583 100 110 HDPE PN 10 -3.89 0.5 3.31
DP89-DP89 4.32722 32 40 HDPE PN 10 0.4 0.5 12.62
BT70-DP73 312.139 32 40 HDPE PN 10 0.4 0.5 12.63
D490-BR9 342.67 150 180 HDPE PN 12 13.68 0.77 4.72
D490-DP131 25.03 32 40 HDPE PN 12 0.4 0.5 12.63
BR7-D489 311.311 150 180 HDPE PN 16 -16.24 0.92 6.49
D489-BR6 86.434 150 180 HDPE PN 16 -16.64 0.94 6.79
D489-DP132 10.8766 32 40 HDPE PN 16 0.4 0.5 12.64
BR11-D488 117.323 200 250 HDPE PN 12 -24.47 0.78 3.42
BR15-D488 549.111 200 250 HDPE PN 12 24.87 0.79 3.52
D488-DP125 50.0735 32 40 HDPE PN 12 0.4 0.5 12.63
BR13-DP126 13.4279 32 40 HDPE PN 10 0.4 0.5 12.64
D487-BR13 284.479 75 90 HDPE PN 10 2.17 0.49 4.58
D487-DP128 39.8212 32 40 HDPE PN 10 0.4 0.5 12.63
BR12-D487 69.7079 100 110 HDPE PN 10 2.57 0.33 1.54
D486-DP118 912.083 50 63 HDPE PN 10 0.4 0.2 1.44
D240-D486 687.71 50 63 HDPE PN 10 0.4 0.2 1.44
DP115-DP116 815.46 50 63 HDPE PN 10 0.8 0.41 5.19
D484-DP115 909.771 50 63 HDPE PN 16 1.2 0.61 10.99
DP124-D484 316.846 50 63 HDPE PN 16 1.2 0.61 10.99
D483-DP124 393.937 50 63 HDPE PN 12 1.6 0.81 18.72
D483-DP127 645.399 200 250 HDPE PN 12 26.66 0.85 4
D482-D483 419.263 200 250 HDPE PN 12 28.26 0.9 4.46
D485-DP123 79.1511 32 40 HDPE PN 10 0.4 0.5 12.63
D482-D485 614.833 50 63 HDPE PN 10 0.4 0.2 1.44
D481-D482 552.716 200 225 HDPE PN 10 28.66 0.91 4.58
D480-D481 1079.78 200 225 HDPE PN 10 29.06 0.92 4.69
D480-DP112 57.8363 50 63 HDPE PN 10 0.4 0.2 1.44
BT25-D480 145.408 200 225 HDPE PN 10 29.46 0.94 4.81
D478-DP108 948.28 32 40 HDPE PN 10 0.4 0.5 12.63
D478-DP113 836.658 32 40 HDPE PN 10 0.4 0.5 12.63

97 of 135
Length Diameter PIPE DESCRIPTION Flow Velocity Unit Headloss
Link ID m mm LPS m/s m/km
DP111-D478 1233.82 50 63 HDPE PN 10 0.8 0.41 5.19
D477-DP111 76.0267 50 63 HDPE PN 10 1.2 0.61 10.99
D476-D477 253.65 50 63 HDPE PN 12 1.2 0.61 10.99
D475-D479 608.052 300 DN 300 GRP PN 20 121.87 1.72 9.27
D476-DP110 214.69 32 40 HDPE PN 12 0.4 0.5 12.63
D475-D476 349.47 63 75 HDPE PN 10 1.6 0.51 6.07
DP402-DP403 1447.16 150 180 HDPE PN 10 9.8 0.55 2.55

98 of 135
Annex 6-3: Design Calculation for Water Treatment Plant

Parameter Unit Value


1 General Data
Water Demand / Treated Water Production
Design flow m/d 35,000
%age water treated % 100%
Phase I treated water production m/d 35,000
Raw Water Production
Percentage of WTP-internal losses/consumption % 5%
Raw water production requirements m/d 35,000
Raw water flow into treatment hours per day h/d 18
Raw water production requirements m/h 1,944
Chosen raw water design flow (rounded off) m/h 1,940
Chosen raw water design flow (rounded off) m/s 0.54
Number of parallel treatment lines 4
Actual Raw and Treated Water Production
Actual Raw Water Production m/d 34,920
Actual Treated Water Production m/d 33,174
Desilting Chamber (Primary Sedimentation)
Chamber entering velocity m/sec
Upflow velocity m/sec 0.0025
Required voume m3 646.67
Depth of sedimentation tank m 3
required area m2 216
length to width ratio ratio 1
Width of desilting chamber m 5.00
length of sedimentation tank m 11.00
Provided volume m3 165.00
2 Inlet and distribution chamber
Chosen HRT in inlet and distribution chamber minutes 2.0
Resulting volume of inlet and distribution chamber m 64.7
Chosen Height m 2.60
Chosen Width m 4.00
Chosen Length m 6.22

3 Cascade Aeration
No. of aeration units (one per treatment line) 4
No. of aeration steps 3
Hydraulic weir loading m3/h*m 90
Total required weir length per step and unit m 4.9
Chosen weir length per step and unit m 5.0
Hydraulic weir loading with one line out of operation m3/h*m 110
Hydraulic fall height per step (Step 1 - lime dosing) m 0.3
Chosen velocity gradient G for coagulant mixing s-1 1,000
Volume of bottom collection basin per unit m 1.0
dynamic viscosity coefficient (at 20C) Pa s 0.0010087
required power input P per unit (P = *G2*V) W 1009
equivalent height h (overfall weir) m 0.8
Chosen hydraulic fall height per step (Step 2 - Coagulation) m 1.0
Collection basin height per step (inkl. wall thickness) m 0.4
Free board at top cascade m 0.3
Overall height of cascade aerator m 2
lime dosing at 1st
step, PAC dosing at
Remark 2nd step
3 Coagulation Channel

99 of 135
Annex 6-3: Design Calculation for Water Treatment Plant

Parameter Unit Value


Flow in coagulation unit m3/s 0.54
The channel width for hydraulic jump mixing m 0.3
Depth of base from top of channel m 1.2
Froude number Fr 7
Depth of flow at the toe of the spillway m 0.4
Conjugate depth required for hydraulic jump to tailwater depth m 0.042
Required conjugate depth for hydraulic jump at toe of spillway m 0.41

4 Flocculation
Type sinuous channel
Number of units (one per treatment line) 4
Choosen HRT in flocculator min. 15
Design flow per unit m/h 485.0
Design flow per unit m/s 0.13
Required flocculator volume per unit m3 121.25
Flocculator width, W m 15.25
Flocculator Lenght, L m 16.20
Required flocculator surface per unit m2 247.1
average baffle width m 0.50
Average water depth in flocculator m 2.5
average flow velocity in channel m/s 0.11
average flow velocity round the baffle ends m/s 0.40
No. of baffles - 24
total width of baffles m 15.5
required length of baffles m 16.0
thickness of baffle separation walls m 0.15
total width of baffles separation walls (each = 0.15 m) m 3.45
total width of flocculator (incl. outer walls of 0.2 m each) m 19.3
total head loss over sinuous channel (h v2/2g) m 0.20
provided power input flocculation (P = *g*h*Q) W 533
resulting velocity gradient G for flocculation (G = (P/(V*))^0.5) s-1 66.0
resulting GT-value for flocculation - 59,432
Section 1
Number of baffles nos 9.00
Distances btn baffle walls m 0.40
Width at bend (1.5*distance btn baffles) m 0.60
Thickness of baffle wall m 0.15
Section 1 total width m 5.00
Baffle length m 15.60
Length subject to friction m 16.06
Section 2
Number of baffles nos 8.00
Distance btn baffles m 0.50
Width at bend (1.5*distance btn baffles) m 0.75
Thickness of baffle wall m 0.15
Section 2 total width m 5.20
Baffle length m 15.45
Length subject to friction m 16.02
Section 3
Number of baffles nos 7.00

100 of 135
Annex 6-3: Design Calculation for Water Treatment Plant

Parameter Unit Value


Distance btn baffles m 0.60
Width at bend (1.5*distance btn baffles) m 0.9
Thickness of baffle wall m 0.15
Section 2 total width m 5.10
Baffle length m 15.30
Length subject to friction m 15.98
5 Sedimentation
Design flow m/h 1,940
Type of settler Vertical sedimentation tank
No of treatment lines 4
Design flow per treatment line m/h 485
Clarifier Surface
Detention time (T = V/Q) hrs 1.50
Maximum hydraulic surface load m (m2xh)
3
4.00
Minimun required surface area m2 121.25
No of Clarifier per Treatment line 2
Total no. of Clarifier 8
Minimum surface area of one clarifier m2 55.11
Choosen Clarifier width m 7.50
Choosen Clarifier length m 7.50
Resulting clarifier surface m2 56.25
Clarifier Height
Vertical height of conical clarifier section m 6.50
Vertical height below tube settlers m 0.30
Vertical height of tube settlers m 0.80
Minimum clear water level above tube settlers m 0.50
Free board m 0.30
Total height of clarifier m 8.40
Tube settlers
Material of tubes polystyrene
Cross - section of tubes hexagonal
Hydraulic diameter of tubes mm 60-80
Angle of inclination to the horizontal " 60
Settled water collecting troughs
Maximum weir load of settled water collecting troughs m3/mxh 5
Minimum required weir length per clarifier m 41
No. of settled water collection troughs 4
trough with v-
choosen type of collecting troughs notched weirs on both
sides
resulting total weir length per clarifier(4 troughs @ 7.5m on 2 sides) m 60
resulting weir load of settled water collecting troughs m /mxh
3
3.44
6 Filtration
Design flow (raw water) m/h 1,940
Considered sludge abstraction (as %-age of raw water design flow) % 2%
Design flow (filtration) m/h 1901.2
Type of filter rapid gravity filter constant rate and var
Filter Surface
Filtration rate at design flow (filtration) m/m/h 6.0
Total required filter surface area m 316.87
Chosen No. of Filters per treatment line 2
Total No. of Filters nos 8
Required surface area of one unit m 39.6
Chosen surface area of one unit 40.0

101 of 135
Annex 6-3: Design Calculation for Water Treatment Plant

Parameter Unit Value


Chosen width of one unit m 5.4
Length of each unit m 6.7
Designed surface area m2 36.0
Resulting filtration rate at design flow (filtration), all filters operated m/m/h 6.7
Resulting filtration rate at design flow (filtration), 1 filter backwashed m/m/h 7.7
Filter build-up (from bottom to top)
Height of filter underdrain mm 800
Height of filterfloor mm 150
Filter floor (PP or PVC nozzles) No/m 40
Height of coarse gravel layer mm 100
Size of coarse gravel mm 12 - 25 mm
Height of medium gravel layer mm 100
Size of medium gravel mm 6 - 12 mm
Height of fine gravel layer mm 100
Size of fine gravel mm 3 - 6 mm
Height of filter sand layer mm 1,000
Size of filter sand grains mm 0,8 - 1,1
Effective size of filter sand grains ES mm 0.9
Uniformity coefficient of filter sand grains UC 1,4
Max Water level above sand bed mm 2,300
Height of freeboard mm 1,000
Total height of filters (approximately) mm 5,550
Filter backwash combined air/water
Chosen air scour rate m/h 60
Chosen duration of air scour minutes 5
required air flow at standard pressure and temperature m/h 2,160
required pressure difference bar 1
type of blower rotary piston
No. of blowers 1 duty; 1 standby
Chosen backwash rate (during air/water backwash) m/h 15
Chosen duration of air/water minutes 5
Chosen backwash rate (during water rinse) m/h 30
Chosen duration of rinsing by water minutes 10
required washwater flow during air/water m/h 540
required washwater flow during water rinse m/h 1,080
type of backwash pumps centrifugal
Capacity of backwash one pump (at about 1.3 bar) m/h 540
No. of backwashpumps 2 duty; 1 standby
total amount of wash water per backwash m 225
Min. volume of backwash water compartment (4 backwashes) m 450

Remark:
Chosen capacity of backwash water receiving tank (2 backwashes/ safety
factor: 20%) m 540

7 Clear Water Tank (Storage, Disinfection and Backwash)


Design flow (raw water) m/h 1,940
Considered sludge abstraction (as %-age of raw water design flow) % 2%
Design flow (filtration) m/h 1,901
Considered backwash water (as %-age of raw water design flow) % 2%
Design flow (clear water storage) m/h 1,863
Chosen storage capacity h 1
required volume for storage m 932
Chosen HRT in section for disinfection with chlorine h 0.50

102 of 135
Annex 6-3: Design Calculation for Water Treatment Plant

Parameter Unit Value


required tank volume for disinfection m 932
required volume for 2 backwashes (including 20% margin) thus m 540
total volume of clear water tank m 2,400
Remark: the total tank volume will be divided into two compartments by a weir; the first compartment with a volume of abo
sufficient HRT to achieve the required disinfection, the second compartment of about 1600m 3 will be used for storage
8 Chemical Preparation and Dosing
Pre-Chlorination
Design flow (raw water) m/h 1,940
m3/d 34,920
Average Chlorine dosage mg/l 2
Maximum Chlorine dosage mg/l 5
Free Chlorine Content of Calcium-Hypochlorite (CaHC) % 70%
Average CaHC-dosing rate kg/h 5.54
Maximum CaHC-dosing rate kg/h 13.86
CaHC-concentration in dosing solution (density: 1,050 kg/m3) % 5%
g/l 50
Average CaHC-solution dosing rate l/h 106
Maximum CaHC-solution dosing rate l/h 264
No. of dosing pumps (1 + 1) 2
Maximum capacity of each dosing pump l/h 264
Disinfection
Design flow (clear water) m/h 1,863
m3/d 33,537
Average Chlorine dosage mg/l 0.5
Maximum Chlorine dosage mg/l 1.5
Free Chlorine Content of Calcium-Hypochlorite (CaHC) % 70%
Average CaHC-dosing rate kg/h 1.33
Maximum CaHC-dosing rate kg/h 3.99
CaHC-concentration in dosing solution (density: 1,050 kg/m3) % 5%
g/l 50
Average CaHC-solution dosing rate l/h 25
Maximum CaHC-solution dosing rate l/h 76
No. of dosing pumps (1 + 1) 2
Maximum capacity of each dosing pump l/h 76
No. of CaHC preparation and dosing tanks 2
Minimum tank operation time at maximum dosing rates h 8
Minimum required tank volume m3 2.72
Chosen tank diameter m 1.5
Chosen tank height m 1.5
Resulting Tank volume m3 2.7
2 stirrers (1 in duty tank, 1 in standby tank) of approx. 1.2 kW Dia.(m) 0.4
Minimum storage capacity at maximum dosing rate days 30
Required CaHC storage capacity kg 11,781
Assume 40kg/drum drums 295
CaHC storage area - 8 drums per m2 (i.e. 320kg/m) m 36.8
Say m 37.0
Lime Dosing
Design flow (raw water) m/h 1,940
m3/d 34,920
Average Lime dosage mg/l 10
Maximum Lime dosage mg/l 30
Average Lime dosing rate kg/h 19.4
Maximum Lime dosing rage kg/h 58.2
Lime-concentration in dosing slurry (density: 1,013 kg/m3) % 5%

103 of 135
Annex 6-3: Design Calculation for Water Treatment Plant

Parameter Unit Value


g/l 50
Average Lime-slurry dosing rate l/h 383
Maximum Lime slurry dosing rate l/h 1149
No. of dosing pumps (2 + 1) 3
Maximum capacity of each dosing pump l/h 500
No. of Lime preparation and dosing tanks 2
Minimum tank operation time at maximum dosing rates h 8
Minimum required tank volume m3 9.19
Chosen tank diameter m 2.27
Chosen tank height m 2.27
Resulting Tank volume m3 9.2
2 stirrers (1 in duty tank, 1 in standby tank) of approx. 3.0 kW Dia.(m) 0.6
Minimum storage capacity at maximum dosing rate days 30
Required Lime storage capacity kg 38,412
Assume 50kg/bag lime Bags 768.24
Lime storage area - bags loaded to 1.5m high (i.e. 1,100kg/m) m 34.92
Say m 35
Coagulant Dosing PolyAluminiumChloride (PAC)
Design flow (raw water) m/h 1,940
m3/d 34,920
Average PAC dosage mg/l 5
Maximum PAC dosage mg/l 30
Average PAC dosing rate kg/h 9.7
Maximum PAC dosing rate kg/h 58.2
Average PAC requirement per day kg 232.8
Maximum PAC requirement per day kg 1396.8
PAC concentration in dosing solution (density: 1,160 kg/m3) % 5%
Average PAC-solution dosing rate l/h 167
Maximum PAC solution dosing rate l/h 1003
No. of dosing pumps (2 + 1) 3
Maximum capacity of each dosing pump l/h 502
No. of PAC dosing tanks 2
Minimum tank operation time at maximum dosing rates h 8
Minimum required tank volume m3 8.03
Chosen tank diameter m 2.17
Chosen tank height m 2.17
Resulting Tank volume m3 8.0
Minimum storage capacity at maximum dosing rate days 30
Required PAC storage capacity kg 31,428
Assume 265kg/drum PAC drums 119
PAC storage area - 4 drums per m2 (i.e. 1,060kg/m) m 29.6
Say m 30.0

9 Backwash Water & Sludge Treatment facilities


Backwash Water Sedimentation Tank
Type of Sedimentation Tank horizontal flow
Min. capacity for two backwash cycles + safety factor of 20 % m3 540
No. of sedimentation tank compartments 2
Volume of one sedimentation tank compartment m3 270
Average depth of sedimentation tank m 3.8
Length of sedimentation tank compartment m 15
Width of sedimentation tank compartment m 5
Remark: the settled sludge from the backwash water tank is transferred - together with the sludge from the
sedimentation tanks - to the sludge drying beds, the supernatant water is discharged back to the lake
SS content in backwash water mg/l 80

104 of 135
Annex 6-3: Design Calculation for Water Treatment Plant

Parameter Unit Value


Sludge generated per backwash kg 43.2
Backwash water settling velocity m/h 0.8
Required settling time h 4.75
SS content in settled sludge % 2%
% SS removal in sedimentation tank % 90%
Volume of settled sludge m3 472.5

Sludge Drying Beds


Design Flow (raw water) m/d 34,920
Drying bed area 40m per 1,000m/d water treatment capacity m 1,397
number of sludge lagoons nos 4
Length of each m 26
Choosen Length m 30
Wdth of each m 13

105 of 135
ANNEX 6-4 STRUCTURAL DESIGN OF 200M3 RESERVOIR

REF CALCULATION OUTPUT

Design Information

Total height of tank, H in m 4.50

Depth of water in the tank, Hw in m 4.25

Internal Diameter of the tank, D in m 8


External Diameter of the tank, De in m 8.60
Thickness of wall,t in mm 300.00

Specific weight of water, W in KN / m3 9.81

Roof slab thickness, h in mm 200.00

Concrete self weight, in KN/M2 24.00


Modular ratio of concrete, e 15.00
Service stress in high yield steel, fst in N/mm2 100.00
BS 8007 Service stress in mild steel, fst in N/mm2 85.00
Table 3.1
Maximum tensile stress in concrete in N/mm2 1.31

Elastic Modulus of concrete, Ec in KN/mm2 26.00

Elastic Modulus of steel, Es in KN/mm2 200.00

Pumice or light weight concrete in KN/m3 11.00

Tensile steel strength for high yield in N/mm2 425.00

Tensile steel strength for mild steel in N/mm2 250.00

Concrete compressive strength in N/mm2 25.00


Bearing capacity of soil at the site Bp in KN / m2 150.00

Reservoir wall design


Direct tension in wall due to internal pressure N = 0.5*W*H 1*D =

Where H1 is Level of liquid above level Considered

Area required per unit height of wall, A s=N/fst

Where fst is the permissible tensile in reinforcement

H1 N

1.00 39.24
2.00 78.48
3.00 117.72
4.00 156.96
4.50 176.58
Minimum thickness of tank wall in mm
t=Nd/b(1/fct - (e-1)/fst) = 61.64

106 of 135
ANNEX 6-4 STRUCTURAL DESIGN OF 200M3 RESERVOIR

REF CALCULATION OUTPUT

t > 100mm

t > 0.025* H + 25 137.50

The provided thickness of 350mm is adequate

Bending Moment due to restraints at the base of wall

Reissners Hw2/(tD)= 7.53


and
Carpenter's k1 = 0.0155
table k2 = 0.4

k3 = 0.56
Maximum circumferential tension Nmax = WHDK3/2 = 98.88

Maximum Bending Moment at the bottom of tank in KN- M =


3 K1WHw3 = 11.67

Position of maximum Circumferential tension = K 2Hw in m = 1.70

Design For Reinforcement


For deformed bars service limit state stress in N/mm2 steel fst = 100.00

Area of steel required As = Nmax/ fst = 989


Therefore provide R12 bars @ 150 mm as hoop steel in each of
two rows one near each face. Area total provided = 1,506 mm 2 in
both faces of the wall section.

Distribution steel
Minimum steel required in the section Asmin= 0.00026 bd = 780
Steel for resisting moment As = M/(fst x Z) 482
Therefore provide R12 @ 170 mm in outer and internal face. Area
provided = 1,292 mm2.

Design of Roof Slab

The roof slab is designed as a continuous 3-span section.

Consider 1m strip of slab.

Self-weight of slab in KN/m= 0.25*24 = 4.80

Pumice 150mm = in KN/M = 0.15*11= 1.65


Floor finishes = 0.40
Total dead load, gk = 6.85
Imposed load, qk in KN/M = 1.50
Design Load qd = 1.4gk + 1.6qk = 11.99

107 of 135
ANNEX 6-4 STRUCTURAL DESIGN OF 200M3 RESERVOIR

REF CALCULATION OUTPUT

BS 8110 Maximum Moment at the mid span = 0.09 * F*L 17.27


Table 3.5
Maximum Moment at the support = 0.11 * F*L 19.18

Bending Reinforcement
M/bd2fcu = 0.01
BS 8110
Z = d*(0.5+(0.25-k/0.9)^0.5 or 0.95*d whichever is less 285
Reinforcement requirement As = (M/(0.87*fy*Z)

As Bottom = in mm2/m 279


As top = in mm2/m 309
As Minimum = 0.0026*b*d = 598

Provide Bottom reinforcements R12 - 130 c/c c/c at the midspan.


As = 869. Elsewhere provie R12 - 150c/c

Provide Top reiforcements R12 - 130 at the supports. Elsewhere


provide minimum reinforcement of R12 - 150c/c.
Design of Columns

Height of column in, L in m = 4.50

Diameter of column, d mm = 600

Column self weight in KN = 1.27

Weight from slab in KN = 187.3

Imposed load in KN = 87.1

Design Load =

Ultimate Load = 1.6*gk +1.6*qk = 403.46

Design For Reinforcement

Therefore:

Ac = pi d/4 = 282743.34 mm

diax' = diay' = dia - d' = 560 mm

Effective column height: le = Lo in m 5.85

Where = 1.3
BS 8110 Check if the column is slender:
Tabble
3.8.1.3 lex/dia = 9.75

the column is short

Design ultimate capacity of section under axial load only:

Nuz = 0.45 fcu Ac + 0.95 fy Asc = 3449.5 kN

108 of 135
ANNEX 6-4 STRUCTURAL DESIGN OF 200M3 RESERVOIR

REF CALCULATION OUTPUT

Design ultimate load and moment:

Design axial load:

Pu = 390 kN

Table For bending about the X-X axis, the maximum design moment is the greatest of
3.8.3.7
(a) M2 + Madd = 19.4 kNm

(b) emin N = 8.3 kNm

Mx = My = 19.4 kNm

Design of column section for ULS:

Through inspection:

The critical section lies at the top end of the column.

The column is bi-axially bent and may be designed to withstand


an increased
3.8.4.5 moment about a single axis

Mx/dia = 34.6 My/dia = 34.6

The effective uniaxial design moment about the X-X axis:

= 1 - 7/6 N/(Ac fcu) = 0.931_x000B_Table 3.24

\ M'x = Mx + dia/dia My = 37.4 kNm

From the design chart, Asc = 1131 mm = 0.40%

Provide 8 R16 main bars

Provide R8 - 150 spiral link

Design For Foundations

Base length, x in m = 2.5


Base width , y in m = 2.5
Base depth , z in m = 0.35
At serviceability Limit State;

Weight from slab and column in KN = 188.61


Self-wt of base in KN assumed = x * y * z * Wc 52.50
Bearing Capacity of the soils = 150 KN/ m2
Total wt to the foundations, Wk in KN = 241.11
Area of base required = Wk/Bp 1.61
The provided base area in m2 6.25

109 of 135
ANNEX 6-4 STRUCTURAL DESIGN OF 200M3 RESERVOIR

REF CALCULATION OUTPUT

The area provided is adequate

At Ultimate limit state, total design load = 1.4 gk + 1.6qk = 476.96

Earth Pressure in N/m2 = 76.31

Bending Reinforcement

At the face of the column the maximum bending moment, M in


KNM= qd *y *(X-z)/2^2 /2 = 110
Mbal = 0.167 *25 *2000 *250^2 521.9
= 521.9 KN-m > 56.7 KN-m OK
As = M/ 0.87fy z = 2,134

As provided = R12 - 130 c/c and R12 - 150 c/c with combined
area of 2093mm2/m

110 of 135
ANNEX 6-5 STRUCTURAL DESIGN OF 500M3 RESERVOIR

REF CALCULATION OUTPUT

Design Information

Total height of tank, H in m 4.75

Depth of water in the tank, Hw in m 4.35

Internal Diameter of the tank, D in m 12.65

External Diameter of the tank, De in m 13.35

Thickness of wall,t in mm 350.00

Specific weight of water, W in KN / m3 9.81

Roof slab thickness, h in mm 250.00

Concrete self weight, in KN/M2 24.00

Modular ratio of concrete, e 15.00

BS 8007 Service stress in high yield steel, fst in N/mm2 100.00


Table 3.1
Service stress in mild steel, fst in N/mm2 85.00

Maximum tensile stress in concrete in N/mm2 1.31

Elastic Modulus of concrete, Ec in KN/mm2 26.00

Elastic Modulus of steel, Es in KN/mm2 200.00

Pumice or light weight concrete in KN/m3 11.00

Tensile steel strength for high yield in N/mm2 425.00

Tensile steel strength for mild steel in N/mm2 250.00

Concrete compressive strength in N/mm2 25.00

Bearing capacity of soil at the site Bp in KN / m2 150.00

Reservoir wall design

Direct tension in wall due to internal pressure N = 0.5*W*H 1*D =

Where H1 is Level of liquid above level Considered

Area required per unit height of wall, A s=N/fst

Where fst is the permissible tensile in reinforcement

H1 N

1.00 62.05
2.00 124.10
3.00 186.14
4.00 248.19
4.75 294.73
Minimum thickness of tank wall in mm

t=Nd/b(1/fct - (e-1)/fst) = 80.84

111 of 135
ANNEX 6-5 STRUCTURAL DESIGN OF 500M3 RESERVOIR

REF CALCULATION OUTPUT

t > 100mm

t > 0.025* H + 25 143.75

The provided thickness of 350mm is adequate

Bending Moment due to restraints at the base of wall

Reissners Hw2/(tD)= 4.28


and
Carpenter's k1 = 0.026
table
k2 = 0.48

k3 = 0.44

Maximum circumferential tension Nmax = WHDK3/2 = 129.68

3 Maximum Bending Moment at the bottom of tank in KN- M = 21.02


K1WHw3 =

Position of maximum Circumferential tension = K 2Hw in m = 2.09

Design For Reinforcement

For deformed bars service limit state stress in N/mm2 steel fst = 100.00
Area of steel required As = Nmax/ fst = 1,297
Therefore provide R12 bars @ 150 mm as hoop steel in each of
two rows one near each face. Area total provided = 1,506 mm 2 in
both faces of the wall section.

Distribution steel

Minimum steel required in the section Asmin= 0.00026 bd = 780


Steel for resisting moment As = M/(fst x Z) 868
Therefore provide R12 @ 170 mm in outer and internal face. Area
provided = 1,292 mm2.

Design of Roof Slab

The roof slab is designed as a continuous 3-span section.

Consider 1m strip of slab.

Self-weight of slab in KN/m= 0.25*24 = 6.00

Pumice 150mm = in KN/M = 0.15*11= 1.65


Floor finishes = 0.40
Total dead load, gk = 8.05
Imposed load, qk in KN/M = 1.50
Design Load qd = 1.4gk + 1.6qk = 13.67

112 of 135
ANNEX 6-5 STRUCTURAL DESIGN OF 500M3 RESERVOIR

REF CALCULATION OUTPUT

BS 8110 Maximum Moment at the mid span = 0.09 * F*L 49.22


Table 3.5
Maximum Moment at the support = 0.11 * F*L 54.69

Bending Reinforcement

BS 8110 M/bd2fcu = 0.04


Z = d*(0.5+(0.25-k/0.9)^0.5 or 0.95*d whichever is less 285
Reinforcement requirement As = (M/(0.87*fy*Z)

As Bottom = in mm2/m 794


As top = in mm2/m 882
As Minimum = 0.0026*b*d = 598
Provide Bottom reinforcements R12 - 130 c/c c/c at the midspan.
As = 869. Elsewhere provie R12 - 150c/c
Provide Top reiforcements R12 - 130 at the supports. Elsewhere
provide minimum reinforcement of R12 - 150c/c.
Design of Columns

Height of column in, L in m = 4.75

Diameter of column, d mm = 600

Column self weight in KN = 1.34

Weight from slab in KN = 535.4

Imposed load in KN = 210.0

Design Load =

Ultimate Load = 1.6*gk +1.6*qk = 1,087.39

Design For Reinforcement

Therefore:

Ac = pi d/4 = 282743.34 mm

diax' = diay' = dia - d' = 560 mm

Effective column height: le = Lo in m 6.18

Where = 1.3

BS 8110 Check if the column is slender:


Tabble
3.8.1.3 lex/dia = 10.29

The column is slender

Design ultimate capacity of section under axial load only:

Nuz = 0.45 fcu Ac + 0.95 fy Asc = 3449.5 kN

Design ultimate load and moment:

113 of 135
ANNEX 6-5 STRUCTURAL DESIGN OF 500M3 RESERVOIR

REF CALCULATION OUTPUT

Design axial load:

Pu = 390 kN

Table For bending about the X-X axis, the maximum design moment is the greatest of
3.8.3.7
(a) M2 + Madd = 19.4 kNm

(b) emin N = 8.3 kNm

Mx = My = 19.4 kNm

Design of column section for ULS:

Through inspection:

The critical section lies at the top end of the column.

The column is bi-axially bent and may be designed to withstand


an increased

3.8.4.5 moment about a single axis

Mx/dia = 34.6 My/dia = 34.6

The effective uniaxial design moment about the X-X axis:

= 1 - 7/6 N/(Ac fcu) = 0.931_x000B_Table 3.24

\ M'x = Mx + dia/dia My = 37.4 kNm

From the design chart, Asc = 1131 mm = 0.40%

Provide 8 R16 main bars

Provide R8 - 150 spiral link

Design For Foundations

Base length, x in m = 2.5


Base width , y in m = 2.5
Base depth , z in m = 0.35
At serviceability Limit State;

Weight from slab and column in KN = 536.75


Self-wt of base in KN assumed = x * y * z * Wc 52.50
Bearing Capacity of the soils = 150 KN/ m2

Total wt to the foundations, Wk in KN = 589.25


Area of base required = Wk/Bp 3.93
The provided base area in m2 6.25

114 of 135
ANNEX 6-5 STRUCTURAL DESIGN OF 500M3 RESERVOIR

REF CALCULATION OUTPUT

The area provided is adequate

At Ultimate limit state, total design load = 1.4 gk + 1.6qk = 1,160.89

Earth Pressure in N/m2 = 185.74

Bending Reinforcement

At the face of the column the maximum bending moment, M in 268


KNM= qd *y *(X-z)/2^2 /2 =

Mbal = 0.167 *25 *2000 *250^2 521.9


= 521.9 KN-m > 56.7 KN-m OK

As = M/ 0.87fy z = 5,194

As provided = R12 - 130 c/c and R12 - 150 c/c with combined
area of 2093mm2/m

115 of 135
ANNEX 6-6 STRUCTURAL DESIGN OF 1000M3 RESERVOIR

REF CALCULATION OUTPUT

Design Information

Total height of tank, H in m 6.13

Depth of water in the tank, Hw in m 5.76

Diameter of the tank, D in m 16.00

Thickness of wall,t in mm 300.00

Specific weight of water, W in KN / m3 9.81

Roof slab thickness, h in mm 250.00

Concrete self weight, in KN/M2 24.00


Modular ratio of concrete, e 15.00
Service stress in high yield steel, fst in N/mm2 100.00
BS 8007 Service stress in mild steel, fst in N/mm2 85.00
Table 3.1
Maximum tensile stress in concrete in N/mm2 1.31

Elastic Modulus of concrete, Ec in KN/mm2 26.00

Elastic Modulus of steel, Es in KN/mm2 200.00

Pumice or light weight concrete in KN/m3 11.00

Tensile steel strength for high yield in N/mm2 425.00

Tensile steel strength for mild steel in N/mm2 250.00

Concrete compressive strength in N/mm2 25.00


Bearing capacity of soil at the site Bp in KN / m2 150.00

Reservoir wall design


Direct tension in wall due to internal pressure N = 0.5*W*H 1*D =

Where H1 is Level of liquid above level Considered

Area required per unit height of wall, A s=N/fst

Where fst is the permissible tensile in reinforcement

H1 N

1.00 78.48
2.00 156.96
3.00 235.44
4.00 313.92
4.50 353.16
5.00 392.40
6.00 470.88
7.00 549.36

116 of 135
ANNEX 6-6 STRUCTURAL DESIGN OF 1000M3 RESERVOIR

REF CALCULATION OUTPUT

Minimum thickness of tank wall in mm


t=Nd/b(1/fct - (e-1)/fst) = 165.54

t > 100mm

t > 0.025* H + 25 178.25

The provided thickness of 350mm is adequate

Bending Moment due to restraints at the base of wall

Reissners Hw2/(tD)= 6.91


and
Carpenter's k1 = 0.0165
table k2 = 0.442

k3 = 0.552
Maximum circumferential tension Nmax = WHDK3/2 = 265.56
Maximum Bending Moment at the bottom of tank in KN- M =
3 K1WHw3 = 30.93

Position of maximum Circumferential tension = K 2Hw in m = 2.55

Design For Reinforcement


For deformed bars service limit state stress in N/mm2 steel fst = 100.00

Area of steel required As = Nmax/ fst = 2,656

Therefore provide R16 bars @ 125 mm as hoop steel in each of


two rows one near each face. Area provided = 3216 mm 2 in both
faces of the wall section.

Distribution steel
Minimum steel required in the section Asmin= 0.00026 bd = 780
Steel for resisting moment As = M/(fst x Z) 1,277
Therefore provide R12 @ 100 mm in outer and internal face. Area
provided = 2,260 mm2.

Design of Roof Slab

The roof slab is designed as a continuous 3-span section.

Consider 1m strip of slab.

Self-weight of slab in KN/m= 0.25*24 = 6.00

Pumice 150mm = in KN/M = 0.15*11= 1.65


Floor finishes = 0.40
Total dead load, gk = 8.05

117 of 135
ANNEX 6-6 STRUCTURAL DESIGN OF 1000M3 RESERVOIR

REF CALCULATION OUTPUT

Imposed load, qk in KN/M = 1.50


Design Load qd = 1.4gk + 1.6qk = 13.67
BS 8110 Maximum Moment at the mid span = 0.09 * F*L 33.91
Table 3.5
Maximum Moment at the support = 0.11 * F*L 37.68

Bending Reinforcement
M/bd2fcu = 0.03
BS 8110
Z = d*(0.5+(0.25-k/0.9)^0.5 or 0.95*d whichever is less 285
Reinforcement requirement As = (M/(0.87*fy*Z)

As Bottom = in mm2/m 547


As top = in mm2/m 608
As Minimum = 0.0026*b*d = 598
Provide Bottom reinforcements R12 - 150 c/c c/c at the midspan.
As = 753. Elsewhere provie R10 - 190c/c

Provide Top reiforcements R12 - 150 at the supports. Elsewhere


provide minimum reinforcement of R10 - 190c/c.
Design of Columns

Height of column in, L in m = 6.13

Diameter of column, d mm = 600

Column self weight in KN = 1.73

Weight from slab in KN = 243.5

Imposed load in KN = 29.5

Design Load =

Ultimate Load = 1.6*gk +1.6*qk = 390.47

Design For Reinforcement

Therefore:

Ac = pi d/4 = 282743.34 mm

diax' = diay' = dia - d' = 560 mm

Effective column height: le = Lo = 7.97 m

Where = 1.3
BS 8110 Check if the column is slender:
Tabble
3.8.1.3 lex/dia = 14.23 > 10 => The column is slender

Design ultimate capacity of section under axial load only:

Nuz = 0.45 fcu Ac + 0.95 fy Asc = 3449.5 kN

118 of 135
ANNEX 6-6 STRUCTURAL DESIGN OF 1000M3 RESERVOIR

REF CALCULATION OUTPUT

Design ultimate load and moment:

Design axial load:

Pu = 390 kN

Table For bending about the X-X axis, the maximum design moment is the greatest of
3.8.3.7
(a) M2 + Madd = 19.4 kNm

(b) emin N = 8.3 kNm

Mx = My = 19.4 kNm

Design of column section for ULS:

Through inspection:

The critical section lies at the top end of the column.

The column is bi-axially bent and may be designed to withstand


an increased
3.8.4.5 moment about a single axis

Mx/dia = 34.6 My/dia = 34.6

The effective uniaxial design moment about the X-X axis:

= 1 - 7/6 N/(Ac fcu) = 0.931_x000B_Table 3.24

\ M'x = Mx + dia/dia My = 37.4 kNm

From the design chart, Asc = 1131 mm = 0.40%

Provide 8 R20 main bars

Provide R8 - 150 spiral link

Design For Foundations

Base length, x in m = 2
Base width , y in m = 2
Base depth , z in m = 0.35
At serviceability Limit State;

Weight from slab and column in KN = 245.25


Self-wt of base in KN assumed = x * y * z * Wc 33.60
Bearing Capacity of the soils = 150 KN/ m2
Total wt to the foundations, Wk in KN = 278.85

119 of 135
ANNEX 6-6 STRUCTURAL DESIGN OF 1000M3 RESERVOIR

REF CALCULATION OUTPUT

Area of base required = Wk/Bp 1.86


The provided base area of 1.73 *6 m2 is therefore adequate.

At Ultimate limit state, total design load = 1.4 gk + 1.6qk = 437.51

Earth Pressure = 463 / 4. m2 = 109.38

Bending Reinforcement
At the face of the column the maximum bending moment, M in
KNM= qd *y *(X-z)/2^2 /2 = 74.45
Mbal = 0.167 *25 *2000 *250^2 521.875
= 521.9 KN-m > 56.7 KN-m OK
As = M/ 0.87fy z = 1441

As provided = R16 - 150 c/c and R12 - 150 c/c with combined
area of 2093mm2/m

120 of 135
ANNEX 6.7 STRUCTURAL DESIGN OF 2000m3 RESERVOIR

REF CALCULATION OUTPUT

Design Information

Total height of tank, H in m 7.05


Annex 7.2
Depth of water in the tank, Hw in m 6.45

Diameter of the tank, D in m 20.00

Thickness of wall,t in mm 350.00

Specific weight of water, W in KN / m3 9.81

Roof slab thickness, h in mm 250.00

Concrete self weight, in KN/M2 24.00


Modular ratio of concrete, e 15.00
Service stress in high yield steel, fst in N/mm2 100.00
BS 8007 Service stress in mild steel, fst in N/mm2 85.00
Table 3.1
Maximum tensile stress in concrete in N/mm2 1.31

Elastic Modulus of concrete, Ec in KN/mm2 26.00

Elastic Modulus of steel, Es in KN/mm2 200.00

Pumice or light weight concrete in KN/m3 11.00

Tensile steel strength for high yield in N/mm2 425.00

Tensile steel strength for mild steel in N/mm2 250.00

Concrete compressive strength in N/mm2 25.00


Bearing capacity of soil at the site Bp in KN / m2 150.00

Reservoir wall design


Direct tension in wall due to internal pressure N = 0.5*W*H 1*D =

Where H1 is Level of liquid above level Considered

Area required per unit height of wall, A s=N/fst

Where fst is the permissible tensile in reinforcement

H1 N

1.00 98.10
2.00 196.20
3.00 294.30
4.00 392.40
4.50 441.45
5.00 490.50
6.00 588.60
7.00 686.70

121 of 135
ANNEX 6.7 STRUCTURAL DESIGN OF 2000m3 RESERVOIR

REF CALCULATION OUTPUT

Minimum thickness of tank wall in mm


t=Nd/b(1/fct - (e-1)/fst) = 224.18

t > 100mm 100.00

t > 0.025* H + 25 201.25

The provided thickness of 350mm is adequate

Bending Moment due to restraints at the base of wall

Hw2/(tD)= 5.94
Reissners k1 = 0.02
and
k2 = 0.442
Carpenter's
table k3 = 0.52
Maximum circumferential tension Nmax = WHDK3/2 = 359.63
Maximum Bending Moment at the bottom of tank in KN- M =
3 K1WHw3 = 52.65

Position of maximum Circumferential tension = K 2Hw in m = 2.85

Design For Reinforcement


For plain bars service limit state stress in N/mm2 steel fst = 85.00
Area of steel required As = Nmax/ fst = 4,231

Therefore provide R20 bars @ 120 mm as hoop steel in each of


two rows one near each face. Area provided = 5,234 mm2 in both
faces of the wall section.

Distribution steel
Minimum steel required in the section Asmin= 0.00026 bd = 780
Steel for resisting moment 2,123
Therefore provide R20 @ 150 mm, and R10 - 150mm. Area provided = 2,617
mm2.

Design of Roof Slab

The roof slab is designed as a continuous 4-span section.

Consider 1m strip of slab.

Self-weight of slab in KN/m= 0.25*24 = 6.00

Pumice 150mm = in KN/M = 0.15*11= 1.65


Floor finishes = 0.40
Total dead load, gk = 8.05

122 of 135
ANNEX 6.7 STRUCTURAL DESIGN OF 2000m3 RESERVOIR

REF CALCULATION OUTPUT

Imposed load, qk in KN/M = 1.50


Design Load qd = 1.4gk + 1.6qk = 13.67
BS 8110 Maximum Moment at the mid span = 0.09 * F*L 33.91
Table 3.5
Maximum Moment at the support = 0.11 * F*L 37.68

Bending Reinforcement
M/bd2fcu = 0.03
BS 8110
Z = d*(0.5+(0.25-k/0.9)^0.5 or 0.95*d whichever is less 285
Reinforcement requirement As = (M/(fst*Z)

As Bottom = in mm2/m 1,400


As top = in mm2/m 1,555
As Minimum = 0.0026*b*d = 598

Provide Bottom reinforcements R20 - 150 c/c c/c at the midspan.


As = 2094. Elsewhere provide R12 - 150c/c

Provide Top reiforcements R20 - 200 at the supports. Elsewhere


provide minimum reinforcement of R12 - 190c/c.
Design of Columns

Height of column in, L in m = 7.05

Diameter of column, d mm = 600

Column self weight in KN = 1.99

Weight from slab in KN = 158.1

Imposed load in KN = 29.5

Design Load =

Ultimate Load = 1.6*gk +1.6*qk = 271.24

Design For Reinforcement

Therefore:

Ac = pi d/4 = 282743.34 mm

diax' = diay' = dia - d' = 560 mm

Effective column height: le = Lo = 9.17 m

Where = 1.3
BS 8110 Check if the column is slender:
Tabble
3.8.1.3 lex/dia = 16.37 > 10 => The column is slender

Design ultimate capacity of section under axial load only:

123 of 135
ANNEX 6.7 STRUCTURAL DESIGN OF 2000m3 RESERVOIR

REF CALCULATION OUTPUT

For 8R16

Nuz = 0.45 fcu Ac + 0.95 fy Asc = 4,630 kN

Design ultimate load and moment:

Design axial load:

Pu = 271.24 kN
For bending about the X-X axis, the maximum design moment is
Table the greatest of
3.8.3.7
(a) M2 + Madd = 19 kNm

(b) emin N = 8.3 kNm

Mx = My = 19 kNm

Design of column section for ULS:

Through inspection:

The critical section lies at the top end of the column.

The column is bi-axially bent and may be designed to withstand


an increased
3.8.4.5 moment about a single axis

Mx/dia = 34.6 My/dia = 34.6

The effective uniaxial design moment about the X-X axis:


Table 3.24 = 1 - 7/6 N/(Ac fcu) = 0.931

\ M'x = Mx + dia/dia My = 37.3 kNm

From the design chart, Asc = 1131 mm = 0.40%

Provide 8 R16 main bars As=1608mm2

Provide R8 - 150 spiral link

Design For Foundations

Base length, x in m = 1.8


Base width , y in m = 1.8
Base depth , z in m = 0.35
At serviceability Limit State;

Weight from slab and column in KN = 160.08


Self-wt of base in KN assumed = x * y * z * Wc 27.22
Bearing Capacity of the soils = 150 KN/ m2
Total wt to the foundations, Wk in KN = 187.29
Area of base required = Wk/Bp 1.25
The provided base area of 1.73 *6 m2 is therefore adequate.

124 of 135
ANNEX 6.7 STRUCTURAL DESIGN OF 2000m3 RESERVOIR

REF CALCULATION OUTPUT

At Ultimate limit state, total design load = 1.4 gk + 1.6qk = 309.34

Earth Pressure = 463 / 4. m2 = 77.33

Bending Reinforcement

At the face of the column the maximum bending moment, M in


KNM= qd *y *(X-z)/2^2 /2 = 36.58
Mbal = 0.167 *25 *2000 *250^2 521.875
= 521.9 KN-m > 36.58 KN-m OK
As = M/ 0.87fy z = 708

As provided = R12 - 150 c/c with combined area of 753mm 2/m

125 of 135
ANNEX 6.8 STRUCTURAL DESIGN OF 3000m3 RESERVOIR

REF CALCULATION OUTPUT

Design Information

Total height of tank, H in m 4.80

Depth of water in the tank, Hw in m 4.50

Diameter of the tank, D in m 30.00

Thickness of wall,t in mm 400.00

Specific weight of water, W in KN / m3 9.81

Roof slab thickness, h in mm 200.00

Column spacing 5.00

Concrete self weight, in KN/M2 24.00


Modular ratio of concrete, e 15.00
Service stress in high yield steel, fst in N/mm2 100.00
BS 8007 Service stress in mild steel, fst in N/mm2 85.00
Table 3.1
Maximum tensile stress in concrete in N/mm2 1.31

Elastic Modulus of concrete, Ec in KN/mm2 26.00

Elastic Modulus of steel, Es in KN/mm2 200.00

Pumice or light weight concrete in KN/m3 11.00

Tensile steel strength for high yield in N/mm2 425.00

Tensile steel strength for mild steel in N/mm2 250.00

Concrete compressive strength in N/mm2 25.00


Bearing capacity of soil at the site Bp in KN / m2 150.00

Reservoir wall design


Direct tension in wall due to internal pressure N = 0.5*W*H 1*D =

Where H1 is Level of liquid above level Considered

Area required per unit height of wall, A s=N/fst

Where fst is the permissible tensile in reinforcement

H1 N

1.00 147.15
2.00 294.30
3.00 441.45
4.00 588.60
4.50 662.18
4.70 691.61
Minimum thickness of tank wall in mm

126 of 135
ANNEX 6.8 STRUCTURAL DESIGN OF 3000m3 RESERVOIR

REF CALCULATION OUTPUT


t=Nd/b(1/fct - (e-1)/fst) = 114.48

t > 100mm 100.00

t > 0.025* H + 25 145.00

The provided thickness of 450mm is adequate

Bending Moment due to restraints at the base of wall

Hw2/(tD)= 1.69
Reissners k1 = 0.045
and
k2 = 0.55
Carpenter's
table k3 = 0.26
Maximum circumferential tension Nmax = WHDK3/2 = 183.64

Maximum Bending Moment at the bottom of tank in KN- M =


3 K1WHw3 = 40.23

Position of maximum Circumferential tension = K 2Hw in m = 2.48

Design For Reinforcement


For plain bars service limit state stress in N/mm2 steel fst = 85.00

Area of steel required As = Nmax/ fst = 2,161


Therefore provide Y20 bars @ 125 mm as hoop steel in each of two
rows one near each face. Area provided = 5,026 mm 2 in both faces
of the wall section.

Distribution steel
Minimum steel required in the section Asmin= 0.00026 bd = 780
Steel for resisting moment 1,622
Therefore provide Y20 @ 125 mm. Area provided = 5,026 mm 2.

Design of Roof Slab


The roof slab is designed as Two way fixed
supported slab

ly/lx= 1

Self-weight of slab in KN/m= 0.20*24 = 4.80


Pumice 150mm = in KN/M = 0.15*11= 1.65
Floor finishes = 0.40
Total dead load, gk = 6.85
Imposed load, qk in KN/M = 1.50

127 of 135
ANNEX 6.8 STRUCTURAL DESIGN OF 3000m3 RESERVOIR

REF CALCULATION OUTPUT

Design Load qd = 1.4gk + 1.6qk = 11.99


BS 8110 Maximum Moment at the mid span = x q L /8
d
2
11.24
Table 3.14
Maximum Moment at the support = x q L /8
d
2
11.24
Bending Reinforcement
M/bd2fcu = 0.01
BS 8110
Z = d*(0.5+(0.25-k/0.9)^0.5 or 0.95*d whichever is less 190
Z = d*(0.5+(0.25-k/0.9)^0.5 198
Z = 0.95*d 190
Reinforcement requirement As = (M/(fst*Z)

As Bottom = in mm2/m 237


As top = in mm2/m 237
As Minimum = 0.0013*b*d = 299
Provide Bottom reinforcements Y12 - 200 c/c c/c at the top and
bottom in both direction

Design of beam

The beam is design and 6-span continuous beam

Dead load from slabs in KN/M 34.3


Beam self weight in KN/m 2.16
Total dead load in KN/M 36.41
Imposed load from slabs in KN/M 8
Design Load qd = 1.4gk + 1.6qk = 62.97
BS 8110 Maximum Moment at the mid span = 0.09 * F*L 28.34
Table 3.5
Maximum Moment at the support = 0.11 * F*L 34.64
Bending Reinforcement
M/bd2fcu = 0.002
Z = d*(0.5+(0.25-k/0.9)^0.5 or 0.95*d whichever is less 428
Z = d*(0.5+(0.25-k/0.9)^0.5 449
Z = 0.95*d 428
Reinforcement requirement As = (M/(fst*Z)

As Bottom = in mm2/m 265


As top = in mm2/m 324
As Minimum = 0.0013*b*d = 195
Provide Bottom reinforcements 2Y20 (As = 628mm2) and 3Y16 at
the top at support (As = 603mm2) Else at top 2Y16 (As = 402mm2)

128 of 135
ANNEX 6.8 STRUCTURAL DESIGN OF 3000m3 RESERVOIR

REF CALCULATION OUTPUT

Design of Columns

Height of column in, L in m = 4.70

thickness of column, d mm = 300

Column self weight in KN = 10.15

Weight from slab in KN = 218.5

Imposed load in KN = 45

Design Load =

Ultimate Load = 1.6*gk +1.6*qk = 392.06

Design For Reinforcement

Therefore:

Ac = 90,000 mm
Lx' = Ly' = L - d' = 260 mm
Effective column height: le = Lo = 6.11 m
Where = 1.3
BS 8110 Check if the column is slender:
Table
3.8.1.3 lex/dia = > 10 => The column is slender 23.50

Design ultimate capacity of section under axial load only:

For 4Y16 Area of steel = 804.2 mm

Nuz = 0.45 fcu Ac + 0.95 fy Asc = 1,203

Design ultimate load and moment:

Design axial load:

Pu in KN 392.06

For bending about the X-X axis, the maximum design moment is the
Table
greatest of
3.8.3.7
Applied Moments(M1, M2) 0.0 kNm, 0.0 kNm

K = Kmin > (Nuz - N)/(Nuz - Nbal) < 11.00 > (1379 - 464)/(1379 - 615) < 1

au = ba K h 0.182, 1.000, 300 54.5 mm

Madd= N au 464 x 54.5 25.3 kNm

Initial Moment Mi=fn(M1,M2) 0.0 kNm, 0.0 kNm 0.0 kNm

M2+Madd, M nom 25.3, 7.0

Design Moment 25.3 kNm


Moment Capacity Mu X-X

Design Data X/h, h, b, X, Ac, Ybar : 0.424, 300mm, 300mm, 127.3mm, 34381 mm,
57.3 mm

129 of 135
ANNEX 6.8 STRUCTURAL DESIGN OF 3000m3 RESERVOIR

REF CALCULATION OUTPUT

Bar group1:M1 fn(bars,d,e%,s,la,F)2 x 16, 46.0, 0.224, 218, 104.0,


87.5 9.1 kNm
Bar group2:M2 fn(bars,d,e%,s,la,F)2 x 16, 254.0, -0.348, -218,
-104.0, -87.5 9.1 kNm
Concrete Mc=(Ac.45fcu)(H/2-Ybar) (34381 x 0.45 x 30 ) x (300 / 2
- 57.3) 43.0 kNm

=Mc + (M1+...+M2) 43.0 + (9.1+9.1) 61.2kNm

Max Moment/Mu 25.3 / 61.2 0.413


X-X Shear Checks
App. Shear Vx, v, v max : 0 kN, 0 N/mm, 4.38 N/mm 0

M/N, 0.6h 54.5 mm, 180 mm Nominal links

Design For Foundations

Base length, x in m = 3.3


Base width , y in m = 3.3
Base depth , z in m = 0.8
Base area in m2 10.89

At serviceability Limit State;

Weight from slab and column in KN = 228.61


Self-wt of base in KN assumed = x * y * z * Wc 209.09
Bearing Capacity of the soils = 150 KN/ m2
Total wt to the foundations, Wk in KN = 437.70
Area of base required = Wk/Bp 2.92
The provided base area of 10.89 m2 is therefore adequate.

At Ultimate limit state, total design load = 1.4 gk + 1.6qk = 684.78

Earth Pressure in m2 = 62.88

Bending Reinforcement

At the face of the column the maximum bending moment, M in


KNM= qd *y *(X-z)/2^2 /2 = 162.12
Mbal = 0.167 *25 *b *d^2 8817.6
= 8817.6 KN-m > 179.18 KN-m OK
As/m = M/ 0.87fy z = 581

As provided = Y16 - 200 c/c with combined area of 1005mm 2/m

130 of 135
ANNEX 6-9: STRUCTURAL DESIGN OF 2500m3 RESERVOIR

REF CALCULATION OUTPUT

Design Information

Total height of tank, H in m 5.85

Depth of water in the tank, Hw in m 5.35

length of the tank, Ly in m 24.00

Width of the tank, Lx in m 24.00


Thickness of outer wall,to in mm 400.00

Specific weight of water, W in KN / m3 9.81

Roof slab thickness, h in mm 200.00

Column spacing in m 4.00

Concrete self weight, in KN/M2 24.00


Modular ratio of concrete, e 15.00
Service stress in high yield steel, fst in N/mm2 100.00
BS 8007 Service stress in mild steel, fst in N/mm2 85.00
Table 3.1
Maximum tensile stress in concrete in N/mm2 1.31

Elastic Modulus of concrete, Ec in KN/mm2 26.00

Elastic Modulus of steel, Es in KN/mm2 200.00

Pumice or light weight concrete in KN/m3 11.00

Tensile steel strength for high yield in N/mm2 425.00

Tensile steel strength for mild steel in N/mm2 250.00

Concrete compressive strength in N/mm2 25.00


Bearing capacity of soil at the site Bp in KN / m2 100.00

Reservoir wall design

Horizontal pressure q = Hw*W 52.48

Ratio of L2/L1 1.00

Bending Moment coefficient k for M1 = 12.00


Bending Moment at corners M=ql12/k

M1 in N m per m = 2,519.21
Free bending Moment at L1 = 1/8 * q * L12 3,778.81
Free bending Moment at L2 = 1/8 * q * L22 3,778.81
Positive bending Moment midspan of at L 1 = 1,259.60
Positive bending Moment midspan of at L 2 = 1,259.60
Direct tension in shorter span in KN/m = ql2/2 629.80
Direct tension in longer span in KN/m = ql1/2 629.80

131 of 135
ANNEX 6-9: STRUCTURAL DESIGN OF 2500m3 RESERVOIR

REF CALCULATION OUTPUT

Minimum thickness of tank wall in mm


t=Nd/b(1/fct - (e-1)/fst) = 392.59

t > 100mm 100.00

t > 0.025* H + 25 171.25

The provided thickness of 600mm is


t= 600
adequate

e = M/Nd 2.00

es = e + 0.5*t - d 1.75

Required Reinforcement As = Nd/fst*(1+es/z) 2,905.34

Therefore provide Y16 bars @ 150 mm as hoop steel in each of two


rows one near each face. Total Area provided = 1340 mm 2 in both
faces of the wall section.

Distribution steel
Minimum steel required in the section Asmin= 0.00026 bd = 1,560

Therefore provide Y16 @ 200 mm, Area provided = 2,011 mm 2.

Design of Roof Slab

The roof slab is designed as Flat slab

ly/lx = 1

Self-weight of slab in KN/m2= 0.2*24 = 4.80

Pumice 150mm = in KN/M = 0.15*11= 1.65

Floor finishes = 0.40


Total dead load, gk in kN/m2= 6.85
Imposed load, qk in kN/m2 = 1.50
Design Load qd = 1.4gk + 1.6qk = 11.99

BS 8110 Maximum Moment at the mid span = qdL2/8 23.98


Table 3.14
Maximum Moment at the support =qdL2/8 23.98

Bending Reinforcement
M/bd2fcu = 0.02
BS 8110
Z = d*(0.5+(0.25-k/0.9)^0.5 or 0.95*d whichever is less 190

Z = d*(0.5+(0.25-k/0.9)^0.5 196

Z = 0.95*d 190

132 of 135
ANNEX 6-9: STRUCTURAL DESIGN OF 2500m3 RESERVOIR

REF CALCULATION OUTPUT

Reinforcement requirement As = (M/(fst*Z)

As Bottom = in mm2/m 297

As top = in mm2/m 297

As Minimum = 0.0013*b*d = 299

Provide Bottom reinforcements Y12 - 300 c/c in both directions As =


377mm2/m

Design of Columns

Height of column in, L in m = 4.15

Column size x,y in mm = 350

Column self weight in KN = 12.20

Weight from slab in KN = 161.1

Imposed load in KN = 35.3

Design Load =

Ultimate Load = 1.6*gk +1.6*qk = 299.12

Design For Reinforcement

Therefore:

Ac in mm 122,500.00

Lx' = Ly' = L - d' = 260 mm 260

Effective column height: le = Lo in m 7.61

Where 1.3

Check if the column is slender:


BS 8110
Tabble lex/dia = > 10 => The column is slender 29.25
3.8.1.3
Design ultimate capacity of section under axial load only:

For 8Y16 Asc in mm = 804.2

Nuz = 0.45 fcu Ac + 0.95 fy Asc in kN = 1,569

Design ultimate load and moment:

Design axial load:

Pu in kN 299.12
For bending about the X-X axis, the maximum design moment is the
greatest of

Applied Moments(M1, M2) 0.0 kNm, 0.0 kNm


K = Kmin > (Nuz - N)/(Nuz - Nbal) < 11.00 > (1178 - 282)/(1178 - 513)
<1 1
Table
3.8.3.7 au = ba K h 0.203, 1.000, 300 60.8 mm

133 of 135
ANNEX 6-9: STRUCTURAL DESIGN OF 2500m3 RESERVOIR
Table
REF CALCULATION OUTPUT
3.8.3.7
Madd= N au 282 x 60.8 17.1 kNm

Mi=fn(Mx1, Mx2) 0.0 kNm, 0.0 kNm 0.0 kNm

M2+Madd, M nom 17.1 kNm, 4.2 kNm

Design Moment 17.1 kNm, 4.2 kNm

Moment Capacity Mu X-X

Data X/h, h, b, X, Ac, Ybar; 0.441, 424mm, 300mm, 187.2mm, 28396 mm, 112.3 mm
Bar group1:M1 fn(bars,d,e%,s,la,F)2 x 16, 46.0, 0.224, 218, 104.0,
87.5 9.1 kNm
Bar group1:M1 fn(bars,d,e%,s,la,F)1 x 16, 359.2, -0.321, -218, -147.1,
-43.7 6.4 kNm
Concrete Mc=(Ac.45fcu)(H/2-Ybar) (28396 x 0.45 x 25 ) x (424 / 2 -
112.3) 31.9 kNm

Mu =Mc + (M1+...+M3) 31.9 + (6.4+0.0+6.4) 44.7kNm

Max Moment/Mu 24.2 / 44.7 0.542

X-X Shear Checks

. Shear Vx, v, v max = 0 kN, 0 N/mm, 4 N/mm 0

M/N, 0.6b = 60.8 mm, 180 mm Nominal links

Design For Foundations

Base length, x in m = 1.5

Base width , y in m = 1.5

Base depth , z in m = 0.25

Base area in m2 2.25

At serviceability Limit State;

Weight from slab and column in KN = 173.33

Self-wt of base in KN assumed = x * y * z * Wc 13.50

Bearing Capacity of the soils in KN/ m2 100.00


Total wt to the foundations, Wk in KN = 186.83
Area of base required = Wk/Bp 1.87

The provided base area of 2.25 m2 is therefore adequate.

At Ultimate limit state, total design load = 1.4 gk + 1.6qk = 318.02

Earth Pressure in m2 = 141.34

Bending Reinforcement

134 of 135
ANNEX 6-9: STRUCTURAL DESIGN OF 2500m3 RESERVOIR

REF CALCULATION OUTPUT


At the face of the column the maximum bending moment, M in KNM=
qd *y *(X-z)/2^2 /2 =
41.41
Mbal = 0.167 *25 *b*d^2 391.40625

= 391.41 KN-m > 41.41 KN-m OK


As = M/ 0.87fy z = 148

As provided = T12 - 200 c/c with combined area of 565mm 2/m

135 of 135

You might also like