II

(i)
(jIiGYANI.)\.~
SOCIETY FOR PREPRINT
NUMBER
MINING, METALLURGY,
93-227
AND EXPLORATION, INC.
P.O. BOX 625002 l..ITTl..ETON, COl..ORADO 80162-5002

BEYOND OPEN PIT OPTIMIZATION PLANNING, SCHEDULING AND


SENSITIVITY ANALYSIS

I' t'~'
i,/ . .;""

, ' , ' \\EET


,,'J
1\ ') 'I 'If)
".. 64110
. . ,

S, j\r;

Y. S. Roditis

~,..I'" C;I"\'''''''1\ /lini .... ,., 1"" ...........,.,,''\\ I


\.AUI\..I I Iv \..I;;:) IVII 11I1l:::! VUIIII-ICU Iy

Golden, Colorado

For presentation at the SME Annual Meeting


Reno, Nevada - February 15-18, 1993

Permission is hereby given to publish with appropriate acknowledgments, excerpts or


summaries not to exceed one-fourth of the entire text of the paper. Permission to print in more
extended form subsequent to publication by the Society for Mining, Metallurgy, and Exploration
(SME), Inc. must be obtained from the Executive Director of the Society.
If and when this paper is published by the SME, it may embody certain changes made by
agreement between the Technical Publications Committee and the author so that the form in
which it appears is not necessarily that in which it may be published later.
Current year preprints are available for sale from the SME, Preprints, P.O. Box 625002,
Uttleton, CO 80162-5002 (303-973-9550). Prior year preprints may be obtained from the
Engineering Societies Ubrary, 345 East 47th Street, New York, NY 10017 (212-705-7611).

PREPRINT AVAIl..ABIUTY UST IS PUBUSHED PERIODICAl..l..Y IN


MINING ENGINEERING
1

Abstract In this paper, a commercial open-pit optimization


package was used (Whittle J., 1988) on several gold
Traditionally, open pit optimization has been used to mining projects and some of the results will be
produce a single outline which can guide the pit presented here.
design. This paper describes how a series of optimum
nested pits are utilized to:
Characteristics and
a. produce different mining sequences and to help in Capabilities of the Software
mine planning and phase design;
The most important characteristics of this package are:
b. evaluate different metallurgical processes,
production scenarios and equipment size; (a) It uses the "pit parameterization" concept
(Francois-Bongarcon, D., 1981) in a simplified
c. investigate the sensitivity of a project to prices, form. The economic parameters that determine
recoveries. production rates, costs, ultimate pit the outline of an optimal pit were combined and
slopes etc. scaled in such a way that were essentially reduced
to two:

Introduction (i) The ratio of processing cost / mining cost


which is assumed to be relatively stable with
The optimal ultimate pit outline for a given ore body time and changes at the same rate of inflation
is defined as the one with the highest Net Present and,
Value (NPV) at a given discount rate. Commodity
prices. various costs such as mining, processing. (ii) The ratio of mining cost / price of the
refining and administration, metallurgical recoveries commodity.
and ultimate pit slopes are the factors that affect the
optimal outline. The most commonly used method This way, a lot more combinations of factors can
that attempts to find the ultimate pit outline is the be examined more quickly.
floating cone method. which although easy to
understand, does not give the optimal. ~.fgre tb.a..~ a (b) ~4..1argeset of nested pits as shov..n in Figure 1 can
dozen algorithms based on Dynamic Programming be generated easily, where each pit is optimal for
(l..erchs, H. and Grossmann, I.F. 1965). Graph Theory a different commodity price (assuming mining cost
and Network Flow (Johnson, T.B.. 1968) have is constant). This set constitutes an excellent data
appeared in the literature in the past 25 years. They base that triggers many possibilities of analysis
all guarantee to find the optimum outline. some faster beyond just the determination of a pit outline.
than others, but they all share the drawback that they
are difficult to understand and implement. (c) The idea of reblocking the original block model
greatly reduces the computer run time while it still
Every technique has in common the input of a three keeps a reasonable accuracy. This option is useful
dimensional computer economic model produced from for quick evaluation of alternatives and for
interpolation. Every block in the model contains sensitivity analysis of several factors as it will be
tonnage and grade or equivalently the commodity seen later.
content. The economic model requires the assumption
of a fIxed set of physical and economic parameters,
(cut-off grade, costs, commodity prices, recoveries,
mining and processing throughput, required pit slopes).
All these parameters have a dynamic nature. If any of
these factors change, then the particular optimal
solution may become obsolete.

During the planning process in an open pit mine, a set


of three to four open pit optimization runs are usually
performed for different commodity prices, keeping all
other inputs constant. Then, the mine phases are
designed by the planning engineer, based on the
outlines of the ultimate pits.

To investigate the sensitivity of the economic


parameters, a range of values should be used rather
than adopting one ultimate pit obtained with the best-
guessed values of economic parameters.
Figure 1. A series of optimal nested pits.
2
(d) After all optimization runs are performed, the they are, the shape of the curve (particularly to the
results can be processed by another program which right of the optimum) could change (drop)
can analyze different economic and production dramatically.
scenarios requested by the user. This is done by
selecting the nearest optimal pit and printing out Figure 3 indicates that this project is extremely
mining schedules with tonnages, grades and cash- sensitive to mining phasing since the best and the
flow figures. By utilizing all the nested pit shells, worst case curves diverge significantly from each other.
the program produces three mining simulations: A selection of many narrow phases will result in a
NPV closer to the best case and a selection of large
The worst case sequence consists of mining wide phases will give a NPV closer to the worst case.
each bench completely before starting the next. The difference in the NPV for the $350joz. scenario
This sequence is feasible and gives the lower can easily be as much as $50 million. On the other
bound on the NPV. hand, Figure 2 shows that the other project is less
sensitive to the phasing.
The best case sequence consists of mining the
inner-most pit shell first, then mining out each Figure 4 shows for project B the relationship of total
subsequent pit shell from the top down before ore, waste and therefore the stripping ratio. It shows
starting the next. This sequence, although it is that pits #20 and #22 are very close to the optimum
not feasible, sets an upper bound to the NPV. #21. This shows that minor changes due to design
smoothness will not significantly affect the NPV.
The selected case sequence allows the user to However, we should be careful when approaching Pit
specify the phases. It mimics very closely the #23 because there is a 'Jump" in the stripping ratio
cash-flow which would be achieved in practical curve.
mining.
In general, when the cut-off grade changes, the optimal
Figure 2 which was obtained from project A displays pit outline is affected. Figure 5 displays a typical cut-
for every pit the total cash flow and the discounted off grade tonnage relationship. Each point on the
cash flows of the worst, selected and best cases with graph represents an optimum pit that was produced
7% discount rate. In general, if worst and best case under a different cut-off grade assumption. Some
NPV differ by only 2% to 3%, then for that pit, mining portions of the curve are steeper than others which
sequence is not importallt. indicates talJat smaller changes in the cut-off grade will
result in large differences in the tonnage.
Figure 3, which is taken from project B is similar to
Figure 2, however on the X-axis "pit number" is By inputting different annual production rates or
replaced by "total tons". It is clear that although a equipment sizes to the program that analyzes
certain pit is the optimum, there are several adjacent production scenarios, the optimums can be found. For
pits that are near optimum if a good mining sequence example, it can be seen from Figure 6 for project B, a
is selected. It is up to the management to decide on total of 45 million tons per year is the best production
a shorter or a longer project. It should be noted that rate, or where the selected discounted cash flow curve
capital expenditures are not included at this point. If flattens out.

TOTAL CASH FLOWS PIT #21 OPTIMUM


IIOUl ~.:I&U TOIISIYII. no RATE
~.-----------------------------~
~r----------------'~rt~21----------~
~+---------------------~~~~~

l00~--------------~~~~~
~ 100+-----------------~~~~~~
E 4OOr~~~===:::=:=:=!~1
~I1~r-----------~----~~
~ i 1~+-------------_,~----------~~
~I~~~~-----------~
BI ~+-____________~~____________~
~ l00It-----------~~--------------~

oo+-------~~~----------------~ ~+-------------------~~~----~

~OO 150 ~ 250 ~ ~ 400 450 ~i


~o 2 4 8 8 101214 18 18 ~ 22 24 28 28 30 32 TOTAL TONS
PIT ... (Millions)

1___ TOTAL Cf' -0- WOIIST Del' ....... BElKT Del' -e- BElIr Del'

Figure 2. Cash Flow vs. Pit numbers; Project A Figure 3. Cash Flows vs. Total Tons; Project B.
Not sensitive to mining Phases. Very sensitive to mining phases.
3

TOTAL ORE .. WASTE PIT #21 OPTIMUM


GOlD II4OOIOZ 35M TONSlYR 7'!f. RATE MILL CUT OFF GRADE vs.
MIll. ORE TONNAGE
22
350,....---------------.:----,-3.2
20
3
~+-------------~
2.8 18

~=
I"
I
250+------------1~

2OO+------------..'1FHHH-lI---l2.4

~ 150
2.8 ~

ui
2 i
~ !! _
~
e~ i
18
14

12
" \
"\.
~
100 1.8 ~ 10
1.8 8 ~
50

0+---",''H'-F-H,...,..~..,.,._
1.4
_I'_h..,.,.'R'_HY'',''--+1.2
e *--.......
1 3 5 7 9 11 131517 192123 25 27 ~
2 4 8 8 1012 14 18 1820 22 24 28
4
----.
PIT" 2
0.018 0.02 0.022 0.024 0.028 0.028 0.03 0.032 0.034 0.038
I_TOTALOIIE ~WASTE -+- SlJUI'. RAllO I CUT OFF GRADE (02'ITON)

Figure 4. Ore-Waste and Stripping Ratio relationship Figure 5. Cut-off grade - Tonnage relationship.
for all nested pits; Project B.

TOTAL CASH FLOWS PIT #21 OPTIMUM


Sensitivity and Risk Analysis GOIJ)~. 7'!f. RATE WIllt CAPITAL

Risk and sensitivity analysis is performed by varying


cosis, commodity prices or other factors that affect the
property and evaluating the various alternatives. e
It is a flexible tool for the decision maker mainly in
three cases:
!j I :t--;:t.7"--~------J
2OOr-~~----------~
150t---~L------ _____________~
1. When a property is evaluated for the purpose of
financing or purchasing, several alternatives have loot-~~-------------_____~

to be examined, and quick decisions are required


5O't-~~~~~---r--'---'-~r-~
to be made. An example is presented later on. o 10 20 110 40 50 80 70 80
ANNUAL PRODUCTION RATES
(Millions) -
2. It is necessary and useful to know before hand
what are the factors that affect the viability of the 1...... 1'OTALCI' - - WONTDeI' --- HLECTDeI' -e- IIESTDCF

project and by how much. Several examples are


shown further on.
Figure 6. Annual Production Rate selection
3. During the life of a project several "what if' type of
questions are asked by the management.
Questions such as the following could be examined
very quickly.

a What if metal prices fall or rise by 10%. How d. What is going to happen to the cash flow if any
is the project affected? Do the phases need to waste mining is deferred for later (or earlier)?
be redesigned?
e. How much is it worth investing in a metallurgical
b. Will changing the cut-off grades improve the study which may decrease the processing cost by a
NPV of the property and if so, by how much? certain percentage?

c. What if the pit slopes were 3 degrees steeper? f. If heap leach recovery is improved or if dump
How much is it worth investing in a leach recovery is poorer than expected how will
geotechnical program? this affect the cash flow and the economic pit
limiis?
4
Some results on Selection of Alternatives and Figures 9 and 10 show for the two respective
Sensitivity Analysis. alternatives the upper and the lower bounds (best and
worst case) and the selected case, the discounted cash
As mentioned above, the results from the nested pits flows by year. The NPV or the Internal Rate of
are processed by another program which can analyze Return (IRR) can also be calculated. It should be
any production scenario. The output of this program noted that no capital was introduced to these
contains information on many associated variables and particular graphs.
is given in a spreadsheet format. Then the user can
produce graphical output. For example, figures 7 and The planning engineer can use graphs such as Figures
8 show the ore and waste relationship over the life of 7 or 8 to determine if a particular production scenario
the same project under two different scenarios: is feasible based on the budget requirements, mining
fleet or mill capacities etc. If several alternatives are
(i) 35 million of total tons mined per year and feasible, then by analyzing figures such as 9 or 10, a
decision can be made based on the economics. The
(ii) 7 million tons of ore processed by heap leach desired criteria can be the NPV, the IRR, the Payback
and 3 million tons milled. period, the life of the mine, etc.

SELECT CASE PRODUCTION PIT#21 OPTIMUM TOTAL DCF PIT #21 OPTIMUM 7% RATE
OOI.D _OZ 35101 TONSIYII no RATE
.
Au ~z 711 HEAl'; :1M IIIU. TONSffR

30. . . - - - - - - - - - - - - - - - - - , . 4 . 5

25 4

20
at
Z
f!
Ii 15

10

5 -,.,." -,-----c1.5
10~-~--:!,-,---:!,-"""",--:!,-"""",,,,,,,,,,,-,,,,,,,,,,,,,,,,,,,...J
23456 7 8 II 2 3 4 5 6 7 8 II 10 11
YEAR YEAR

i_TOTALORE liliiii WASTE --- lIlIIN'. RATIO I 1--- WORST -+- BS.ECT --- DEBT

Figure 7. Ore - Waste relationship of production Figure 9. Discounted Cash Flows of Worst, Best and
scenario 1 Select cases of production scenario 1.

SELECT CASE PRODUCT1ON-ft1 0f'T. 7%RATE TOTAL DCF PIT #21 OPTIMUM
Au ~7II_,3III1111U TN OOI.D ~Z. 35101 TONSffR no RATE
2OO.-----r--------------.
OO~------------~----,.4

~+_---------111. 100t----7-T----------~
3.5
~+----------~

:.f----'' r--+-II-B-I---l:' i
~+_--~-------+-JI 3 ~

!I
15 1I-_S----i.U5 at
10
6
0+---<'I...,.-..,.....y....,.--.,.A"........
.....,-~---.l().6 ~~r-~-~-r-~-~-~~-_r...J
234 567 8 9
8 II
YEAR

i - TOTAL ORE _ WASTE ...... STIlII'. RATIO I

Figure 8. Ore Waste relationship of production Figure 10. Discounted Cash Flows of Worst, Best and
scenario 2. Select cases of production scenario 2.
5
Some sensitivity analysis results are presented next.
TOTAL OUNCES FOR DIFF. OPERATING COSTS
1.4 Each point on the graph of figure 11 represents the
1.8 _-c~ ounces contained within the optimal pit for a range of
1.2 ~ gold prices and operating mining costs. This particular
/. -----~~ project is less sensitive to mining costs.
rI/J'./
Figure 12 shows the same type of graph but this time
..... .':'''''-)!I';;;.r
~,/ the processing cost is examined. For the $25/ton
TIT,?' curve, the sensitivity range is for gold prices between
0.5
0.4 Y $310 and $390. The same information on this graph
can be presented in a different format in figure 13. It
0.3
150 200 250 300 350 400 450 500 can be recognized how extremely sensitive this project
OOLOPRICE is to the processing cost. For a $375/oz gold price, the
total ounces can range from -50% to + 50% if the
1---- SO.60 -+- SO.1'O - - SO.75 processing cost changes from +$5 to -$5. It is more
-e- SO.60 --- SO.90 sensitive to lower gold prices than higher ones.

Figures 14 and 15 present similar sensitivity analysis


Figure 11. Total Ounces affected by Operating Mining results for metallurgical recoveries. The sensitive
Cost for different Gold prices. ranges can be picked from Figure 14, their magnitude
is shown on Figure 15.

TOTAL OUNCES FOR OIFF. PROCESSING COSTS TOTAL OUNCES FOR DIFFERENT RECOVERIES
7,---------------------------------, 6,---------------------------------,
6;+----------------
o 4t-------------__~
~ I
~ ~ 3-t------+---c
~ i
12

~ 300 320 340 360 380 400 420 440 480


GOLD PRICE ($IOZ)

...... $2OITON -- 822.aJTON - - ~


1 ...... 7~ __ 76% ___ 8O% I
118% __ 80% ..... 86%
I...... m.51OZ
-<It-
-M- I3OIOZ

Figure 12. Total Ounces affected by Processing Cost Figure 14. Total Ounces affected by metallurgical
for different Gold prices. Recoveries for different Gold prices.

totAl.. OUNCES" CHANGE VS. ~IIS. COST TOTAL OUNCES % CHANGE VS. RECOVERIES

tlJ

.,.~
40

20

0
, _IL

-I ~-
ijfJ
-20
~
0

~
;;!
-40

60
--- ---

g -so
loo'-!------.---,.....---....,.--..,...------1
20 22.5 25 27.5
-100
70 75 80 8S 90 95
30
PROCESSING COST ($/TON) SULFIDE MILL RECOVERY (%)

1_ _/OZ liliiii 8371110Z _ ...2II/OZ 1 _ _IOZ liliiii 1376/02 _ ... 25/0Z

Figure 13. Ounce % change vs. Processing Cost. Figure 15. Ounce % change vs. Recovery.
6
TOTAL UNO. CFFOR OIFF. ULT. PIT SLOPES TOTAL CASH FLOW "VS. ULT. PIT SLOPES

1~r-----------------~~=v~~=---, w
CJ
1~+-------------.r~~~~~-+--,.~ ~ 6
x
x .,.0 4
~ 1~+-------~.~~~"~~----------~
~ ... 150 ~x 2

0
z J! 1401+------D----!'-.:E---------------------_j Jj
i 1~+-----~~----------------------~ ~ -2
~
Z lro+---~~------------------------~
0
I!!z -4
11
::l
110+--m--------------------------_j
~
-e
l00+--4~--------------------------_j ~
z -8
~+---~----r_--~--~----,_--~--~ ::l

~
150 200 250 300 350 400 '450 500 -10
GOLD PRICE (S/Ol) ,3 0 -3 -6
ULT. PIT SLOPES DIFFERENCES FROM BASE

Figure 16. Cash Flow affected by pit slopes Figure 17. Cash Flow % change vs. pit slopes.

Finally, Figure 16 shows how the cash flow is affected Planning and Scheduling
by different ultimate pit slopes for a range of gold
prices in another project. The magnitude of the The sequence of the nested optimal pits can be useful
sensitivity is clearly shown for a hypothetical $400 per in planning and scheduling. Figure 18 shows one of
ounce gold price in Figure 17. The total undiscounted the plan views of a gold project with 3 individual pits.
cash flow can change by 4% for a 3 degree change of Each number or letter represents the pit that the
the ultimate pit slope. particular block belongs to. The smaller the number
or the lower in the alphabetical order the letter is, the
In general, the more sensmve a proje(.i is tU it higher the r-.JP\' of the pit. By grouping together
particular factor, the more justified it is to spend several blocks as shown on Figure 18, the planning
money to improve that factor and the amount of engineer can choose which is the best phase to design
money that could be spent is dictated by the magnitude within each pit but also which is the best sequence of
of the sensitivity. phases among all pits.

ee
eee
deVT
ee ezas
ee IISY
ee ZllTa
ee bbZ
e cd
eZee
YeYb
zx.
aaaaVe
ebbW
ddd dxvx
ddddddddd xv
ddddddddd d cVL
doldoldjixtc ebIIR ee
ddddddddb ed ebbc b
edddddbbee
ddc e
ce eo
SXa
100
ES
Q

x
cV ecccee
aRJ Deocee
cAlRM 1908Gec
eYGEOOX88Uc.
ebVVXY88Uce
dYY II8Ue

Figure 18. A plan view of nested pits can assist in


planning and scheduling.
7
STRIPPING RATIO VS. GOLD PRICE
b. examine several production alternatives;
25
c. evaluate different metallurgical processes,
20
production rates and cutoff-grade scenarios.
15
d. investigate the sensitivity of a project to commodity
prices, recoveries, costs, ultimate pit slopes etc.
10

e. answer "what if' type of questions.


5

0
150 200 250 300 350 400 450 500 References
BREAKEVEN GOLD PRICE (Sial)

Alford, CG., and Whittle J., 1986, Application of


I. . . . N -e-- 5 Lerchs-Grossman Pit Optimization to the Design
of Open Pit Mines", The AusIMMjIE Aust
Figure 19. Stripping Ratio relationship of four Newman Combined Group, Large Open Pit Mining
separate pits in the same property Conference.
for a range of gold values.
Charbonneau, D.J., 1990, "Application of the Whittle
4D Pit Optimizing Program for Mineral Resource
TOTAl. UNOISCOUNTED CASH FLOW Evaluation", Internal Report, Steffen Robertson
and Kirsten, Vancouver, BC, Canada.
~+---------------~~~~------~
Dagdalen, K., and Francois-Bongarcon, D., 1982,
~+-------~~~~--------------~ 'Towards the complete Double Parameterization of
!:
Recovered Reserves in Open Pit Mining", 17th
~g 35t=::~6=~~~==i APCOM Symp., Golden, CO.,
~I OO+---~~------------~~------~
~ 25~~----=-~------------~ Francois-Bongarcon, D., and Guibal, D., 1981,
2O~~L----------- __- - - - - -______~
"Parameterization of Optimai Designs of Open Pit;
Beginning of a New Phase of Research", AIME
1~50 200 250 300 350 400
Annual Meeting, Chicago, Ill.
BAEAKEVEN GOLD PRICE (S10Z)
Johnson, T.B., 1968, "Optimum Open Pit Mine
Production Scheduling" Ph D Dissertation,
University of California Berkley, Operations
Research Department.
Figure 20. Cash Flow contribution of four
separate pits in the same property Johnson, T.B., 1973, "A Comparative Study for
for a range of gold values. Determining Ultimate Open-Pit Mining Limits,"
11th APCOM, Tucson, AZ.

Kim, Y.C, 1978, "Ultimate Pit Design Methodologies


If there are a number of deposits that exist on the Using Computer Models - The State of the Art",
same property, scheduling becomes more challenging. Mining Engineering, Vol. 30, pp. 1454-1459.
Figure 19 shows the stripping ratio relationship for
different gold prices for each one of the four pits on a Lerchs, H. and Grossmann, I.F., 1965, "Optimum
property. Figure 20 shows the contribution to the cash Design of Open Pit Mines", Transactions, CLM.,
flow of each one of the four pits for a range of gold Vol. LXVIII, pp. 17-24
prices.
Stewart, D.H., 1991, "Aspects of Pit Optimization, Pit
Design, Planning and Scheduling", ACADS
Conclusions Conference, Kalgoorlie, Australia.

When certain assumptions are made on the economic Whittle, J. and Rozman, L.I., 1991, "Open Pit Design
parameters that determine the outline of an optimal in the 90s", Mining Industry Optimization
pit, a large set of nested pits can be generated easily. Conference, Sydney, Australia.
These can be utilized to:
Whittle, J., 1988, "Beyond Optimization in Open Pit
a. obtain a lower and an upper bound on the NPV of Design", First Canadian Conference on Computer
a project; Applications in the Mineral Industry, Quebec City,
Canada.