You are on page 1of 25

MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender

Gas Power Plant Projects 2011

Republic of Iraq
Ministry of Electricity

DIBIS 2xSGT5-PAC 2000E


Dual fuel + Heavy Fuel Oil

Section-VI-Chapter 3
Annex 01
Informative Data

TOTAL PAGES: 27
Including this page

Page 1 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011

CONTENTS

AQUEOUS EMISSIONS 3
NOISE EMISSIONS 3
RAW WATER ANALYSIS AFTER CONTRACTOR TREATMENT 3
POTABLE WATER TREATMENT 4
Potable water analysis after treatment 5
DEMINERALIZATION UNIT 6
Demineralization. water treatment Plant 6
WATER DEMAND AND STORAGE 7
Systems 7
Storage tanks 8
Pumps 9
Pipe work materials 9
FUEL GAS SUPPLY 10
Fuel gas supply system: 10
Emergency shutdown valve station: 10
Fuel Gas Metering Station: 10
Separator/filter station 11
Gas condensate tank 11
Gas dew point heating station (if required) 11
Gas compressor plant (if required) 12
Pressure regulating valve station 12
LIGHT DISTILLATE FUEL OIL SUPPLY SYSTEM 14
Road tanker unloading station 14
Pumps 14
Strainers duty/service 15
Supply line metering/sampling station 15
Fuel oil storage tanks 15
HEAVY FUEL OIL SUPPLY SYSTEM 17
Road tanker unloading station 17
Pumps 17
Strainers duty/service 18
Page 2 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Supply line metering/sampling station 18
Fuel oil storage tanks 18
AUXILIARY BOILERS 20
FIRE DETECTION AND PROTECTION 20
General 20
Description of fire detection and alarm system 20
Pumps 20
Water storage 21
Portable fire extinguishers 21
Fire alarm system 21
Pipework 21
INSTRUMENT&SERVICE AIR SYSTEM 22
Air receiver 22
Filters 22
Dryers 22
Distribution piping 22
CRANES (To be completed for each type of crane supplied) 24
CATHODIC PROTECTION-details of anodes and monitoring half cells 25
DETAILS OF BUILDINGS-STRUCTURES AND EXTERNAL FINISHES 26
SUPERIMPOSED LOADING FOR DESIGN 26
SITE INVESTIGATIONS 26
SUPPLIERS OF MATERIALS, MANUFACTURERS, PLACES OF MANUFACTURE 26
TESTING AND INSPECTION 26

Page 3 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
The present Informative Data are intended to show details of the Works proposed by the Tenderer, who shall complete the required information and shall not
consider requirements which are not applicable.

AQUEOUS EMISSIONS

Description Unit Maximum value

PH range

Total suspended solids mg/l

Oil and grease mg/l

Total residual chlorine mg/l

Chromium, copper/iron/zinc mg/l

Temperature rise (difference between C


inflow and outflow points)

NOISE EMISSIONS

Description Unit Maximum value

Equipment noise level (measured at m from dB(A)


source)

Far field noise level (site boundary) dB(A)

RAW WATER ANALYSIS AFTER CONTRACTOR TREATMENT

Description Unit Maximum value

Total dissolved Solids (T.D.S) (as CaCO3) ppm

Page 4 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Total Suspended Solids (T.S.S.) (as CaCO3) ppm

M-alkalinity (as CaCO3) ppm

Silica (as SiO2) ppm

Ca** (as CaCO3) ppm

Mg** (as CaCO3) ppm

Na* (as CaCO3) ppm

Cl (as CaCO3) ppm

Sulphate (as CaCO3) ppm

Settleable solids ppm

POTABLE WATER TREATMENT

Description Unit Value

Treatment type

Manufacturer

Number of streams and rating N %

Continuous capacity (net) m3/day

Page 5 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Auxiliary power consumption kW

Potable water analysis after treatment Maximum value

Sodium as Na mg/l

Potassium as K mg/l

Calcium as Ca mg/l

Magnesium as Mg mg/l

Chloride as Cl mg/l

Sulphate as SO4 mg/l

Copper as Cu mg/l

Iron as Fe mg/l

TDS mg/l

pH range

Page 6 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011

DEMINERALIZATION UNIT
Parameter Unit Maximum value
Ph
Total cations ( as CaCO3) mg/l
Specific conductivity @ 25C S/cm
Sodium as Na + Potassium mg/l
Chloride as Cl mg/l
Vanadium mg/l
Silica as Si mg/l
Copper as Cu mg/l
Net throughput to service between regenerations m3
Minimum net throughput to service m 3/day

Demineralization. water treatment Plant


Treatment type
Manufacturer
Number of streams and duty Nx%
Net capacity to service m3/h
Throughput rate m3/h
Design net output between regeneration m3
Service period between regeneration cycles h
Total waste water per regeneration m3 m3
Waste water per m3 treated water to service m3/m3
Weight of 100% sulphuric acid for effluent kg

Page 7 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
neutralization per regeneration
Weight of 100% caustic soda for effluent kg
neutralization per regeneration
Maximum flow rate to drain m3/h
Rigenerant concentration (acid/caustic) %
Heaviest weight to be lifted kg
Air compressor capacity kW
Add information on:
Ion exchange units and material
Resin guarantees
Activated carbon filters (if required)

WATER DEMAND AND STORAGE

Description Unit Value

Peak water demand m3/h

Design flow rate m3/h

Systems Raw Service/Fire water Demi Potable -

Peak demand m3/h -

Flow rates m3/h

Storage tanks Unit Raw Service/Fire water Demi Potable Chemicals

Page 8 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Manufacturer

Type of construction

Material

Design code

Number

Internal diameter m

Height on straight m

Plate thickness:
Base mm
Shell mm
Roof mm

Corrosion allowance mm

Internal treatment

Capacity of each tank (net) m3

Capacity of each tank (gross) m3

Weight of tank empty t

Weight of tank full t

Test pressure bar


Pumps Unit Raw Service/Fire water Demi Potable

Page 9 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Number and rating N %
Type
Manufacturer
Capacity m3/h
Discharge pressure at rated output bar
Drive rating kW
Materials:
Impeller
Casing
Pipe work materials Unit Raw Service/Fire water Demi Potable Chemicals

Material above ground

Material below ground

Internal coating

External coating below ground

External coating above ground

Pipe outside diameter mm

Pipe thickness mm

Page 10 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011

FUEL GAS SUPPLY

Description Unit Particulars


Fuel gas supply system:
Design Code

System Design Flow Rate (DFR) (flow to two GTs) kg/s

Piping design code

Below ground piping:


Pipe material
External protection

Above ground piping:


Pipe material
External protection

Allowable gas pressure range at supply TP bar a


(min/max)

System design pressure bar g

Allowable gas temperature range at supply TP C


(min/max)

System Design Temperature C


Emergency shutdown valve station:

No. of slam shut

Valve type and manufacturer

Size of valve mm

Time to close from receipt of signal s


Fuel Gas Metering Station:

Fiscal quality metering

No of meters

Type

Manufacturer

Capacity Nm3/s

Accuracy %

Page 11 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Turn down capability

Gas Chromatograph
Type/model
%
Accuracy
Range
Separator/filter station Gas scrubbers Gas filters

Manufacturer

No of streams and rating N %

Capacity Nm3/s

Separation efficiency %/particle size

Solid particles %/

Aerosols/liquids %/

Pressure drop at design flow (clean/dirty) mbar

Flow turndown

Casing material

Filter material
Gas condensate tank

Number

Capacity m3

Drain pump capacity m3/h


Gas dew point heating station (if required)

No of heaters and rating N %

Type

Manufacturer

Capacity kg/s

Thermal input kW

Thermal efficiency of heater %

Gas inlet/outlet temperature C

Type of control system

Page 12 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Gas compressor plant (if required)

Number of compressors and rating N %

Manufacturer

Type

Model number

Capacity Nm3/day

Discharge temperature C

Discharge pressure bar(a)

Speed rpm

Critical speeds rpm

Compressor rating kW

Motor power requirement:

With minimum inlet pressure kW

With average inlet pressure kW

With maximum inlet pressure kW

Lubricated/non-lubricated

Cooling water system


Pressure regulating valve station

No of streams and rating N %

Manufacturer

Valve type and manufacture

Actuator type and manufacture

Fuel gas inlet pressure (min/max) bar a

Fuel gas inlet temperature (min/max) C

Fuel gas outlet pressure (min.) bar a

Pressure drop bar

Size of valve mm

Method of control

Page 13 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011

LIGHT DISTILLATE FUEL OIL SUPPLY SYSTEM

Description Unit Particulars

System Design Flow Rate (DFR) (flow to two GTs) kg/s

Piping design code

Below ground piping:


Pipe material
External protection

Above ground piping:


Pipe material
External protection

Allowable pressure range at supply point bar a


(min/max)

System design pressure bar g

Allowable temperature range at supply point C


(min/max)

System design temperature C


Road tanker unloading station

Unloading tank:
Capacity m3
Material
Pumps Unloading Transfer

Number and rating N %


Type
Manufacturer
Capacity m3/h
Discharge pressure at rated output bar
Drive rating kW
Materials:
Impeller
Casing

Page 14 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Strainers duty/service Unloading Transfer

Number and rating N %


Type
Manufacturer
Filtration level micron
Materials:
Strainer body
Strainer screen
Supply line metering/sampling station

Number of meters and rating

Meter type

Meter range

Accuracy

Sampler type
Fuel oil storage tanks

Manufacturer

Type of construction

Material

Design code

Number

Internal diameter m

Height on straight m

Plate thickness:
Base mm
Shell mm
Roof mm

Corrosion allowance mm

Internal treatment

Capacity of each tank (net) m3

Capacity of each tank (gross) m3

Weight of tank empty t

Page 15 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Weight of tank full t

Test pressure bar

Contents gauge:
Manufacturer
Type
Range

Alarm indicators:
Manufacturer
Type

Page 16 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011

HEAVY FUEL OIL SUPPLY SYSTEM

Description Unit Particulars

System Design Flow Rate (DFR) (flow to two GTs) kg/s

Piping design code

Below ground piping:


Pipe material
External protection

Above ground piping:


Pipe material
External protection

Allowable pressure range at supply point bar a


(min/max)

System design pressure bar g

Allowable temperature range at supply point C


(min/max)

System design temperature C


Road tanker unloading station

Unloading tank:
Capacity m3
Material
Pumps Unloading Transfer Certified

Number and rating N %


Type
Manufacturer
Capacity m3/h
Discharge pressure at rated output bar
Drive rating kW
Materials:
Impeller
Casing
Strainers duty/service Unloading Transfer Certified

Page 17 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Number and rating N %
Type
Manufacturer
Filtration level micron
Materials:
Strainer body
Strainer screen
Supply line metering/sampling station

Number of meters and rating

Meter type

Meter range

Accuracy

Sampler type
Fuel oil storage tanks Row Certified Treated

Manufacturer

Type of construction

Material

Design code

Number

Internal diameter m

Height on straight m
Plate thickness:
Base mm
Shell mm
Roof mm
Corrosion allowance mm

Internal treatment

Capacity of each tank (net) m3

Capacity of each tank (gross) m3

Weight of tank empty t

Weight of tank full t

Page 18 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Test pressure bar

Contents gauge:
Manufacturer
Type
Range

Alarm indicators:
Manufacturer
Type

Page 19 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011

AUXILIARY BOILERS

Description Unit Particulars

Manufacturer

Type

Design code

Number

Design pressure bar

Design Temperature C

Thermal capacity kWt

FIRE DETECTION AND PROTECTION

Description Unit Particulars


General

Design codes/standards

All equipment FM/UL approved

Largest fire risk (identify)

Total water flow to feed largest risk area l/min

Descriptions of firefighting systems Add


references
Description of fire detection and alarm Add reference
system
Pumps

Number and rating of electric driven pumps N %


Type
Manufacturer N
Capacity m3/h
Discharge pressure at rated output bar
Drive rating kW
Materials:
Impeller
Casing
Number and rating of diesel pumps N %
Number of jokey pumps N

Page 20 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011

Water storage

Capacity of dedicated storage m3

Type of tank construction


Portable fire extinguishers

Number& capacity of dry powder type provided N kg

Number&capacity of foam type provided N l

Number&capacity of carbon dioxide type N kg


provided
Fire alarm system

Manufacturer

Model

Number of fully equipped zones


Pipework

Size of ring main pipework for largest risk mm

System operating pressure bar

Spacing between external fire hydrants

Page 21 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011

INSTRUMENT&SERVICE AIR SYSTEM

Description Unit Service Instruments

Compressed air design capacity Nm3/h

Basis of design (define)

Air compressors

1 Type
3.2 Number and rating N %
3.3 Capacity Nm3/h
Discharge pressure bar g bar g
Compressor motor rating kW
After coolers

Type

Cooling fluid
Air receiver

Number

Capacity/retention time

Design code

Design pressure Bar g


Filters

Type

Number and rating N %

Method of cleaning
Dryers

Number and rating N %

Dessicant/refrigerant

Power consumption kW
Distribution piping

Main pipe size mm

Material

Page 22 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011

CRANES (To be completed for each type of crane supplied)

Description Unit

Location

Manufacturer

Type and classification

Hoisting capacity t

Hosting speed m/min

Page 23 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
CATHODIC PROTECTION-details of anodes and monitoring half cells
No Length Diameter Platinized Design Description
Plant
mm mm length current
mm amps
Fuel gas pipe

Fuel oil pipe

Raw water pipe

Service water pipe

Fire water pipe

Demi water pipe

Potable water pipe

Effluent water pipe

Fuel oil tanks

Water storage Tanks

Page 24 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011

DETAILS OF BUILDINGS-STRUCTURES AND EXTERNAL FINISHES


The Tenderer shall describe his proposals for GT foundations calculation procedures, for structures, external
and internal finishes of every building including internal facilities.

SUPERIMPOSED LOADING FOR DESIGN


The Tenderer shall detail the superimposed loads to be used for the design of all buildings and major areas
within and around main buildings (including wheel axle loads for road design)

SITE INVESTIGATIONS
The Tenderer shall describe fully the site investigations he proposed to carry out prior to and/or during the
design and construction of the Works.

SUPPLIERS OF MATERIALS, MANUFACTURERS, PLACES OF MANUFACTURE


TESTING AND INSPECTION
The Tenderer shall list the major items is offering indicating the place of workshop manufacture where
inspections and tests shall be carried out.

Page 25 of 25

You might also like