Republic of Iraq
Ministry of Electricity
Section-VI-Chapter 3
Annex 01
Informative Data
TOTAL PAGES: 27
Including this page
Page 1 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
CONTENTS
AQUEOUS EMISSIONS 3
NOISE EMISSIONS 3
RAW WATER ANALYSIS AFTER CONTRACTOR TREATMENT 3
POTABLE WATER TREATMENT 4
Potable water analysis after treatment 5
DEMINERALIZATION UNIT 6
Demineralization. water treatment Plant 6
WATER DEMAND AND STORAGE 7
Systems 7
Storage tanks 8
Pumps 9
Pipe work materials 9
FUEL GAS SUPPLY 10
Fuel gas supply system: 10
Emergency shutdown valve station: 10
Fuel Gas Metering Station: 10
Separator/filter station 11
Gas condensate tank 11
Gas dew point heating station (if required) 11
Gas compressor plant (if required) 12
Pressure regulating valve station 12
LIGHT DISTILLATE FUEL OIL SUPPLY SYSTEM 14
Road tanker unloading station 14
Pumps 14
Strainers duty/service 15
Supply line metering/sampling station 15
Fuel oil storage tanks 15
HEAVY FUEL OIL SUPPLY SYSTEM 17
Road tanker unloading station 17
Pumps 17
Strainers duty/service 18
Page 2 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Supply line metering/sampling station 18
Fuel oil storage tanks 18
AUXILIARY BOILERS 20
FIRE DETECTION AND PROTECTION 20
General 20
Description of fire detection and alarm system 20
Pumps 20
Water storage 21
Portable fire extinguishers 21
Fire alarm system 21
Pipework 21
INSTRUMENT&SERVICE AIR SYSTEM 22
Air receiver 22
Filters 22
Dryers 22
Distribution piping 22
CRANES (To be completed for each type of crane supplied) 24
CATHODIC PROTECTION-details of anodes and monitoring half cells 25
DETAILS OF BUILDINGS-STRUCTURES AND EXTERNAL FINISHES 26
SUPERIMPOSED LOADING FOR DESIGN 26
SITE INVESTIGATIONS 26
SUPPLIERS OF MATERIALS, MANUFACTURERS, PLACES OF MANUFACTURE 26
TESTING AND INSPECTION 26
Page 3 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
The present Informative Data are intended to show details of the Works proposed by the Tenderer, who shall complete the required information and shall not
consider requirements which are not applicable.
AQUEOUS EMISSIONS
PH range
NOISE EMISSIONS
Page 4 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Total Suspended Solids (T.S.S.) (as CaCO3) ppm
Treatment type
Manufacturer
Page 5 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Auxiliary power consumption kW
Sodium as Na mg/l
Potassium as K mg/l
Calcium as Ca mg/l
Magnesium as Mg mg/l
Chloride as Cl mg/l
Copper as Cu mg/l
Iron as Fe mg/l
TDS mg/l
pH range
Page 6 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
DEMINERALIZATION UNIT
Parameter Unit Maximum value
Ph
Total cations ( as CaCO3) mg/l
Specific conductivity @ 25C S/cm
Sodium as Na + Potassium mg/l
Chloride as Cl mg/l
Vanadium mg/l
Silica as Si mg/l
Copper as Cu mg/l
Net throughput to service between regenerations m3
Minimum net throughput to service m 3/day
Page 7 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
neutralization per regeneration
Weight of 100% caustic soda for effluent kg
neutralization per regeneration
Maximum flow rate to drain m3/h
Rigenerant concentration (acid/caustic) %
Heaviest weight to be lifted kg
Air compressor capacity kW
Add information on:
Ion exchange units and material
Resin guarantees
Activated carbon filters (if required)
Page 8 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Manufacturer
Type of construction
Material
Design code
Number
Internal diameter m
Height on straight m
Plate thickness:
Base mm
Shell mm
Roof mm
Corrosion allowance mm
Internal treatment
Page 9 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Number and rating N %
Type
Manufacturer
Capacity m3/h
Discharge pressure at rated output bar
Drive rating kW
Materials:
Impeller
Casing
Pipe work materials Unit Raw Service/Fire water Demi Potable Chemicals
Internal coating
Pipe thickness mm
Page 10 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Size of valve mm
No of meters
Type
Manufacturer
Capacity Nm3/s
Accuracy %
Page 11 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Turn down capability
Gas Chromatograph
Type/model
%
Accuracy
Range
Separator/filter station Gas scrubbers Gas filters
Manufacturer
Capacity Nm3/s
Solid particles %/
Aerosols/liquids %/
Flow turndown
Casing material
Filter material
Gas condensate tank
Number
Capacity m3
Type
Manufacturer
Capacity kg/s
Thermal input kW
Page 12 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Gas compressor plant (if required)
Manufacturer
Type
Model number
Capacity Nm3/day
Discharge temperature C
Speed rpm
Compressor rating kW
Lubricated/non-lubricated
Manufacturer
Size of valve mm
Method of control
Page 13 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Unloading tank:
Capacity m3
Material
Pumps Unloading Transfer
Page 14 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Strainers duty/service Unloading Transfer
Meter type
Meter range
Accuracy
Sampler type
Fuel oil storage tanks
Manufacturer
Type of construction
Material
Design code
Number
Internal diameter m
Height on straight m
Plate thickness:
Base mm
Shell mm
Roof mm
Corrosion allowance mm
Internal treatment
Page 15 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Weight of tank full t
Contents gauge:
Manufacturer
Type
Range
Alarm indicators:
Manufacturer
Type
Page 16 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Unloading tank:
Capacity m3
Material
Pumps Unloading Transfer Certified
Page 17 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Number and rating N %
Type
Manufacturer
Filtration level micron
Materials:
Strainer body
Strainer screen
Supply line metering/sampling station
Meter type
Meter range
Accuracy
Sampler type
Fuel oil storage tanks Row Certified Treated
Manufacturer
Type of construction
Material
Design code
Number
Internal diameter m
Height on straight m
Plate thickness:
Base mm
Shell mm
Roof mm
Corrosion allowance mm
Internal treatment
Page 18 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Test pressure bar
Contents gauge:
Manufacturer
Type
Range
Alarm indicators:
Manufacturer
Type
Page 19 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
AUXILIARY BOILERS
Manufacturer
Type
Design code
Number
Design Temperature C
Design codes/standards
Page 20 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Water storage
Manufacturer
Model
Page 21 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Air compressors
1 Type
3.2 Number and rating N %
3.3 Capacity Nm3/h
Discharge pressure bar g bar g
Compressor motor rating kW
After coolers
Type
Cooling fluid
Air receiver
Number
Capacity/retention time
Design code
Type
Method of cleaning
Dryers
Dessicant/refrigerant
Power consumption kW
Distribution piping
Material
Page 22 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
Description Unit
Location
Manufacturer
Hoisting capacity t
Page 23 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
CATHODIC PROTECTION-details of anodes and monitoring half cells
No Length Diameter Platinized Design Description
Plant
mm mm length current
mm amps
Fuel gas pipe
Page 24 of 25
MINISTRY OF ELECTRICITY General Directorate For DIBIS Tender
Gas Power Plant Projects 2011
SITE INVESTIGATIONS
The Tenderer shall describe fully the site investigations he proposed to carry out prior to and/or during the
design and construction of the Works.
Page 25 of 25