Quality planning

Project phase
Deliverable Quality objective (s) Metrics

Requirements Fresh ingredients To maintain the freshness of the ingredients Shelf life

Good Taste To satisfy the customer's taste pallet Customer Feedback

Certified source of To ensure quality check documents of the Quality audit


origin of ingredients ingredients obtained from the vendors documents

Appropriate quantity of Toaccording


ensure the quantity of the dish served is Pre-decided size of
to the pre-decided size of the the utensil/number of
ordered dish utensil/number of pieces pieces

Timing of service,
To ensure the service is consistent and is feedback from
Prompt service prompt according to the customers customers as well as
supervisors
Quality Management Plan
Quality Assurance
Quality standard to Activity schedule responsible Accountable
be followed

Internal/external
benchmarks
Quality control

Activity schedule responsible Accountable


Quality Management Plan
Quality planning
Project phase
Deliverable

Good Construction Material

Requirements

High quality equipments


(electrical/kitchen/computer/water
supply/ fire extinguisher/furniture)

Trustworthy contractor

Qualified Waiters + Cooking assistants

Qualified Labor for miscellaneous


activities( guard/ vallet parking)

Qualified caf administrators


( Cashier/Caf manager)

Planning

Qualified Head Chef


Certified vendors

Good interior decorator

Proper Wiring system and water supply

Construction Layout of the caf

Proper installation of kitchen


equipments

Decoration Interior decoration

Training High quality staff training

Fresh ingredients

Good Taste

Certified source of origin of ingredients


Closing inspection
( Dummy trial week)
Appropriate quantity of ordered dish

Prompt service
Quality standard to
Quality objective (s) Metrics be followed

1) Brand of material used


To procure high quality material for 2) Specification of material as per
construction purposes within the specified construction standards
timeline 3) Quality check of material
procured

1) Brand of equipments used


2) Specification of equipments as
per desired standards
To procure high quality equipments within 3) Quality check of equipments
the specified timeline procured
4) Functional check of equipments
procured

1) Track record of contractor


providing skilled labor
To obtain skilled manforce for starting the 2 )Registration details and
construction of cafe employment details of the
contractor

1) Basic Educational qualifications


To obtain skilled waiters for runninng the 2) Language proficiency
cafe

1) Basic Educational qualifications


To obtain skilled waiters for runninng the 2) Language proficiency
cafe

1) Basic Educational qualifications


2) Language proficiency
To have a skilled administrators for 3) Basic accounting
supervising the day to day activities 4) Customer management skills
including billing and customer handling

1) Educational qualifications from


specialised institute( Hotel
Management)
To have skilled chefs at the cafe who will 2) Language proficiency
oversee the cooking procees and administer 3) Basic accounting
the same 4) Customer management skills
5) Proficiency in cooking
1) Vendor rating
To have certified vendors for providing
kitchen equipments, raw materials for food 2) Vendor License and certificates
3) Reputation

1) Educational qualifications from


specialised institute( Interior
Decoration)
To have a good interior decorator for 2) Relevant workex
decorating the caf as per client standards 3) Customer testimonials

To have wiring done in the caf as per safety 1) Electricity Safety standards
2) Blueprint of the cafe
standards and set design

To ensure that the construction is done as 1) Validation against the blueprint


per pre decided design of the caf
1) Validation against the blueprint
To ensure that kitchen equipments are
properly installed at the predecided location of the caf

To ensure that the furnitures used by the


interior decorator are not defective and are 1) Visual validation by project
as per desired quality standards and the team/client
interior decoration is visually appealing.

1) Training evaluation
2) Traninig Feedback by attendees
To ensure that the staff are adequately 3) Demo performance
trained to run the caf 4) Candidate feedback by training
supervisor

To maintain the freshness of the ingredients Shelf life

To satisfy the customer's taste pallet Customer Feedback

To ensure quality check documents of the Quality audit documents


ingredients obtained from the vendors

To ensure the quantity of the dish served is Pre-decided size of the


according to the pre-decided size of the utensil/number of pieces
utensil/number of pieces

To ensure the service is consistent and is Timing of service, feedback from


prompt according to the customers customers as well as supervisors
Quality Assurance Quality control

Activity schedule responsible Accountable Activity

To check if the To check the


construction quality of the
material arrives the Decided time of delivery Procurement Project Manager construction
Manager
site on time from material that has
vendor arrived

To ensure if the
labour is doing
quality work in all
stages of
construction
control

schedule responsible Accountable

After arrival of
every Procurement Manager Project Manager
procuremnt
consignment