Question 1.

2 sample T & Homogeneity of variance tests conducted on two sets of samples, one prior to
improve and another after improve showed the following P values; P value for 2 samples T test
= 0.015 and P value for HOV: 0.003. Choose the right conclusion from below

The process capability has definitely shown improvement


The means of the 2 samples are statistically significantly different, where as variances are
not.
The mean & variance are statistically significantly different
Data insufficient to conclude

Mark for follow up

Question 2.

A 1way ANOVA test conducted on stacked data of 5 operators in a process. After HOV test
gives a P value of 0.039. Choose the right conclusion.

The variances of the 5 operators are not statistically significantly


different
The means of 5 operators are not statistically significantly different
The means of at least one operator is statistically different from others.
Both (a & c)

Mark for follow up

Question 3.
A Main Effects Plot should be used to

Show statistically which input has the most effect on the output
Show graphically which input(s) are likely to have significant effect on the
output
Show graphically interactions between two or more variables
Show the correlation between two variables

Mark for follow up

Question 4.

A normal distribution curve is characterized by

Standard deviation &


variance
Mean & Range
Mean only
Mean & Standard deviation

Mark for follow up

Question 5.

A performance standard for a continuous variable would consist of

Specification limits & defect


definition
Mean & standard deviation
Variance required per spec
Specification limits & defect
definition

Mark for follow up


Question 6.

Choose one of choices below which is not an Analyze phase deliverable

Select CTQ characteristic


Prove statistically that each one is vital few x
Identify all X's and isolate vital few Xs
Quantify the magnitude of the impact of each
x

Mark for follow up

Question 7.

Choose the right answer

S^2Obs = (S^2Process + S^2Reproducibility + S^2Repeatability) *


2
Zst = Zlt + 1.5
Zst = Cp / 3
Zlt = Ppk + 3

Mark for follow up

Question 8.

How do you calculate the process efficiency?

VA/NVA
VA/Total Time
NVA+VA/Total
time
VA+NVA
Mark for follow up

Question 9.

In case of discrete Y and discrete X, choose the right test among those shown below for
hypothesis test

ANOVA
T test
Homogenity of
variance
None of the Above

Mark for follow up

Question 10.

In the relation Y=F (X)

Y' is a factor & is a dependant variable


Y is an effect & a dependent variable
X' is an effect & an independent
variable
X' is the effect & a dependent variable

Mark for follow up

Question 11.

Mistake proofing is

Method of identifying potential defects


Technique for eliminating defects
Part of SPC
Means of responding to defects prior to delivery of product /
service

Mark for follow up

Question 12.

Prediction equations for DOE experimentation shall include

Mean of response only


Mean & standard
deviation
Standard deviation only
None of the above

Mark for follow up

Question 13.

Run chart and descriptive stat were performed on a sample set 25 different hardness readings.
The output of run chart gave P values of 0.71, 0.06, 0.032 &0.55 for trends, clusters, oscillation
and mixtures respectively. Also, the P value obtained in the latter (descriptive stat) was 0.057.
Choose the right conclusions that can be drawn from the data.

Stable and normally distributed


Unstable as it shows signs of trend but is normally distributed
Unstable as it shows signs of mixtures and is not normally
distributed
Unstable as it shows signs of oscillation and is normally distributed

Mark for follow up

Question 14.

Run chart determines


Normality of
data
Precision of data
Stability of data
Both a & c

Mark for follow up

Question 15.

Six Sigma Quality in DPMO approximately corresponds to

230 defects per million


opportunities
30 defects per million opportunities
3.4 defects per million opportunities
300 defects per million
opportunities

Mark for follow up

Question 16.

The number of experimental runs in a Half factorial run of 2 levels and K factors are

2^k-1
2^k-2
2^2
None of the
above

Mark for follow up


Question 17.

The primary purpose of risk management is to

Monitor potential problems


Prevent potential problems
Respond to problem
occurrences
None of the above

Mark for follow up

Question 18.

The probability distribution obtained on a toss of coin or a fair dice is

Normal distribution
Uniform distribution
Poisson's
distribution
None of the Above

Mark for follow up

Question 19.

Value Stream mapping is to be done by the time captured through

Walking the process


Discussion with team in a conference
room
Expert opinion
Historical Experience
Mark for follow up

Question 20.

Variable control chart tracks

Several characteristics
Response to defects
Discrete data such as pass / fail, good / bad
etc
None of the above

Mark for follow up

Question 21.

What is the tradeoff using fractional factorial strategy?

Requires less time


Cost effective
Some information may he
lost
All of the above

Mark for follow up

Question 22.

What tool would you use to statistically prove the mean of your new process has Significantly
improved compared to the mean of your original process?

Homogeneity of
Variance
Regression Analysis
Gage R&R
2-Sample T-test

Mark for follow up

Question 23.

What type of control chart should be used for defects on lots of differing size?

C chart
U chart
X bar R
chart
P chart

Mark for follow up

Question 24.

Which of the following statements is true?

Continuous data is not capable of being meaningfully subdivided into more Precise
increments
The normal distribution is used with continuous data.
The normal distribution is used with discrete data.
Discrete data is capable of being meaningfully subdivided into more precise Increments.

Mark for follow up

Question 25.

You need to have an effective process control system because

The process has a tendency to deteriorate over time


Operators need to know what to do if process gets out of control
The management team needs to know how to manage the
process
All of the above