TECHNOLOGY TRANSFER CASE STUDIES

C ASE STUDY 1: C ASE STUDY 2: C ASE STUDY 3:


Cost Advantages and Continuous Customer dedicated facilities Commercialisation from a Laboratory
Local Management A large, multinational pharmaceutical Process within 12 months
The first three steps from a registered company required significant cost of goods A European Speciality Pharmaceutical
process, previously run in Switzerland on reduction to deliver a market leading drug company approached Dishman for the
1,600 L scale, were successfully transferred product. contract manufacture of a late life cycle API.
to operations in India within a timeframe Dishman optimised the process and The Client had a non-infringing laboratory
of five months. The intermediate of an built a dedicated facility for the API scale process for the API which needed
API which goes generic in a few years production. Dishman further reduced costs optimisation and scale up to commercial
required us to provide larger quantities of by developing its own more cost-effective production.
intermediates at lower costs. The process routes for the three key starting materials. The process was transferred & then optimised
is now being performed on a scale up to An overall cost reduction of more than at an R&D level. This was followed by pilot
4,000 L with the intermediate being sent 50% was achieved. Routine commercial scale validation batches and then 10mT
to Switzerland for further conversion to the manufacture is now ongoing at the Bavla commercial production within 9 months of
final API. This approach offers the maximum site, offering the customer significant cost initiating technology transfer.
flexibility in handling the cost and quantity advantages and a simplified and secure
demands of the product in development supply chain. During the commercial production,
and commercialisation life cycles. The alternative, more cost effective supply
customer benefits from cost advantage and solutions were found for key starting
continuous local project management. materials & these were incorporated into
production post validation. An agreed
regulatory programme was completed
and Dishman provided the Client with a
full technical dossier to enable regulatory
filings. As a consequence of the success of
this program, the Client has transferred a
further 3 projects into the Dishman group.