GW2/RWH/DH7/ek4 10/16/2017

FILED
10-16-17
02:27 PM
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Application of California-American Water


Company (U210W) for Approval of the Application 12-04-019
Monterey Peninsula Water Supply Project
and Authorization to Recover All Present
and Future Costs in Rates.

ADMINISTRATIVE LAW JUDGES RULING REGARDING


ADDITIONAL INFORMATION FOR PARTIES TO PROVIDE
PRIOR TO EVIDENTIARY HEARINGS

On August 28, 2017, the assigned Administrative Law Judges issued a


Ruling that set forth the schedule for the remainder of the proceeding.
Evidentiary hearings were determined to be needed in this proceeding, and
hearings are set for October 25 through November 3, 2017.
In order to ensure proper facilitation for the upcoming evidentiary
hearings, the parties are directed to provide the following information, and
comply with the Instructions to Parties to Preparation for October 25
- November 3, 2017 Evidentiary Hearings set forth in Attachment A to this
ruling.
1. The Applicant in coordination with all parties is to provide a witness list
for the hearings, the proposed order of witnesses, and an estimate of the time
necessary to cross-examine opposing witnesses (parties shall prepare one excel
spreadsheet that lists the witnesses, order, and estimated time for
cross-examination using Attachment B to this ruling as an example) to be served
on the service list no later than 5pm October 20, 2017;

197259186 -1-
A.12-04-019 GW2/RWH/DH7

2. The Applicant is to coordinate with all parties and provide a complete


exhibit list using Attachment C to this ruling as an example (the parties are to
provide 5 complete copies of all exhibits requested to be entered into the record
on the first day of hearings ) to be served no later than 5pm October 20, 2017;
3. Any party that intends to file and serve a motion to strike any portion of
another partys testimony shall file and serve such motion no later than 5pm two
days prior to the scheduled date of cross examination as to the testimony that is
subject to the motion to strike; and
4. A joint proposed outline for briefs and reply briefs to be served on the
service list in this proceeding no later than 5pm on the last day of evidentiary
hearing.1

IT IS SO RULED.

Dated October 16, 2017, at San Francisco, California.

/s/ JEANNE M. MCKINNEY /s/ ROBERT W. HAGA


Gary Weatherford Robert W. Haga
Administrative Law Judge Administrative Law Judge

/s/ JEANNE M. MCKINNEY


Darcie L. Houck
Administrative Law Judge

1 The Parties will prepare briefs and reply briefs using an approved common briefing outline.
The briefing outline will be approved in a ruling shortly after the evidentiary hearing or at the
conclusion of evidentiary hearings.

-2-
A.12-04-019 GW2/RWH/DH7/ek4
ATTACHMENT A

Instructions to Parties in Preparation for October 25-November 3, 2017


Evidentiary Hearings
Our hearings are scheduled to begin at 10:00 AM on Thursday, October 25, 2017 in the Commission
Hearing Rooms at 505 Van Ness Avenue. In order to proceed efficiently and make best use of our time
during the hearings, we require the following:

Before the hearings:

- Parties should all work together to develop a list of all witnesses, the approximate amount of time
needed for cross-examination and redirect, as well as a proposed order for witnesses. The
Applicants should determine a point person who will be responsible for assembling a final
proposed schedule. The point person should contact the service list so that everyone knows to
whom they should send the required information. The point person should provide us via
email the final proposed schedule no later than 5:00 pm on Friday, October 20, 2017. The
proposed schedule, in Microsoft Excel, should highlight any requested dates and times that have
restrictions, e.g. witness is only available between 2 and 3 on Thursday. We will review and
provide parties a final schedule on Tuesday, October 24, 2017. Party estimates of time to cross-
examine witnesses is subject to reduction by the assigned ALJs.

- Preparing your exhibits


1. Acronyms, if your witnesses use them, then each party should include as one of its
exhibit, a complete list of all acronyms used in the rest of its exhibits. The list should be
alphabetized by the acronyms.
2. The upper right hand corner of each exhibits front page should be blank for the ALJs
exhibit stamp. (Approximately 2.5 inches high x 4.5 inches wide). If there is not sufficient
room in the upper right hand corner for an exhibit stamp, please prepare a cover sheet
for the exhibit.
3. We will be labeling the exhibits using the framework set forth in the exhibit list used for
the last set of hearings in this proceeding (see Attachment B to ruling).

Daily before the hearings


- On the morning of October 25, 2017 we will take a few minutes to discuss how we will move
efficiently through the hearing.

- Prior to going on the record each day, we will distribute and label exhibits to be introduced that
day.

1. Each party sponsoring exhibits that day should provide the ALJs with a list of each of its
exhibits that includes a name and description of the exhibit as well as an exhibit number
written in pencil. See above for properly labeling exhibits.

2. Each party sponsoring an exhibit should, in the hearing room, provide one copy to each
ALJ and one to the court reporter, and have copies available for distribution to parties
present in the hearing room and all witnesses you are questioning about the exhibit. Also
provide an additional copy of each exhibit to the ALJ for the Commissions formal file.

- We ask that parties be present at 9:45 am for each day of hearings so that, prior to going on
the record, we can distribute and label exhibits to be introduced that day.

During the hearings:


A.12-04-019 GW2/RWH/DH7/ek4

- Once we go on the record, we will be able to quickly mark the exhibits. By distributing and
marking exhibits prior to going on the record at the beginning of each day, we hope to limit
disruptions during the course of the day. At the end of each day, we will formally receive the
exhibits used that day into the record.

- During the hearings, the Applicant will maintain a list of exhibits including the exhibit numbers
and brief names of exhibits. At the end of each hearing day, the Applicant responsible for
the exhibit list should provide the ALJs with a physical copy of the most current exhibit
list and then email a copy to the service list.

- Generally, corrections to an exhibit should be made in advance and not orally from the witness
stand. Corrections should be made in a timely manner by providing new exhibit pages on which
corrections appear. The original text to be deleted should be lined out with the substitute or
added text shown above or inserted. Each correction page should be marked with the word
revised and the revision date.
- Exhibit corrections will receive the same number as the original exhibit plus a letter to identify the
correction. For example, Exhibit TRN 5-A is the first correction to Exhibit TRN 5.
- Individual chapters of large, bound volumes of testimony may be marked with separate exhibit
numbers, as convenient.
- Partial documents or excerpts from documents must include a title page or first page from the
source document; excerpts from lengthy documents should include a table of contents page
covering the excerpted material. It may be helpful to include language before and after the
excerpt to provide clarity or context.
- Motions to strike prepared testimony must be made at least two working days before the witness
appears, to allow the ALJ time for review of the arguments and relevant testimony.
- No food is allowed in the hearing room; drinks are allowed if you dispose of containers and
napkins every morning and afternoon. Leave-no-trace: take out what you bring in. (ALJ Longs
Rules for Effective Hearings, vol.1).

Applicant should email me by 3:00 pm Tuesday (October 24, 2017) with the names and contact
information for the representatives responsible for each of the two tasks I have assigned to them.
Likewise, if parties have any questions on these instructions, please contact me by 3:00 pm
Monday, October 23, 2017. I expect to be unavailable Tuesday, October 24, 2017.

(END OF ATTACHMENT A)
0 0 0 0 0 0 0 0 Yes/NoAvailability Yes/NoAvailability Yes/NoAvailability

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

(END OF ATTACHMENT B)
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16 ATTACHMENT C

Application A.12-04-019 Judge Gary Weatherford

EXHIBIT INDEX

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED
CA-1 Israel Direct Testimony (04-23-2012) 04-02-13 05-02-13
CA-2 Linam Direct Testimony (04-23-2012) 04-02-13 05-02-13
CA-3 Sabolsice Direct Testimony (04-23-2012) 04-02-13 05-02-13
CA-4 Schubert Direct Testimony (04-23-2012) 04-02-13 05-02-13
CA-5 Stephenson Direct Testimony (04-23-2012); ERRATA (06- 04-02-13 05-02-13
04-2012)
CA-6 Svindland Direct Testimony (04-23-2012) 04-02-13 05-02-13
CA-7 Thomas Direct Testimony (04-23-2012) 04-02-13 05-02-13
CA-8 Linam Supplemental Testimony (01-11-2013) 04-02-13 05-02-13
CA-9 Linam Supplemental Testimony of ERRATA (02-15- 04-02-13 05-02-13
2013)
CA-10 Pilz Direct Testimony (01-11-2013) 04-02-13 05-02-13
CA-11 Stephenson Supplemental Testimony (01-11-2013) 04-02-13 05-02-13
CA-12 Svindland Supplemental Testimony (01-11-2013) 04-02-13 05-02-13
CA-13 Barrett Rebuttal Testimony (03-08-2013) 04-02-13 05-02-13
CA-14 Chambers Rebuttal Testimony (03-08-2013) 04-02-13 05-02-13
CA-15 Leffler Rebuttal Testimony (03-08-2013) 04-02-13 05-02-13
CA-16 Linam Rebuttal Testimony (03-08-2013) 04-02-13 05-02-13
CA-17 Reno Rebuttal Testimony (03-08-2013) 04-02-13 05-02-13
CA-18 Rogers Rebuttal Testimony (03-08-2013) 04-02-13 05-02-13
CA-19 Sabolsice Rebuttal Testimony (03-08-2013) 04-02-13 05-02-13
CA-20 Stephenson Rebuttal Testimony (03-08-2013) 04-02-13 05-02-13
CA-21 Svindland Rebuttal Testimony (03-08-2013) 04-02-13 05-02-13
CA-22 Linam Rebuttal Testimony ERRATA (04-02-2013, 04-02-13 05-02-13
partial)
CA-23 Reno Rebuttal Testimony ERRATA (04-01-2013) 04-02-13 05-02-13
CA-24 Rogers Rebuttal Testimony ERRATA (04-01-2013) 04-02-13 05-02-13
CA-25 Stephenson Direct Testimony FURTHER ERRATA (04-02- 04-02-13 05-02-13
2013)
CA-26 Stephenson Rebuttal Testimony ERRATA full (04-01-2013) 04-02-13 05-02-13
CA-27 Svindland Rebuttal Testimony ERRATA partial (04-01- 04-02-13 05-02-13
2013)
CA-28 Form 10-K-Southern California Edison Company, 04-11-13 05-02-13
Fiscal Year Ended December 31, 2998, Excerpt
CA-29 MPWMD Board Meeting 01-13-2013 04-11-13 05-02-13
CA-30 Tables 1, 2, 3, 4 (re of Max Demand Year at 12-02-13 12-02-13
Start of Desal Operation with SB) (Svindland)
CA-31 Customer Cost Estimates (Stephenson) 12-02-13 12-02-13
CA-32 CAW Late Filed Exhibit - Non-Revenue Water Factored 04-14-16 04-15-16
into the Desalination Plant Size
CA-33 CAW Late Filed Exhibit - Response to Questions on 04-14-16 04-15-16
Ratemaking
CA-34 CAW Late Filed Exhibit-Appendix B Accounting Rules 4-14-16 04-15-16

1
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED
for Government Contamination Loan Funds
CA-35 Linam Supplemental Testimony (12-15-2015) 4-11-16 4-11-16
CA-36 Linam Supplemental Testimony (01-22-2016) 4-11-16 4-11-16
CA-37 Linam Rebuttal Testimony (03-22-2016) 4-11-16 4-11-16
CA-38 MacLean Testimony (01-22-2016) 4-11-16 4-11-16
CA-39 Leffler Rebuttal Testimony (03-22-2016) 4-11-16 4-12-16
CA-40 Svindland Supplemental Testimony (12-15-2015) 4-12-16 4-13-16
CA-41 Svindland Supplemental Testimony (01-22-2015; 02-12- 4-12-16 4-13-16
2016 update; 04-14-16 errata)
CA-42 Svindland Rebuttal Testimony (03-22-2016) 4-12-16 4-13-16
CA-43 CAW/Sciuto GWR EIR Excerpt 4-11-16 4-11-16
CA-44 CAW/Sciuto July 2013 Large Settlement 4-11-16 4-11-16
CA-45 CAW/Moore Photo of Presentation to City of Marina Council 4-14-16 4-14-16
CA-46 CAW Photo of whiteboard drawing used by Panel on 4-18-16 4-21-16
April 13, 2016
CA-47 Rose Excerpt of Agreement of Several Parties dated 5-26-16 5-26-16
July 31, 2013
CA-48 Rose Excerpt of Volume 1 Final EIR for Pure Water 5-26-16 5-26-16
Monterey Groundwater Replenishment Project
January 2016 (cover and page 2-81)

2
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED

DRA-1a Rose, Shia, DRA Report on California-American Water 4-2-13 5-2-13


Anatrya, Atwal, Companys Application for Monterey Peninsula
Menda Water Supply Project (Public Version) (Errata
Version) dated March 26, 2013
DRA- Rose, Shia, DRA Report on California-American Water 4-2-13 5-2-13
1b* Anatrya, Atwal, Companys Application for Monterey Peninsula
Menda Water Supply Project (Confidential Version)
(Errata Version) dated March 26, 2013
DRA-3 Rose 26 CFR 1.118-2 4-3-13 5-2-13
DRA-4 Rose CAW Email Attaching Updated Model 4-5-13 5-2-13
DRA-5 Rose Sheet Piling Description and Cost Estimate for 4-5-13 5-2-13
9.6 Plant
DRA-6 Rose Sheet Piling Description and Cost Estimate for 4-5-13 5-2-13
for 6.4 Plant
DRA-7 Rose North Marina Facilities Summary CWP FEIR 4-5-13 5-2-13
DRA-8 Rose CAW CWP 2009 Cost Estimate for N. Marina 4-5-13 5-2-13
Alternative
DRA-9 Rose HDPE Pipe Size Table 4-5-13 5-2-13
DRA-10 Rose Feedwater Pipeline Description and Cost Est. for 4-5-13 5-2-13
9.6 MGD Plant
DRA-11 Rose Feedwater Pipeline Description and Cost Est. for 4-5-13 5-2-13
6.5 MGD Plant
DRA-12 Rose Feedwater Pipeline Description and Cost Est. for 4-5-13 5-2-13
9.0 MGD Plant
DRA-13 Rose Cost Mark-up for 9.6 MGD Plant 4-5-13 5-2-13
DRA-14 Rose CAW-Only Facilities Cost Estimate 4-5-13 5-2-13
DRA-15 Rose, Shia, DRA Report on California-American Water 4-5-13 5-2-13
Anatrya, Atwal, Companys Application for Monterey Peninsula
Menda Water Supply Project (Public Version) (Further
Errata Version) dated March 26, 2013
DRA-16 Rose Supplemental Testimony 4-14-16 4-14-16
DRA-17 Rose Rebuttal Testimony 4-14-16 4-14-16
DRA-18 Rose Supplemental Testimony 5-26-16 5-26-16
DRA-19 Rose Rebuttal Testimony 5-26-16 5-26-16

3
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED
FB-1 Groot Direct Testimony 4-12-16 4-12-16

4
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED
JE-1 CAW/ORA/ Joint Exhibit Updated Cost Model 4-13-16 4-14-16
MRWPCA/
MPWMD
JE-2 CAB Joint Supplemental Testimony 5-26-16 5-26-16
MPWMD
MRWPCA
JE-3 CAW Joint Rebuttal Testimony 5-26-16 5-26-16
JE-4 CAW Schematic: Baseline 5-26-16 5-26-16
JE-5 CAW Schematic: Injection w/o MP&PS 5-26-16 5-26-16
JE-6 CAW Schematic: Extraction w/o MP&PS 5-26-16 5-26-16
JE-7 CAW Schematic: Injection with MP&PS 5-26-16 5-26-16
JE-8 CAW Schematic: Extraction with MP&PS 5-26-16 5-26-16
JE-9 CAW Excerpt of Proposed Order Amending and 5-26-16 Not received
Restating Order WR 2009-0060
JE-10 CAW Updated Insurance Attachment to WPA 5-26-16 5-26-16

5
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED

MCD-1A Lowrey Direct Testimony 4-2-13 5-2-13


MCD-1 Lowrey Summary of Education and Professional
Experience
MCD-2 Lowrey Monterey County Bd of Supervisors Res. 60-7 4-2-13 5-2-13
MCD-3 Lowrey Marina Coast Water District Res. 94-5 4-2-13 5-2-13
MCD-4 Lowrey Outfall Agreement 4-2-13 5-2-13
MCD-5 Lowrey Memo of Agreement re Annexation of Fort Ord 4-2-13 5-2-13
MCD-6 Lowrey Annexation Agreement and Groundwater 4-2-13 5-2-13
Mitigation Framework
MCD-7 Lowrey Water/Wastewater Facilities Agreement 4-2-13 5-2-13
MCD-8 Lowrey Potable Water Svc for Presidio of Monterey 4-2-13 5-2-13
(Contract DABT 67-98-C-1001)
MCD-9 Lowrey Assignment of Easement on Former Ford Ord 4-2-13 5-2-13
and Ord Military Community, County of
Monterey, and Quitclaim Deed for Water and
Wastewater Systems
MCD-10 Lowrey MOU Regional Urban Water Augmentation Project 4-2-13 5-2-13
MCD-11 Lowrey Annexation Agreement btw MCWD and 4-2-13 5-2-13
MRWPCA
MCD-12 Lowrey Amendment Affecting MCWD and J.G. 4-2-13 5-2-13
Armstrong Family Members to Annexation
Agreement and Groundwater Mitigation
Framework for Marina Area Lands
MCD-13 Lowrey Memorandum of Amendment 4-2-13 5-2-13
MCD-14 Lowrey Grant of Easement 4-2-13 5-2-13
MCD-15 Lowrey Grant Deed 4-2-13 5-2-13
MCD-16 Moore Direct Testimony 4-14-16 4-14-16
MCD-17 Moore July 31, 2013 SWRCB Final Review (w/o 4-14-16 4-14-16
appendices)
MCD-18 Hopkins Direct Testimony 4-14-16 4-14-16
MCD-19 Hopkins Resume 4-14-16 4-14-16
MCD-20 Hopkins Memo of Hopkins Groundwater Consultants to 4-14-16 4-14-16
MCWD, Jan. 22, 2016
MCD-21 Moore Rebuttal Testimony 4-14-16 4-14-16
MCD-22 Moore Responses of CAW to MCWD Data Requests 3- 4-14-16 4-14-16
29 and 3-30
MCD-23 Moore Responses of CAW to MCWD Data Requests 3- 4-14-16 4-14-16
25 and 3-26
MCD-24 Moore Responses of CAW to MCWD Data Request 3- 4-14-16 4-14-16
27
MCD-25 Moore Responses of CAW to MCWD Data Requests 3- 4-14-16 4-14-16
21 and 3-22
MCD-26 Moore Three news articles re erosion at CEMEX site 4-14-16 4-14-16
MCD-27 Hopkins Rebuttal Testimony (revised 4-14-16) 4-14-16 4-14-16
MCD-28 Hopkins Responses of CAW to MCWD Data Requests 3- 4-14-16 4-15-16

6
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED
19 and 3-20
MCD-29 Hopkins Response of CAW to MCWD Data Request 3-1 4-14-16 4-15-16
MCD-30 Hopkins Response of CAW to MCWD Data Request 3-12 4-14-16 4-15-16
MCD-31 Leffler Excerpt from Geoscience Tech Memo, dated 4-12-16 4-12-16
4/20/15
MCD-32 Leffler Email M. Feeney Email April 7, 2014 4-12-16 4-12-16
MCD-33 Leffler Email M. Feeney Email April 17, 2014 4-12-16 4-12-16
MCD-34 Burnett Email J. Cullen to Ms. Borak July 30, 2015 4-15-16 4-15-16
MCD-35 Panel Data Response MCWD-CAW-004-Q009 date 5-26-16 5-26-16
received 4/19/16

7
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED

PCA-1 Sciuto Opening Testimony (w/ attachments A-K) 4-11-16 4-11-16


PCA-2 Imamura Opening Testimony (w/ attachments A-E) 4-14-16 4-14-16
PCA-3 Holden Opening Testimony 4-14-16 4-14-16
PCA-4 Nellor Opening Testimony (w/ attachments A-C) 4-14-16 4-14-16
PCA-5 Sciuto Rebuttal Testimony (including Attachments A- 4-11-16 4-11-16
B)
PCA-6 Nellor Rebuttal Testimony (w/ attachment A) 4-14-16 4-14-16

8
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED

PCL-1 Minton Intervenor Testimony of Jonas Minton, dated 4-2-13 5-2-13


February 22, 2013
PCL-2 State of California Desalination Task Force 4-2-13 5-2-13
Findings Recommendations and
Recommendations, October 2003 (attached to
Intervenor Testimony of Jonas Minton as Exhibit
1)
PCL-3 Intervenor Testimony of Fred Keeley, dated 4-2-13 5-2-13
February 22, 2013
PCL-4 Assembly Bill No. 1182, an act relating to the 4-2-13 5-2-13
Public Utilities Commission, filed September 24,
1998 (attached to Intervenor Testimony of Fred
Keeley as Exhibit 1)
PCL-5 Minton Testimony of Jonas Minton dated January 22, 4-14-16 4-14-16
2016`
PCL-6 Rose May 6, 2016 Memorandum from Rami Kahlon 5-26-16 5-26-16
and Jonathan Koltz to the Commission re: CPUC
Comments in support of Cal-Am amended
application to modify CDO
PCL-7 Rose May 20, 2016 Letter to Matthew Quint at 5-26-16 5-26-16
SWRCB from Timothy Sullivan, Executive
Director, CPUC
PCL-8 Rose April 28, 2016 Letter to Tom Howard, Executive 5-26-16 5-26-16
Director SWRCB from Robert Dolan with
Amended Application for Order Modifying CDO

9
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED

PG-9 Frutchey Direct Testimony of Thomas Frutchey, dated 4-2-13 5-2-13


February 22, 2013 (w/ attachment, Exhibit PG-1)
PG-10 Hardgrave Direct Testimony of Sarah Hardgrave, dated 4-2-13 5-2-13
February 22, 2013 (w/ attachments, Exhibits PG-
2, PG-3, PG-4)
PG-11 Brezack Direct Testimony of James Brezack, dated 4-2-13 5-2-13
February 22, 2013 (w/ attachments, Exhibits PG-
5, PG-6, PG-7)
PG-12 Gho Direct Testimony of Daniel Gho, dated February 4-2-13 5-2-13
22, 2013 (w/ attachments, Exhibit PG-81)

10
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED

RWA-1 Burnett Direct Testimony of Jason Burnett, dated 4-4-13


February 22, 2013
RWA-2 Helm Direct Testimony of Kris Helm, dated February 4-4-13
22, 2013
RWA-3 Wesner Direct Testimony of Alex Wesner, dated 4-4-13
February 22, 2013
RWA-4 Burnett Draft Agreement to Form the MPWSP 4-4-13
Governance Committee
RWA-5 Burnett MPRWA Position Statement, Adopted January 4-4-13
31, 2013
RWA-6 Burnett Order of the Monterey County Board of 4-4-13
Supervisors, Adopted February 21, 2013
RWA-7 Burnett Letter from Congressman Sam Farr, February 22, 4-4-13
2013, in support of MPRWA's Position
Statement
RWA-8 Burnett Letter from Fred Keeley, February 20, 2013, in 4-4-13
support of MPRWA's Position Statement
RWA-9 Burnett Letter from Julia Packard, February 19, 2013, in 4-4-13
support of MPRWA's Position Statement
RWA-10 Wesner Evaluation of Seawater Desalination Projects, 4-4-13
Final Report, Updated January 2013
RWA-11 Helm Memorandum titled "Permitting Concerns, Open 4-4-13
Intake," from Kris Helm to MPRWA, January
29, 2013
RWA-12 N/A: Cross- Moody's Global: Regulated Electric & Gas 4-4-13
examination Utilities, August 2009
exhibit
RWA-13 N/A: Cross- Decision 97-09-057 Financing Order In the 4-4-13
examination Matter of the Application of San Diego Gas and
exhibit Electric Company
RWA-14 N/A: Cross- Decision 98-10-021, October 8th, 1998, In the 4-4-13
examination Matter of the Application of Sierra Pacific Power
exhibit Company
RWA-15 N/A: Cross- Standard & Poor's 2008 Corporate Criteria: 4-4-13
examination Ratios and Adjustments, April 15, 2008
exhibit
RWA-16 N/A: Cross- Rating North American Utilities, Power, Gas, 4-4-13
examination and Water Companies, dated May 16, 2011
exhibit
RWA-17 Burnett Supplemental Testimony of Jason Burnett, dated 4-15-16 4-15-16

11
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED
January 22, 2016
RWA-18 Burnett Attachment 1 to Supplemental Testimony of 4-15-16 4-15-16
Jason Burnett, 1/22/2016: Robert Donlan Letter
to State Water Resources Control Board (Tom
Howard) re Application for CDO, dated
November 20, 2015
RWA-19 Burnett Attachment 2 to Supplemental Testimony of 4-15-16 4-15-16
Jason Burnett, 1/22/2016: Editorial: Jan. 22,
2016: Cooperation key on water agreements
RWA-20 Burnett Attachment 3 to Supplemental Testimony of 4-15-16 4-15-16
Jason Burnett, 1/22/2016: State Water Board
(Felicia Marcus) Letter to CPUC (Catherine
Sandoval) re Support for Pure Water Monterey,
dated January 22, 2016
RWA-21 Preston Direct Testimony of Al Preston, Ph.D., 4-15-16 4-15-16
P.E., dated January 22, 2916
RWA-22 Preston Exhibit A to Direct Testimony of Al Preston, 4-15-16 4-15-16
1/22/2016: [Draft] Brine Settlement Term
Sheet, dated January 21, 2016
RWA-23 Thrupp Rebuttal Testimony of Gordon Thrupp, PhD, 4-15-16 4-15-16
PG, CHG, dated March 22, 2016
RWA-24 Thrupp Attachment 1 to Rebuttal Testimony of Gordon 4-15-16 4-15-16
Thrupp, dated March 22, 2016: Resume of
Gordon Thrupp, PhD, PG, CHG
RWA-25 Thrupp Attachment 2 to Rebuttal Testimony of Gordon 4-15-16 4-15-16
Thrupp, dated March 22, 2016: Memorandum
of Gordon Thrupp, Geosyntec Consultants,
dated March 22, 2016
RWA-26 RWA/Hopkins Map of Particle Tracking form EIR 4-14-16 4-14-16

12
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED

SF-1 Testimony of Joe Greever, dated February 22nd, 4-2-13 5-2-13


2013
SF-2 Letter from Victoria Whitney, Deputy Director, 4-2-13 5-2-13
Division of Water Quality, State Water
Resources Control Board, dated November 13,
2012
SF-3 Testimony of Craig Jones, dated February 22, 4-2-13 5-2-13
2013
SF-4 Management of Brine Discharges to Coastal 4-2-13 5-2-13
Waters Recommendations of a Science Advisory
Panel
SF-5 Testimony of Bradley Damitz, dated February 4-2-13 5-2-13
22, 2013
SF-6 Guidelines for Desalination Plants of the 4-2-13 5-2-13
Monterey Bay National Marine Sanctuary
SF-7 [not admitted]
SF-8 SF/Svindland Responses to Surfrider Foundation's Data 4-10-13 5-2-13
Requests
SF-9 [not admitted]
SF-10 SF/Svindland CAW Compliance Filing, Nov. 19, 2013 4-12-16 4-13-16
SF-11 SF/Svindland CAWs Objections and Responses to Surfrider 4-12-16 4-13-16
Foundation's Data Request 5

13
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED

SV-1 Resume of Timothy Durbin


SV-la Testimony of Timothy Durbin, February 22,
2013
SV-2 Technical Memorandum by Timothy Durbin,
December 3, 2012
SV-3 Technical Memorandum No. 2 by Timothy
Durbin, February 21, 2013
SV-4 Technical Memorandum by Geoscience,
February 6, 2013
SV-5 Groundwater modeling report by Durbin, T. J.,
Kapple, G. W., and Freckleton, J. R., 1978, Two-
dimensional and three-dimensional digital
models for the Salinas Valley groundwater basin,
California: U. S. Geological Survey Water
Resources Investigations 78-113
SV-6 Groundwater modeling report by Geosciences
Support Systems, Inc., 2008, North Marina
groundwater model evaluation of potential
project, 2008: Report prepared for California
American Water
SV-7 Hydrogeological report by Greene, H. G., 1970,
Geology of southern Monterey Bay and its
relationship to the ground water basin and salt
water intrusion: U. S. Geological Survey Open-
File Report 70-141
SV-8 Hydrogeological report by Monterey County
Water Resources Agency, 2001, Final report on
hydrogeologic investigation of the Salinas Valley
basin in the vicinity of Fort Ord and Marina,
Salinas Valley, California: Report prepared by
Harding Lawson
SV-9 Hydrogeological report by Monterey County
Water Resources Agency, 2004,
Hydrostratigraphic analysis of the northern
Salinas Valley: Report prepared by
Kennedy/Jenks Consultants
SV-10 Feasiblity Study Saline Ground Water Intake
System Monterey Sand Company Site, Marina,
California, For Monterey Peninsula Water
Management District, February, 1992; by Staal
Gardner & Dunne Inc.
SV-11 Isakson Direct testimony of Nancy lsakson, January 22, 4-15-16 4-15-16`
2016

14
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED

WD-5 Stoldt Direct Testimony of David J. Stoldt, dated 4-2-13 5-2-13


February 22, 2013 (Attachments, Exhibits WD-1,
WD-2)
WD-6 Hampson Direct Testimony of Larry M. Hampson, dated 4-2-13 5-2-13
February 22, 2013
WD-7 Oliver Direct Testimony of Joseph Oliver, dated 4-2-13 5-2-13
February 22, 2013
WD-8 Larkins Direct Testimony of Robert Larkins, dated 4-2-13 5-2-13
February 22,2013 (Attachments, Exhibits WD-3.
WD-4)
WD-9 Stoldt Direct Testimony, dated January 22, 2016 4-13-16 4-14-16
WD-10 Bruce Direct Testimony, dated January 22, 2016 4-15-16 4-15-16
WD-11 Stoldt Rebuttal Testimony, dated March 22, 2016 4-13-16 4-14-16
WD-12 Stoldt Pure Water Monterey Project Costs Revised 4-13-16 4-14-16
3-22-16 prepared by MPWMD
WD-13 None None None None
WD-14 Stoldt Economic Evaluation of GWR Project 4-13-16 4-14-16
Externalities prepared by HDR

15
A.12-04-019 GW2/RWH/DH7/ek4
draft 7/21/16

EXH.NO WITNESS OR DESCRIPTION DATE DATE


SPONSOR IDENTIFIED RECEIVED

WP-1 Prepared Testimony by Ron Weitzman on Behalf 4-10-13


of Water Plus, dated February 22, 2013
WP-2 Revised Testimony of Ron Weitzman on Behalf 4-10-13
of Water Plus, dated March 21, 2013
WP-3 Wellington Letter to Israel on Water Supply 5-2-13
Expenditures, January 22, 2008
WP-4 Ag Land Trust Draft Lease Agreement, dated 4-10-13
June 2, 2010
WP-5 Pollution Control Agency Reclamation 4-10-13 5-2-13
Expenditures Report, dated March 31, 2011
WP-6 MCWD Table of Revenue and Expenses, dated 4-10-13 5-2-13
June 30, 2012
WP-7 Steven Collins' Letter on Reclamation Ditch 4-10-13 5-2-13
Analysis, dated February 19, 2013
WP-8 Weitzman Supplementary Testimony of Ron 4-12-16 4-12-16
Weitzman, January 22, 2016
WP-9 Weitzman Rebuttal Testimony 5-26-16 5-26-16

LMC-1 Thrupp Excerpts of MPWSP DEIR April 2015 4-15-16 Not received

(END OF ATTACHMENT C)