CalendarioMuni 2009_Carmen pa valorizado

10

7
Costo

Meses
Municipalidad Distrital de Checca - Canas - Cusco
Sub Gerencia de Infraestrucctura Publica

GRADO DE CUMPLIMIENTO DE LA METAS ALCANZADOS

OBRA : "Construccion de Sistema de Riego Por Aspersion Ccocayro - Distrito de Checca"

MODALIDAD: Administracion Directa


RESIDENTE: Ing: HUGO FLORES APAZA
SUPERVISOR: Ing. Otorino U. Cachi Quispe
UBICACIN: Secctor Ccocayro

Avance Acumulado
ITEM DESCRIPCION UND METRADO
Metrado %
COMP. CONST. SIST. DE RIEO POR ASPERSION CCOCAYRO MARGEN IZQUIERDO
01 OBRAS PROVISIONALES
01.01 CARTEL DE OBRA und 1.00 0.00 0.00%
01.02 ALMACEN DE OBRA m2 40.00 40.00 100.00%
02 CAPTACION DE MANANTE TIPO I (02 UND)
02.01 TRAZO Y REPLANTEO PRELIMINAR m2 32.00 16.00 50.00%
02.02 EXCAVACION MASIVA MANUAL BAJO AGUA m3 19.58 9.05 46.22%
02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 24.47 10.50 42.91%
02.04 ENCOFRADO Y DESENCOFRADO m2 59.66 0.00 0.00%
02.05 ACERO FY= 4200 KG/CM2. kg 160.27 0.00 0.00%
02.06 FILTRO DE GRAVA m3 7.02 0.00 0.00%
02.07 CONCRETO F'C= 175 KG/CM2. m3 7.69 0.00 0.00%
02.08 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 17.36 0.00 0.00%
02.09 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 25.56 0.00 0.00%
02.10 PINTURA ESMALTE EN MUROS EXTERIORES m2 25.56 0.00 0.00%
02.11 TAPA SANITARIA METALICA 0.60 X 0.60M. X 1/8" und 4.00 0.00 0.00%
02.12 SUMINISTRO Y COLOCACION TUB. VENT. FG DE 2" und 2.00 0.00 0.00%
02.13 SUMINISTRO Y COLOC. VALV. CONTROL D= 2" GLB 2.00 0.00 0.00%
02.14 ACCESORIOS CAPTACION D=2", COSTO GLOBAL GLB 2.00 0.00 0.00%
02.15 COLOCACION DE ACCESORIOS PROMEDIO und 32.00 0.00 0.00%
02.16 PRUEBA HIDRAULICA Y DESINFECCION EN CAPTACION GLB 2.00 0.00 0.00%
02.17 EXCAVACION DE ZANJAS CUNETAS DE CORONACION m 30.00 0.00 0.00%
02.18 CERCO CON ALAMBRE DE PUAS m 40.00 0.00 0.00%
03 CAMARA DISTRIBUIDORA DE CAUDALES - CAMARA DE CARGA
03.01 TRAZO Y REPLANTEO PRELIMINAR m2 5.38 0.00 0.00%
03.02 EXCAVACION MASIVA MANUAL TIERRA COMPACTA m3 10.41 0.00 0.00%
03.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 13.01 0.00 0.00%
03.04 SOLADO PARA CIMENTACIONES H= 0.10M. m2 5.38 0.00 0.00%
03.05 ENCOFRADO Y DESENCOFRADO m2 28.36 0.00 0.00%
03.06 ACERO FY= 4200 KG/CM2. kg 145.91 0.00 0.00%
03.07 CONCRETO F'C= 175 KG/CM2. m3 2.84 0.00 0.00%
03.08 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 13.65 0.00 0.00%
03.09 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 16.36 0.00 0.00%
03.10 PINTURA ESMALTE EN MUROS EXTERIORES m2 16.36 0.00 0.00%
03.11 SUMINISTRO Y COLOCACION TUB. VENT. FG DE 2" und 1.00 0.00 0.00%
03.12 TAPA SANITARIA METALICA 0.80 X 0.80M. X 1/8" und 1.00 0.00 0.00%
03.13 TAPA SANITARIA METALICA 0.60 X 0.60M. X 1/8" und 1.00 0.00 0.00%
03.14 ACCESORIOS PARTIDOR-CAMARA DE CARGA, COSTO GLOBAL GLB 1.00 0.00 0.00%
03.15 COLOCACION DE ACCESORIOS, PROMEDIO und 23.00 0.00 0.00%
03.16 PRUEBA HIDRAULICA Y DESINFECCION EN CAPTACION GLB 1.00 0.00 0.00%
Municipalidad Distrital de Checca - Canas - Cusco
Sub Gerencia de Infraestrucctura Publica

GRADO DE CUMPLIMIENTO DE LA METAS ALCANZADOS

OBRA : "Construccion de Sistema de Riego Por Aspersion Ccocayro - Distrito de Checca"

MODALIDAD: Administracion Directa


RESIDENTE: Ing: HUGO FLORES APAZA
SUPERVISOR: Ing. Otorino U. Cachi Quispe
UBICACIN: Secctor Ccocayro

Avance Acumulado
ITEM DESCRIPCION UND METRADO
Metrado %
04 VALVULA DE LIMPIA CAMARA DISTRIBUIDORA DE CAUDALES
04.01 CAJA DE VALVULA und 1.00 0.00 0.00%
04.02 SUMINISTRO Y COLOC. VALV. CONTROL D= 2" GLB 1.00 0.00 0.00%
04.03 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 1.00 0.00 0.00%
05 TRABAJOS DE PROTECCION CAMARA DISTRIBUIDORA DE CAUDALES
05.01 EXCAVACION DE ZANJAS CUNETAS DE CORONACION m 20.00 0.00 0.00%
05.02 EMPEDRADO ASENTADO EN CONCRETO, EMB. MORTERO 1:5 m2 10.00 0.00 0.00%
05.03 CERCO CON ALAMBRE DE PUAS m 20.00 0.00 0.00%
06 LINEA DE CONDUCCION
06.01 TRAZO, NIVELACION Y REPLANTEO m 1,075.00 1,075.00 100.00%
06.02 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA m 1,040.00 1,040.00 100.00%
06.03 EXC. MANUAL ZANJAS ROCA SUELTA BOLONERIA MEDIANA m 35.00 0.00 0.00%
06.04 REFINE, NIVELACION Y FONDOS PARA TUBERIA HASTA 6" m 1,075.00 1,075.00 100.00%
06.05 CAMA DE APOYO PARA TUBERIAS MENORES DE 6" m 1,075.00 1,075.00 100.00%
06.06 RELLENO PRIMERA CAPA H=0.30M. ZARANDEADO m 1,075.00 0.00 0.00%
06.07 RELLENO Y APISONADO DE ZANJAS m 1,075.00 0.00 0.00%
06.08 TUBERIA PVC SAP D= 2", CLASE 7.5 m 1,040.00 0.00 0.00%
06.09 TUBERIA PVC SAP D= 3", CLASE 7.5 m 35.00 0.00 0.00%
06.10 ACCESORIOS CONDUCCION, COSTO GLOBAL GLB 1.00 0.00 0.00%
06.11 COLOCACION DE ACCESORIOS, PROMEDIO und 22.00 0.00 0.00%
06.12 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA m 1,075.00 0.00 0.00%
07 VALVULA DE PURGA (01 UND.)
07.01 CAJA DE VALVULA und 1.00 0.00 0.00%
07.02 SUMINISTRO Y COLOC. VALV. PURGA D= 2" GLB 1.00 0.00 0.00%
07.03 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 1.00 0.00 0.00%
08 VALVULA DE INGRESO CAMARA DE REUNION
08.01 CAJA DE VALVULA und 1.00 0.00 0.00%
08.02 SUMINISTRO Y COLOC. VALV. CONTROL D= 2" GLB 1.00 0.00 0.00%
08.03 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 1.00 0.00 0.00%
09 CAMARA DE REUNION (01 UND.)
09.01 TRAZO Y REPLANTEO PRELIMINAR m2 4.08 0.00 0.00%
09.02 EXCAVACION MASIVA MANUAL TIERRA COMPACTA m3 6.12 0.00 0.00%
09.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 7.65 0.00 0.00%
09.04 SOLADO PARA CIMENTACIONES H= 0.10M. m2 4.08 0.00 0.00%
09.05 ENCOFRADO Y DESENCOFRADO m2 22.62 0.00 0.00%
09.06 ACERO FY= 4200 KG/CM2. kg 119.76 0.00 0.00%
09.07 CONCRETO F'C= 175 KG/CM2. m3 2.41 0.00 0.00%
09.08 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 12.26 0.00 0.00%
09.09 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 13.66 0.00 0.00%
09.10 PINTURA ESMALTE EN MUROS EXTERIORES m2 13.66 0.00 0.00%
09.11 TAPA SANITARIA METALICA 0.80 X 0.80M. X 1/8" und 1.00 0.00 0.00%
09.12 SUMINISTRO Y COLOCACION TUB. VENT. FG DE 2" und 1.00 0.00 0.00%
09.13 ACCESORIOS CAMARA REUNION D=3", COSTO GLOBAL GLB 1.00 0.00 0.00%
09.14 COLOCACION DE ACCESORIOS, PROMEDIO und 17.00 0.00 0.00%
09.15 PRUEBA HIDRAULICA Y DESINFECCION EN CAPTACION GLB 1.00 0.00 0.00%
10 VALVULA DE LIMPIA CAMARA DE REUNION
10.01 CAJA DE VALVULA und 1.00 0.00 0.00%
10.02 SUMINISTRO Y COLOC. VALV. CONTROL D= 2" GLB 1.00 0.00 0.00%
10.03 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 1.00 0.00 0.00%
11 CAMARA DE VALVULA INGRESO RESERVORIO
Municipalidad Distrital de Checca - Canas - Cusco
Sub Gerencia de Infraestrucctura Publica

GRADO DE CUMPLIMIENTO DE LA METAS ALCANZADOS

OBRA : "Construccion de Sistema de Riego Por Aspersion Ccocayro - Distrito de Checca"

MODALIDAD: Administracion Directa


RESIDENTE: Ing: HUGO FLORES APAZA
SUPERVISOR: Ing. Otorino U. Cachi Quispe
UBICACIN: Secctor Ccocayro

Avance Acumulado
ITEM DESCRIPCION UND METRADO
Metrado %
11.01 TRAZO Y REPLANTEO PRELIMINAR m2 1.96 0.00 0.00%
11.02 EXCAVACION MASIVA MANUAL TIERRA COMPACTA m3 2.94 0.00 0.00%
11.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 3.68 0.00 0.00%
11.04 SOLADO PARA CIMENTACIONES H= 0.10M. m2 1.96 0.00 0.00%
11.05 ENCOFRADO Y DESENCOFRADO m2 9.84 0.00 0.00%
11.06 ACERO FY= 4200 KG/CM2. kg 70.00 0.00 0.00%
11.07 CONCRETO F'C= 175 KG/CM2. m3 1.26 0.00 0.00%
11.08 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 7.44 0.00 0.00%
11.09 PINTURA ESMALTE EN MUROS EXTERIORES m2 3.84 0.00 0.00%
11.10 TAPA SANITARIA METALICA 0.60 X 0.60M. X 1/8" und 1.00 0.00 0.00%
11.11 SUMINISTRO Y COLOC. VALV. INGRESO RESERVORIO D= 3" GLB 1.00 0.00 0.00%
12 RESERVORIO NOCTURNO DE GEOMEMBRANA HDPE E=1MM V= 80 M3.
12.01 TRAZO Y REPLANTEO PRELIMINAR m2 120.96 0.00 0.00%
12.02 EXCAVACION MASIVA MANUAL TIERRA COMPACTA m3 163.73 0.00 0.00%
12.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 204.66 0.00 0.00%
12.04 PERFILADO Y COMPACTADO EN TALUDES E=0.15 M m2 136.56 0.00 0.00%
12.05 GEOMEMBRANA HDPE DE 1.00MM INC/INSTALACION m2 141.04 0.00 0.00%
12.06 ENCOFRADO Y DESENCOFRADO m2 2.04 0.00 0.00%
12.07 ACERO FY= 4200 KG/CM2. kg 20.00 0.00 0.00%
12.08 CONCRETO F'C= 175 KG/CM2. m3 0.81 0.00 0.00%
12.09 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 2.04 0.00 0.00%
12.10 REJILLA METALICA DE 0.60 X 0.60M. und 1.00 0.00 0.00%
12.11 PRUEBA HIDRAULICA Y DESINFECCION, RESERVORIO GLB 1.00 0.00 0.00%
13 CAMARA DE VALVULA SALIDA DE RESERVORIO
13.01 TRAZO Y REPLANTEO PRELIMINAR m2 1.96 0.00 0.00%
13.02 EXCAVACION MASIVA MANUAL TIERRA COMPACTA m3 2.94 0.00 0.00%
13.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 3.68 0.00 0.00%
13.04 SOLADO PARA CIMENTACIONES H= 0.10M. m2 1.96 0.00 0.00%
13.05 ENCOFRADO Y DESENCOFRADO m2 9.84 0.00 0.00%
13.06 ACERO FY= 4200 KG/CM2. kg 70.00 0.00 0.00%
13.07 CONCRETO F'C= 175 KG/CM2. m3 1.26 0.00 0.00%
13.08 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 7.44 0.00 0.00%
13.09 PINTURA ESMALTE EN MUROS EXTERIORES m2 3.84 0.00 0.00%
13.10 TAPA SANITARIA METALICA 0.60 X 0.60M. X 1/8" und 1.00 0.00 0.00%
13.11 ACCESORIOS CAMARA VALVULA SALIDA DE RESERVORIO, COSTO GLOBAL GLB 1.00 0.00 0.00%
13.12 COLOCACION DE ACCESORIOS, PROMEDIO und 19.00 0.00 0.00%
14 TRABAJOS DE PROTECCION EN RESERVORIO
14.01 EXCAVACION DE ZANJAS CUNETAS DE CORONACION m 30.00 0.00 0.00%
14.02 EMPEDRADO ASENTADO EN CONCRETO, EMB. MORTERO 1:5 m2 20.00 0.00 0.00%
14.03 CERCO CON ALAMBRE DE PUAS m 60.00 0.00 0.00%
15 RED DE DISTRIBUCION
15.01 TRAZO, NIVELACION Y REPLANTEO m 2,860.00 2,860.00 100.00%
15.02 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA m 2,820.00 1,280.00 45.39%
15.03 EXC. MANUAL ZANJAS ROCA SUELTA BOLONERIA MEDIANA m 40.00 0.00 0.00%
15.04 REFINE, NIVELACION Y FONDOS PARA TUBERIA HASTA 6" m 2,860.00 55.00 1.92%
15.05 CAMA DE APOYO PARA TUBERIAS MENORES DE 6" m 2,860.00 10.00 0.35%
15.06 RELLENO PRIMERA CAPA H=0.30M. ZARANDEADO m 2,860.00 0.00 0.00%
15.07 RELLENO Y APISONADO DE ZANJAS m 2,860.00 0.00 0.00%
15.08 TUBERIA PVC SAP D= 3", CLASE 7.5 m 2,100.00 0.00 0.00%
15.09 TUBERIA PVC SAP D= 1 1/2", CLASE 7.5 m 360.00 0.00 0.00%
Municipalidad Distrital de Checca - Canas - Cusco
Sub Gerencia de Infraestrucctura Publica

GRADO DE CUMPLIMIENTO DE LA METAS ALCANZADOS

OBRA : "Construccion de Sistema de Riego Por Aspersion Ccocayro - Distrito de Checca"

MODALIDAD: Administracion Directa


RESIDENTE: Ing: HUGO FLORES APAZA
SUPERVISOR: Ing. Otorino U. Cachi Quispe
UBICACIN: Secctor Ccocayro

Avance Acumulado
ITEM DESCRIPCION UND METRADO
Metrado %
15.10 TUBERIA PVC SAP D= 1", CLASE 10 m 400.00 0.00 0.00%
15.11 ACCESORIOS DISTRIBUCION 01, COSTO GLOBAL GLB 1.00 0.00 0.00%
15.12 COLOCACION DE ACCESORIOS PROMEDIO und 57.00 0.00 0.00%
15.13 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA m 2,860.00 0.00 0.00%
16 VALVULA DE INGRESO CAMARA ROMPE PRESION
16.01 CAJA DE VALVULA und 1.00 0.00 0.00%
16.02 SUMINISTRO Y COLOC. VALV. CONTROL D= 3" GLB 1.00 0.00 0.00%
16.03 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 1.00 0.00 0.00%
17 CAMARA ROMPE-PRESION - CAMARA DE CARGA
17.01 TRAZO Y REPLANTEO PRELIMINAR m2 4.78 0.00 0.00%
17.02 EXCAVACION MASIVA MANUAL TIERRA COMPACTA m3 7.47 0.00 0.00%
17.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 9.34 0.00 0.00%
17.04 SOLADO PARA CIMENTACIONES H= 0.10M. m2 4.78 0.00 0.00%
17.05 ENCOFRADO Y DESENCOFRADO m2 25.02 0.00 0.00%
17.06 ACERO FY= 4200 KG/CM2. kg 129.42 0.00 0.00%
17.07 CONCRETO F'C= 175 KG/CM2. m3 2.63 0.00 0.00%
17.08 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 12.26 0.00 0.00%
17.09 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 14.98 0.00 0.00%
17.10 PINTURA ESMALTE EN MUROS EXTERIORES m2 14.98 0.00 0.00%
17.11 TAPA SANITARIA METALICA 0.80 X 0.80M. X 1/8" und 1.00 0.00 0.00%
17.12 TAPA SANITARIA METALICA 0.60 X 0.60M. X 1/8" und 1.00 0.00 0.00%
17.13 SUMINISTRO Y COLOCACION TUB. VENT. FG DE 2" und 1.00 0.00 0.00%
17.14 SUMINISTRO Y COLOC. VALV. CONTROL D= 3" GLB 1.00 0.00 0.00%
17.15 SUMINISTRO Y COLOC. VALV. CONTROL D= 2" GLB 1.00 0.00 0.00%
17.16 ACCESORIOS CAMARA ROMPE PRESION D=3", COSTO GLOBAL GLB 1.00 0.00 0.00%
17.17 COLOCACION DE ACCESORIOS, PROMEDIO und 15.00 0.00 0.00%
17.18 PRUEBA HIDRAULICA Y DESINFECCION EN CAPTACION GLB 1.00 0.00 0.00%
18 PASE AEREO (L= 5.00 M.)
18.01 TRAZO, NIVELACION Y REPLANTEO m 5.00 0.00 0.00%
18.02 EXCAVACION MASIVA EN TERRENO COMPACTO m3 2.10 0.00 0.00%
18.03 ENCOFRADO Y DESENCOFRADO m2 3.83 0.00 0.00%
18.04 CONCRETO F'C= 175 KG/CM2. m3 0.90 0.00 0.00%
18.05 TUBERIA FG DE 3" m 6.00 0.00 0.00%
18.06 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 3.83 0.00 0.00%
18.07 PINTURA ESMALTE EN MUROS EXTERIORES m2 3.83 0.00 0.00%
18.08 ACCESORIOS PASE AEREO DE 3" GLB 1.00 0.00 0.00%
18.09 COLOCACION DE ACCESORIOS pza 6.00 0.00 0.00%
19 VALVULA DE CONTROL (08 UND.)
19.01 CAJA DE VALVULA und 8.00 0.00 0.00%
19.02 SUMINISTRO Y COLOC. VALV. CONTROL D= 1" GLB 8.00 0.00 0.00%
19.03 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 8.00 0.00 0.00%
20 VALVULA DE PURGA (04 UND.)
20.01 CAJA DE VALVULA und 4.00 0.00 0.00%
20.02 SUMINISTRO Y COLOC. VALV. PURGA D= 1 1/2" GLB 1.00 0.00 0.00%
20.03 SUMINISTRO Y COLOC. VALV. PURGA D= 3" GLB 3.00 0.00 0.00%
20.04 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 4.00 0.00 0.00%
21 VALVULA DE AIRE (03 UND.)
21.01 CAJA DE VALVULA und 3.00 0.00 0.00%
21.02 SUMINISTRO Y COLOC. VALV. AIRE D=3/4", COSTO GLOBAL GLB 3.00 0.00 0.00%
21.03 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 3.00 0.00 0.00%
22 HIDRANTES (8 UND)
22.01 TRAZO Y REPLANTEO PRELIMINAR m2 2.88 0.00 0.00%
22.02 EXCAVACION MASIVA EN TERRENO COMPACTO m3 1.30 0.00 0.00%
22.03 ENCOFRADO Y DESENCOFRADO m2 5.12 0.00 0.00%
22.04 CONCRETO F'C= 175 KG/CM2. m3 0.71 0.00 0.00%
22.05 CONCRETO F'C= 100 KG/CM2. m3 0.26 0.00 0.00%
22.06 TAPA METALICA SANITARIA DE 0.40 X 0.40M. X 1/8" und 8.00 0.00 0.00%
22.07 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 3.84 0.00 0.00%
22.08 PINTURA ESMALTE EN MUROS EXTERIORES m2 3.84 0.00 0.00%
Municipalidad Distrital de Checca - Canas - Cusco
Sub Gerencia de Infraestrucctura Publica

GRADO DE CUMPLIMIENTO DE LA METAS ALCANZADOS

OBRA : "Construccion de Sistema de Riego Por Aspersion Ccocayro - Distrito de Checca"

MODALIDAD: Administracion Directa


RESIDENTE: Ing: HUGO FLORES APAZA
SUPERVISOR: Ing. Otorino U. Cachi Quispe
UBICACIN: Secctor Ccocayro

Avance Acumulado
ITEM DESCRIPCION UND METRADO
Metrado %
22.09 ACCESORIOS EN HIDRANTES GLB 8.00 0.00 0.00%
22.10 COLOCACION DE ACCESORIOS und 40.00 0.00 0.00%
23 LINEA DE RIEGO MOVIL (8 UND)
23.01 LINEAS DE RIEGO MOVIL und 8.00 0.00 0.00%
24 FLETES
24.01 FLETE EN ZONA RURAL VJE 4.00 0.00 0.00%
25 CAPACITACION EN RIEGO
25.01 MODULO DE CAPACITACION EN RIEGO MOD 1.00 0.00 0.00%
Municipalidad Distrital de Checca - Canas - Cusco
Sub Gerencia de Infraestrucctura Publica

GRADO DE CUMPLIMIENTO DE LA METAS ALCANZADOS

OBRA : "Construccion de Sistema de Riego Por Aspersion Ccocayro - Distrito de Checca"

MODALIDAD: Administracion Directa


RESIDENTE: Ing: HUGO FLORES APAZA
SUPERVISOR: Ing. Otorino U. Cachi Quispe
UBICACIN: Secctor Ccocayro

Avance Acumulado
ITEM DESCRIPCION UND METRADO
Metrado %
COMP. CONST. SIST. DE RIEGO POR ASPERSION FAMILIAR SECTOR CCOCAYRO (MARGEN DERECHO)
01 CAPTACION DE MANANTE TIPO II (22 UND)
01.01 TRAZO Y REPLANTEO PRELIMINAR m2 352.00 0.00 0.00%
01.02 EXCAVACION MASIVA MANUAL BAJO AGUA m3 138.77 0.00 0.00%
01.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 173.46
01.04 ENCOFRADO Y DESENCOFRADO m2 401.06 0.00 0.00%
01.05 ACERO FY= 4200 KG/CM2. kg 554.40 0.00 0.00%
01.06 FILTRO DE GRAVA m3 16.50 0.00 0.00%
01.07 CONCRETO F'C= 175 KG/CM2. m3 47.34 0.00 0.00%
01.08 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 60.72 0.00 0.00%
01.09 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 120.12 0.00 0.00%
01.10 PINTURA ESMALTE EN MUROS EXTERIORES m2 120.12 0.00 0.00%
01.11 TAPA SANITARIA METALICA 0.60 X 0.60M. X 1/8" und 22.00 0.00 0.00%
01.12 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 22.00 0.00 0.00%
01.13 SUMINISTRO Y COLOC. VALV. CONTROL D= 1" GLB 22.00 0.00 0.00%
01.14 ACCESORIOS CAPTACION D=1", COSTO GLOBAL GLB 22.00 0.00 0.00%
01.15 COLOCACION DE ACCESORIOS PROMEDIO und 352.00 0.00 0.00%
01.16 PRUEBA HIDRAULICA Y DESINFECCION EN CAPTACION GLB 22.00 0.00 0.00%
01.17 EXCAVACION DE ZANJAS CUNETAS DE CORONACION m 264.00 0.00 0.00%
02 LINEA DE CONDUCCION
02.01 TRAZO, NIVELACION Y REPLANTEO m 1,100.00 0.00 0.00%
02.02 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA m 1,100.00 0.00 0.00%
02.03 REFINE, NIVELACION Y FONDOS PARA TUBERIA HASTA 6" m 1,100.00 0.00 0.00%
02.04 CAMA DE APOYO PARA TUBERIAS MENORES DE 6" m 1,100.00
02.05 RELLENO PRIMERA CAPA H=0.30M. ZARANDEADO m 1,100.00 0.00 0.00%
02.06 RELLENO Y APISONADO DE ZANJAS m 1,100.00 0.00 0.00%
02.07 TUBERIA PVC SAP D= 1", CLASE 10 m 1,100.00 0.00 0.00%
02.08 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA m 1,100.00 0.00 0.00%
03 TANQUE NOCTURNO DE ALMACENAMIENTO
03.01 EXCAVACION MASIVA MANUAL TIERRA COMPACTA m3 137.28 0.00 0.00%
03.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 171.60 0.00 0.00%
03.03 SOLADO PARA CIMENTACIONES H= 0.10M. m2 137.28 0.00 0.00%
03.04 TANQUE DE ALMACENAMIENTO DE POLIETILENO DE 2500 Lt und 22.00 0.00 0.00%
03.05 INSTALACION DE TANQUE DE ALMACENAMIENTO DE POLIETILENO DE 2500 Lt und 22.00 0.00 0.00%
03.06 TECHO DE PROTECCION Y SEGURIDAD und 22.00 0.00 0.00%
04 VALVULA SALIDA DE TANQUE 2500 LT (22 UND.)
04.01 CAJA DE VALVULA und 22.00 0.00 0.00%
04.02 SUMINISTRO Y COLOC. VALV. CONTROL D= 1" GLB 22.00 0.00 0.00%
04.03 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 22.00 0.00 0.00%
05 RED DE DISTRIBUCION 0.00
Municipalidad Distrital de Checca - Canas - Cusco
Sub Gerencia de Infraestrucctura Publica

GRADO DE CUMPLIMIENTO DE LA METAS ALCANZADOS

OBRA : "Construccion de Sistema de Riego Por Aspersion Ccocayro - Distrito de Checca"

MODALIDAD: Administracion Directa


RESIDENTE: Ing: HUGO FLORES APAZA
SUPERVISOR: Ing. Otorino U. Cachi Quispe
UBICACIN: Secctor Ccocayro

Avance Acumulado
ITEM DESCRIPCION UND METRADO
Metrado %
05.01 TRAZO, NIVELACION Y REPLANTEO m 1,100.00
05.02 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA m 1,100.00 0.00 0.00%
05.03 REFINE, NIVELACION Y FONDOS PARA TUBERIA HASTA 6" m 1,100.00 0.00 0.00%
05.04 CAMA DE APOYO PARA TUBERIAS MENORES DE 6" m 1,100.00 0.00 0.00%
05.05 RELLENO PRIMERA CAPA H=0.30M. ZARANDEADO m 1,100.00
05.06 RELLENO Y APISONADO DE ZANJAS m 1,100.00 0.00 0.00%
05.07 TUBERIA PVC SAP D= 1", CLASE 10 m 1,100.00 0.00 0.00%
05.08 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA m 1,100.00 0.00 0.00%
06 HIDRANTES (22 UND)
06.01 TRAZO Y REPLANTEO PRELIMINAR m2 7.92 0.00 0.00%
06.02 EXCAVACION MASIVA EN TERRENO COMPACTO m3 3.56 0.00 0.00%
06.03 ENCOFRADO Y DESENCOFRADO m2 14.08 0.00 0.00%
06.04 CONCRETO F'C= 175 KG/CM2. m3 1.96 0.00 0.00%
06.05 CONCRETO F'C= 100 KG/CM2. m3 0.70 0.00 0.00%
06.06 TAPA METALICA SANITARIA DE 0.40 X 0.40M. X 1/8" und 22.00 0.00 0.00%
06.07 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 10.56 0.00 0.00%
06.08 PINTURA ESMALTE EN MUROS EXTERIORES m2 10.56 0.00 0.00%
06.09 ACCESORIOS EN HIDRANTES GLB 22.00 0.00 0.00%
06.10 COLOCACION DE ACCESORIOS und 110.00 0.00 0.00%
07 LINEA DE RIEGO MOVIL (22 UND)
07.01 LINEAS DE RIEGO MOVIL und 22.00 0.00 0.00%
08 FLETES
08.01 FLETE EN ZONA RURAL VJE 4.00 0.00 0.00%
09 CAPACITACION EN RIEGO
09.01 MODULO DE CAPACITACION EN RIEGO MOD 1.00 0.00 0.00%
Municipalidad Distrital de Checca - Canas - Cusco
Sub Gerencia de Infraestrucctura Publica

GRADO DE CUMPLIMIENTO DE LA METAS ALCANZADOS

OBRA : "Construccion de Sistema de Riego Por Aspersion Ccocayro - Distrito de Checca"

MODALIDAD: Administracion Directa


RESIDENTE: Ing: HUGO FLORES APAZA
SUPERVISOR: Ing. Otorino U. Cachi Quispe
UBICACIN: Secctor Ccocayro

Avance Acumulado
ITEM DESCRIPCION UND METRADO
Metrado %
COMP. CONST. SIST. DE RIEGO POR ASPERSION COLLANA SECTOR CCOCAYRO (MARGEN IZQUIERDO)
01 RED DE DISTRIBUCION
01.01 TRAZO, NIVELACION Y REPLANTEO m 600.00 0.00 0.00%
01.02 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA m 600.00 0.00 0.00%
01.03 REFINE, NIVELACION Y FONDOS PARA TUBERIA HASTA 6" m 600.00 0.00 0.00%
01.04 CAMA DE APOYO PARA TUBERIAS MENORES DE 6" m 600.00 0.00 0.00%
01.05 RELLENO PRIMERA CAPA H=0.30M. ZARANDEADO m 600.00 0.00 0.00%
01.06 RELLENO Y APISONADO DE ZANJAS m 600.00 0.00 0.00%
01.07 TUBERIA PVC SAP D= 1 1/2", CLASE 7.5 m 600.00 0.00 0.00%
01.08 ACCESORIOS DISTRIBUCION D1, COSTO GLOBAL GLB 1.00 0.00 0.00%
01.09 COLOCACION DE ACCESORIOS PROMEDIO und 10.00 0.00 0.00%
01.10 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA m 600.00 0.00 0.00%
02 VALVULA DE CONTROL (01 UND.)
02.01 CAJA DE VALVULA und 1.00 0.00 0.00%
02.02 SUMINISTRO Y COLOC. VALV. CONTROL D= 1 1/2" GLB 1.00 0.00 0.00%
02.03 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 1.00 0.00 0.00%
03 VALVULA DE PURGA (01 UND.)
03.01 CAJA DE VALVULA und 1.00 0.00 0.00%
03.02 SUMINISTRO Y COLOC. VALV. PURGA D= 1 1/2" GLB 1.00 0.00 0.00%
03.03 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 1.00 0.00 0.00%
04 HIDRANTES (2 UND)
04.01 TRAZO Y REPLANTEO PRELIMINAR m2 0.72 0.00 0.00%
04.02 EXCAVACION MASIVA EN TERRENO COMPACTO m3 0.32 0.00 0.00%
04.03 ENCOFRADO Y DESENCOFRADO m2 1.28
04.04 CONCRETO F'C= 175 KG/CM2. m3 0.18 0.00 0.00%
04.05 CONCRETO F'C= 100 KG/CM2. m3 0.06 0.00 0.00%
04.06 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 2.00 0.00 0.00%
04.07 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 0.96 0.00 0.00%
04.08 PINTURA ESMALTE EN MUROS EXTERIORES m2 0.96 0.00 0.00%
04.09 ACCESORIOS EN HIDRANTES GLB 2.00 0.00 0.00%
04.10 COLOCACION DE ACCESORIOS und 10.00 0.00 0.00%
05 LINEA DE RIEGO MOVIL (2 UND)
05.01 LINEAS DE RIEGO MOVIL und 2.00 0.00 0.00%
06 FLETES
06.01 FLETE EN ZONA RURAL VJE 1.00 0.00 0.00%