PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT POTENTIAL TRANSFORMERS


IDCT PMCC-4B

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 1 of 3


EPC-BOP BGR ENERGY SYSTEMS LTD - POWER PROJECT DIVISION Date:

1. Board Details

1 STATION NAME/BOARD Unit 3 & 4 / 4B BOARD


2 AREA/LOCATION IDCT PMCC
3 DRAWING NUMBER IC9/507,IC9/508,BPT1/510
4 RATING 415/3:110/3 ; 50VA ;CL-1.0

2. Verification of Name Plate Details

Line /Bus
Results
Identification Insulation
Make Sl.No. Ratio VA Class (Ok /
with module Class
Not Ok)
no.

PRAGATI 415/3:1103 50 1 B

9F1 PRAGATI 415/3:1103 50 1 B


LINE PT-2
PRAGATI 415/3:1103 50 1 B

PRAGATI 415/3:1103 50 1 B

7F2BUS PT PRAGATI 415/3:1103 50 1 B

PRAGATI 415/3:1103 50 1 B

PRAGATI 415/3:1103 50 1 B
2F1
PRAGATI 415/3:1103 50 1 B
LINE PT-1
PRAGATI 415/3:1103 50 1 B

Acceptance Criteria: Ratings, Make & Type shall be as per approved Drg

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. SURESH M Testing Engr.
BGRESL Rathina Kumar D Dy.Manager
OPGCL
PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT POTENTIAL TRANSFORMERS


IDCT PMCC-4B

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 2 of 3


EPC-BOP BGR ENERGY SYSTEMS LTD - POWER PROJECT DIVISION Date:

3. Physical Verification of Wiring Tightness from Primary & secondary terminals to


Protective &Metering terminals

Line /Bus Wiring Tightness (Ok/Not Ok)


Identification
Remarks
with Module R Y B
No.
9F1
7F2
2F1

Acceptance Criteria: There shall not be any loose connections and Terminal connections shall be as
per approved Drg.

4. Ratio test

Line /Bus Ratio


Identification
R Y Y B B R Results(Ok/Not Remarks
with Module
no. 415/3 110/3 415/3 110/3 415/3 110/3 Ok)

9F1

7F2

2F1

Acceptance Criteria: Ratio error for Accuracy Class 1 is +/-1% and for 3P +/-%

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. SURESH M Testing Engr.
BGRESL Rathina Kumar D Dy.Manager
OPGCL
PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT POTENTIAL TRANSFORMERS


IDCT PMCC-4B

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 3 of 3


EPC-BOP BGR ENERGY SYSTEMS LTD - POWER PROJECT DIVISION Date:

5. Insulation Resistance (IR testing voltage:500V)

Line /Bus IR (in OHM) Results(O Remarks


Identificati
k/Not Ok)
on with R Y B
Module no.
PE S-E P S P-E S-E P S PE S-E P S

9F1

7F2

2F1

(P-Primary, S-Secondary, E-Earth)


Acceptance Criteria: Approximately 100 Mohm & above
Note: IR value varies with temperature and environment conditions hence value lesser than the
prescribed value also shall be acceptable. There shall not be gross short circuit and abnormal
reduction in the value

6. Measurement of secondary winding resistance for protection CTs

Line / Bus
Identification Resistance ()
Remarks
with Module Ref.
No. R Y B
Primary
9F1
Secondary
Primary
7F2
Secondary
Primary
2F1
Secondary

7. Remarks

Test results of all the PTs in the board arefound satisfactory.

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. SURESH M Testing Engr.
BGRESL Rathina Kumar D Dy.Manager
OPGCL