ABSTRACT OF COST
Bill of Quantity
Contract Number:- F/Y : 073/074
Name of project :-Khairenighat Khaniyapani Dase Sunapati Dogma R (Rupakot - Dogma Section)
Total time period for the job: months
Rate (NRs.) excluding VAT in
S. N. Description of work Quantity Unit Amount (NRs.)
Figures Words
1+700 0 2.400
1+725 25 3.800 3.10 77.50 50.00 38.75 40 31 0 0 0 0 0 0
1+750 25 1.920 2.86 71.50 60.00 42.90 40 28.6 0 0 0 0 0 0
1+775 25 3.496 2.71 67.75 60.00 40.65 40 27.1 0 0 0 0 0 0
1+800 25 3.520 3.51 87.75 60.00 52.65 40 35.1 0 0 0 0 0 0
1+825 25 4.200 3.86 96.50 60.00 57.90 40 38.6 0 0 0 0 0 0
1+850 25 3.800 4.00 100.00 60.00 60.00 40 40 0 0 0 0 0 0
1+875 25 2.600 3.20 80.00 60.00 48.00 40 32 0 0 0 0 0 0
1+900 25 4.000 3.30 82.50 60.00 49.50 40 33 0 0 0 0 0 0
1+925 25 3.696 3.85 96.25 60.00 57.75 40 38.5 0 0 0 0 0 0
1+950 25 3.496 3.60 90.00 60.00 54.00 40 36 0 0 0 0 0 0
1+975 25 4.200 3.85 96.25 60.00 57.75 40 38.5 0 0 0 0 0 0
2+000 25 4.800 4.50 112.50 60.00 67.50 40 45 0 0 0 0 0 0
2+025 25 5.200 5.00 125.00 60.00 75.00 40 50 0 0 0 0 0 0
2+050 25 4.800 5.00 125.00 60.00 75.00 40 50 0 0 0 0 0 0
2+075 25 5.200 5.00 125.00 60.00 75.00 40 50 0 0 0 0 0 0
2+100 25 5.600 5.40 135.00 60.00 81.00 40 54 0 0 0 0 0 0
2+125 25 6.400 6.00 150.00 60.00 90.00 40 60 0 0 0 0 0 0
2+150 25 2.184 4.29 107.25 70.00 75.08 30 32.18 0 0 0 0 0 0
2+175 25 2.112 2.15 53.75 70.00 37.63 30 16.13 0 0 0 0 0 0
2+200 25 3.680 2.90 72.50 70.00 50.75 30 21.75 0 0 0 0 0 0
2+225 25 4.232 3.96 99.00 70.00 69.30 30 29.7 0 0 0 0 0 0
2+250 25 2.392 3.31 82.75 70.00 57.93 30 24.83 0 0 0 0 0 0
2+275 25 3.680 3.04 76.00 70.00 53.20 30 22.8 0 0 0 0 0 0
2+300 25 4.416 4.05 101.25 70.00 70.88 30 30.38 0 0 0 0 0 0
2+325 25 3.080 3.75 93.75 70.00 65.63 30 28.13 0 0 0 0 0 0
2+350 25 2.816 2.95 73.75 70.00 51.63 30 22.13 0 0 0 0 0 0
Remarks
Rupakot
Grade Down
2+000 to 2+125
Remarks
Grade Down
.................... ............................. ...................
Prepared By Checked By Approved By
Government of Nepal
Ministry of Local Development
Office of District Development Committee
District Technical Office Page: 10 of 23
Ramechhap
Remarks
3+100 to 3+300
Remarks
4+100 t0 4+200
Grade Down
Sunapati Danda
Grade Down
.................... ............................. ...................
Prepared By Checked By Approved By
Government of Nepal
Ministry of Local Development
Office of District Development Committee
District Technical Office Page: 12 of 23
Ramechhap
Remarks
4+600 t0 4+875
Dogma
3.0 Excavation in roadway and drain including removal and satisfactory disposal of all
materials up to a lead of 50 m along the lead route. This includes handling and stacking or
hauling (to sites of embankment construction) of suitable cut materials as
a) Ordinary soil
Resource Description Quantity Unit Rate Amount
Labour Unskilled 0.5 md 350 175
Skilled 0 md 450 0
Materials Tools and Equipments 3% L/S 5.25
Total = 180.25
Rate (Per m3) = 180.25
b) Hard soil
Resource Description Quantity Unit Rate Amount
Labour Unskilled 0.6 md 350 210
Skilled 0 md 450 0
Materials Tools and Equipments 3% L/S 6.3
Total = 216.3
Rate (Per m3) = 216.3
c) Ordinary rock
Resource Description Quantity Unit Rate Amount
Labour Unskilled 2 md 350 700
Skilled 0 md 450 0
Materials Tools and Equipments 3% L/S 21
Total = 721
Rate (Per m3) = 721
d) Medium rock
Resource Description Quantity Unit Rate Amount
Labour Unskilled 4 md 350 1400
Skilled 0 md 450 0
Materials Tools and Equipments 3% L/S 42
Total = 1442
Rate (Per m3) = 1442
Total = 40 40 10 10
Gabion Filling
Existing
Chainage Length Cutting width Height area OS HS OR MR HR
width
1+700 3 2.50 1.20 2.40 50 40 0 0 0
1+725 25 3 2.50 1.90 3.80 60 40 0 0 0
1+750 25 3 2.40 1.00 1.92 60 40 0 0 0
1+775 25 3 2.30 1.90 3.50 60 40 0 0 0
1+800 25 3 2.20 2.00 3.52 60 40 0 0 0
1+825 25 3 2.50 2.10 4.20 60 40 0 0 0
1+850 25 3 2.50 1.90 3.80 60 40 0 0 0
1+875 25 3 2.50 1.30 2.60 60 40 0 0 0
1+900 25 3 2.50 2.00 4.00 60 40 0 0 0
1+925 25 3 2.20 2.10 3.70 60 40 0 0 0
1+950 25 3 2.30 1.90 3.50 60 40 0 0 0
1+975 25 3 2.50 2.10 4.20 60 40 0 0 0
2+000 25 0 5.00 1.20 4.80 60 40 0 0 0
2+025 25 0 5.00 1.30 5.20 60 40 0 0 0
2+050 25 0 5.00 1.20 4.80 60 40 0 0 0
2+075 25 0 5.00 1.30 5.20 60 40 0 0 0
2+100 25 0 5.00 1.40 5.60 60 40 0 0 0
2+125 25 0 5.00 1.60 6.40 70 30 0 0 0
2+150 25 3 2.10 1.30 2.18 70 30 0 0 0
2+175 25 3 2.20 1.20 2.11 70 30 0 0 0
2+200 25 3 2.30 2.00 3.68 70 30 0 0 0
2+225 25 3 2.30 2.30 4.23 70 30 0 0 0
2+250 25 3 2.30 1.30 2.39 70 30 0 0 0
2+275 25 3 2.30 2.00 3.68 70 30 0 0 0
2+300 25 3 2.30 2.40 4.42 70 30 0 0 0
2+325 25 3 2.20 1.75 3.08 70 30 0 0 0
2+350 25 3 2.20 1.60 2.82 70 30 0 0 0
2+375 25 3 2.20 2.00 3.52 70 30 0 0 0
2+400 25 3 2.20 2.20 3.87 70 30 0 0 0
2+425 25 3 2.20 1.90 3.34 70 30 0 0 0
2+450 25 3 2.10 2.00 3.36 70 30 0 0 0
2+475 25 3 2.10 1.50 2.52 70 30 0 0 0
2+500 25 3 2.10 1.20 2.02 70 30 0 0 0
2+525 25 3 2.10 1.20 2.02 70 30 0 0 0
2+550 25 3 3.20 2.00 5.12 70 30 0 0 0
2+575 25 3 3.20 1.90 4.86 70 30 0 0 0
2+600 25 3 3.20 1.60 4.10 70 30 0 0 0
2+625 25 3 3.20 1.50 3.84 70 30 0 0 0
2+650 25 3 2.10 1.30 2.18 70 30 0 0 0
2+675 25 3 2.10 1.10 1.85 70 30 0 0 0
2+700 25 3 2.10 1.10 1.85 70 30 0 0 0
2+725 25 3 2.10 1.40 2.35 70 30 0 0 0
2+750 25 3 2.10 0.90 1.51 70 30 0 0 0
2+775 25 3 2.00 1.40 2.24 70 30 0 0 0
2+800 25 2.5 2.50 1.20 2.40 70 30 0 0 0
2+825 25 2.5 2.50 1.30 2.60 70 30 0 0 0
2+850 25 2.5 2.50 1.20 2.40 70 30 0 0 0
2+875 25 2.5 2.50 1.30 2.60 70 30 0 0 0
2+900 25 2.5 2.50 1.80 3.60 70 30 0 0 0
2+925 25 3 2.00 1.30 2.08 70 30 0 0 0
Page: 17 of 23
Existing
Chainage Length Cutting width Height area OS HS OR MR HR
width
2+950 25 3 2.00 1.60 2.56 70 30 0 0 0
2+975 25 3 2.10 1.40 2.35 70 30 0 0 0
3+000 25 3 2.10 0.90 1.51 55 40 5 0 0
3+025 25 3 2.10 1.10 1.85 65 30 5 0 0
3+050 25 3 2.10 1.20 2.02 65 30 5 0 0
3+075 25 3 2.00 1.20 1.92 65 30 5 0 0
3+100 25 0 5.00 1.10 4.40 70 30 0 0 0
3+125 25 0 5.00 1.10 4.40 70 30 0 0 0
3+150 25 0 5.00 1.00 4.00 70 30 0 0 0
3+175 25 0 5.00 1.50 6.00 70 30 0 0 0
3+200 25 0 5.00 1.40 5.60 70 30 0 0 0
3+225 25 0 5.00 1.30 5.20 70 30 0 0 0
3+250 25 0 5.00 1.90 7.60 70 30 0 0 0
3+275 25 0 5.00 2.00 8.00 70 30 0 0 0
3+300 25 0 5.00 1.90 7.60 70 30 0 0 0
3+325 25 3 2.30 1.90 3.50 70 30 0 0 0
3+350 25 3 2.30 1.90 3.50 70 30 0 0 0
3+375 25 3 2.30 1.10 2.02 70 30 0 0 0
3+400 25 3 2.30 1.50 2.76 70 30 0 0 0
3+425 25 3 2.30 1.40 2.58 70 30 0 0 0
3+450 25 3 2.30 1.20 2.21 70 30 0 0 0
3+475 25 3 2.15 1.20 2.06 70 30 0 0 0
3+500 25 3 2.15 1.20 2.06 70 30 0 0 0
3+525 25 3 2.15 2.00 3.44 70 30 0 0 0
3+550 25 3 2.15 1.60 2.75 70 30 0 0 0
3+575 25 3 2.15 2.70 4.64 70 30 0 0 0
3+600 25 3 2.00 2.20 3.52 70 30 0 0 0
3+625 25 3 2.10 2.60 4.37 70 30 0 0 0
3+650 25 3 2.10 1.50 2.52 70 30 0 0 0
3+675 25 3 2.10 2.30 3.86 70 30 0 0 0
3+700 25 3 2.10 1.50 2.52 70 30 0 0 0
3+725 25 3 2.10 1.90 3.19 70 30 0 0 0
3+750 25 3 2.10 1.30 2.18 70 30 0 0 0
3+775 25 3 2.10 1.20 2.02 70 30 0 0 0
3+800 25 3 2.10 1.30 2.18 70 30 0 0 0
3+825 25 3 2.00 1.40 2.24 70 30 0 0 0
3+850 25 3 2.00 1.50 2.40 70 30 0 0 0
3+875 25 3 2.00 2.50 4.00 70 30 0 0 0
3+900 25 3 2.00 1.20 1.92 70 30 0 0 0
3+925 25 3 2.00 1.00 1.60 70 30 0 0 0
3+950 25 3 2.00 1.20 1.92 70 30 0 0 0
3+975 25 3 2.00 1.90 3.04 70 30 0 0 0
4+000 25 3 2.00 1.30 2.08 70 30 0 0 0
4+025 25 3 2.00 1.20 1.92 70 30 0 0 0
4+050 25 3 2.00 2.00 3.20 70 30 0 0 0
4+075 25 3 2.00 2.20 3.52 70 30 0 0 0
4+100 25 0 5.20 1.60 6.66 70 30 0 0 0
4+125 25 0 5.20 1.90 7.90 70 30 0 0 0
4+150 25 0 5.20 1.50 6.24 70 30 0 0 0
4+175 25 0 5.20 2.30 9.57 70 30 0 0 0
Page: 18 of 23
Existing
Chainage Length Cutting width Height area OS HS OR MR HR
width
4+200 25 0 5.20 2.00 8.32 70 30 0 0 0
4+225 25 3 2.20 1.95 3.43 70 30 0 0 0
4+250 25 3 2.20 3.00 5.28 70 30 0 0 0
4+275 25 3 2.20 3.00 5.28 70 30 0 0 0
4+300 25 3 2.20 2.20 3.87 70 30 0 0 0
4+325 25 3 2.20 2.00 3.52 70 30 0 0 0
4+350 25 3 2.20 2.20 3.87 70 30 0 0 0
4+375 25 3 2.20 2.30 4.05 70 30 0 0 0
4+400 25 3 2.20 2.40 4.22 70 30 0 0 0
4+425 25 3 2.30 2.00 3.68 70 30 0 0 0
4+450 25 3 2.30 1.60 2.94 65 30 5 0 0
4+475 25 3 2.30 2.00 3.68 65 30 5 0 0
4+500 25 3 2.30 2.10 3.86 65 30 5 0 0
4+525 25 3 2.30 2.20 4.05 65 30 5 0 0
4+550 25 3 2.30 2.40 4.42 65 30 5 0 0
4+575 25 3 2.30 2.40 4.42 65 30 5 0 0
4+600 25 0 5.30 1.90 10.07 65 30 5 0 0
4+625 25 0 5.30 1.80 9.54 65 30 5 0 0
4+650 25 0 5.30 3.20 16.96 65 30 5 0 0
4+675 25 0 5.30 2.30 12.19 65 30 5 0 0
4+700 25 0 5.30 2.30 12.19 65 30 5 0 0
4+725 25 0 5.30 2.40 12.72 65 30 5 0 0
4+750 25 0 5.30 2.40 12.72 70 30 0 0 0
4+775 25 0 5.30 2.50 10.60 70 30 0 0 0
4+800 25 0 5.30 1.80 7.63 70 30 0 0 0
4+825 25 0 5.30 2.00 8.48 70 30 0 0 0
4+850 25 0 5.30 2.00 8.48 70 30 0 0 0
4+875 25 0 5.30 2.00 8.48 70 30 0 0 0
4+900 25 3 2.30 1.90 3.50 70 30 0 0 0
4+925 25 3 2.30 2.10 3.86 70 30 0 0 0
4+950 25 3 2.30 2.30 4.23 70 30 0 0 0
4+975 25 3 2.30 2.40 4.42 70 30 0 0 0
5+000 25 3 2.30 1.00 1.84 50 50 0 0 0
Passingone
Zone 25 3 3 1 2.4 50 50 0 0 0
Government of Nepal
Ministry of Local Development
Office of the District Development Committee
District Technical office
Manthali, Ramechhap
Anusuchi - 116
Contractor/Chairperson:
Signature:-
Seal:-
BILL OF CONTRACT
Bill Nos. final Voucher No.of Previous Bill
#REF! Date of Work Order:-
#REF! Date of Work to be completed:-
Name of Contractor/Chairperson:- Rajendra katwal Date of Work Completed:-
Contract No.:- Payment Date & Voucher No.:-
Serial no.of Previous Bill:- X Page No. to of Devitar pokhari Danda Road maintence Project of M.B.
Work completed upto this Bill Previous Bill Work completed in this Bill Remarks
S.N. Item No. Description of Works Unit
Quantity Rate Amount Quantity Amount Quantity Amount
1.1 Ordinary Soil (OS) m3 23.00 309.00 7,107.00 319.50 98,725.50 (296.50) (91,618.50)
1.2 Hard Soil (HS) m3 #REF! 1,519.25 #REF! 319.50 485,400.38 #REF! #REF!