Professional Documents
Culture Documents
COM 1
JUNE 2017
NAVAL ARCHITECTURE
TIME ALLOWED - 3 HOURS
Instructions
Q1. A. Sketch a transverse section through the hold space of a container ship hull; B. Referring to the sketch in
A. describe how adequate structural strength is built into the hull.
2009/SR8 2009/SR2 2008/SR8 2007/SR9 2007/SR2 2006/SR8 2006/S6 2010/SR1 2011/SR2
2013/SR3 2015/SR11 2016/SR01 2016/SR07 2017/SR06
Q2. A. Describe the arrangement made in a main structural bulkhead for a watertight door aperture; B. Explain a
procedure for ensuring that sliding watertight doors are operated safely. Differentiate between the categories of
watertight door and state the regulation pertaining the each type.
2010/SR10 2011/SR10 2011/SR12 2013/SR11 2013/SR12 2014/SR02 2014/SR07
2015/SR02 2015/SR04 2015/SR09 2016/SR02 2016/SR11 2017/SR06
Q5. Describe the arrangement of tank top and double bottom in the machinery space making particular reference
to the structure and scantlings below the main engine. Show the method adopted in the arrangement of DB tanks
to avoid contamination of fresh water, fuel oil and lube oil stored in DB tanks.
2015/SR11 2017/SR06
Section - II
Q6. A. Sketch the cross-section of a bulk carrier with either deep or shallow double bottom showing the type of
framing used; B. Describe the corrosion problems experienced with ballast tanks; C.State how such tanks are
protected against extensive corrosion.
WWW.DIESELSHIP.COM
WWW.DIESELSHIP.COM 2
2008/SR3 2007/SR10 2007/SR1 2006/SR3 2006/SR1 2011/SR1 2010/SR7 2012/SR8 2013/SR09
2014/SR03 2015/SR09 2016/SR03 2016/SR11 2017/SR02 2017/SR06
Q7. With respect to trim and stability, describe the following - A. Effects on centre of gravity of slack tanks; B.
Effect on stability of ice formation on superstructure; C. Effects of wind and waves on ships stability; D. Effect of
water absorption by deck cargo and retention of water on deck.
2011/SR4 2010/SR8 2012/SR6 2012/SR7 2013/SR4 2013/SR10 2014/SR08 2014/SR10 2014/SR12
2015/SR07 2015/SR11 2016/SR09 2017/SR06
Q8. With reference to the ships anchor cable arrangement using simple sketches, illustrate how the following are
attached to the ship.
A. Cable Stopper
B. Anchor Windlass
C. Chain locker end of cable elenchus
2008/SR11 07-08/EMG 2008/SR3 2007/SR10 2007/SR6 2010/SR3 2011/SR11 2013/SR12
2015/SR09 2017/SR06
Q10. A. Explain in detail, how an underwater survey is carried out; B. State the requirements to be fulfilled before
an underwater survey is acceptable to the survey authority; C. Construct a list of the items in order of importance
that the underwater survey authority should include.
2010/SR2 2015/SR11 2016/SR01 2017/SR06
Note : If you are looking for answers prepared in organized manner with clear drawings please visit our website by
CLICKING HERE
WWW.DIESELSHIP.COM