SOP FOR PRINT SET UP

1. Authorised QC person to be
physically present during the set up
process to monitor the operation.
2. The operation is done by the
operator.
3. QC shall make sure to keep the
TRIAL containers separate, wipe the
containers of the defective trial print.
4. QC to confirm the correct print, in
terms of position, font size, matter and
legibility.
5. QC shall give approval for
commercial production.
6. QC shall make sure that the wiped
containers are printed with the right
matter in terms of position, font size,
and legibility.
7. QC shall document the approval by
indicating the number of containers
wiped and reprinted.
8. This is responsibility of QC and
operator has to just follow the
instruction of QC
LINE SET UP APPROVAL

DATE

SHIFT

MACHINE NO

PRODUCT

GRADE & PACK SIZE

OPERATOR NAME

FLUSHING SET UP
FLUSHING REQUIRED / NOT REQUIRED
FLUSHING QUANTITY
NAME OF QC PERSON
APPROVAL AFTER
FLUSHING
NOZZLE SET UP
STROKE 1 STROKE STROKE STROKE STROKE APPROVAL
2 3 4 5
NOZZLE 1

NOZZLE 2

NOZZLE 3

NOZZLE 4
NOZZLE 5

NOZZLE 6

INDUCTION SEAL SET UP


CURRENT SETTNG(no.) HEIGHT SETTING( cm) SPEED(bottle /min)

SEAL CHECK SAM SAM 2 SAM 3 SAM 4 SAM 5 APPROVAL


1
RESULT OF SAMPLE
CHECK(OK/NOT OK)
PRINT SET UP
MRP MFD ( MONTH & YEAR
)
BATCH. NO FONT SIZE

NO OF CONTAINERS USED
IN TRIAL
HAS THE TRIAL YES/NO IF YES, BY WHOM- NAME
CONTAINERS WIPED &
REPRENTED
APPROVED BY QC SIGN

QC HEAD SIGN

UNIT MANAGER SIGN