Professional Documents
Culture Documents
state
In India, demand for milk and milk products are growing with rising income, population growth and c
in lifestyle. The demand is estimated to be about 200-210 Million MT by 2021-22. To meet this future
demand internally, milk production of the country has to grow by 9 Million MT per year incrementally
its exiting level of 138 Million MT. With the objective to enhance milk production, various central
government schemes such as NDP, NPBBDD, NLM, RKVY and LH&DC are being implemented all over
country.
To achieve the targeted milk production, there is need for a state specific intervention in the area of A
dairying. To understand the existing status of various animal husbandry and dairy development activ
schemes being implemented, funds allocated and state governments vision for 2021-22 and beyond,
has developed a template to collate various information under following heading:
This would help us in finding the gaps in various critical areas of animal husbandry and dairy develop
in the state, thus formulating a state specific strategy and develop/design components for the next ph
National Dairy Plan (NDP).
It is requested to provide information along with a detailed vision document (if available) as per the fo
given hereunder.
Name of State: __________________________
Nos.
2a Existing
Capacity (MTPD)
Nos.
2b New
Capacity (MTPD)
- Cooperatives
- Private
Milk chilling Capacity to be created (under co-
4
operatives)
4a Chilling Centres
Number
Capacity (KL)
4b BMC
Number
Capacity (KL)
- Total members
- Women Members
9 Number of animals to be Insured (000)
Fund received under various schemes of State and Central Government for Dairy Develop
(Also provide expected fund to be received or allocation made under the scheme up to 2021-22)
No. Name of Scheme 11-12 12-13 13-14 14-15 15-16
A Central Schemes
NPBBDD
NMPS of RKVY
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
B State Schemes
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
C Special schemes :
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Describe in brief the special schemes (if any) on Dairy Development activities in the state
No. Scheme Name Description about the sch
Note: Please insert the pages (if required) for providing detailed description of the scheme
Suggest new initiatives for Dairy Development activities to increase milk production
No. Description
Note: Please insert the pages (if required) for providing detailed description of the scheme
Vision
21-22
Existing
Semen stations to be
1 strengthened/established
(Nos.)
New
Fund received under various Central and State government schemes for HGM bull and fro
(Also provide expected fund to be received or allocation made under the scheme up to 2021-22)
No. Name of Scheme 11-12 12-13 13-14 14-15 15-16 16-17
A Central Schemes
NPBBDD
RGM (Rashtriya Gokul
Mission)
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
B State Schemes
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
C Special schemes :
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Note: Please insert the pages (if required) for providing detailed description of the scheme
Suggest new initiatives (if any) for HGM bull and frozen semen doses production activities
No. Description
Note: Please insert the pages (if required) for providing detailed description of the scheme
Additional targets envisaged under various
schemes (cumulative)
Name of scheme
14-15 15-16 16-17
(Central/State)
ngthening /establishment of more than 1 semen station,
HGM bull and frozen semen doses production activities (Rs. lakh)
duction activities
Format III - Artificial Insemination (AI) activity of the state
Existing Status Vision
No. Particulars
11-12 12-13 13-14 16-17 21-22
Breedable bovine population (figures in
lakh)
- Indigenous Cattle
1
- Cross bred Cattle
- Buffalo
% covered
Breedable bovines to be
2
covered under AI* Actual
numbers (in
lakh)
Actual
Number of animals to be
3 numbers (in
ear tagged
lakh)
4 Number of AI centres to be setup (Nos.)
Stationary
-Govt. Dept.
Mobile
Stationary
- Cooperative
Mobile
Stationary
- Private/NGOs
Mobile
5a Name of Agency___________
- Indigenous Cattle
- Pure HF
- Pure Jersey
- Crossbred HF
- Crossbred Jersey
- Buffalo
5b Name of Agency____________
- Indigenous Cattle
- Pure HF
- Pure Jersey
- Crossbred HF
- Crossbred Jersey
- Buffalo
5c Name of Agency____________
- Indigenous Cattle
- Pure HF
- Pure Jersey
- Crossbred HF
- Crossbred Jersey
- Buffalo
*Please provide the present coverage and calculation of arriving at the said figure.
^In case of more than one agency providing AI service, please provide agency wise details.
Fund received under various schemes of State and Central Government for AI delivery ser
(Also provide expected fund to be received or allocation made under the scheme up to 2021-22)
No. Name of Scheme 11-12 12-13 13-14 14-15 15-16 16-17
A Central Schemes
NPBBDD
RGM (Rashtriya Gokul
Mission)
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
B State Schemes
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
C Special schemes :
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
State budgetary
D
allocation (for AI services)
Describe in brief the Special schemes (if any) for AI service in the state
No. Scheme Name Description about the scheme
Note: Please insert the pages (if required) for providing detailed description of the scheme
Describe in brief the Special schemes (if any) for AI services in the state
No. Description
Note: Please insert the pages (if required) for providing detailed description of the scheme
Additional targets envisaged under various
schemes (cumulative)
Name of scheme
14-15 15-16 16-17
(Central/State)
-NA-
ment for AI delivery service (Rs. lakh)
Fund received under various schemes of State and Central Government for Animal health
Also provide expected fund to be received or allocation made under the scheme up to 2021-22)
A Central Schemes
LH&DC
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
B State Schemes
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
C Special schemes :
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Describe in brief the special schemes (if any) on Animal Health activities in the state
No. Scheme Name Description about the scheme
Note: Please insert the pages (if required) for providing detailed description of the scheme
Note: Please insert the pages (if required) for providing detailed description of the scheme
nal targets envisaged under various
schemes (cumulative)
15 Mowers/Harvesters (Nos.)
Fund received under various schemes of State and Central Government for Animal Nutriti
(Also provide expected fund to be received or allocation made under the scheme up to 2021-22)
A Central Schemes
NPBBDD
NLM
NMPS of RKVY
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
B State Schemes
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
C Special schemes :
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
Name of
scheme:________________
State budgetary
D allocation (for Animal
Nutrition activities)
Note: Please insert more rows (if required)
Describe in brief the special schemes (if any) on Animal Nutrition activities in the state
No. Scheme Name Description about the scheme
Note: Please insert the pages (if required) for providing detailed description of the scheme
Note: Please insert the pages (if required) for providing detailed description of the scheme
Additional targets envisaged under various
Vision
schemes (cumulative)
Name of scheme
21-22 14-15 15-16 16-17
(Central/State)
Outsourced
No. Name of the position
Contract/
en 2016-17
Regular
production (Nos.)
etc.)
A Animal Health
A1
A2
A3
A4
B Semen Production
B1
B2
B3
B4
C Artificial Insemination
C1
C2
C3
C4
Total
LCD Projector
In-built visual aid (Nos.)
Television
White/Black
Board
Dining Hall
A/c Rooms
Lodging & Boarding
arrangements (Nos.) Non-a/c
Rooms
Dormitories
Name & location of Training Centre
2
2:___________________
Number of Class rooms
Seating Capacity (nos.)
Trainers (nos.)
PC
LCD Projector
In-built visual aid (Nos.)
Television
White/Black
Board
Dining Hall
A/c Rooms
Lodging & Boarding
arrangements (Nos.) Non-a/c
Rooms
Dormitories
Name & location of Training Centre
3
3:___________________
Number of Class rooms
Seating Capacity (nos.)
Trainers (nos.)
PC
LCD Projector
In-built visual aid (Nos.)
Television
White/Black
Board
Dining Hall
A/c Rooms
Lodging & Boarding
arrangements (Nos.) Non-a/c
Rooms
Dormitories
*In case of proposed new training centre(s) in the state, please mention new or tentative location of training centre.
Fund received under various schemes of State and Central Government for Extension a
(Also provide expected fund to be received or allocation made under the scheme up to 2021-22)
A Central Schemes
NPBBDD
NLM
LH&DC
Name of scheme:________________
Name of scheme:________________
B State Schemes
Name of scheme:________________
Name of scheme:________________
Name of scheme:________________
Name of scheme:________________
C Special schemes :
Name of scheme:________________
Name of scheme:________________
Name of scheme:________________
Name of scheme:________________
Describe in brief the Special schemes (if any) on Extension and Training activities in th
No. Scheme Name Description about the
Note: Please insert the pages (if required) for providing detailed description of the scheme
Outsourced
Outsourced
Contract/
Contract/
Regular
Regular
Description