INFORMACION GENERAL

COMPANIA IGAPO CAMPO PALO AZUL POZO PLAC 048 ST1 0 4


TALADRO GEOPETSA 05 FECHA 14/6/2017 TMD 10709 60 4
ELABORADO POR: CAMILO VIZCARRA HPM DEEP INTERN 60 3
270 3
RESUMEN DE LAS ACTIVIDADES DE CIRCULACION 270 0
FECHA INICIO 15/6/2017 7:00 PM 300 0
FECHA FIN 16/6/2017 8:00 AM 300 3
750 3
VOLUMEN
CIRCULADO BLS 750 0

LIMPIAN LAS LINEAS CON 20 BLS DE AGUA FRESCA. SE CIRCULA ACIDO A REVERSA AL
7:00 PM CATCH TAN CON BOMBA DE RIG CON 120 BLS @ 4,0 BPM, 350 PSI. SE VERIFICA PH Y 240
NUTRALIZA ACIDO CON 3 SXS DE SODA CAUSTICA: 165 LBS, PH MINIMO 3 - PH QUEDA 6-7.

EMPIEZAN OPERACIONES PARA ENGANCHAR PESCADO CON SCREW SUB. CIRCULA A 3


8:00 PM BLS/MIN CON 350 PSI. INCREMENTA TORQUE RELATIVO DE 150 A 200 Y CAE. NO SE LOGRA 300
ENGANCHAR.
SE DESCONECTA LANDING JOINT Y SE CONECTA KELLY. SE CIRCULA A 3 BLS/MIN CON 350
9:40 PM PSI. 330

11:30 PM SE DETIENE CIRCULACION. REUNION PARA COORDINAR PROXIMA OPERACION.


SE DECIDE CIRCULAR POR DOS HORAS A 3 BLS/MIN CON 350 PSI PARA EN DOS HORAS
12:00 AM
CONTINUAR CON LAS MANIOBRAS DE PESCA. Variacion del caudal
TECNICO DE BAKER CONTINUA CON LAS MANIOBRAS DE ENGANCHE. SIN EXITO. SE 5
3:00 AM
CIRCULA A 3 BLS/MIN CON 350 PSI.
1380 4
NO SE CONTINUA CON OPERACIONES DE MANIOBRA PARA ENGANCHAR. SE CONTINUA
4:00 AM CIRCULANDO A 3 BLS/MIN A 350 PSI.

BL/MIN
3

SE PARA LA CIRCULACION. 2
7:40 AM
1
EMPIEZAN A SACAR BHA EN PARADAS A LA TORRE. SE ESPERA ORDEN DE QUITO PARA
8:00 AM BAJAR BHA CON OVERSHOT O JUNK MILL. 0
0 200 400 600 800
TOTAL 2250 MIN ACCUM.

BHA DE ENGANCHE OD (IN) ID (IN) LENGTH (FT) CSG (IN) ID CSG (IN) VOL. INTERNO (BLS) VOL. ANULAR (BLS)
Drill Pipe 3.5 2.4 9,462.0 9 5/8 8.681 52.94 580.09
Drill Pipe 3.5 2.4 814.4 9 5/8 8.681 4.56 49.93
Hydraulic Intensifier 4.75 2.25 14.85 7 6.184 0.07 0.23
Drill Collar 4.75 2.25 180.6 7 6.184 0.89 2.75
FISHING JAR 4.75 2.25 12.51 7 6.184 0.06 0.19
Lub. Fishing Bumper 4.75 2.25 7.72 7 6.184 0.04 0.12
SAFETY JOINT 4.75 2.625 2.4 7 6.184 0.02 0.04
Screw sub 4.75 2.625 2 7 6.184 0.01 0.03
58.59 633.37
VOLUMEN TOTAL
BLS 691.96

LAYOUT DE LOS TANQUES @ LAS 8:00 AM FDO

450 bls 20 bls 0 bls

Agua Fresca fluido control Catch Tank


Max: 471 bls 500 bls 220 bls

45 bls 130 bls 45 bls 30 bls

Pildorero Succion Viaje Trampa


Max: 95 bls 195 bls 55 bls 50 bls
PARAMETROS DE LA BOMBA PARA LOS CALCULOS

PUMP OUT BOMBA DEL CHIVO 0.041 BLS/STK


@ 98 STK/MIN TENEMOS 4 BLS/MIN
@ 73 STK/MIN TENEMOS 3 BLS/MIN

SODA CAUSTICA UTILIZADA

PH MAS BAJO
LBS SX PH FINAL LEIDO
LEIDO
165 3.0 3.0 7.0

NO SE LOGRO CONECTAR CON LA ROSCA DEL PESCADO. POSIBILIDADES: ROSCA LAVADA, RESIDUOS METALICOS EN LA ROSCA.
OBSERVACIONES EL TORQUE RELATIVO AUMENTABA PERO BAJABA AL TENSIONAR. (AL INTENTAR ENGANCHAR PESCADO)

REFERENCIAS
HMIS III
DESCRIPCION SALUD INFLAMABILIDAD PELIGROS FISICOS EPP
FORMIATO DE SODIO DENSIFICANTE 2 0 0 E
MUSOL E SOLVENT GLYCOL ETHER/ SURFACTANT SOLVENT 2 2 0 H
HCL ACIDO CLORHIDRICO 3 0 1 JOQ

Mixing Sodium Formate HOOCNa


Density @ 60 F 1 Cubic Meter 1 Barrel

Density, SG, % by wght Water, 96% NaCOOH, Water,


96% NaCOOH, Kg dry
ppg gm/cc NaCOOH cubic meter lb dry bbl
8.5 1.020 3.9 41.00 0.9815 14.4 0.9815

HCL / MUSOL
OBJETIVO Densidad PPG

DEGRADAR LA RESINA DEL


8.8
PESCADO