Professional Documents
Culture Documents
Welding spatters
4
and steel lamina-
tion
-To remove irregular angle/angle sharp
spatters
-To remove steel lamination
Stripe coated
-To remove zinc stripe coated welding lines
8 Welding lines with
during secondary surface reparation
zinc primer
Balance between
As per the drawing of paint specification
12 dew point and steel
(DWG.NO: 2P104001 HB)
temperature
- 11
2) Subsequent painting inspection
NO Check-point Inspection basis Remark
-Not to show push-up painted film when
Drying condition for thumb is fiercely twisted on painted film
1
painted film -Not to find when feet is trodden on painted
film
Re-coat interval
3 As per Paint Maker's recommendation
(Min/Max.)
Cleaning/Foreign
4 To remove foreign matters and spray dust
matters Condition
- 12
NO Check-point Inspection -basis Remark
Stripe coat condi-
tion for the edge of
-To make specified DFT for possible
5 various hole, ac-
measuring
cess hale, outfits,
etc.
6 Dry film thickness As per toe drawing of Paint specification
Insufficiently
Power/Hand tool Cleaning
Blasted area
- Hull stage
Item Process Grade Remark
Side shell Power tool cleaning ISO ST3
Bottom Ditto Ditto
Exposed area Ditto Ditto
WBT(incl.
Ditto ISO ST2
APT&FPT)
E/R
(incl. Various room Ditto Ditto
in E/R, Accom.) Please refer to the DWG.
Accomodation(IN) Ditto Ditto of Paint specification in
detail grade
Bosun/Paint store Ditto ISO St3
Deck/Chemical
cleaning equip Ditto Ditto
store (out)
Deck/chemical
Cleaning equip Ditto Ditto
store (IN)
Accomodation(out) Ditto Ditto
- 13
Item Process Grade Remark
Void, cofferdam Ditto Ditto
COT(incl. SLOP TK,
Blasting ISO Sa2.5
Residualoil thank)
Dry space : ISO
Repair of the outfits Power tool St2 Wet space:
ISOS13
Fresh water Tank Power tool ISO St3
1st Coating
Intermediate Coat- To confirm the previous coated
condition be-
ing condition In- surface is suitable for application 1ST
fore application
spection of next coat
of 2 coating
2 Coating con-
Intermediate Coat- To confirm the previous coated
dition before
ing condition In- surface is suitable for application 2ND
application of 3
spection of next coat
coating
- 14
Kind of inspection description Abbreviation Remark
RD
3 Coating
To confirm the previous coated
Intermediate coating condition be-
surface is suitable for application 3RD
condition inspection fore application
of next coat
of 4 coating
- 15