Equipment

Boilers, burners, furnaces (ea)


Unit heaters, convectors (ea)
Compressor or chiller units (ea)
Condensers (ea)
Receivers (ea)
Cooling towers (ea)
Chimneys (ea)
Heat exchangers (ea)
Air handling units (ea)
Exhaust fans (ea)
Ventilators (ea)
Expansion tanks (ea)
Storage tanks (ea)
Heat pumps (ea)
Condensate pumps (ea)
Dust collector (ea)
Fume hoods (ea)
Piping

Chilled water piping (lf)


Hot water piping (lf)
Condenser water piping (lf)
Refrigerant lines piping (lf)
Steam piping (lf)
Condensate piping (lf)
Oil piping (lf)
Gas piping (lf)
Pipe insulation (lf)
Fittings and valves (ea)
Pipe painting (l/s or sf) (continues)
Ductwork

Supply ducts (lf, sf, lb)


Return ducts (lf, sf, lb)
Ductwork insulation (sf)
Louvers, diffusers, registers, dampers, and grilles (ea)
Fittings (ea)
Valves (ea)
Filters (ea)

Miscellaneous

Packaged control (ea)


Starters (ea)
Motors (ea)
Thermostat (ea)
Humidistat (ea)
Air purification (l/s)
Humidification and dehumidification (l/s)
Test and balance (l/s)
Refrigerant (lb)
Vibration isolation (l/s)
Access panels (ea)
Valve tags (ea)
Covers and frames (ea)
Rigging (l/s)
Equipment room construction (l/s)
Concrete pad (ea or sf)
Excavation and backfill (l/s)
Electrical wiring (l/s)