Professional Documents
Culture Documents
BRISTOL EMERSON
Run Mounting
Bristol model Capacity* EER Voltage Copeland Model Capacity* EER Voltage capacitor feet
details dimension
H2EB24SABKA 20,200 9.5 220-240 CR24K6M-PFZ-141 19,800 10.2 220-240 36 @ 370 7.5x7.5
H2EB24SABKB 20,200 9.5 220-240 CR24K6M-PFZ-341 19,800 10.2 220-240 36 @ 370 4.8x8.0
H2EB243ABKA CR24K6M-PFZ- 141 19,800 10.2 220-240 36 @ 370 7.5x7.5
H2EB243ABKB 20,600 9.3 220-240 CR24K6M-PFZ- 341 19,800 10.2 220-240 36 @ 370 4.8x8.0
H2EB243ABKC CR24K6M-PFZ- 441 19,800 10.2 220-240 36 @ 370 8.44x9.75
H2EB29SABKA 24,500 9.2 220-240 CR30K6M-PF1-101/102 24,250 10.3 230 45 @ 440 7.5x7.5
H2EB32SABKA 26,000 9.0 220-240 CR32K6M-PFZ-141 27,200 10.0 220-240 45 @ 370 7.5x7.5
Single H2EB32SABKB 26,000 9.0 220-240 CR32K6M-PFZ-341 27,200 10.0 220-240 45 @ 370 4.8x8.0
Phase H2EB323ABKA CR32K6M-PFZ-141 27,200 10.0 220-240 45 @ 370 7.5x7.5
H2EB323ABKB 26,600 9.2 220-240 CR32K6M-PFZ-341 27,200 10.0 220-240 45 @ 370 4.8x8.0
H2EB323ABKC CR32K6M-PFZ-441 27,200 10.0 220-240 45 @ 370 8.44x9.75
H29B35UABHA 30,000 10.6 220-240 CR36K6M-PFZ-101/102 29,300 10.8 220-240 45 @ 370 7.5x7.5
H29B35UABHABN 30,000 10.6 220-240 CR37K6M-PFZ-101 30,600 10.0 220-240 50 @ 440 7.5x7.5
H23A383ABKA 32,400 10.1 220-240 CR42K6M-PFZ-101 35,200 10.9 220-240 60 @ 370 7.5x7.5
H23A423ABKA 35,000 10.2 220-240 CR42K6M-PFZ-101 35,200 10.9 220-240 60 @ 370 7.5x7.5
H23A463ABKA 39,200 10.4 220-240 CR47KQM-PFZ-101/102 40,700 10.3 220-240 60 @ 440 7.5x7.5
C R 2 4 K 6 M E - P F Z - 1 0 1
Product family variations
6,7,8 CR
Q CR large Electrical codes
Code 50 Hz 60 Hz
Identifier V 208-230 V
M Optimized design Z 220-240 V
D 380-420 V 380-460 V
Oil type M 380-420 V
Blank Mineral oil 5 200-230 V
E POE oil 1 230 V
Motor type
P Single phase
Permanent split capacitor
T Three Phase
Tube orientation
Mounting Mounting kit Terminal fence Suction Discharge Process
1 Long leg Standard Standard 0 Upward Tube Upward
2 Long leg Standard Rectangular 1 Angular Tube Upward
3 Short leg Standard Standard 2 Angular Tube Other Crank case Heater
4 3 leg Standard Standard 3 Spud Spud Upward 1 No heater
5 Short leg Other Standard 4 Upward Tube Inclined outwards 2 1 Phase heater
6 3 leg modified Other Standard 5 Angular Tube Inclined outwards 3 3 Phase heater
Side View
Compressor BOM
"A" "B" Suction "C" "D"
Discharge
"Mounting Side view
Total Suction Tube Tube Process Tube Discharge Type"
Model code Tube ID
Height Height ID Height Tube Height Refer View Suction Tube
Ensure the air conditioning system is clean and free from contaminants Replace the liquid line filter drier.
before replacing the compressor. Use proper vacuum pump and micron gauge during evacuation.
Use suction line filter with acid removal core during replacement, if the Use correct amount of refrigerant charge by weight.
previous compressor failure was due to motor burn out. Monitor the system to ensure proper operation.
Inspect all system controls like expansion valve, solenoid valves,
accumulators, contactors etc. and clean/replace if necessary.
2017/MEA/46
Emerson, Copeland Scroll and CoreSense are trademarks of Emerson Electric Co. or one of its affiliated companies.
2017 Emerson Climate Technologies, Inc. All rights reserved.