1 FAENAS MINERAS EN CHILE 2011 Cerro Colorado

Mining Sites in Chile 2011

CERRO COLORADO

Fuente / Source: MCH

Razn Social Business Name Ca. Minera Cerro Colorado Ltda.


Location 120 km al este de la ciudad de Iquique, Regin de Tarapac /
Ubicacin
120 km east from the city of Iquique, Tarapac Region
Direccin Address San Martn 255 Of.46, Edificio Empresarial, Iquique
Telfono Telephone (56-57) 404 000 / 413 561
Fax Fax (56-57) 421 397
Internet Internet www.cerrocolorado.cl

Propietarios Ownership BHP Billiton

Nmero Empleados Work force 2.577


Personal Ejecutivo Executive Staff Gerente General / General Manager Hernn Rincn
Gerente de Recursos Humanos / Carlos Gonzlez
Human Resources Manager
Gerente de Asuntos Externos / Ricardo Jopia
External Affairs Manager

Certificaciones Certifiactions ISO 14.001

Descripcin / Description
2 FAENAS MINERAS EN CHILE 2011 Cerro Colorado
Mining Sites in Chile 2011

El yacimiento cuprfero de la Compaa Cerro Colorado se encuentra ubicado a 120 Km. al este de Iquique en
la Regin de Antofagasta, a 2600 m.s.n.m. La faena pertenece a la divisin Metales Bsicos que es 100%
propiedad de BHP Billiton.
Las instalaciones de la mina y de la planta fueron construidas en 1992 e iniciaron su etapa operacional en
1994 con una capacidad original de produccin de 40.000 tpa. de ctodos de cobre. Posterior a su
construccin, y por medio de 2 expansiones (1996 y 1997) y un proyecto de optimizacin de procesos (2002),
la produccin aument casi de tres veces su volumen.
En noviembre de 2009, fue aprobado el proyecto de optimizacin de 60.000 tpd de Cerro colorado que
mediante modificaciones menores en una correa transportadora de la planta de chancado permiti aumentar
la capacidad de tratamiento de 52.000 a 60.000 tpd. La iniciativa no contempl ningn reemplazo de equipos
o aumento de las pilas de lixiviacin. En tanto, la inversin ascendi a US$ 9 millones y permiti alargar la vida
de la mina en al menos 6 aos.

Cerro Colorado copper deposit is located 120 Km. east of Iquique in the Tarapac Region, at 2,600 m.a.s.l. The site belongs to the
Basic Metal Division, 100% the property of BHP Billiton.
The construction of Cerro Colorado started in 1992 and was completed in 2004 when the mine was inaugurated with a production
capacity of 40,000 tpa of copper cathodes. Thanks to two expansions in 1996 and 1997 and an optimization of the processes in 2002,
production could be increased three times its initial volume.
In November 2009, the project Cerro Colorado 60,000 tpd Optimization was approved which, through minor modifications to the
crushing plant conveyor belt, increased treatment capacity from 52,000 to 60,000 tpd. The initiative did not include replacement of any
piece of equipment or increase of leaching heaps. Meanwhile, the investment was US$9 million and extended the mine useful life in at
least 6 years.

Caractersticas Yacimiento / Ore Body -Characteristics


Tipo de Yacimiento Type of Ore Body Prfido cuprfero
Mineral Minerals Minerales principales: calcosina y a crisocola. / Main minerals:
Chalcosite and Chrysocolla.
Reserva Reserves 155,2 Mt
Ley Grade 0,68 %

Caractersticas Mina / Mine Characterisics


Tipo de Operacin Operation Type Rajo Abierto / Open Pit
rea de Mina Mine Area rea Rajo: 2,1 km de largo x 1,3 km de ancho; 290 m
profundidad / Area Pit: 2.1 km long x 1.3 km wide; 290 m depth.
Inicio Operacin Start up 1994
Vida til Life of Mine 6
Cierre Closure 2022

Capacidades Productivas / Productive Capacities


Produccin 2010 Production 89.100 tpa

Procesos Planta / /Plant Processes


(1)
Capacidad de tratamiento 60.000 tpd
Treatment Capacity
Chancado Primario 2 Svela 54 * 74, 210CR001 (Giratorio / Giratoty)
Primary Grinding
2 Fuller Giratorio42 * 64, 010CR001 (Giratorio / Giratoty)
Chancado Secundario Secondary Grinding 1 Allis Chalmers de 84* 10 (Cono estandar / Standard Cone)
Chancado Terciario Tertiary Grinding 3 Allis Chalmers 84 * 3 (cono / cone short head)
Lixiviacin Leaching Mdulos de 40m de largo x 80m ancho / 40 m long and 80 m wide
modules
Riego / Watering: 15 meses / 15 months
SX 5 trenes en paralelo con un caudal de 750 850 m3 hr
EW 420 celdas, con 63 nodos-62 ctodos / 420 cells with 63 anodes and
62 cathodes
(1) Datos incluyen ltimo proyecto de optimizacin a 60ktpd / Data include last optimization project to 60 ktpd.