01 02 03 04 05

10075 1665 2130 2400

SHUTTERING AND TENDON ARE


CHANGED DUE TO CANTILEVER

1
J

600
PT BEAM-1 (600x450)

500
CLOUDED AREA TO BE CASTED AFTER
1000 2400

STRESSING OF THE BEAM TENDONS


5500

1000 1500
400 400

900
PT BEAM-2 (900x450)
H
1000 1500
3220

1000 2000
G
995

500

1000
PT BEAM-3 (1000x450)
F
500
2155

1000 2000

E
1000 2000
2060

500

1000

PT BEAM-4 (1000x450)
D
500

1000 2000
6075

1000 2000
500

1000

C PT BEAM-5 (1000x450)
500

1000 2000
900
3840

PT BEAM-8 (900x450)

1000 2000
500

1000

B PT BEAM-6 (1000x450)
500

1000 2000
2400

2400
3925

1000 1000
500

1000

1000
800

PT BEAM-7 (800x450)
A
300 300
1

CLOUDED AREA TO BE CASTED AFTER


STRESSING OF THE BEAM TENDONS

POST-TENSIONING BEAM SHUTTERING DETAILS FOR FIRST FLOOR.

A B C D F H J
RC SLAB RC SLAB RC SLAB RC SLAB RC SLAB RC SLAB
450

450

450

450

450

450

450

PTB-7 PTB-6 PTB-5 PTB-4 PTB-3 PTB-2 PTB-1

800 1000 1000 1000 1000 900 600

LOADING: SECTION 1-1

SLAB LL SDL TOTAL LOAD


4.0 2.0
PERIPHERAL WALL LOAD = 9.0 KN/m
EXCLUDING SELF WEIGHT

NOTES: FOR APPROVAL CLIENT:


HEAD OFFICE:- 13-A, D-SECTOR, INDUSTRIAL AREA,
GOVINDPURA BHOPAL-462023
MUMBAI OFFICE:- 502-B,5th FLOOR,KOTIA NIRMAN,
NEW ANDHERI LINK ROAD,ANDHERI(W)-400058
CONSULTANT: PROJECT:
PROPOSED OFFICE BUILDING AT A-30, SECTOR-67,
RELIABLE CONSULTING ENGINEERS GREATER NOIDA

TITLE:
POST-TENSIONING BEAM SHUTTERING DETAILS
FOR FIRST FLOOR .
DESHUTTERING SCHEDULE :
ARCHITECT: DATE: CHECKED: DESIGN: DRAWN:

09.11.2017 A.S. A.S. Vetri

81, RAIL VIHAR,SEC-33 DRG NO:


SCALE ISSUE
R0 09.11.2017 FIRST ISSUE `A' A.S. Vetri
NOIDA 201307 SIL_O-B_S-67_G-NOIDA_1st-FL_FWK_R0
ISSUED planindiagroup@rediffmail.com NTS R0
NO: DATE DESCRIPTION DESIGN DRAWN
FOR THIS DRAWING IS THE PROPERTY OF SANFIELD (INDIA) LTD. IT IS SUBJECT TO
THEIR RECALL,AND MUST NOT BE LENT, COPIED OR REPRODUCED WITHOUT
T H E I R W R I T T E N P E R M I S S I O N .