Professional Documents
Culture Documents
Sl No Requirements
Warehouse, Fabric & Materials Storage
Control
Comments
Highest
Raw materials receive with proper receive documnents i.e. requirement by
1 PI, Challan, Invoice etc. tesco.
Standard
Raw materials should keep in Quratine area before requirement for
2 Inspection. all buyers
Standard
requirement for
3 Inventory of the goods with proper records. all buyers
George
4 3 days stock Capacity at the store requirement.
Accessories inspection should 10% of receive Quantity for
all customers, AQL 1.5 for H&M and George, AQL 2.5 for Standard
VF Asia and Perryellis. IF fails 15% goods need to be requirement for
5 inspected . all buyers
Standard
In house accessories testing report i.e. colour fastness to requirement for
6 wash, Nikel test, Color bled test. all buyers
Standard
All approved trim cards /PO sheet are available to the requirement for
7 Inspector . all buyers
Standard
requirement for
8 Roll /Batch /Lot no should be mentioned at the roll. all buyers
Standard
requirement for
9 Prepare Shade Group & Shade bands for all buyers . all buyer
Standard
Color shade checking (According to approved shade requirement for
10 standard, end to end, side to side , Roll to roll shading ) all buyer
Cutting Section
Standard
Fabric relaxation system for Spandex (24 ,48,72 Hours requirement for
1 depends on the fabric composition ) & keep proper record . all buyer
Standard
requirement for
2 Fabric needs unrolled by the relax M/c for every order . all buyer
Sewing section
Standard
PP meeting report on new styles with attendance record of requirement for
1 participants & pp sample reports need availabe all buyer
Standard
Pilot Run procedure on new styles before Bulk starts & requirement for
2 Show reports. all buyer
Different buyer
have different
requirement
1st outputed bundle review & report. but VF asia is
the Highest
3 requirement
Different buyers
have different
The concern should follow minimum requirement during requirement
the production . but H&M is the
4 pioneer.
Button attach
Standard
requirement for
1 All buttons must attached with lockstitch machine. all buyer
Different buyer
have different
requirement
If operator off the machine for any reason for a certain but H&M is the
time, he will do the mock up while starting the work again Highest
2 in the machine. requirement
Pull test
The is the
Highest
1 Pull test after 2 Hours , H&M 3 (90N, 10 sec) requirement
Standard
Visual and relevant SOP present both English & local requirement for
2 language all buyer
Snap Button
Standard
Snap /rivet Attachment machines must be pneumatic and requirement for
1 not manual. all buyer
Standard
Technical Data Sheet must be available at the machine. requirement for
2 all buyer
Standard
Physical standard (Mock up ) of the positioning must be requirement for
3 available at the machine. all buyer
Standard
Pinch Gauge testing or pinch thickness must be done by requirement for
4 trained staff. all buyer
Standard
All machines must be positioned on a Gridded Floor to requirement for
5 allow for the capture of any spilt parts. all buyer
Different buyer
have different
requirement
Critical path management (CP) for each PO and analysis of but Tesco is the
CP performance for improvement. Highest
2 requirement
Different buyer
have different
requirement
All sample & sample related document keep 10 years & but Highest
Broken requirement by
3 needle record keep 6 years Tesco.
Different buyer
have different
requirement
but H&M is the
Highest
4 KPI ( For all deparment ) , Departmentwise goal & Goal follo requirement
Different buyer
have different
requirement
but H&M is the
Highest
5 workin flow chart must know all the employees. requirement
Different buyer
have different
Visual and relevant SOP present both in English & in local requirement
language. but H&M is the
Highest
6 requirement
Different buyer
have different
requirement
Lighting in all areas like all inspction area 1000 + Lux, but George is the
Needle point 1000+Lux , Cutting 600-800 Lux, Iron Table, Highest
7 Fusing, Marking table & Packing area 600-800 Lux. requirement
Different buyer
have different
requirement
Management review record & Internal audit periodically but Tesco is the
( monthly Highest
8 or 3 Monthly ) requirement
Different buyer
have different
requirement
but Sainsburry is
the Highest
9 Goods/Raw metirials disposition record. requirement
Facility requirement
Different buyer
have different
requirement
but Tesco is the
Highest
1 Factory perimiter with fencing wall. requirement
Different buyer
have different
requirement
but Tesco is the
Wastage area must be identified like Glass keeping area, Highest
Different buyer
2 Poly keeping area. requirement
have different
requirement
but Tesco is the
Highest
Different buyer
3 Visitor in out resistar requirement
have different
requirement
but Tesco is the
Highest
4 Personel locker for each employee. requirement
Standard
requirement for
Different buyer
5 Access control for Packing, Store & Finished goods area. all buyer
have different
requirement
but Tesco is the
Highest
6 9 Point Inspection report by the security. requirement
Different buyer
have different
requirement
Lighting in all areas like all inspction area 1000 + Lux, but George is the
Needle point 1000+Lux , Cutting 600-800 Lux, Iron Table, Different
Highestbuyer
7 Fusing, Marking table & Packing area 600-800 Lux. have different
requirement
requirement
but Tescobuyer
Different is the
Basic Fire safety, Fist aid, Drinking water, Health safety haveHighest
different
8 policy & Environment policy, (EIA) etc. requirement
Different
but Tescobuyer
is the
have different
Highest
9 Employee's changing room. requirement
but Tescobuyer
Different is the
Pin ,Drawing Pins, Staples & Metal staples must not be have different
Highest
10 used any part ot the manufactruing unit . requirement
requirement
but Tesco is the
ETI base code & protector line must be hanged on the Highest
11 facility . requirement
People Management
Different buyer
have different
requirement
but Tesco is the
Highest
1 Training Plan & feedback system for for all QC & Operator . requirement
Different buyer
have different
requirement
but H&M, Tesco is
the Highest
2 On Job training for all employees. requirement
Highest
requirement by
3 Mensall test for all employee. H&M
Maintenance
Standard
Planned preventative maintenance (PPM) program that Different buyer
requirement for
1 covers all equipment with maintaining records. have different
all buyer
requirement
but Tesco is the
Workshops/maintenance room must have a barrier across Highest
2 the doorway and rubber floor mat located outside the door. requirement
Factory has a sufficient & proper metal detection process for all
the products & Critical by all
12 Metal detection is Mandatory for all products .(Critical ) customers.
Critical by all
17 Pull test report hourly (90 N 10 sec) (Critical ) customers.
Example : Though plant tour it was noted that factory attached all finishing
label like hang tag, packing sticker etc after metal pass at metal free area.
During plant tour it was observed that the garments cannot pass through
metal detector due to RFID hang tag but it was not discussed with Tesco
concern person .