Suite 5.23 - 5.26, 5th Floor,Wisma Central, CADANGAN BANGUNAN PERNIAGAAN (INSTITUT PENGAJIAN TINGGI SWASTA TAR UC) Sheet No Rev
SELUAS 62234 METER PERSEGI (15.378 EKAR) DI ATAS SEBAHAGIAN PT 30710 (H.S.D 9836)
Jalan Ampang,50450 Kuala Lumpur.
LOT BARU 106525, MAHKOTA VALLEY DI INDERA MAHKOTA, MUKIM KUALA KUANTAN, 3
Tel : 03-21661992 Fax : 03-21661993 DAERAH KUANTAN PAHANG DARUL MAKMUR Date :
From To Length Pipe Roughness Design Peak Flow ( Pipe Flow Head Loss
Diameter Coefficeint Flow,Q Q x 2.5 ) Velocity
Node Node (m) (m) c (m3/s) (m3/s) (m/s) (m)
Tapping 1 151.37 0.200 100 0.01730 0.04326 1.37702 2.4488
1 2 111.08 0.200 100 0.01730 0.04326 1.37702 1.7970
2 3 129.92 0.200 100 0.01730 0.04326 1.37702 2.1018
3 4 44.99 0.200 100 0.01730 0.04326 1.37702 0.7278
2 5 67.61 0.200 100 0.01730 0.04326 1.37702 1.0938
5 6 74.57 0.200 100 0.01730 0.04326 1.37702 1.2064
6 7 32.89 0.200 100 0.01730 0.04326 1.37702 0.5321
1 A) Information Of Flow Rate
a) Normal Flow, Q
Refer to the water reticulation layout plan,
The total length from tapping to node 1 = 151.37 m
where,
Thus the pressure at node 1 > height of supply level = 31.45 > 7.5 ok
b) Peak Flow
NOTE : Refer to the water reticulation layout plan to determine the node and pipe numbering
where,
Length, L = 151.37 m
Rough coefficient,C = 100
Peak flow rate, Qp = 0.043260 m3/s
Diameter of pipe, D = 0.2 m
Sectional Area, A = 0.03141593 m2
Velocity, V = 1.37701564 m/s
Tapping point pressure = 69.00 m O.D.L
RL of pipe at Tapping = 43.28 m
RL of pipe at Node 1 = 37.10 m
Thus the pressure at node 1 > height of supply level = 29.45 > 7.5 OK
Project Title : Project No :
2392
Suite 5.23 - 5.26, 5th Floor,Wisma Central, CADANGAN BANGUNAN PERNIAGAAN (INSTITUT PENGAJIAN TINGGI SWASTA Sheet No Rev
TAR UC) SELUAS 62234 METER PERSEGI (15.378 EKAR) DI ATAS SEBAHAGIAN PT
Jalan Ampang,50450 Kuala Lumpur. 30710 (H.S.D 9836) LOT BARU 106525, MAHKOTA VALLEY DI INDERA MAHKOTA, 1
Tel : 03-21661992 Fax : 03-21661993 MUKIM KUALA KUANTAN, DAERAH KUANTAN PAHANG DARUL MAKMUR Date :
a) Normal Flow, Q
Refer to the water reticulation layout plan,
The total length from node 1 to node 2 = 111.08 m
where,
b) Peak Flow
NOTE : Refer to the water reticulation layout plan to determine the node and pipe numbering
where,
Length, L = 111.08 m
Rough coefficient,C = 100
Peak flow rate, Qp = 0.043260 m3/s
Diameter of pipe, D = 0.20 m
Sectional Area, A = 0.03141593 m2
Velocity, V = 1.37701564 m/s
RL of pipe at Node 1 = 37.10 m
RL of pipe at Node 2 = 37.10 m
Residual Head at node 1 = 29.45 m
Thus the pressure at node 2 > height of supply level = 27.65 > 7.5 ok
Project Title : Project No :
2392
Suite 5.23 - 5.26, 5th Floor,Wisma Central, CADANGAN BANGUNAN PERNIAGAAN (INSTITUT PENGAJIAN TINGGI SWASTA Sheet No Rev
TAR UC) SELUAS 62234 METER PERSEGI (15.378 EKAR) DI ATAS SEBAHAGIAN PT
Jalan Ampang,50450 Kuala Lumpur. 30710 (H.S.D 9836) LOT BARU 106525, MAHKOTA VALLEY DI INDERA MAHKOTA, 1
Tel : 03-21661992 Fax : 03-21661993 MUKIM KUALA KUANTAN, DAERAH KUANTAN PAHANG DARUL MAKMUR Date :
a) Normal Flow, Q
Refer to the water reticulation layout plan,
The total length from node 2 to node 3 = 129.92 m
where,
Thus the pressure at node 3 > height of supply level = 44.33 > 7.5 ok
Project Title : Project No :
2392
Suite 5.23 - 5.26, 5th Floor,Wisma Central, CADANGAN BANGUNAN PERNIAGAAN (INSTITUT PENGAJIAN TINGGI SWASTA Sheet No Rev
TAR UC) SELUAS 62234 METER PERSEGI (15.378 EKAR) DI ATAS SEBAHAGIAN PT
Jalan Ampang,50450 Kuala Lumpur. 30710 (H.S.D 9836) LOT BARU 106525, MAHKOTA VALLEY DI INDERA MAHKOTA, 1
Tel : 03-21661992 Fax : 03-21661993 MUKIM KUALA KUANTAN, DAERAH KUANTAN PAHANG DARUL MAKMUR Date :
where,
Length, L = 129.92 m
Rough coefficient,C = 100
Peak flow rate, Qp = 0.043260 m3/s
Diameter of pipe, D = 0.20 m
Sectional Area, A = 0.03141593 m2
Velocity, V = 1.37701564 m/s
RL of pipe at Node 2 = 37.10 m
RL of pipe at Node 3 = 23.50 m
Residual Head at node 2 = 27.65 m
Thus the pressure at node 3 > height of supply level = 39.15 > 7.5 ok
a) Normal Flow, Q
Refer to the water reticulation layout plan,
The total length from node 3 to node 4 = 44.99 m
where,
Thus the pressure at node 4 > height of supply level = 44.30 > 7.5 OK
b) Peak Flow
NOTE : Refer to the water reticulation layout plan to determine the node and pipe numbering
where,
Length, L = 44.99 m
Rough coefficient,C = 100
Peak flow rate, Qp = 0.043260 m3/s
Diameter of pipe, D = 0.2 m
Sectional Area, A = 0.03141593 m2
Velocity, V = 1.37701564 m/s
RL of pipe at Node 3 = 23.50 m
RL of pipe at Node 4 = 23.40 m
Residual Head at node 3 = 39.15 m
Thus the pressure at node 4 > height of supply level = 38.52 > 7.5 OK
Project Title : Project No :
2392
Suite 5.23 - 5.26, 5th Floor,Wisma Central, CADANGAN BANGUNAN PERNIAGAAN (INSTITUT PENGAJIAN TINGGI SWASTA Sheet No Rev
TAR UC) SELUAS 62234 METER PERSEGI (15.378 EKAR) DI ATAS SEBAHAGIAN PT
Jalan Ampang,50450 Kuala Lumpur. 30710 (H.S.D 9836) LOT BARU 106525, MAHKOTA VALLEY DI INDERA MAHKOTA, 1
Tel : 03-21661992 Fax : 03-21661993 MUKIM KUALA KUANTAN, DAERAH KUANTAN PAHANG DARUL MAKMUR Date :
a) Normal Flow, Q
Refer to the water reticulation layout plan,
The total length from node 4 to node 5 = 67.61 m
where,
Thus the pressure at node 5 > height of supply level = 44.50 > 7.5 ok
Project Title : Project No :
2392
Suite 5.23 - 5.26, 5th Floor,Wisma Central, CADANGAN BANGUNAN PERNIAGAAN (INSTITUT PENGAJIAN TINGGI SWASTA Sheet No Rev
TAR UC) SELUAS 62234 METER PERSEGI (15.378 EKAR) DI ATAS SEBAHAGIAN PT
Jalan Ampang,50450 Kuala Lumpur. 30710 (H.S.D 9836) LOT BARU 106525, MAHKOTA VALLEY DI INDERA MAHKOTA, 1
Tel : 03-21661992 Fax : 03-21661993 MUKIM KUALA KUANTAN, DAERAH KUANTAN PAHANG DARUL MAKMUR Date :
where,
Length, L = 67.61 m
Rough coefficient,C = 100
Peak flow rate, Qp = 0.043260 m3/s
Diameter of pipe, D = 0.2 m
Sectional Area, A = 0.03141593 m2
Velocity, V = 1.37701564 m/s
RL of pipe at Node 4 = 23.40 m
RL of pipe at Node 5 = 23.00 m
Residual Head at node 4 = 38.52 m
Thus the pressure at node 5 > height of supply level = 37.83 > 7.5 OK
a) Normal Flow, Q
Refer to the water reticulation layout plan,
The total length from node 5 to node 6 = 74.57 m
where,
Thus the pressure at node 6 > height of supply level = 44.78 > 7.5 ok
b) Peak Flow
NOTE : Refer to the water reticulation layout plan to determine the node and pipe numbering
where,
Length, L = 74.57 m
Rough coefficient,C = 100
Peak flow rate, Qp = 0.043260 m3/s
Diameter of pipe, D = 0.2 m
Sectional Area, A = 0.03141593 m2
Velocity, V = 1.37701564 m/s
RL of pipe at Node 5 = 23.00 m
RL of pipe at Node 6 = 22.50 m
Residual Head at node 5 = 37.83 m
Thus the pressure at node 6 > height of supply level = 37.12 > 7.5 OK
Project Title : Project No :
2392
Suite 5.23 - 5.26, 5th Floor,Wisma Central, CADANGAN BANGUNAN PERNIAGAAN (INSTITUT PENGAJIAN TINGGI SWASTA Sheet No Rev
TAR UC) SELUAS 62234 METER PERSEGI (15.378 EKAR) DI ATAS SEBAHAGIAN PT
Jalan Ampang,50450 Kuala Lumpur. 30710 (H.S.D 9836) LOT BARU 106525, MAHKOTA VALLEY DI INDERA MAHKOTA, 1
Tel : 03-21661992 Fax : 03-21661993 MUKIM KUALA KUANTAN, DAERAH KUANTAN PAHANG DARUL MAKMUR Date :
a) Normal Flow, Q
Refer to the water reticulation layout plan,
The total length from node 6 to node 7 = 32.89 m
where,
Thus the pressure at node 7 > height of supply level = 44.68 > 7.5 OK
b) Peak Flow
NOTE : Refer to the water reticulation layout plan to determine the node and pipe numbering
where,
Length, L = 32.89 m
Rough coefficient,C = 100
Peak flow rate, Qp = 0.043260 m3/s
Diameter of pipe, D = 0.2 m
Sectional Area, A = 0.03141593 m2
Velocity, V = 1.37701564 m/s
RL of pipe at Node 6 = 22.50 m
RL of pipe at Node 7 = 22.50 m
Residual Head at node 6 = 37.12 m
Thus the pressure at node 7 > height of supply level = 36.59 > 7.5 OK
Project Title : Project No :
2392
CADANGAN BANGUNAN PERNIAGAAN (INSTITUT PENGAJIAN TINGGI SWASTA TAR UC) SELUAS Sheet No Rev
Suite 5.23 - 5.26, 5th Floor,Wisma Central,
62234 METER PERSEGI (15.378 EKAR) DI ATAS SEBAHAGIAN PT 30710 (H.S.D 9836) LOT BARU
Jalan Ampang,50450 Kuala Lumpur. 106525, MAHKOTA VALLEY DI INDERA MAHKOTA, MUKIM KUALA KUANTAN, DAERAH KUANTAN 2
Tel : 03-21661992 Fax : 03-21661993 PAHANG DARUL MAKMUR Date :
Thus the pressure at node 1 > height of supply level hydrant = 32.40> 7.5 m - OK
Project Title : Project No :
2392
CADANGAN BANGUNAN PERNIAGAAN (INSTITUT PENGAJIAN TINGGI SWASTA TAR UC) SELUAS Sheet No Rev
Suite 5.23 - 5.26, 5th Floor,Wisma Central,
62234 METER PERSEGI (15.378 EKAR) DI ATAS SEBAHAGIAN PT 30710 (H.S.D 9836) LOT BARU
Jalan Ampang,50450 Kuala Lumpur. 106525, MAHKOTA VALLEY DI INDERA MAHKOTA, MUKIM KUALA KUANTAN, DAERAH KUANTAN 2
Tel : 03-21661992 Fax : 03-21661993 PAHANG DARUL MAKMUR Date :
Thus the pressure at node 8 > height of supply level hydrant = 29.62 m > 7.5 m - OK
Project Title : Project No :
2392
CADANGAN BANGUNAN PERNIAGAAN (INSTITUT PENGAJIAN TINGGI SWASTA TAR UC) SELUAS Sheet No Rev
Suite 5.23 - 5.26, 5th Floor,Wisma Central,
62234 METER PERSEGI (15.378 EKAR) DI ATAS SEBAHAGIAN PT 30710 (H.S.D 9836) LOT BARU
Jalan Ampang,50450 Kuala Lumpur. 106525, MAHKOTA VALLEY DI INDERA MAHKOTA, MUKIM KUALA KUANTAN, DAERAH KUANTAN 2
Tel : 03-21661992 Fax : 03-21661993 PAHANG DARUL MAKMUR Date :
Thus the pressure at node 9 > height of supply level hydrant = 28.43m > 7.5m - OK
Thus the pressure at node 10 > height of supply level hydrant = 26.39m > 7.5m - OK
Project Title : Project No :
2392
CADANGAN BANGUNAN PERNIAGAAN (INSTITUT PENGAJIAN TINGGI SWASTA TAR UC) SELUAS Sheet No Rev
Suite 5.23 - 5.26, 5th Floor,Wisma Central,
62234 METER PERSEGI (15.378 EKAR) DI ATAS SEBAHAGIAN PT 30710 (H.S.D 9836) LOT BARU
Jalan Ampang,50450 Kuala Lumpur. 106525, MAHKOTA VALLEY DI INDERA MAHKOTA, MUKIM KUALA KUANTAN, DAERAH KUANTAN 2
Tel : 03-21661992 Fax : 03-21661993 PAHANG DARUL MAKMUR Date :
Thus the pressure at node 11 > height of supply level hydrant = 31.09m > 7.5m - OK
Thus the pressure at node 12 > height of supply level hydrant = 29.25m > 7.5m - OK
Thus the pressure at node 13 > height of supply level hydrant = 29.42m > 7.5m - OK