West Qurna I

Produced Water Treatment M109 Inspection Request Schedule RESPONSIBILITY

SUBCONTRACTO
Date Time Location IR No. Discription Action R
14-NOV-Civil
Loading Dry concrete for the pipe support in DS7.(blindingPS-
BR BATCH
14-Nov 6:30 PLANT CE-C1408 D7-001-016-017-075-082-096-097-098-099-100-101-102-103- Witness HALIDE
104;columnPS-D7-010-014,CTS-1001)
Sampling water that used mixing concrete for the pipe support in
14-Nov 8:00 DS7 CE-C1409 DS7.(blindingPS-D7-001-016-017-075-082-096-097-098-099-100- Witness HALIDE
101-102-103-104;columnPS-D7-010-014,CTS-1001).
Pouring concrete (including slump test, temperature and make
specimen (cubes)) for the pipe support in DS7.(blindingPS-D7-
14-Nov 8:30 DS7 CE-C1410 001-016-017-075-082-096-097-098-099-100-101-102-103-104;column Witness HALIDE
PS-D7-010-014,CTS-1001).

14-Nov 8:00 DS6 CE-C1411 Final inspection for the formwork,rebar and anchor bolts of the
containment for pump (including survey work) in DS6. inspection HALIDE

Witness conducting compaction degree test for pipe support


14-Nov 10:00 ALFO D8 LAB CE-C1412 areathird layerelevation=1.35)(2400mtank south-east Witness HALIDE
Corner

14-Nov 10:30 DS7 CE-C1412 Re-sampling backfill soil for pipe support areasixth
layerelevation=1.95) between two tanks. Witness HALIDE
ISSUED
West Qurna I
RESPONSIBILITY Date: 13-11-2017 Produced Water Treatment M109
Time:
CPECC COMPANY- Comments
QC DEP. OWNER 8 9 10 11 12 13 14 15 16

MAGANG MR.MAHER

MAGANG MR.MAHER

MAGANG MR.MAHER

MAGANG MR.HAMEED

MAGANG MR.MAHER

MAGANG MR.MAHER