You are on page 1of 57

1600/5A

Please check
incomer size;
1600A LOAD SUMMARY SHEET

PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI OWNERS NAME : AZIZI DEVELOPMENTS LLC


DETAILS OF CONNECTED LOAD / MAX. DEMAND PLOT NO. : AFNU 44B-45
CONSULTANT : 360 Degree
PLANNED COMPLETION DATE: LOCATION : ELECT. LVP ROOM
SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP ACB MCCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
INCOMER 4P 1,293.17 1,309.37 1,295.38 3,897.92 WITH INTERGRAL
METERS
OUTGOING

1 LVP-01 @D.F. 0.90 4P 2500 @ 0.85 65 DEWA 2CX150 314.66 322.14 327.42 964.22 126 6 1 2400/5A

2 LVP-02 @D.F. 0.80 4P 2500 @ 0.85 65 DEWA 2CX150 494.62 500.38 486.40 1481.41 111 23 1+2 2400/5A

4 LVP-03 @D.F. 0.80 4P 2500 @ 0.85 65 DEWA 2CX150 483.89 486.84 481.563 1452.29 63 19 1 2400/5A

NOTE Transformer with LV Integral Meter. ( 2X1500KVA AND 1X1000KVA)


All tenant meters are sub-meter. ( 436 Nos.)
TOTAL
TOTAL CONNECTED LOAD PER PHASE 1,293.17 1,309.37 1,295.38 3,897.92 300 48 0 3+2

DEMAND FACTOR . 0.80 MAX DEMAND .. 3118.34 KW TOTAL CONNECTED LOAD (3PH) 3897.92 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
MEP CONTRACTORS NAME : AL SHAFAR ELECTROMECHANICAL ENGINEERING CO. LLC.
TEL NO : 04 3346996
FAX NO : 04 3345115
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI OWNERS NAME : AZIZI DEVELOPMENTS LLC
DETAILS OF CONNECTED LOAD / MAX. DEMAND PLOT NO. : DHCC- RS DUBAI
LVP REF : LVP-01 CONSULTANT : 360 Degree
PLANNED COMPLETION DATE: LOCATION : ELECT. LVP ROOM
FED FORM : TRANSFORMER 01 ( 1.0 MVA )

SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP ACB MCCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
INCOMER 4P 1600 @ 0.9 65 DEWA 2CX150 302.16 309.64 314.92 926.72 1 1600/5A
OUTGOING

1 BUS BAR 01 TP 1600 50 1500 A - RYB+100% N+50% GROUND 302.16 309.64 314.92 926.72 126 6

2 CAP BANK 01(350Kvar) TP 800 65 XLPE/SWA/PVC 2-4Cx300 2-1C150 0.00

3 SPARE TP 100 35 12.50 12.50 12.50 37.50

TOTAL
TOTAL CONNECTED LOAD PER PHASE 314.66 322.14 327.42 964.22 126 6 0 1

DEMAND FACTOR . 0.80 MAX DEMAND .. 771.38 KW TOTAL CONNECTED LOAD (3PH) 964.22 KW TOTAL BUILD-UP AREA.
Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A 0 (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)

Rating shall be
1800A as per the
load
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI OWNERS NAME : AZIZI DEVELOPMENTS LLC
DETAILS OF CONNECTED LOAD / MAX. DEMAND PLOT NO. : DHCC- RS DUBAI
LVP REF : LVP-02 CONSULTANT : 360 Degree
PLANNED COMPLETION DATE: LOCATION : ELECT. LVP ROOM
FED FORM : TRANSFORMER 02 ( 1.5 MVA )
SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP ACB MCCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
INCOMER 4P 2500 @ 0.85 65 DEWA 2CX150 494.62 500.38 486.40 1,481.41 1 2400/5A
OUTGOING

1 BUS BAR 02 TP 1600 50 1600 A - RYB+100% N+50% GROUND 302.98 308.75 293.79 905.52 111 21
2 CAP BANK 01(350Kvar) TP 800 65 XLPE/SWA/PVC 2-4Cx300 2-1C150
3 MDB-G TP 800 35 XLPE/SWA/PVC 2-4Cx300 2Cx150 129.31 129.30 127.78 386.39 2 200/5A

4 FIRE PUMP TP 400 35 XLPE/SWA/PVC 1-4Cx300 1-1C150 62.33 62.33 62.33 187.00 ELS+Alarm+Strt
5 DB-SS SP 40 35 XLPE/SWA/PVC 1-3CX10 1.50 1.50
6 DB-RMU SP 40 35 XLPE/SWA/PVC 1-3CX10 1.00 1.00
TOTAL
TOTAL CONNECTED LOAD PER PHASE 494.62 500.38 486.40 1481.41 111 23 1

DEMAND FACTOR . 0.80 MAX DEMAND .. 1185.13 KW TOTAL CONNECTED LOAD (3PH) 1481.41 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)

Rating shall be
1800A as per the
load
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI OWNERS NAME : AZIZI DEVELOPMENTS LLC
DETAILS OF CONNECTED LOAD / MAX. DEMAND PLOT NO. : DHCC- RS DUBAI
LVP REF : LVP-03 CONSULTANT : 360 Degree
PLANNED COMPLETION DATE: LOCATION : ELECT. LVP ROOM
FED FORM : TRANSFORMER 03 ( 1.5 MVA )
SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP ACB MCCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
INCOMER 4P 2500 @ 0.85 65 DEWA 2CX150 483.89 486.84 481.56 1,452.29 1 2400/5A
OUTGOING
1 BUSBAR 03 TP 1500 50 1500 A BUSBAR RYB+100%N+50%E COPPER 231.50 238.04 232.90 702.44 75 5
2 CAP BANK 02 (350 KVAr) TP 800 65 XLPE/SWA/PVC 2-4Cx300 2-1C150
3 MDBE-G TP 800 35 XLPE/SWA/PVC 2-4Cx300 2Cx150 118.23 114.63 114.49 347.36
4 MCC-B TP 300 35 XLPE/SWA/PVC 1-4Cx185 1C 95 49.00 49.00 49.00 147.00
5 SPARE TP 125 35 21.33 21.33 21.33 64.00
6 SPARE TP 125 35 21.17 21.17 21.17 63.50
7 SPARE TP 125 35 21.33 21.33 21.33 64.00
8 SPARE TP 125 35 21.33 21.33 21.33 64.00
TOTAL
`
TOTAL CONNECTED LOAD PER PHASE 483.89 486.84 481.56 1452.29 63 19 0 1
DEMAND FACTOR . 0.80 MAX DEMAND .. 1161.83 KW TOTAL CONNECTED LOAD (3PH) 1452.29 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)

Rating shall be
1400A as per the
load
refer earlier
comments

PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI


DETAILS OF CONNECTED LOAD / MAX. DEMAND
BB REF : BUS BAR 01 CONSULTANT : 360 Degree
LOCATION : ELECT. LVP ROOM
FED FORM : LVP- 1
SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
INCOMER TP 1500 50 1500 A - RYB+100% N+50& GROUND BUS BAR 302.16 309.64 314.92 926.72
OUTGOING

1 SMDB-L1 TP 630 35 XLPE/SWA/PVC 2-4Cx185 1Cx95 85.56 85.71 91.01 262.28 30 2


2 SMDB-L2 TP 630 35 XLPE/SWA/PVC 2-4Cx150 1Cx70 76.89 77.85 71.62 226.37 32 2
3 SMDB-L3 TP 630 35 XLPE/SWA/PVC 2-4Cx150 1Cx70 73.92 68.54 76.58 219.04 32 1
4 SMDB-L4 TP 630 35 XLPE/SWA/PVC 2-4Cx150 1Cx70 65.78 77.54 75.71 219.04 32 1
TOTAL
TOTAL CONNECTED LOAD PER PHASE 302.16 309.64 314.92 926.72 126 6

DEMAND FACTOR . 0.85 MAX DEMAND .. 787.71 KW TOTAL CONNECTED LOAD (3PH) 926.72 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)

Rating shall be
400A
Please revise the cable size as per
the commented breaker size
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI
DETAILS OF CONNECTED LOAD / MAX. DEMAND
BB REF : BUS BAR 02 CONSULTANT : 360 Degree
LOCATION : ELECT. LVP ROOM
FED FORM : LVP- 2
SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
INCOMER TP 1500 50 1500 A - RYB+100% N+50& GROUND BUS BAR 302.98 308.75 293.79 905.52
OUTGOING 1+2

1 SMDB-L5 TP 630 35 XLPE/SWA/PVC 2-4Cx150 1Cx70 76.04 68.96 67.42 212.42 31 1


2 SMDB-L6 TP 630 35 XLPE/SWA/PVC 2-4Cx150 1Cx70 66.28 66.37 67.63 200.28 24 2
3 SMDB-L7 TP 400 35 XLPE/SWA/PVC 1-4Cx300 1Cx150 57.85 59.00 52.41 169.26 23 2
4 SMDB-L8 TP 400 35 XLPE/SWA/PVC 1-4Cx300 1Cx150 55.78 59.07 57.71 172.56 24 2
5 SMDB-L9 TP 350 35 XLPE/SWA/PVC 1-4Cx240 1Cx120 47.03 55.35 48.62 151.00 22 1
TOTAL
TOTAL CONNECTED LOAD PER PHASE 302.98 308.75 293.79 905.52 124 8

DEMAND FACTOR . 0.85 MAX DEMAND .. 769.69 KW TOTAL CONNECTED LOAD (3PH) 905.52 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
Breaker size shall
be 400A, revise the
cable size
Breaker size shall
be 300A, revise the
cable size
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI
DETAILS OF CONNECTED LOAD / MAX. DEMAND
BB REF : BUS BAR 03 CONSULTANT : 360 Degree
LOCATION : ELECT. LVP ROOM
FED FORM : LVP- 3
SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
INCOMER TP 1500 50 1500 A - RYB+100% N+50& GROUND BUS BAR 231.50 238.04 232.90 702.44
OUTGOING

1 SMDB-L10 TP 300 35 XLPE/SWA/PVC 1-4Cx185 1Cx95 41.19 44.60 51.29 137.07 19 1


2 SMDB-L11 TP 300 35 XLPE/SWA/PVC 1-4Cx185 1Cx95 48.96 42.93 41.94 133.84 16 1
3 SMDB-L12 TP 250 35 XLPE/SWA/PVC 1-4Cx150 1Cx70 36.13 38.60 37.67 112.40 15 1
4 SMDB-L13 TP 250 35 XLPE/SWA/PVC 1-4Cx150 1Cx70 35.50 38.69 30.24 96.52 13 1
5 SMDB-L14 TP 200 35 XLPE/SWA/PVC 1-4Cx95 1Cx50 27.72 31.23 29.77 88.71 12 1
6 SMDB-RF TP 300 35 XLPE/SWA/PVC 1-4Cx185 1Cx95 42.00 42.00 42.00 126.00
TOTAL
TOTAL CONNECTED LOAD PER PHASE 231.50 238.04 232.90 702.44 75 5

DEMAND FACTOR . 0.85 MAX DEMAND .. 597.07 KW TOTAL CONNECTED LOAD (3PH) 702.44 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)

Breaker size shall


be 250A
80A 100mA ELCB

PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI


DETAILS OF CONNECTED LOAD / MAX. DEMAND
MDBREF
REFMDB-G
:
LOCATION : ELECT. LVP ROOM
FED FORM : LVP- 2
SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 800 25 XLPE/SWA/PVC 2-4Cx300 2Cx150 129.31 129.30 127.78 386.39
OUTGOING

1 RYB1 DB -G TP 125 25 XLPE/SWA/PVC 1-4CX50 1C25 14.16 14.23 12.76 41.15

2 RYB2 TRANSFER PUMPS TP 63 25 XLPE/SWA/PVC 1-4CX16 1C16 7.33 7.33 7.33 22.00 30 mA/ELCB

3 RYB3 SUMP PUMP-1 TP 40 25 XLPE/SWA/PVC 1-4CX10 1C10 1.13 1.13 1.13 3.40 ELS+Alrm

3 RYB4 SUMP PUMP-2 TP 40 25 XLPE/SWA/PVC 1-4CX10 1C10 1.33 1.33 1.33 4.00 ELS+Alrm
250/5A
4 RYB5 SMDB-R1 TP 250 25 XLPE/SWA/PVC 1-4CX150 1C95 40.00 40.00 40.00 120.00 1
250/5A
5 RYB6 SMDB-R2 TP 250 25 XLPE/SWA/PVC 1-4CX150 1C95 40.00 40.00 40.00 120.00 1

7 RYB7 FAHU CORRIDOR 1 TP 63 25 XLPE/SWA/PVC 1-4CX16 1C16 10.00 10.00 10.00 30.00 100mA/WYE-DELTA

8 RYB8 FAHU CORRIDOR 2 TP 63 25 XLPE/SWA/PVC 1-4CX16 1C16 10.00 10.00 10.00 30.00 100mA/WYE-DELTA

9 RYB9 IRRAGATION PUMPS TP 40 25 XLPE/SWA/PVC 1-4CX10 1C10 5.00 5.00 5.00 15.00 100 mA/ELCB

10 RYB10 DB -GD TP 40 25 XLPE/SWA/PVC 1-4CX10 1C10 0.35 0.27 0.22 0.84


129.3 129.3 127.8 386.39 TOTAL
TOTAL CONNECTED LOAD PER PHASE 0 2
.
DEMAND FACTOR . 0.85 MAX DEMAND .. 328.4 KW TOTAL CONNECTED LOAD (3PH) 386.39 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)

Provide MCC panel


for FAHU
230V

400V

PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai


DB REF :TYPICAL STUDIO Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
SUBSTATION
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION
Typical
: Flat
DB No. : : DB -SS Fed From : LVP-02 System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A 1P MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W REMARKS
LOAD PER CIRCUIT
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG UNIT WATTS
ROOM/AREA
EX 13A 13A
35.6 BELL S/H FCU CCU D/W W/M
IN SIZE SIZE KA FAN SSO TSSO R Y B
2
Amp. mm mm2 W
40A 1 C1 10 2.5 2.5 RMU 4 36 0.14
2P 2 C2 10 2.5 2.5 RMU(CB LIGHT) 2 36 0.07
100mA 3 C3 20 Spare 36 0.20
40A 4 C4 20 4.0 4.0 Substation 3 200 0.60
2P 5 C5 space
30mA 6 C6 space
TOTAL LOAD
CABLE SIZE: 1X 3C 10mm2 Cu./PVC-XLPE/SWA/PVC PER PHASE 1.0

TOTAL LOAD : 1.0 KW


PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL STUDIO Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
SUBSTATION
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION
Typical
: Flat
DB No. : : DB -RMU Fed From : LVP-02 System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A 1P MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W REMARKS
LOAD PER CIRCUIT
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG UNIT WATTS
ROOM/AREA
EX 13A 13A
35.6 BELL S/H FCU CCU D/W W/M
IN SIZE SIZE KA FAN SSO TSSO R Y B
2
Amp. mm mm2 W
40A 1 C1 10 2.5 2.5 RMU ROOM 6 36 0.21
2P 2 C2 10 2.5 2.5 RMU ROOM (CB LIGHT) 2 36 0.07
100mA 3 C3 20 Spare 36 0.10
40A 4 C4 20 4.0 4.0 RMU ROOM 3 200 0.60
2P 5 C5 20 4.0 4.0 RMU ROOM 1 200
30mA 6 C6 space
TOTAL LOAD
CABLE SIZE: 1X 3C 10mm2 Cu./PVC-XLPE/SWA/PVC PER PHASE 0.98

TOTAL LOAD : 1.0 KW


Owner : Azizi Developments
Location : AL FURJAN , DUBAI
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : LVP ROOM
DB No. : : DB - G Fed From MDB - G
B System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 125A TP MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. EXF 13A BELL WH UNIT KILO Watts
ROOM/AREA

SPLIT
ACU

Others
IN SIZE SIZE KA 22 48 50 200 50 S/O FCU 50 1500 R Y B
2 2
Amp. mm mm W W W W W W W W
1 R1 10 2.5 2.5 Basement Parking Area 17 48 0.82 CONTROLLED M.S
2 Y1 10 2.5 2.5 Basement Parking Area 11 48 0.53 CONTROLLED M.S
40A 3 B1 10 2.5 2.5 Basement Parking Area 7 48 0.34 CONTROLLED M.S
4P 4 R2 10 2.5 2.5 Basement Drive way,Slope to Ground 15 48 0.72 CONTROLLED M.S
100mA 5 Y2 10 2.5 2.5 Basement Parking Area 16 48 0.77 CONTROLLED M.S
6 B2 10 2.5 2.5 Basement Parking Area 7 48 0.34 CONTROLLED M.S
7 R3 10 2.5 2.5 Basement Drive way 6 48 0.29 CONTROLLED M.S
8 Y3 10 2.5 2.5 Basement MEP Room 2 48 0.10 CONTROLLED SWITCH
40A 9 B3 10 2.5 2.5 Basement Lift Enterance Lobby 11 22 0.24 CONTROLLED M.S
4P 10 R4 10 2.5 2.5 Ground Parking Area 11 48 0.53 CONTROLLED M.S
100mA 11 Y4 10 2.5 2.5 Ground Parking Area 6 48 0.29 CONTROLLED M.S
12 B4 10 2.5 2.5 Ground Parking Area 12 48 0.58 CONTROLLED M.S
13 R5 10 2.5 2.5 Ground Drive way 8 48 0.38 CONTROLLED M.S
14 Y5 10 2.5 2.5 Ground Drive way 14 48 0.67 CONTROLLED M.S
40A 15 B5 10 2.5 2.5 Ground MEP Room,Security & Garbage Room 8 48 0.38 CONTROLLED SWITCH
4P 16 R6 10 2.5 2.5 Ground External Area 14 50 0.70 CONTROLLED SWITCH
100mA 17 Y6 10 2.5 2.5 Ground External Area 15 50 0.75 CONTROLLED SWITCH
18 B6 10 2.5 2.5 Ground External Area 7 48 0.34 CONTROLLED SWITCH
19 R7 10 2.5 2.5 External Area 6 48 0.29 CONTROLLED SWITCH
20 Y7 10 2.5 2.5 Ground Enterance Lobby 10 22 0.22 CONTROLLED M.S
40A 21 B7 10 2.5 2.5 Podium 01 Parking Area 12 48 0.58 CONTROLLED M.S
4P 22 R8 10 2.5 2.5 Podium 01 Parking Area 8 48 0.38 CONTROLLED M.S
100mA 23 Y8 10 2.5 2.5 Podium 01 Lift enterance Lobby 11 22 0.24 CONTROLLED SWITCH
24 B8 10 2.5 2.5 Podium 01 Parking Area 8 48 0.38 CONTROLLED M.S
25 R9 10 2.5 2.5 Podium 01 Parking Area 17 48 0.82 CONTROLLED M.S
26 Y9 10 2.5 2.5 Podium 01 Drive way 6 48 0.29 CONTROLLED M.S
40A 27 B9 10 2.5 2.5 Podium 01 Drive way & GroundSlope 14 48 0.67 CONTROLLED M.S
4P 28 R10 10 2.5 2.5 Podium 02 Lift Enterance Lobby 11 22 0.24 CONTROLLED M.S
100mA 29 Y10 10 2.5 2.5 Podium 02 MEP Room(RMU) 1 48 0.05 CONTROLLED SWITCH
30 B10 10 2.5 2.5 Podium 02 Parking Area 12 48 0.58 CONTROLLED M.S
31 R11 10 Spare 48 0.05
32 Y11 10 2.5 2.5 Podium 02 Parking Area 8 48 0.38 CONTROLLED M.S
40A 33 B11 10 Spare 48 0.05
4P 34 R12 10 2.5 2.5 Podium 02 Parking Area 18 48 0.86 CONTROLLED M.S
100mA 35 Y12 10 Spare 48 0.05
36 B12 10 2.5 2.5 Podium 02 Drive way 12 48 0.58 CONTROLLED M.S
37 R13 10 Spare 48 0.05
38 Y13 10 2.5 2.5 Podium 02 Parking Area 17 48 0.82 CONTROLLED M.S
40A 39 B13 10 2.5 2.5 Podium 02 Parking Area 7 48 0.34 CONTROLLED M.S
4P 40 R14 10 Spare 48 0.05
100mA 41 Y14 10 2.5 2.5 Podium 02 Drive way 10 48 0.48 CONTROLLED M.S
42 B14 10 2.5 2.5 Podium-02 MEP Room 3 48 0.144 CONTROLLED SWITCH
80A

Owner : Azizi Developments


Location : AL FURJAN , DUBAI
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : LVP ROOM
DB No. : : DB - G Fed From MDB - G
B System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 125A TP MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. EXF 13A BELL WH UNIT KILO Watts
ROOM/AREA

SPLIT
ACU

Others
IN SIZE SIZE KA 22 48 50 200 50 S/O FCU 50 1500 R Y B
2 2
Amp. mm mm W W W W W W W W
43 R15 20 4 4 Basement Enterance Lobby 1 143 0.14 FCU-B1-01
40A 44 Y15 20 4 4 Basement RMU Room (Primary Pump Room) 1 190 0.19 FCU-B1-04
4P 45 B15 20 4 4 Basement MEP Room 1 132 0.13 FCU-B1-02
100mA 46 R16 20 4 4 Basement RMU ROOM 1 132 0.1 FCU-B1-03
47 Y16 20 4 4 Basement PUMP Room 1 1100 1.10 FCU-B1-05
48 B16 20 4 4 G.D Garbage Room 1 522 0.52 FCU-GF-04
49 R17 20 4 4 G.D Telecom Room 1 1100 1.10 FCU-GF-01
40A 50 Y17 20 4 4 G.DSecurity Room 1 259 0.26 FCU-GF-08
4P 51 B17 20 4 4 G.D Enterance Lobby 1 190 0.19 FCU-GF-03
100mA 52 R18 20 4 4 G.D MEP Room 1 132 0.13 FCU-GF-06
53 Y18 20 4 4 G.D LV Room 1 522 0.52 FCU-GF-05
54 B18 20 Spare 132 0.132
55 R19 20 4 4 P-02 Enterance Lobby 1 143 0.143 P2-01
40A 56 Y19 20 4 4 P-01 Enterance Lobby 1 143 0.143 P1-01
4P 57 B19 20 4 4 P-01 MEP Room 1 132 0.132 P1-02
100mA 58 R20 20 Spare 132 0.132
59 Y20 20 4 4 P-02 MEP Room 1 190 0.19 P2-02
60 B20 20 4 4 P-02 RMU Room Area 1 132 0.132 P2-03
61 R21 20 4 4 BasementParking Area & Generator 4 200 0.80
62 Y21 20 4 4 BasemntParking Area Pump & RMU Room 5 200 1.00 RING
40A 63 B21 20 4 4 Basement LV Room& Enterance Lobby 5 200 1.00 RING
4P 64 R22 20 4 4 Basement Parking Area 4 200 0.80
30mA 65 Y22 20 4 4 Basement Parking Area 5 200 1.00 RING
66 B22 20 4 4 Ground Parking Area Near & Stair-03 Wall 4 200 0.80
67 R23 20 4 4 Ground Parking Area 4 200 0.80
40A 68 Y23 20 4 4 Ground Garbage Room Near & Stair-01 4 200 0.80
4P 69 B23 20 4 4 Ground Parking Area & external Area 4 200 0.80
30mA 70 R24 20 4 4 Ground Lift Enterance Lobby & LV Room 5 200 1.00 RING
71 Y24 20 4 4 Podium-01 Parking Area 4 200 0.80
72 B24 20 4 4 Podium-01 Parking Area & MEP Room 5 200 1.00 RING
73 R25 20 4 4 Podiu m-01 Parking Area 5 200 1.00 RING
40A 74 Y25 20 4 4 Podium-01 Parking Area 5 200 1.00 RING
4P 75 B25 20 4 4 Podium-02 Parking Area 5 200 1.00 RING
30mA 76 R26 20 4 4 Podium-02 Parking Area & MEP Room 5 200 1.00 RING
77 Y26 20 4 4 Podium-02 Parking Area 5 200 1.00 RING
78 B26 20 4 4 Podium-02 Parking Area & Enterance Lobby 5 200 1.00 RING
79 R27 20 4 4 Ground Security Room 3 200 0.60
40A 80 Y27 20 4 4 Basement Lift(maintance) 2 200 0.40
4P 81 B27 20 Spare 200 0.20
30mA 82 R28 20 Spare 200 0.2
83 Y28 20 4 4 Basement Lift(maintance) 1 200 0.20
84 B28 20 Spare 200 0.20

TOTAL LOAD PER PHASE


CABLE SIZE : 1x4C -50mm2 XLPE/SWA/PVC + 1C 25mm2 CU ECC. 14.16 14.23 12.76

TOTAL LOAD : 41.15 KW


PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

MCC REF : MCC -B LOCATION : MECH. ROOM BASEMENT

FED FORM : LVP-03


SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 300 35 XLPE/SWA/PVC 1-4Cx185 1C 95 49.00 49.00 49.00 147.00
OUTGOING
1 RYB1 PRIMARY PUMP 01 TP 63 25 XLPE/SWA/PVC 1-4CX16 1C 16 12.00 12.00 12.00 36.00
VFD,
2 RYB2 PRIMARY PUMP 02 TP 63 25 XLPE/SWA/PVC 1-4CX16 1C 16 12.00 12.00 12.00 36.00 300mA
ELCB
3 RYB3 PRIMARY PUMP 03 TP 63 25 XLPE/SWA/PVC 1-4CX16 1C 16 12.00 12.00 12.00 36.00
4 RYB4 PRIMARY PUMP 04 TP 63 25 XLPE/SWA/PVC 1-4CX16 1C 16 12.00 12.00 12.00 36.00
5 RYB4 PRESSURAZATION UNIT TP 20 25 XLPE/SWA/PVC 1-4CX6 1C6 1.00 1.00 1.00 3.00

Note: VFD controlled motors shall have by Pass of wye-Delta Start controls.
TOTAL CONNECTED LOAD PER PHASE 49.00 49.00 49.00 147.00 0 TOTAL

DEMAND FACTOR . 1.00 MAX DEMAND .. 147.00 KW TOTAL CONNECTED LOAD (3PH) 147.00 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
Owner : Azizi Developments
Location : AL FURJAN , DUBAI
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : LVP ROOM
DB No. : : DB - GD ( DIMMER ) Fed From MDB - B System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A TP ISOLATOR
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. CH LTG. EXF 13A FCU BELL WH UNIT KILO Watts
ROOM/AREA Strip Light

Others
IN SIZE SIZE KA 20 35.6 50 200 50 S/O 14.4/5m 400 50 1500 R Y B
2 2
Amp. mm mm W W W W W W W W
1 R1 10 2.5 2.5 Ground Chandelier Enterance Lobby 1 50 0.05 CONTROLLED SWITCH
40A 2 Y1 10 2.5 2.5 Ground Chandelier Enterance Lobby 1 50 0.05 CONTROLLED SWITCH
4P 3 B1 10 2.5 2.5 Ground Retail Side 25 14.4 0.07 CONTROLLED SWITCH
100mA 4 R2 10 2.5 2.5 Ground External Area 25 14.4 0.07 CONTROLLED SWITCH
5 Y2 10 2.5 2.5 Ground External Area 25 14.4 0.07 CONTROLLED SWITCH
6 B2 10 2.5 2.5 Ground External Area 25 14.4 0.07 CONTROLLED SWITCH
7 R3 10 2.5 2.5 Ground External Area 25 14.4 0.07 CONTROLLED SWITCH
40A 8 Y3 10 2.5 2.5 Ground External Area 25 14.4 0.07 CONTROLLED SWITCH
4P 9 B3 10 2.5 2.5 Ground Enterance Lobby 25 14.4 0.07 CONTROLLED M.S
100mA 10 R4 10 2.5 2.5 Ground Enterance Lobby Lift Side 8 20 0.16 CONTROLLED SWITCH
11 Y4 10 2.5 2.5 Ground Retail Side 25 14.4 0.07 CONTROLLED M.S
12 B4 10 Spare 200
TOTAL LOAD 0.35 0.27 0.22
CABLE SIZE : 1x4C -10mm2 XLPE/SWA/PVC + 1C 10.0mm2 CU ECC. PER PHASE

TOTAL LOAD : 0.84 KW


PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L1 LOCATION : ELECT. ROOM L1

FED FORM : LVP 01 / BUSBAR 01


SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)

RYB INCOMER TP 630 35 XLPE/SWA/PVC 2-4Cx185 1Cx95 85.56 85.71 91.01 262.28
OUTGOING
1 R1 DB-F-102 SP 32 25 CU/PVC/WIRE 2-1CX10 52 1-1CX10 5.50 5.50 1 STD
2 Y1 DB-F-105 SP 32 25 CU/PVC/WIRE 2-1CX10 45 1-1CX10 5.47 5.47 1 STD
3 B1 DB-F-106 SP 32 25 CU/PVC/WIRE 2-1CX10 40 1-1CX10 5.47 5.47 1 STD
4 R2 DB-F-107 SP 32 25 CU/PVC/WIRE 2-1CX10 37 1-1CX10 5.47 5.47 1 STD
5 Y2 DB-F-108 SP 32 25 CU/PVC/WIRE 2-1CX10 34 1-1CX10 5.47 5.47 1 STD
6 B2 DB-F-109 SP 32 25 CU/PVC/WIRE 2-1CX10 32 1-1CX10 5.47 5.47 1 STD
7 R3 DB-F-110 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.47 5.47 1 STD
8 Y3 DB-F-111 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.47 5.47 1 STD
9 B3 DB-F-112 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.47 5.47 1 STD
10 R4 DB-F-113 SP 32 25 CU/PVC/WIRE 2-1CX10 35 1-1CX10 5.47 5.47 1 STD
11 Y4 DB-F-114 SP 32 25 CU/PVC/WIRE 2-1CX10 36 1-1CX10 5.47 5.47 1 STD
12 B4 DB-F-116 SP 32 25 CU/PVC/WIRE 2-1CX10 42 1-1CX10 5.50 5.50 1 STD
13 R5 DB-F-118 SP 32 25 CU/PVC/WIRE 2-1CX10 40 1-1CX10 5.47 5.47 1 STD
14 Y5 DB-F-120 SP 32 25 CU/PVC/WIRE 2-1CX10 22 1-1CX10 5.47 5.47 1 STD
15 B5 DB-F-121 SP 32 25 CU/PVC/WIRE 2-1CX10 27 1-1CX10 5.46 5.46 1 STD
16 R6 DB-F-125 SP 32 25 CU/PVC/WIRE 2-1CX10 45 1-1CX10 5.47 5.47 1 STD
17 Y6 DB-F-126 SP 32 25 CU/PVC/WIRE 2-1CX10 48 1-1CX10 5.47 5.47 1 STD
18 B6 DB-F-128 SP 32 25 CU/PVC/WIRE 2-1CX10 58 1-1CX10 5.50 5.50 1 STD
19 R7 DB-F-130 SP 32 25 CU/PVC/WIRE 2-1CX10 57 1-1CX10 5.47 5.47 1 STD
20 Y7 DB-F-131 SP 32 25 CU/PVC/WIRE 2-1CX10 50 1-1CX10 5.47 5.47 1 STD
21 B7 DB-F-132 SP 32 25 CU/PVC/WIRE 2-1CX10 48 1-1CX10 5.47 5.47 1 STD
22 R8 DB-F-103 SP 40 25 CU/PVC/WIRE 2-1CX16 52 1-1CX16 7.90 7.90 1 1BR
23 Y8 DB-F-104 SP 40 25 CU/PVC/WIRE 2-1CX16 50 1-1CX16 . 7.90 7.90 1 1BR
24 B8 DB-F-115 SP 40 25 CU/PVC/WIRE 2-1CX16 38 1-1CX16 8.24 8.24 1 1BR
25 R9 DB-F-117 SP 40 25 CU/PVC/WIRE 2-1CX16 45 1-1CX16 8.19 8.19 1 1BR
26 Y9 DB-F-119 SP 40 25 CU/PVC/WIRE 2-1CX16 38 1-1CX16 7.96 7.96 1 1BR
27 B9 DB-F-122 SP 40 25 CU/PVC/WIRE 2-1CX16 28 1-1CX16 8.37 8.37 1 1BR
28 R10 DB-F-123 SP 40 25 CU/PVC/WIRE 2-1CX16 34 1-1CX16 7.85 7.85 1 1BR
29 Y10 DB-F-124 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.85 7.85 1 1BR
30 B10 DB-F-129 SP 40 25 CU/PVC/WIRE 2-1CX16 60 1-1CX16 8.19 8.19 1 1BR
31 RYB11 DB-F-101 TP 32 25 CU/PVC/WIRE 4-1CX16 55 1-1CX16 3.42 4.06 3.02 10.50 1 2BR
32 RYB12 DB-F-127 TP 32 25 CU/PVC/WIRE 4-1CX16 52 1-1CX16 3.42 4.06 3.02 10.50 1 2BR
33 RYB13 DB-L1 TP 100 25 XLPE/SWA/PVC 1-4CX35 10 1C16 16.46 15.59 21.82 53.88

TOTAL CONNECTED LOAD PER PHASE 85.56 85.71 91.01 262.28 30 2

DEMAND FACTOR . 0.85 MAX DEMAND .. 222.94 KW TOTAL CONNECTED LOAD (3PH) 262.28 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
Owner : Azizi Developments
Location : AL FURJAN , DUBAI
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : ELEC ROOM
DB No. : : DB - L1 Fed From SMDB - L1 System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 100 TP ISOLATOR
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS KW LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. 13A HD FCU BELL WH UNIT KILO Watts
ROOM/AREA

Others
IN SIZE SIZE KA 11 48 22 72 2.2 15 S/O 1000 50 1500 R Y B
2
Amp. mm mm2 W W W W W W W W W W W
1 R1 10 2.5 2.5 Lighting Corridor L1 13 11 0.14
40A 2 Y1 10 2.5 2.5 Lighting Corridor L2 13 11 0.14
4P 3 B1 10 2.5 2.5 Lighting Corridor L3 12 11 0.13
100mA 4 R2 10 2.5 2.5 Lighting Corridor L4 11 11 0.12
5 Y2 10 2.5 2.5 Lighting Corridor L5 11 11 0.12
6 B2 10 2.5 2.5 KIDS Playground Floor Light 4 2.2 8.80
7 R3 10 2.5 2.5 Lighting Corridor L1 16 11 0.80
40A 8 Y3 10 2.5 2.5 Lighting Corridor L2 16 11 0.18
4P 9 B3 10 2.5 2.5 Lighting Corridor L3 16 11 0.18
100mA 10 R4 10 2.5 2.5 Lighting Corridor L4 15 11 0.75
11 Y4 10 2.5 2.5 Lighting Corridor L5 15 11 0.17
12 B4 10 2.5 2.5 Garden Lighting 9 15 0.14
13 R5 10 2.5 2.5 Atrium Lighting 14 72 1.01
40A 14 Y5 10 2.5 2.5 Atrium Lighting 14 72 1.01
4P 15 B5 10 2.5 2.5 Toilet Lights 12 22 0.26
100mA 16 R6 10 2.5 2.5 Toilet Lights 2 11 22/48 0.34
17 Y6 10 2.5 2.5 Gym Lightings 7 22 0.15
18 B6 20 2.5 2.5 Gym Lightings 7 22 0.15
19 R7 20 4.0 4.0 FCU Corridor L1 1 143 0.14
20 Y7 20 4.0 4.0 FCU Corridor L1 1 143 0.14
40A 21 B7 20 4.0 4.0 FCU Corridor L1 1 190 0.19
4P 22 R8 20 4.0 4.0 FCU Corridor L1 1 143 0.14
100mA 23 Y8 20 4.0 4.0 FCU Corridor L1 1 597 0.60
24 B8 Space
25 R9 Space
40A 26 Y9 Space
4P 27 B9 20 4.0 4.0 FCU Corridor L2 1 P 0.00
100mA 28 R10 20 4.0 4.0 FCU Corridor L2 1 50 0.00
29 Y10 20 4.0 4.0 FCU Corridor L2 1 69 0.07
30 B10 20 4.0 4.0 FCU Corridor L2 1 50 0.05
31 R11 20 4.0 4.0 FCU Corridor L3 1 50 0.05
40A 32 Y11 20 4.0 4.0 FCU Corridor L3 1 50 0.05
4P 33 B11 20 4.0 4.0 FCU Corridor L3 1 69 0.07
100mA 34 R12 20 4.0 4.0 FCU Corridor L3 1 50 0.05
35 Y12 20 4.0 4.0 FCU Corridor L4 1 50 0.05
36 B12 20 4.0 4.0 FCU Corridor L4 1 50 0.05
Owner : Azizi Developments
Location : AL FURJAN , DUBAI
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : ELEC ROOM
DB No. : : DB - L1 Fed From SMDB - L1 System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 100 TP ISOLATOR
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS KW LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. 13A HD FCU BELL WH UNIT KILO Watts
ROOM/AREA

Others
IN SIZE SIZE KA 11 48 22 72 2.2 15 S/O 1000 50 1500 R Y B
2
Amp. mm mm2 W W W W W W W W W W W
37 R13 20 4.0 4.0 FCU Corridor L4 1 69 0.07
40A 38 Y13 20 4.0 4.0 FCU Corridor L4 1 50 0.05
4P 39 B13 20 4.0 4.0 FCU Corridor L5 1 50 0.05
100mA 40 R14 20 4.0 4.0 FCU Corridor L5 1 50 0.05
41 Y14 20 4.0 4.0 FCU Corridor L5 1 69 0.07
42 B14 20 4.0 4.0 FCU Corridor L5 1 50 0.05
43 R15 20 4.0 4.0 Socket Outlet Corridor L1 4 200 0.80
40A 44 Y15 20 4.0 4.0 Socket Outlet Corridor L2 4 200 0.80
4P 45 B15 20 4.0 4.0 Socket Outlet Corridor L3 4 200 0.80
30mA 46 R16 20 4.0 4.0 Socket Outlet Corridor L4 4 200 0.80
47 Y16 20 4.0 4.0 Socket Outlet Corridor L5 4 200 0.80
48 B16 20 4.0 4.0 KIDS Playground Socket 5 200 1.00 RING
49 R17 20 4.0 4.0 Socket Outlet Corridor L5 4 200 0.80
40A 50 Y17 20 4.0 4.0 Socket Outlet Corridor L1 4 200 0.80
4P 51 B17 20 4.0 4.0 Socket Outlet Corridor L2 4 200 0.80
30mA 52 R18 20 4.0 4.0 Socket Outlet Corridor L3 4 200 0.80
53 Y18 20 4.0 4.0 Socket Outlet Corridor L4 4 200 0.80
54 B18 20 4.0 4.0 GYM Socket 5 200 1
55 R19 20 4.0 4.0 GYM Socket 5 200 1.00
40A 56 Y19 20 4.0 4.0 Hand Drier 1 1000 1.00
4P 57 B19 20 4.0 4.0 Hand Drier 1 1000 1.00
30mA 58 R20 20 4.0 4.0 Water Heater 1 1500 1.50
59 Y20 20 4.0 4.0 Water Heater 1 1500 1.50
DB not balanced
60 B20
40A 61 R21 3
4P 62 Y21 32 6.0 6.0 MALE SAUNA 9000 3
30mA 63 B21 3
40A 64 R22 3
FEMALE SAUNA
4P 65 Y22 32 6.0 6.0 9000 3
30mA 66 B22 3
40A 67 0.37
4P 68 RYB23 20 4.0 4.0 FCU-L01-33A 1100 0.37
100mA 69 0.37
40A 70 0.37
4P 71 RYB24 20 4.0 4.0 FCU-L01-33B 1100 0.37
100mA 72 0.37
40A 73 0.37
4P 74 RYB25 20 4.0 4.0 FCU-L01-33C 1100 0.37
100mA 75 0.37

CABLE SIZE : 1x4C -35mm2 XLPE/SWA/PVC + 1C 16.0mm2 CU ECC. 16 16 22

TOTAL LOAD : 54 KW
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L2 LOCATION : ELECT. ROOM L2

FED FORM : LVP 01 / BUSBAR 01


SR. CKT.NO CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 630 35 XLPE/SWA/PVC 2-4Cx150 1Cx70 76.89 77.85 71.62 226.37
OUTGOING
1 R1 DB-F-203 SP 32 25 CU/PVC/WIRE 2-1CX10 58 1-1CX10 5.50 5.50 1 STD
2 Y1 DB-F-206 SP 32 25 CU/PVC/WIRE 2-1CX10 48 1-1CX10 5.47 5.47 1 STD
3 B1 DB-F-207 SP 32 25 CU/PVC/WIRE 2-1CX10 45 1-1CX10 5.47 5.47 1 STD
4 R2 DB-F-208 SP 32 25 CU/PVC/WIRE 2-1CX10 40 1-1CX10 5.47 5.47 1 STD
5 Y2 DB-F-209 SP 32 25 CU/PVC/WIRE 2-1CX10 35 1-1CX10 5.47 5.47 1 STD
6 B2 DB-F-210 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.47 5.47 1 STD
7 R3 DB-F-211 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.47 5.47 1 STD
8 Y3 DB-F-212 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.47 5.47 1 STD
9 B3 DB-F-213 SP 32 25 CU/PVC/WIRE 2-1CX10 32 1-1CX10 5.47 5.47 1 STD
10 R4 DB-F-214 SP 32 25 CU/PVC/WIRE 2-1CX10 36 1-1CX10 5.47 5.47 1 STD
11 Y4 DB-F-215 SP 32 25 CU/PVC/WIRE 2-1CX10 40 1-1CX10 5.47 5.47 1 STD
12 B4 DB-F-217 SP 32 25 CU/PVC/WIRE 2-1CX10 46 1-1CX10 5.50 5.50 1 STD
13 R5 DB-F-219 SP 32 25 CU/PVC/WIRE 2-1CX10 40 1-1CX10 5.47 5.47 1 STD
14 Y5 DB-F-221 SP 32 25 CU/PVC/WIRE 2-1CX10 24 1-1CX10 5.47 5.47 1 STD
15 B5 DB-F-222 SP 32 25 CU/PVC/WIRE 2-1CX10 27 1-1CX10 5.46 5.46 1 STD
16 R6 DB-F-226 SP 32 25 CU/PVC/WIRE 2-1CX10 45 1-1CX10 5.47 5.47 1 STD
17 Y6 DB-F-227 SP 32 25 CU/PVC/WIRE 2-1CX10 55 1-1CX10 5.47 5.47 1 STD
18 B6 DB-F-229 SP 32 25 CU/PVC/WIRE 2-1CX10 60 1-1CX10 5.50 5.50 1 STD
19 R7 DB-F-231 SP 32 25 CU/PVC/WIRE 2-1CX10 56 1-1CX10 5.47 5.47 1 STD
20 Y7 DB-F-232 SP 32 25 CU/PVC/WIRE 2-1CX10 50 1-1CX10 5.47 5.47 1 STD
21 B7 DB-F-201 SP 40 25 CU/PVC/WIRE 2-1CX16 48 1-1CX16 7.90 7.90 1 1BR
22 R8 DB-F-204 SP 40 25 CU/PVC/WIRE 2-1CX16 58 1-1CX16 7.90 7.90 1 1BR
23 Y8 DB-F-205 SP 40 25 CU/PVC/WIRE 2-1CX16 54 1-1CX16 7.90 7.90 1 1BR
24 B8 DB-F-216 SP 40 25 CU/PVC/WIRE 2-1CX16 44 1-1CX16 8.24 8.24 1 1BR
25 R9 DB-F-218 SP 40 25 CU/PVC/WIRE 2-1CX16 48 1-1CX16 8.24 8.24 1 1BR
26 Y9 DB-F-220 SP 40 25 CU/PVC/WIRE 2-1CX16 36 1-1CX16 7.96 7.96 1 1BR
27 B9 DB-F-223 SP 40 25 CU/PVC/WIRE 2-1CX16 28 1-1CX16 8.37 8.37 1 1BR
28 R10 DB-F-224 SP 40 25 CU/PVC/WIRE 2-1CX16 32 1-1CX16 7.85 7.85 1 1BR
29 Y10 DB-F-225 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.85 7.85 1 1BR
30 B10 DB-F-230 SP 40 25 CU/PVC/WIRE 2-1CX16 64 1-1CX16 8.19 8.19 1 1BR
31 R11 DB-F-233 SP 40 25 CU/PVC/WIRE 2-1CX16 46 1-1CX16 7.74 7.74 1 1BR
32 Y11 DB-F-234 SP 40 25 CU/PVC/WIRE 2-1CX16 44 1-1CX16 7.74 7.74 1 1BR
33 B11 SPACE
34 RYB12 DB-F-202 TP 32 25 CU/PVC/WIRE 4-1CX16 55 1-1CX16 3.42 4.06 3.02 10.50 1 2BR
35 RYB12 DB-F-228 TP 32 25 CU/PVC/WIRE 4-1CX16 58 1-1CX16 3.42 4.06 3.02 10.50 1 2BR

76.89 77.85 71.62 226.37 32 2

DEMAND FACTOR . 0.85 MAX DEMAND .. 192.41 KW TOTAL CONNECTED LOAD (3PH) 226.37 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L3 LOCATION : ELECT. ROOM L3

FED FORM : LVP 01 / BUSBAR 01

SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 630 35 XLPE/SWA/PVC 2-4Cx150 1Cx70 73.92 68.54 76.58 219.04
OUTGOING
1 R1 DB-F-303 SP 32 25 CU/PVC/WIRE 2-1CX10 60 1-1CX10 5.50 5.50 1 STD
2 Y1 DB-F-305 SP 32 25 CU/PVC/WIRE 2-1CX10 52 1-1CX10 5.47 5.47 1 STD
3 B1 DB-F-306 SP 32 25 CU/PVC/WIRE 2-1CX10 46 1-1CX10 5.47 5.47 1 STD
4 R2 DB-F-307 SP 32 25 CU/PVC/WIRE 2-1CX10 42 1-1CX10 5.47 5.47 1 STD
5 Y2 DB-F-308 SP 32 25 CU/PVC/WIRE 2-1CX10 38 1-1CX10 5.47 5.47 1 STD
6 B2 DB-F-309 SP 32 25 CU/PVC/WIRE 2-1CX10 35 1-1CX10 5.47 5.47 1 STD
7 R3 DB-F-310 SP 32 25 CU/PVC/WIRE 2-1CX10 37 1-1CX10 5.47 5.47 1 STD
8 Y3 DB-F-311 SP 32 25 CU/PVC/WIRE 2-1CX10 25 1-1CX10 5.47 5.47 1 STD
9 B3 DB-F-312 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.47 5.47 1 STD
10 R4 DB-F-313 SP 32 25 CU/PVC/WIRE 2-1CX10 34 1-1CX10 5.47 5.47 1 STD
11 Y4 DB-F-316 SP 32 25 CU/PVC/WIRE 2-1CX10 47 1-1CX10 5.50 5.50 1 STD
12 B4 DB-F-318 SP 32 25 CU/PVC/WIRE 2-1CX10 48 1-1CX10 5.47 5.47 1 STD
13 R5 DB-F-320 SP 32 25 CU/PVC/WIRE 2-1CX10 22 1-1CX10 5.47 5.47 1 STD
14 Y5 DB-F-321 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.46 5.46 1 STD
15 B5 DB-F-325 SP 32 25 CU/PVC/WIRE 2-1CX10 52 1-1CX10 5.47 5.47 1 STD
16 R6 DB-F-326 SP 32 25 CU/PVC/WIRE 2-1CX10 56 1-1CX10 5.47 5.47 1 STD
17 Y6 DB-F-328 SP 32 25 CU/PVC/WIRE 2-1CX10 64 1-1CX10 5.50 5.50 1 STD
18 B6 DB-F-330 SP 32 25 CU/PVC/WIRE 2-1CX10 60 1-1CX10 5.47 5.47 1 STD
19 R7 DB-F-331 SP 32 25 CU/PVC/WIRE 2-1CX10 55 1-1CX10 5.47 5.47 1 STD
20 Y7 DB-F-301 SP 40 25 CU/PVC/WIRE 2-1CX16 50 1-1CX16 7.90 7.90 1 1BR
21 B7 DB-F-302 SP 40 25 CU/PVC/WIRE 2-1CX16 54 1-1CX16 8.19 8.19 1 1BR
22 R8 DB-F-304 SP 40 25 CU/PVC/WIRE 2-1CX16 56 1-1CX16 8.19 8.19 1 1BR
26 Y8 DB-F-314 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.90 7.90 1 1BR
27 B8 DB-F-315 SP 40 25 CU/PVC/WIRE 2-1CX16 45 1-1CX16 8.24 8.24 1 1BR
28 R9 DB-F-317 SP 40 25 CU/PVC/WIRE 2-1CX16 50 1-1CX16 8.24 8.24 1 1BR
29 Y9 DB-F-319 SP 40 25 CU/PVC/WIRE 2-1CX16 42 1-1CX16 7.96 7.96 1 1BR
30 B9 DB-F-322 SP 40 25 CU/PVC/WIRE 2-1CX16 32 1-1CX16 8.37 8.37 1 1BR
31 R10 DB-F-323 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.85 7.85 1 1BR
32 Y10 DB-F-324 SP 40 25 CU/PVC/WIRE 2-1CX16 47 1-1CX16 7.85 7.85 1 1BR
33 B10 DB-F-329 SP 40 25 CU/PVC/WIRE 2-1CX16 60 1-1CX16 8.19 8.19 1 1BR
34 R11 DB-F-332 SP 40 25 CU/PVC/WIRE 2-1CX16 50 1-1CX16 7.90 7.90 1 1BR
35 Y11 SPACE
36 B11 DB-F-333 SP 40 25 CU/PVC/WIRE 2-1CX16 46 1-1CX16 7.74 7.74 1 1BR
37 RYB13 DB-F-327 TP 32 25 CU/PVC/WIRE 4-1CX16 62 1-1CX16 3.42 4.06 3.02 10.50 1 2BR

TOTAL CONNECTED LOAD PER PHASE 73.92 68.54 76.58 219.04 32 1

DEMAND FACTOR . 0.85 MAX DEMAND .. 186.18 KW TOTAL CONNECTED LOAD (3PH) 219.04 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L4 LOCATION : ELECT. ROOM L4


FED FORM : LVP 01 / BUSBAR 01
SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)

RYB INCOMER TP 630 35 XLPE/SWA/PVC 2-4Cx150 1Cx70 65.78 77.54 75.71 219.04
OUTGOING
1 R1 DB-F-403 SP 32 25 CU/PVC/WIRE 2-1CX10 52 1-1CX10 5.50 5.50 1 STD
2 Y1 DB-F-405 SP 32 25 CU/PVC/WIRE 2-1CX10 50 1-1CX10 5.47 5.47 1 STD
3 B1 DB-F-406 SP 32 25 CU/PVC/WIRE 2-1CX10 46 1-1CX10 5.47 5.47 1 STD
4 R2 DB-F-407 SP 32 25 CU/PVC/WIRE 2-1CX10 42 1-1CX10 5.47 5.47 1 STD
5 Y2 DB-F-408 SP 32 25 CU/PVC/WIRE 2-1CX10 38 1-1CX10 5.47 5.47 1 STD
6 B2 DB-F-409 SP 32 25 CU/PVC/WIRE 2-1CX10 34 1-1CX10 5.47 5.47 1 STD
7 R3 DB-F-410 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.47 5.47 1 STD
8 Y3 DB-F-411 SP 32 25 CU/PVC/WIRE 2-1CX10 26 1-1CX10 5.47 5.47 1 STD
9 B3 DB-F-412 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.47 5.47 1 STD
10 R4 DB-F-413 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.47 5.47 1 STD
11 Y4 DB-F-414 SP 32 25 CU/PVC/WIRE 2-1CX10 34 1-1CX10 5.47 5.47 1 STD
12 B4 DB-F-415 SP 32 25 CU/PVC/WIRE 2-1CX10 38 1-1CX10 5.47 5.47 1 STD
13 R5 DB-F-417 SP 32 25 CU/PVC/WIRE 2-1CX10 45 1-1CX10 5.50 5.50 1 STD
14 Y5 DB-F-419 SP 32 25 CU/PVC/WIRE 2-1CX10 40 1-1CX10 5.47 5.47 1 STD
15 B5 DB-F-421 SP 32 25 CU/PVC/WIRE 2-1CX10 24 1-1CX10 5.47 5.47 1 STD
16 R6 DB-F-422 SP 32 25 CU/PVC/WIRE 2-1CX10 26 1-1CX10 5.46 5.46 1 STD
17 Y6 DB-F-426 SP 32 25 CU/PVC/WIRE 2-1CX10 52 1-1CX10 5.47 5.47 1 STD
18 B6 DB-F-427 SP 32 25 CU/PVC/WIRE 2-1CX10 56 1-1CX10 5.47 5.47 1 STD
19 R7 DB-F-429 SP 32 25 CU/PVC/WIRE 2-1CX10 62 1-1CX10 5.50 5.50 1 STD
20 Y7 DB-F-401 SP 40 25 CU/PVC/WIRE 2-1CX16 45 1-1CX16 8.24 8.24 1 1BR
21 B7 DB-F-402 SP 40 25 CU/PVC/WIRE 2-1CX16 50 1-1CX16 8.19 8.19 1 1BR
22 R8 DB-F-404 SP 40 25 CU/PVC/WIRE 2-1CX16 54 1-1CX16 8.19 8.19 1 1BR
23 Y8 DB-F-416 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 8.24 8.24 1 1BR
24 B8 DB-F-418 SP 40 25 CU/PVC/WIRE 2-1CX16 44 1-1CX16 8.24 8.24 1 1BR
25 R9 DB-F-420 SP 40 25 CU/PVC/WIRE 2-1CX16 36 1-1CX16 7.96 7.96 1 1BR
26 Y9 DB-F-423 SP 40 25 CU/PVC/WIRE 2-1CX16 30 1-1CX16 8.37 8.37 1 1BR
27 B9 DB-F-424 SP 40 25 CU/PVC/WIRE 2-1CX16 38 1-1CX16 7.85 7.85 1 1BR
28 R10 DB-F-425 SP 40 25 CU/PVC/WIRE 2-1CX16 46 1-1CX16 7.85 7.85 1 1BR
29 Y10 DB-F-430 SP 40 25 CU/PVC/WIRE 2-1CX16 60 1-1CX16 7.90 7.90 1 1BR
30 B10 DB-F-431 SP 40 25 CU/PVC/WIRE 2-1CX16 56 1-1CX16 7.85 7.85 1 1BR
31 R11 SPACE
32 Y11 DB-F-433 SP 40 25 CU/PVC/WIRE 2-1CX16 48 1-1CX16 7.90 7.90 1 1BR
32 B11 DB-F-432 SP 40 25 CU/PVC/WIRE 2-1CX16 44 1-1CX16 7.74 7.74 1 1BR
33 RYB12 DB-F-428 TP 32 25 CU/PVC/WIRE 4-1CX16 60 1-1CX16 3.42 4.06 3.02 10.50 1 2BR
TOTAL CONNECTED LOAD PER PHASE 65.78 77.54 75.71 219.04 32 1

DEMAND FACTOR . 0.85 MAX DEMAND .. 186.18 KW TOTAL CONNECTED LOAD (3PH) 219.04 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L5 LOCATION : ELECT. ROOM L5

FED FORM : LVP 02 / BUSBAR 02


SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 630 35 XLPE/SWA/PVC 2-4Cx150 1Cx70 76.04 68.96 67.42 212.42
OUTGOING
1 R1 DB-F-503 SP 32 25 CU/PVC/WIRE 2-1CX10 52 1-1CX10 5.50 5.50 1 STD
2 Y1 DB-F-505 SP 32 25 CU/PVC/WIRE 2-1CX10 50 1-1CX10 5.47 5.47 1 STD
3 B1 DB-F-506 SP 32 25 CU/PVC/WIRE 2-1CX10 46 1-1CX10 5.47 5.47 1 STD
4 R2 DB-F-507 SP 32 25 CU/PVC/WIRE 2-1CX10 42 1-1CX10 5.47 5.47 1 STD
5 Y2 DB-F-508 SP 32 25 CU/PVC/WIRE 2-1CX10 38 1-1CX10 5.47 5.47 1 STD
6 B2 DB-F-509 SP 32 25 CU/PVC/WIRE 2-1CX10 34 1-1CX10 5.47 5.47 1 STD
7 R3 DB-F-510 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.47 5.47 1 STD
8 Y3 DB-F-511 SP 32 25 CU/PVC/WIRE 2-1CX10 26 1-1CX10 5.47 5.47 1 STD
9 B3 DB-F-512 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.47 5.47 1 STD
10 R4 DB-F-513 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.47 5.47 1 STD
11 Y4 DB-F-514 SP 32 25 CU/PVC/WIRE 2-1CX10 34 1-1CX10 5.47 5.47 1 STD
12 B4 DB-F-515 SP 32 25 CU/PVC/WIRE 2-1CX10 38 1-1CX10 5.47 5.47 1 STD
13 R5 DB-F-518 SP 32 25 CU/PVC/WIRE 2-1CX10 44 1-1CX10 5.47 5.47 1 STD
14 Y5 DB-F-520 SP 32 25 CU/PVC/WIRE 2-1CX10 36 1-1CX10 5.47 5.47 1 STD
15 B5 DB-F-521 SP 32 25 CU/PVC/WIRE 2-1CX10 24 1-1CX10 5.46 5.46 1 STD
16 R6 DB-F-525 SP 32 25 CU/PVC/WIRE 2-1CX10 46 1-1CX10 5.47 5.47 1 STD
17 Y6 DB-F-526 SP 32 25 CU/PVC/WIRE 2-1CX10 52 1-1CX10 5.47 5.47 1 STD
18 B6 DB-F-528 SP 32 25 CU/PVC/WIRE 2-1CX10 60 1-1CX10 5.50 5.50 1 STD
19 R7 DB-F-501 SP 40 25 CU/PVC/WIRE 2-1CX16 50 1-1CX16 7.90 7.90 1 1BR
20 Y7 DB-F-502 SP 40 25 CU/PVC/WIRE 2-1CX16 54 1-1CX16 8.19 8.19 1 1BR
21 B7 DB-F-504 SP 40 25 CU/PVC/WIRE 2-1CX16 50 1-1CX16 7.85 7.85 1 1BR
22 R8 DB-F-516 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.85 7.85 1 1BR
23 Y8 DB-F-517 SP 40 25 CU/PVC/WIRE 2-1CX16 45 1-1CX16 8.19 8.19 1 1BR
24 B8 DB-F-519 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.96 7.96 1 1BR
25 R9 DB-F-522 SP 40 25 CU/PVC/WIRE 2-1CX16 26 1-1CX16 8.37 8.37 1 1BR
26 Y9 DB-F-523 SP 40 25 CU/PVC/WIRE 2-1CX16 30 1-1CX16 7.85 7.85 1 1BR
27 B9 DB-F-524 SP 40 25 CU/PVC/WIRE 2-1CX16 38 1-1CX16 7.85 7.85 1 1BR
28 R10 DB-F-529 SP 40 25 CU/PVC/WIRE 2-1CX16 62 1-1CX16 7.90 7.90 1 1BR
29 Y10 DB-F-530 SP 40 25 CU/PVC/WIRE 2-1CX16 60 1-1CX16 7.85 7.85 1 1BR
30 B10 DB-F-531 SP 40 25 CU/PVC/WIRE 2-1CX16 56 1-1CX16 7.90 7.90 1 1BR
31 R11 DB-F-532 SP 40 25 CU/PVC/WIRE 2-1CX16 48 1-1CX16 7.74 7.74 1 1BR
32 Y11 SPACE
33 B11 SPACE
34 RYB12 DB-F-527 TP 32 25 CU/PVC/WIRE 4-1CX16 56 1-1CX16 3.42 4.06 3.02 10.50 1 2BR
TOTAL CONNECTED LOAD PER PHASE 76.04 68.96 67.42 212.42 31 1

DEMAND FACTOR . 0.85 MAX DEMAND .. 180.55 KW TOTAL CONNECTED LOAD (3PH) 212.42 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L6 LOCATION : ELECT. ROOM L6

FED FORM : LVP 02 / BUSBAR 02


SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)

RYB INCOMER TP 630 35 XLPE/SWA/PVC 2-4Cx150 1Cx70 66.28 66.37 67.63 200.28
OUTGOING
1 R1 DB-F-604 SP 32 25 CU/PVC/WIRE 2-1CX10 40 1-1CX10 5.47 5.47 1 STD
2 Y1 DB-F-605 SP 32 25 CU/PVC/WIRE 2-1CX10 35 1-1CX10 5.47 5.47 1 STD
3 B1 DB-F-606 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.47 5.47 1 STD
4 R2 DB-F-607 SP 32 25 CU/PVC/WIRE 2-1CX10 25 1-1CX10 5.47 5.47 1 STD
5 Y2 DB-F-608 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.47 5.47 1 STD
6 B2 DB-F-611 SP 32 25 CU/PVC/WIRE 2-1CX10 42 1-1CX10 5.50 5.50 1 STD
7 R3 DB-F-614 SP 32 25 CU/PVC/WIRE 2-1CX10 24 1-1CX10 5.47 5.47 1 STD
8 Y3 DB-F-615 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.47 5.47 1 STD
9 B3 DB-F-619 SP 32 25 CU/PVC/WIRE 2-1CX10 54 1-1CX10 5.47 5.47 1 STD
10 R4 DB-F-620 SP 32 25 CU/PVC/WIRE 2-1CX10 58 1-1CX10 5.47 5.47 1 STD
11 Y4 DB-F-622 SP 32 25 CU/PVC/WIRE 2-1CX10 64 1-1CX16 5.50 5.50 1 STD
19 B4 DB-F-602 SP 40 25 CU/PVC/WIRE 2-1CX16 50 1-1CX16 7.90 7.90 1 1BR
20 R5 DB-F-603 SP 40 25 CU/PVC/WIRE 2-1CX16 45 1-1CX16 7.85 7.85 1 1BR
21 Y5 DB-F-609 SP 40 25 CU/PVC/WIRE 2-1CX16 36 1-1CX16 7.85 7.85 1 1BR
22 B5 DB-F-610 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.85 7.85 1 1BR
23 R6 DB-F-612 SP 40 25 CU/PVC/WIRE 2-1CX16 42 1-1CX16 8.19 8.19 1 1BR
24 Y6 DB-F-613 SP 40 25 CU/PVC/WIRE 2-1CX16 37 1-1CX16 7.90 7.90 1 1BR
25 B6 DB-F-616 SP 40 25 CU/PVC/WIRE 2-1CX16 32 1-1CX16 8.37 8.37 1 1BR
26 R7 DB-F-617 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.85 7.85 1 1BR
27 Y7 DB-F-618 SP 40 25 CU/PVC/WIRE 2-1CX16 48 1-1CX16 7.85 7.85 1 1BR
28 B7 DB-F-623 SP 40 25 CU/PVC/WIRE 2-1CX16 62 1-1CX16 7.90 7.90 1 1BR
29 R8 DB-F-624 SP 40 25 CU/PVC/WIRE 2-1CX16 60 1-1CX16 7.85 7.85 1 1BR
30 Y8 DB-F-625 SP 40 25 CU/PVC/WIRE 2-1CX16 58 1-1CX16 7.90 7.90 1 1BR
31 B8 DB-F-626 SP 40 25 CU/PVC/WIRE 2-1CX16 52 1-1CX16 7.74 7.74 1 1BR
32 RYB9 DB-F-601 TP 32 25 CU/PVC/WIRE 4-1CX16 50 1-1CX16 3.42 4.06 3.02 10.50 1 2BR
33 RYB10 DB-F-621 TP 32 25 CU/PVC/WIRE 4-1CX16 60 1-1CX16 3.42 4.06 3.02 10.50 1 2BR
34 R11 DB-L6 TP 40 25 XLPE/SWA/PVC 1-4CX16 10 1Cx16 5.82 4.84 5.37 16.03

TOTAL CONNECTED LOAD PER PHASE 66.28 66.37 67.63 200.28 24 2 TOTAL

DEMAND FACTOR . 0.85 MAX DEMAND .. 170.24 KW TOTAL CONNECTED LOAD (3PH) 200.28 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L9 LOCATION : ELECT. ROOM L9

FED FORM : LVP 02 / BUSBAR 02


SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 350 35 XLPE/SWA/PVC 1-4Cx240 1Cx120 47.03 55.35 48.62 151.00
OUTGOING
1 R1 DB-F-902 SP 32 25 CU/PVC/WIRE 2-1CX10 45 1-1CX10 5.50 5.50 1 STD
2 Y1 DB-F-904 SP 32 25 CU/PVC/WIRE 2-1CX10 40 1-1CX10 5.47 5.47 1 STD
3 B1 DB-F-905 SP 32 25 CU/PVC/WIRE 2-1CX10 35 1-1CX10 5.47 5.47 1 STD
4 R2 DB-F-906 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.47 5.47 1 STD
5 Y2 DB-F-907 SP 32 25 CU/PVC/WIRE 2-1CX10 32 1-1CX10 5.47 5.47 1 STD
6 B2 DB-F-910 SP 32 25 CU/PVC/WIRE 2-1CX10 24 1-1CX10 5.47 5.47 1 STD
7 R3 DB-F-911 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.46 5.46 1 STD
8 Y3 DB-F-913 SP 32 25 CU/PVC/WIRE 2-1CX10 40 1-1CX10 5.47 5.47 1 STD
9 B3 DB-F-914 SP 32 25 CU/PVC/WIRE 2-1CX10 44 1-1CX10 5.47 5.47 1 STD
10 R4 DB-F-915 SP 32 25 CU/PVC/WIRE 2-1CX10 46 1-1CX10 5.46 5.46 1 STD
11 Y4 DB-F-916 SP 32 25 CU/PVC/WIRE 2-1CX10 50 1-1CX10 5.47 5.47 1 STD
12 B4 DB-F-917 SP 32 25 CU/PVC/WIRE 2-1CX10 54 1-1CX10 5.47 5.47 1 STD
13 R5 DB-F-919 SP 32 25 CU/PVC/WIRE 2-1CX10 58 1-1CX10 5.50 5.50 1 STD
14 Y5 DB-F-921 SP 20 25 CU/PVC/WIRE 2-1CX10 56 1-1CX10 5.47 5.47 1 STD
15 B5 DB-F-901 SP 32 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.85 7.85 1 1BR
16 R6 DB-F-903 SP 40 25 CU/PVC/WIRE 2-1CX16 46 1-1CX16 7.85 7.85 1 1BR
17 Y6 DB-F-908 SP 40 25 CU/PVC/WIRE 2-1CX16 36 1-1CX16 7.85 7.85 1 1BR
18 B6 DB-F-909 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.96 7.96 1 1BR
19 R7 DB-F-912 SP 40 25 CU/PVC/WIRE 2-1CX16 36 1-1CX16 8.37 8.37 1 1BR
20 Y7 DB-F-920 SP 40 25 CU/PVC/WIRE 2-1CX16 54 1-1CX16 8.19 8.19 1 1BR
21 B7 DB-F-922 SP 40 25 CU/PVC/WIRE 2-1CX16 52 1-1CX16 7.90 7.90 1 1BR
22 R8 SPACE
23 Y8 DB-F-923 SP 40 25 CU/PVC/WIRE 2-1CX16 48 1-1CX16 7.90 7.90 1 1BR
24 B8 SPACE
25 RYB9 DB-F-918 TP 32 25 CU/PVC/WIRE 4-1CX16 1Cx16 3.42 4.06 3.03 10.51 1 2BR

TOTAL CONNECTED LOAD PER PHASE 47.03 55.35 48.62 151.00 22 1 TOTAL

DEMAND FACTOR . 0.85 MAX DEMAND .. 128.35 KW TOTAL CONNECTED LOAD (3PH) 151.00 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
Owner : Azizi Developments
Location : AL FURJAN , DUBAI
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : ELEC ROOM
DB No. : : DB - L6 Fed From SMDB - L6 System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40 TP ISOLATOR
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS KW LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. CH LTG. EXF 13A HD FCU BELL WH UNIT KILO Watts
ROOM/AREA
IN SIZE SIZE KA 11 48 100 200 50 S/O 1000 400 50 1500 R Y B

Others
2 2
Amp. mm mm W W W W W W W W W W
1 R1 10 2.5 2.5 Lighting Corridor L6 10 11 0.11
40A 2 Y1 10 2.5 2.5 Lighting Corridor L7 10 11 0.11
4P 3 B1 10 2.5 2.5 Lighting Corridor L8 6 1 11/48 0.11
100mA 4 R2 10 2.5 2.5 Lighting Corridor L9 21 11 0.23
5 Y2 10 2.5 2.5 Lighting Corridor L10 19 11 0.21
6 B2 20 space
40A 7 R3 10 2.5 2.5 Lighting Corridor L6 15 11 0.17
4P 8 Y3 10 2.5 2.5 Lighting Corridor L7 14 11 0.15
100mA 9 B3 10 2.5 2.5 Lighting Corridor L8 14 11 0.15
14 R4 20 Faade Lighting (Prov) 1000 1.00
40A 15 Y4 20 Faade Lighting (Prov) 1000 1.00
4P 16 B4 20 Faade Lighting (Prov) 1000 1.00
100mA 17 R5 space
17 Y5 20 Faade Lighting (Prov) 1000 1.00
18 Y5 20 Faade Lighting (Prov) 1000 1.00
19 R6 20 4 4 FCU Corridor L6 1 50 0.40
20 Y6 20 4 4 FCU Corridor L6 1 50 0.05
40A 21 B6 20 4 4 FCU Corridor L6 1 69 0.07
4P 22 R7 20 4 4 FCU Corridor L6 1 50 0.40
100mA 23 Y7 space
24 B7 20 4 4 FCU Corridor L7 1 50 0.05
25 R8 20 4 4 FCU Corridor L7 1 50 0.40
40A 26 Y8 20 4 4 FCU Corridor L7 1 69 0.07
4P 27 B8 20 4 4 FCU Corridor L7 1 50 0.05
100mA 28 R9 space
29 Y9 20 4 4 FCU Corridor L8 1 50 0.05
30 B9 20 4 4 FCU Corridor L8 1 69 . 0.07
Owner : Azizi Developments
Location : AL FURJAN , DUBAI
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : ELEC ROOM
DB No. : : DB - L6 Fed From SMDB - L6 System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40 TP ISOLATOR
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS KW LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. CH LTG. EXF 13A HD FCU BELL WH UNIT KILO Watts
ROOM/AREA
IN SIZE SIZE KA 11 48 100 200 50 S/O 1000 400 50 1500 R Y B

Others
2
Amp. mm mm2 W W W W W W W W W W
25 R10 20 4 4 FCU Corridor L8 1 69 0.07
40A 26 Y10 20 4 4 FCU Corridor L8 1 50 0.05
4P 27 B10 space
100mA 28 R11 20 4 4 FCU Corridor L9 1 50 0.05
29 Y11 20 4 4 FCU Corridor L9 1 50 0.05
30 B11 20 4 4 FCU Corridor L9 1 69 0.07
31 R12 Space
40A 32 Y12 20 4 4 FCU Corridor L10 1 50 0.05
4P 33 B12 20 4 4 FCU Corridor L9 1 50 0.05
100mA 34 R13 Space
35 Y13 20 4 4 FCU Corridor L10 1 46 0.05
36 B13 20 4 4 FCU Corridor L10 1 46 0.05
37 R14 20 4 4 Socket Outlet Corridor L6 4 200 0.80
40A 38 Y14 20 4 4 Socket Outlet Corridor L7 4 200 0.80
4P 39 B14 20 4 4 Socket Outlet Corridor L8 3 200 0.60
30mA 40 R15 20 4 4 Socket Outlet Corridor L9 3 200 0.60
41 Y15 20 4 4 Socket Outlet Corridor L10 2 200 0.40
42 B15 20 4 4 Socket Outlet Corridor L6 4 200 0.80
43 R16 20 4 4 Socket Outlet Corridor L7 4 200 0.80
40A 44 Y16 20 4 4 Socket Outlet Corridor L8 4 200 0.80
4P 45 B16 20 4 4 Socket Outlet Corridor L9 4 200 0.80
30mA 46 R17 20 4 4 Socket Outlet Corridor L10 4 200 0.80
47 Y17 space
48 B17 20 4 4 spare 200 0.50
TOTAL LOAD PER PHASE 5.82 4.84 5.37

TOTAL LOAD : 16.03 KW


PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L7 LOCATION : ELECT. ROOM L7

FED FORM : LVP 02 / BUSBAR 02


SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 400 35 XLPE/SWA/PVC 1-4Cx300 1Cx150 57.85 59.00 52.41 169.26
OUTGOING
1 R1 DB-F-702 SP 32 25 CU/PVC/WIRE 2-1CX10 48 1-1CX10 5.50 5.50 1 STD
2 Y1 DB-F-703 SP 32 25 CU/PVC/WIRE 2-1CX10 44 1-1CX10 5.47 5.47 1 STD
3 B1 DB-F-704 SP 32 25 CU/PVC/WIRE 2-1CX10 40 1-1CX10 5.47 5.47 1 STD
4 R2 DB-F-705 SP 32 25 CU/PVC/WIRE 2-1CX10 36 1-1CX10 5.47 5.47 1 STD
5 Y2 DB-F-706 SP 32 25 CU/PVC/WIRE 2-1CX10 32 1-1CX10 5.47 5.47 1 STD
6 B2 DB-F-707 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.47 5.47 1 STD
7 R3 DB-F-708 SP 32 25 CU/PVC/WIRE 2-1CX10 24 1-1CX10 5.47 5.47 1 STD
8 Y3 DB-F-709 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.47 5.47 1 STD
9 B3 DB-F-710 SP 32 25 CU/PVC/WIRE 2-1CX10 32 1-1CX10 5.47 5.47 1 STD
10 R4 DB-F-714 SP 32 25 CU/PVC/WIRE 2-1CX10 24 1-1CX10 5.47 5.47 1 STD
11 Y4 DB-F-715 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.46 5.46 1 STD
12 B4 DB-F-719 SP 32 25 CU/PVC/WIRE 2-1CX10 52 1-1CX10 5.47 5.47 1 STD
13 R5 DB-F-721 SP 32 25 CU/PVC/WIRE 2-1CX10 60 1-1CX10 5.50 5.50 1 STD
14 Y5 DB-F-723 SP 32 25 CU/PVC/WIRE 2-1CX10 56 1-1CX10 5.46 5.46 1 STD
15 B5 DB-F-711 SP 40 25 CU/PVC/WIRE 2-1CX16 35 1-1CX16 7.85 7.85 1 1BR
16 R6 DB-F-712 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.85 7.85 1 1BR
17 Y6 DB-F-713 SP 40 25 CU/PVC/WIRE 2-1CX16 35 1-1CX16 7.96 7.96 1 1BR
18 B6 DB-F-716 SP 40 25 CU/PVC/WIRE 2-1CX16 30 1-1CX16 8.37 8.37 1 1BR
19 R7 DB-F-717 SP 40 25 CU/PVC/WIRE 2-1CX16 38 1-1CX16 7.85 7.85 1 1BR
20 Y7 DB-F-718 SP 40 25 CU/PVC/WIRE 2-1CX16 46 1-1CX16 7.85 7.85 1 1BR
21 B7 DB-F-722 SP 40 25 CU/PVC/WIRE 2-1CX16 58 1-1CX16 8.24 8.24 1 1BR
22 R8 DB-F-724 SP 40 25 CU/PVC/WIRE 2-1CX16 52 1-1CX16 7.90 7.90 1 1BR
23 Y8 DB-F-725 SP 40 25 CU/PVC/WIRE 2-1CX16 46 1-1CX16 7.74 7.74 1 1BR
24 B8 SPACE 0.00 1BR
25 RYB9 DB-F-701 TP 32 25 CU/PVC/WIRE 4-1CX16 50 1Cx16 3.42 4.06 3.03 10.51 1 2BR
26 RYB10 DB-F-720 TP 32 25 CU/PVC/WIRE 4-1CX16 58 1Cx16 3.42 4.06 3.03 10.51 1 2BR
TOTAL CONNECTED LOAD PER PHASE 57.85 59.00 52.41 169.26 23 2

DEMAND FACTOR . 0.85 MAX DEMAND .. 143.87 KW TOTAL CONNECTED LOAD (3PH) 169.26 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L8 LOCATION : ELECT. ROOM L8


FED FORM : LVP 02 / BUSBAR 02
SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 400 35 XLPE/SWA/PVC 1-4Cx300 1Cx150 55.78 59.07 57.71 172.56
OUTGOING
1 R1 DB-F-803 SP 32 25 CU/PVC/WIRE 2-1CX10 46 1-1CX10 5.50 5.50 1 STD
2 Y1 DB-F-805 SP 32 25 CU/PVC/WIRE 2-1CX10 46 1-1CX10 5.47 5.47 1 STD
3 B1 DB-F-806 SP 32 25 CU/PVC/WIRE 2-1CX10 42 1-1CX10 5.47 5.47 1 STD
4 R2 DB-F-807 SP 32 25 CU/PVC/WIRE 2-1CX10 38 1-1CX10 5.47 5.47 1 STD
5 Y2 DB-F-808 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.47 5.47 1 STD
6 B2 DB-F-809 SP 32 25 CU/PVC/WIRE 2-1CX10 32 1-1CX10 5.47 5.47 1 STD
7 R3 DB-F-810 SP 32 25 CU/PVC/WIRE 2-1CX10 36 1-1CX10 5.47 5.47 1 STD
8 Y3 DB-F-813 SP 32 25 CU/PVC/WIRE 2-1CX10 24 1-1CX10 5.47 5.47 1 STD
9 B3 DB-F-814 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.46 5.46 1 STD
10 R4 DB-F-816 SP 32 25 CU/PVC/WIRE 2-1CX10 40 1-1CX10 5.47 5.47 1 STD
11 Y4 DB-F-817 SP 32 25 CU/PVC/WIRE 2-1CX10 44 1-1CX10 5.47 5.47 1 STD
12 B4 DB-F-818 SP 32 25 CU/PVC/WIRE 2-1CX10 48 1-1CX10 5.46 5.46 1 STD
13 R5 DB-F-819 SP 32 25 CU/PVC/WIRE 2-1CX10 52 1-1CX10 5.47 5.47 1 STD
14 Y5 DB-F-820 SP 32 25 CU/PVC/WIRE 2-1CX10 56 1-1CX10 5.47 5.47 1 STD
15 B5 DB-F-822 SP 32 25 CU/PVC/WIRE 2-1CX10 60 1-1CX10 5.50 5.50 1 STD
17 R6 DB-F-824 SP 32 25 CU/PVC/WIRE 2-1CX10 52 1-1CX10 5.47 5.47 1 STD
18 Y6 DB-F-801 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.85 7.85 1 1BR
19 B6 DB-F-802 SP 40 25 CU/PVC/WIRE 2-1CX16 44 1-1CX16 8.19 8.19 1 1BR
20 R7 DB-F-804 SP 40 25 CU/PVC/WIRE 2-1CX16 48 1-1CX16 7.85 7.85 1 1BR
21 Y7 DB-F-811 SP 40 25 CU/PVC/WIRE 2-1CX16 32 1-1CX16 7.85 7.85 1 1BR
22 B7 DB-F-815 SP 40 25 CU/PVC/WIRE 2-1CX16 32 1-1CX16 8.37 8.37 1 1BR
23 R8 DB-F-823 SP 40 25 CU/PVC/WIRE 2-1CX16 56 1-1CX16 8.24 8.24 1 1BR
24 Y8 DB-F-825 SP 40 25 CU/PVC/WIRE 2-1CX16 46 1-1CX16 7.90 7.90 1 1BR
25 B8 DB-F-826 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.74 7.74 1 1BR
26 RYB9 DB-F-812 TP 32 25 CU/PVC/WIRE 4-1CX16 35 1Cx16 3.42 4.06 3.02 10.50 1 2BR
27 RYB10 DB-F-821 TP 32 25 CU/PVC/WIRE 4-1CX16 58 1Cx16 3.42 4.06 3.02 10.50 1 2BR

TOTAL CONNECTED LOAD PER PHASE 55.78 59.07 57.71 172.56 24 2

DEMAND FACTOR . 0.85 MAX DEMAND .. 146.68 KW TOTAL CONNECTED LOAD (3PH) 172.56 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L10 LOCATION : ELECT. ROOM L10

FED FORM : LVP 03 / BUSBAR 03


SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 300 35 XLPE/SWA/PVC 1-4Cx185 1Cx95 41.19 44.60 51.29 137.07
OUTGOING
1 R1 DB-F-1002 SP 32 25 CU/PVC/WIRE 2-1CX10 32 1-1CX10 5.47 5.47 1 STD
2 Y1 DB-F-1003 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.47 5.47 1 STD
3 B1 DB-F-1004 SP 32 25 CU/PVC/WIRE 2-1CX10 24 1-1CX10 5.47 5.47 1 STD
4 R2 DB-F-1007 SP 32 25 CU/PVC/WIRE 2-1CX10 24 1-1CX10 5.47 5.47 1 STD
5 Y2 DB-F-1008 SP 32 25 CU/PVC/WIRE 2-1CX10 28 1-1CX10 5.47 5.47 1 STD
6 B2 DB-F-1010 SP 32 25 CU/PVC/WIRE 2-1CX10 38 1-1CX10 5.47 5.47 1 STD
7 R3 DB-F-1011 SP 32 25 CU/PVC/WIRE 2-1CX10 40 1-1CX10 5.47 5.47 1 STD
8 Y3 DB-F-1012 SP 32 25 CU/PVC/WIRE 2-1CX10 42 1-1CX10 5.47 5.47 1 STD
9 B3 DB-F-1013 SP 32 25 CU/PVC/WIRE 2-1CX10 46 1-1CX10 5.47 5.47 1 STD
10 R4 DB-F-1015 SP 32 25 CU/PVC/WIRE 2-1CX10 54 1-1CX10 5.50 5.50 1 STD
11 Y4 DB-F-1001 SP 40 25 CU/PVC/WIRE 2-1CX16 30 1-1CX16 7.85 7.85 1 1BR
12 B4 DB-F-1005 SP 40 25 CU/PVC/WIRE 2-1CX16 28 1-1CX16 7.85 7.85 1 1BR
13 R5 DB-F-1006 SP 40 25 CU/PVC/WIRE 2-1CX16 30 1-1CX16 7.96 7.96 1 1BR
14 Y5 DB-F-1009 SP 40 25 CU/PVC/WIRE 2-1CX16 32 1-1CX16 8.37 8.37 1 1BR
15 B5 DB-F-1016 SP 40 25 CU/PVC/WIRE 2-1CX16 52 1-1CX16 8.24 8.24 1 1BR
16 R6 DB-F-1017 SP 40 25 CU/PVC/WIRE 2-1CX16 48 1-1CX16 7.90 7.90 1 1BR
17 Y6 DB-F-1018 SP 40 25 CU/PVC/WIRE 2-1CX16 42 1-1CX16 7.90 7.90 1 1BR
18 B6 DB-F-1019 SP 40 25 CU/PVC/WIRE 2-1CX16 38 1-1CX16 7.85 7.85 1 1BR
19 R7 SPACE
20 Y7 SPACE
20 B7 DB-F-1020 SP 40 25 CU/PVC/WIRE 2-1CX16 30 1-1CX16 7.90 7.90 1 1BR
21 RYB8 DB-F-1014 TP 32 25 CU/PVC/WIRE 4-1CX16 50 1Cx16 3.42 4.06 3.03 10.51 1 2BR

TOTAL CONNECTED LOAD PER PHASE 41.19 44.60 51.29 137.07 19 1 TOTAL

DEMAND FACTOR . 0.85 MAX DEMAND .. 116.51 KW TOTAL CONNECTED LOAD (3PH) 137.07 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L11 LOCATION : ELECT. ROOM L11

FED FORM : LVP 03 / BUSBAR 03


SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 300 35 XLPE/SWA/PVC 1-4Cx185 1Cx95 48.96 42.93 41.94 133.84
OUTGOING
1 R1 DB-F-1103 SP 32 25 CU/PVC/WIRE 2-1CX10 15 1-1CX10 5.46 5.46 1 STD
2 Y1 DB-F-1104 SP 32 25 CU/PVC/WIRE 2-1CX10 20 1-1CX10 5.47 5.47 1 STD
3 B1 DB-F-1105 SP 32 25 CU/PVC/WIRE 2-1CX10 23 1-1CX10 5.46 5.46 1 STD
4 R2 DB-F-1107 SP 32 25 CU/PVC/WIRE 2-1CX10 34 1-1CX10 5.47 5.47 1 STD
5 Y2 DB-F-1108 SP 32 25 CU/PVC/WIRE 2-1CX10 38 1-1CX10 5.47 5.47 1 STD
6 B2 DB-F-1109 SP 32 25 CU/PVC/WIRE 2-1CX10 42 1-1CX10 5.47 5.47 1 STD
7 R3 DB-F-1110 SP 32 25 CU/PVC/WIRE 2-1CX10 45 1-1CX10 5.47 5.47 1 STD
8 Y3 DB-F-1112 SP 32 25 CU/PVC/WIRE 2-1CX10 50 1-1CX10 5.50 5.50 1 STD
9 B3 DB-F-1101 SP 40 25 CU/PVC/WIRE 2-1CX16 30 1-1CX16 7.90 7.90 1 1BR
10 R4 DB-F-1102 SP 40 25 CU/PVC/WIRE 2-1CX16 30 1-1CX16 7.90 7.90 1 1BR
11 Y4 DB-F-1106 SP 40 25 CU/PVC/WIRE 2-1CX16 27 1-1CX16 8.37 8.37 1 1BR
12 B4 DB-F-1113 SP 40 25 CU/PVC/WIRE 2-1CX16 48 1-1CX16 8.24 8.24 1 1BR
13 R5 DB-F-1114 SP 40 25 CU/PVC/WIRE 2-1CX16 44 1-1CX16 7.90 7.90 1 1BR
14 Y5 DB-F-1115 SP 40 25 CU/PVC/WIRE 2-1CX16 38 1-1CX16 7.90 7.90 1 1BR
15 B5 DB-F-1116 SP 40 25 CU/PVC/WIRE 2-1CX16 30 1-1CX16 7.85 7.85 1 1BR
16 R6 DB-F-1117 SP 40 25 CU/PVC/WIRE 2-1CX16 20 1-1CX16 7.90 7.90 1 1BR
17 Y6 SPACE
18 B6 SPACE
19 RYB7 DB-F-1111 TP 32 25 CU/PVC/WIRE 4-1CX16 48 1Cx16 3.42 4.06 3.03 10.51 1 2BR
20 RYB8 DB-L11 TP 63 25 XLPE/SWA/PVC 1-4CX16 10 1Cx16 5.44 6.15 3.99 15.58

TOTAL CONNECTED LOAD PER PHASE 48.96 42.93 41.94 133.84 16 1 TOTAL

DEMAND FACTOR . 0.85 MAX DEMAND .. 113.76 KW TOTAL CONNECTED LOAD (3PH) 133.84 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
Owner : Azizi Developments
Location : AL FURJAN , DUBAI
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : ELEC ROOM
DB No. : : DB - L11 Fed From SMDB - L11 System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 63 TP ISOLATOR
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS KW LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG LTG. EXF 13A FCU BELL WH UNIT KILO Watts
ROOM/AREA

SPLIT
ACU
IN SIZE SIZE KA 11 9 3 15 50 S/O 200 50 1500 R Y B

Others
2 2
Amp. mm mm W W W W W W W W
1 R1 10 2.5 2.5 Lighting Corridor L11 15 11 0.17
40A 2 Y1 10 2.5 2.5 Lighting Corridor L12 15 11 0.17
4P 3 B1 10 2.5 2.5 Lighting Corridor L13 15 11 0.17
100mA 4 R2 10 2.5 2.5 Lighting Corridor L14 12 11 0.13
5 Y2 10 2.5 2.5 Lighting Roof Services 6 7 11/9 0.13
6 B2 10 2.5 2.5 Lighting Roof Services 10 9 0.09
7 R3 10 2.5 2.5 Lighting Roof Services 4 9 0.04
40A 8 Y3 10 2.5 2.5 Lighting Roof Services 1 9 0.01
4P 9 B3 10 2.5 2.5 Lighting Roof Swimming Pool 6 15 0.09
100mA 10 R4 10 2.5 2.5 Lighting Roof Swimming Pool 6 15 0.09
11 Y4 10 2.5 2.5 Lighting Roof Services 1 9 0.01
12 B4 10 2.5 2.5 Lighting Roof Services 6 9 0.05
40A 13 R5 20 4.0 4.0 Faade Lighting (Prov) 1000 1.00
4P 14 Y5 20 4.0 4.0 Faade Lighting (Prov) 1000 1.00
100mA 15 B5 Space
16 R6 20 4.0 4.0 FCU Corridor L11 1 49.7 0.05
40A 17 Y6 20 4.0 4.0 FCU Corridor L11 1 46.4 0.05
4P 18 B6 20 4.0 4.0 FCU Corridor L11 1 46.4 0.05
100mA 19 R7 20 4.0 4.0 FCU Corridor L12 1 49.7 0.05
20 Y7 20 4.0 4.0 FCU Corridor L12 1 46.4 0.05
21 B7 Space
22 R8 20 4.0 4.0 FCU Corridor L12 1 46.4 0.05
40A 23 Y8 20 4.0 4.0 FCU Corridor L13 1 49.7 0.05
4P 24 B8 20 4.0 4.0 FCU Corridor L13 1 46.4 0.05
100mA 25 R9 20 4.0 4.0 FCU Corridor L13 1 46.4 0.05
26 Y9 20 4.0 4.0 FCU Corridor L14 1 49.7 0.05
27 B9 20 Space
Owner : Azizi Developments
Location : AL FURJAN , DUBAI
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : ELEC ROOM
DB No. : : DB - L11 Fed From SMDB - L11 System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 63 TP ISOLATOR
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS KW LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG LTG. EXF 13A FCU BELL WH UNIT KILO Watts
ROOM/AREA

SPLIT
ACU
IN SIZE SIZE KA 11 9 3 15 50 S/O 200 50 1500 R Y B

Others
2 2
Amp. mm mm W W W W W W W W
28 R10 20 4.0 4.0 FCU Corridor L14 1 46.4 0.05
40A 29 Y10 20 4.0 4.0 FCU Corridor L14 1 46.4 0.05
4P 30 B10 20 4.0 4.0 FCU Corridor Roof 1 98 0.10
100mA 31 R11 20 4.0 4.0 FCU Corridor Roof 1 478.3 0.48
32 Y11 20 4.0 4.0 FCU Corridor Roof 1 98 0.10
33 B11 Space
34 R12 20 4.0 4.0 Socket Outlet Corridor L11 4 200 0.80
40A 35 Y12 20 4.0 4.0 Socket Outlet Corridor L12 4 200 0.80
4P 36 B12 20 4.0 4.0 Socket Outlet Corridor L13 4 200 0.80
30mA 37 R13 20 4.0 4.0 Socket Outlet Corridor L14 3 200 0.60
38 Y13 20 4.0 4.0 Roof Servces Outlet 5 200 1.00
39 B13 20 4.0 4.0 Roof Servces Outlet 5 200 1.00
40 R14 20 4.0 4.0 Roof Servces Outlet 5 200 1.00
41 Y14 20 4.0 4.0 Water Heater 1 1500 1.50
40A 42 B14 20 4.0 4.0 Roof Servces Outlet 2 200 0.40
4P 43 R15 20 4.0 4.0 Roof Servces Outlet 2 200 0.40
30mA 44 Y15 20 4.0 4.0 Roof Servces Outlet 1 200 0.20
45 B15 20 4.0 4.0 Roof Servces Outlet Isolator 1 200 0.20
40A 46 R16 20 4.0 4.0 Spare 500 0.50
4P 47 Y16 20 4.0 4.0 Gabage Shute Cleaner 1000 1.00
30mA 48 B16 20 4.0 4.0 Spare 1000 1.00
TOTAL LOAD
CABLE SIZE : 1x4C -16mm2 XLPE/SWA/PVC + 1C 16.0mm2 CU ECC. PER PHASE 5.44 6.15 3.99

TOTAL LOAD : 15.58 KW


PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L12 LOCATION : ELECT. ROOM L12

FED FORM : LVP 03 / BUSBAR 03


SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 250 35 XLPE/SWA/PVC 1-4Cx150 1Cx70 36.13 38.60 37.67 112.40
OUTGOING
1 R1 DB-F-1203 SP 32 25 CU/PVC/WIRE 2-1CX10 15 1-1CX10 5.46 5.46 1 STD
2 Y1 DB-F-1204 SP 32 25 CU/PVC/WIRE 2-1CX10 20 1-1CX10 5.47 5.47 1 STD
3 B1 DB-F-1205 SP 32 25 CU/PVC/WIRE 2-1CX10 24 1-1CX10 5.46 5.46 1 STD
4 R2 DB-F-1207 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.47 5.47 1 STD
5 Y2 DB-F-1208 SP 32 25 CU/PVC/WIRE 2-1CX10 36 1-1CX10 5.47 5.47 1 STD
6 B2 DB-F-1210 SP 32 25 CU/PVC/WIRE 2-1CX10 42 1-1CX10 5.47 5.47 1 STD
7 R3 DB-F-1212 SP 32 25 CU/PVC/WIRE 2-1CX10 46 1-1CX10 5.50 5.50 1 STD
9 Y3 DB-F-1201 SP 40 25 CU/PVC/WIRE 2-1CX16 50 1-1CX16 7.90 7.90 1 1BR
10 B3 DB-F-1202 SP 40 25 CU/PVC/WIRE 2-1CX16 30 1-1CX16 7.90 7.90 1 1BR
11 R4 DB-F-1206 SP 40 25 CU/PVC/WIRE 2-1CX16 30 1-1CX16 8.37 8.37 1 1BR
12 Y4 DB-F-1209 SP 40 25 CU/PVC/WIRE 2-1CX16 28 1-1CX16 7.85 7.85 1 1BR
13 B4 DB-F-1213 SP 40 25 CU/PVC/WIRE 2-1CX16 46 1-1CX16 7.90 7.90 1 1BR
14 R5 DB-F-1214 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.90 7.90 1 1BR
15 Y5 DB-F-1215 SP 40 25 CU/PVC/WIRE 2-1CX16 35 1-1CX16 7.85 7.85 1 1BR
16 B5 DB-F-1216 SP 40 25 CU/PVC/WIRE 2-1CX16 24 1-1CX16 7.90 7.90 1 1BR
17 R6 SPACE
18 Y6 SPACE
20 RYB6 DB-F-1211 TP 32 25 CU/PVC/WIRE 4-1CX16 50 1Cx16 3.42 4.06 3.03 10.51 1 2BR

TOTAL CONNECTED LOAD PER PHASE 36.13 38.60 37.67 112.40 15 1 TOTAL

DEMAND FACTOR . 0.85 MAX DEMAND .. 95.54 KW TOTAL CONNECTED LOAD (3PH) 112.40 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L13 LOCATION : ELECT. ROOM L13

FED FORM : LVP 03 / BUSBAR 03


SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 250 35 XLPE/SWA/PVC 1-4Cx150 1Cx70 35.50 38.69 30.24 96.52
OUTGOING
1 R1 DB-F-1302 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.46 5.46 1 STD
2 Y1 DB-F-1303 SP 32 25 CU/PVC/WIRE 2-1CX10 15 1-1CX10 5.46 5.46 1 STD
3 B1 DB-F-1304 SP 32 25 CU/PVC/WIRE 2-1CX10 20 1-1CX10 5.47 5.47 1 STD
4 R2 DB-F-1305 SP 32 25 CU/PVC/WIRE 2-1CX10 24 1-1CX10 5.46 5.46 1 STD
5 Y2 DB-F-1307 SP 32 25 CU/PVC/WIRE 2-1CX10 34 1-1CX10 5.46 5.46 1 STD
6 B2 DB-F-1308 SP 32 25 CU/PVC/WIRE 2-1CX10 40 1-1CX10 5.46 5.46 1 STD
7 R3 DB-F-1310 SP 32 25 CU/PVC/WIRE 2-1CX10 50 1-1CX10 5.46 5.46 1 STD
8 Y3 DB-F-1301 SP 40 25 CU/PVC/WIRE 2-1CX16 30 1-1CX16 7.90 7.90 1 1BR
9 B3 DB-F-1306 SP 40 25 CU/PVC/WIRE 2-1CX16 28 1-1CX16 8.37 8.37 1 1BR
10 R4 DB-F-1309 SP 40 25 CU/PVC/WIRE 2-1CX16 44 1-1CX16 7.85 7.85 1 1BR
11 Y4 DB-F-1312 SP 40 25 CU/PVC/WIRE 2-1CX16 48 1-1CX16 7.90 7.90 1 1BR
12 B4 DB-F-1313 SP 40 25 CU/PVC/WIRE 2-1CX16 40 1-1CX16 7.90 7.90 1 1BR
13 R5 DB-F-1314 SP 40 25 CU/PVC/WIRE 2-1CX16 32 1-1CX16 7.85 7.85 1 1BR
14 Y5 DB-F-1315 SP 40 25 CU/PVC/WIRE 2-1CX16 24 1-1CX16 7.90
15 B5 SPACE
16 RYB6 DB-F-1311 TP 32 25 CU/PVC/WIRE 4-1CX16 52 1Cx16 3.42 4.06 3.03 10.51 1 2BR

TOTAL CONNECTED LOAD PER PHASE 35.50 38.69 30.24 96.52 13 1 TOTAL

DEMAND FACTOR . 0.85 MAX DEMAND .. 82.04 KW TOTAL CONNECTED LOAD (3PH) 96.52 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB - L14 LOCATION : ELECT. ROOM L14

FED FORM : LVP 03 / BUSBAR 03


SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 200 35 XLPE/SWA/PVC 1-4Cx95 1Cx50 27.72 31.23 29.77 88.71
OUTGOING
1 R1 DB-F-1402 SP 32 25 CU/PVC/WIRE 2-1CX10 15 1-1CX10 5.46 5.46 1 STD
2 Y1 DB-F-1403 SP 32 25 CU/PVC/WIRE 2-1CX10 20 1-1CX10 5.47 5.47 1 STD
3 B1 DB-F-1404 SP 32 25 CU/PVC/WIRE 2-1CX10 24 1-1CX10 5.46 5.46 1 STD
4 R2 DB-F-1406 SP 32 25 CU/PVC/WIRE 2-1CX10 30 1-1CX10 5.47 5.47 1 STD
5 Y2 DB-F-1407 SP 32 25 CU/PVC/WIRE 2-1CX10 34 1-1CX10 5.47 5.47 1 STD
6 B2 DB-F-1408 SP 32 25 CU/PVC/WIRE 2-1CX10 38 1-1CX10 5.47 5.47 1 STD
7 R3 DB-F-1409 SP 32 25 CU/PVC/WIRE 2-1CX10 42 1-1CX10 5.47 5.47 1 STD
9 Y3 DB-F-1405 SP 40 25 XLPE/SWA/PVC 2-1CX16 28 1-1CX16 8.37 8.37 1 1BR
10 B3 DB-F-1411 SP 40 25 XLPE/SWA/PVC 2-1CX16 42 1-1CX16 7.90 7.90 1 1BR
11 R4 DB-F-1412 SP 40 25 XLPE/SWA/PVC 2-1CX16 40 1-1CX16 7.90 7.90 1 1BR
12 Y4 DB-F-1413 SP 40 25 XLPE/SWA/PVC 2-1CX16 34 1-1CX16 7.85 7.85 1 1BR
13 B4 DB-F-1414 SP 40 25 XLPE/SWA/PVC 2-1CX16 26 1-1CX16 7.90 7.90 1 1BR
15 RYB5 DB-F-1410 TP 32 25 XLPE/SWA/PVC 4-1CX16 46 1Cx16 3.42 4.06 3.03 10.51 1 2BR
TOTAL CONNECTED LOAD PER PHASE 27.72 31.23 29.77 88.71 12 1 TOTAL

DEMAND FACTOR . 0.85 MAX DEMAND .. 75.41 KW TOTAL CONNECTED LOAD (3PH) 88.71 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL STUDIO Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : Typical Flat
DB No. : : DB-STD-A
DB-STD(A&C) Fed From System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 32A 1P MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS

OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. CH HOOD 13A 13A REF FCU IG WIFI BELL WH WM UNIT KILO WATTS
ROOM/AREA
IN SIZE SIZE KA 8 11 14 22 28 40 50 200 200 400 200 190 50 50 50 1500 1000
2 2
Amp. mm mm W W W W W W W W W W W W W W W W W
40A 1 C1 10 2.5 2.5 Lighting Circuit BedRoom 01 2 1 1 1 2 1 1 1 8/11/14/22/28/40/50/200 0.48
2P 2 C2 Space
100mA 3 C3 Space
40A
4 C4 20 4.0 4.0 Water Heater 1 1500 1.50
2P
30mA 5 C5 20 4.0 4.0 Studio Room 01 Sockets 3 1 200/400 1.00
6 C6 20 4.0 4.0 12 U Cabinet 1 400 0.40

40A 7 C7 20 4.0 4.0 Washing Machine w/o Drier 1 1000 1.00


2P
8 C8 20 4.0 4.0 Kitchen Sockets/Ref 1 1 2 400/200/50 0.70
30mA
9 C9 20 4.0 4.0 Gas Detector 1 200 0.20
40A 10 C10 20 4.0 4.0 FCU Bedroom 01 1 190 0.19
2P 11 C11 20 4.0 4.0 Space
100mA 12 C12 20 4.0 4.0 Space
TOTAL LOAD 5.47
CABLE SIZE : 2X1C.....10 .........mm2,CU/PVC/WIRE..... .1CX10........mm2,Cu,G/Y, PVC,ECC. PER PHASE

Provide DP Switch + Outlet for Washing Machine TOTAL LOAD : 5.5 KW

STD-A [105,106,107,108,109,110,111,112,113,114,118,120,125,126,130,131,132,206,207,208,209,210,211,212,213,214,215,219,221,226,227,231,232,305,306,307,308,309,310,311,312,313,318,320,325,326,330,331,405,406,
407,408,409,410,411,412,413,414,415,419,421,426,427,505,506,507,508,509,510,511,512,513,514,515,518,520,525,526,604,605,606,607,608,614,619,620,703,704,705,706,707,708,709,710,714,719,723,805,806,807,808,
809,810,813,816,817,818,819,820,824,904,905,906,907,910,913,914,915,916,917,921,1002,1003,1004,1007,1010,1011,1012,1013,1104,1107,1108,1109,1110,1204,1207,1208,1210,1304,1307,1308,1310,1403,1406,
1407,1408,1409]
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL STUDIO Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : Typical Flat
DB No. : : DB-STD-B
DB-STD (B) Fed From System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 32A 1P MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. CH HOOD 13A 13A REF FCU IG WIFI BELL WH WM UNIT KILO WATTS
ROOM/AREA
IN SIZE SIZE KA 8 11 14 22 28 40 50 200 200 400 200 190 50 50 50 1500 1000
2 2
Amp. mm mm W W W W W W W W W W W W W W W W W
40A 1 C1 10 2.5 2.5 Lighting Circuit BedRoom 01 2 1 1 1 2 1 1 1 1 8/11/14/22/28/40/50/200 0.51
2P 2 C2 Space
100mA 3 C3 Space
40A 4 C4 20 4.0 4.0 Water Heater 1 1500 1.50
2P 5 C5 20 4.0 4.0 Studio Room 01 Sockets 3 1 200/400 1.00
30mA 6 C6 20 4.0 4.0 12 U Cabinet 1 400 0.40
40A 7 C7 20 4.0 4.0 Washing Machine w/o Drier 1 1000 1.00
2P 8 C8 20 4.0 4.0 Kitchen Sockets/Ref 1 1 2 50/200/400 0.70
30mA 9 C9 20 4.0 4.0 Gas Detector 1 200 0.20
40A 10 C10 20 4.0 4.0 FCU Bedroom 01 1 190 0.19
2P 11 C11 Space
100mA 12 C12 Space
TOTAL LOAD
5.50
CABLE SIZE : 2X1C.....10 .........mm2,CU/PVC/WIRE..... .1CX10........mm2,Cu,G/Y, PVC,ECC. PER PHASE

Provide DP Switch + Outlet for Washing Machine TOTAL LOAD : 5.5 KW

STD-B [102,116,128,203,217,229,303,316,328,403,417,429,503,528,611,622,702,721,813,822,902,919,1015,1112,1212,1309,]
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL STUDIO Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : Typical Flat
DB No. : : DB-STD-C
DB-STD(A&C) Fed From System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 32A 1P MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. CH HOOD 13A 13A REF FCU IG WIFI BELL WH WM UNIT KILO WATTS
ROOM/AREA
IN SIZE SIZE KA 8 11 14 22 28 40 50 200 200 400 200 190 50 50 50 1500 1000
2 2
Amp. mm mm W W W W W W W W W W W W W W W W W
40A 1 C1 10 2.5 2.5 Lighting Circuit BedRoom 01 2 1 1 1 1 1 1 1 1 8/11/14/22/28/40/50/200 0.47
2P 2 C2 Space
100mA 3 C3 Space
40A 4 C4 20 4.0 4.0 Water Heater 1 1500 1.50
2P 5 C5 20 4.0 4.0 Studio Room 01 Sockets 3 1 200/400 1.00
30mA 6 C6 20 4.0 4.0 12 U Cabinet 1 400 0.40
40A 7 C7 20 4.0 4.0 Washing Machine w/o Drier 1 1000 1.00
2P 8 C8 20 4.0 4.0 Kitchen Sockets/Ref 1 1 1 1 50/200/400 0.70
30mA 9 C9 20 4.0 4.0 Gas Detector 1 200 0.20
40A 10 C10 20 4.0 4.0 FCU Bedroom 01 1 190 0.19
2P 11 C11 20 4.0 4.0 Space
100mA 12 C12 20 4.0 4.0 Space
TOTAL LOAD
5.46
CABLE SIZE : 2X1C.....10 .........mm2,CU/PVC/WIRE..... .1CX10........mm2,Cu,G/Y, PVC,ECC. PER PHASE

Provide DP Switch + Outlet for Washing Machine TOTAL LOAD : 5.5 KW

STD-C [121,222,321,422,521,615,715,814,911,1008,1103,1105,1203,1205,1302,1303,1305,1402,1404]
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL 1BED ROOM Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION
Typical
: Flat
DB No. : : DB - 1B-A Type Fed From SMDB -L TYPICAL System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A 1P MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS

OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. CH HOOD13A 13A REF FCU IG WIFI SH BELL DW WH WM UNIT KILO WATTS
ROOM/AREA
IN SIZE SIZE KA 8 11 14 22 28 40 50 200 200 400 200 870 50 50 50 50 1000 1500 1000
2 2
Amp. mm mm W W W W W W W W W W W W W W W W W W W
1 C1 10 2.5 2.5 Lighting Circuit Living/Kitchen 1 1 1 2 2 1 1 1 8/11/14/22/28/40/50/200 0.51
40A
2P 2 C2 10 2.5 2.5 2 2 2 3 1 8/11/14/22/28/40/50/200 0.26
Lighting Circuit Toilet/Bedroom
100mA
3 C3 Space
40A 4 C4 Space
2P 5 C5 20 4.0 4.0 Living Room Sockets 3 1 200/400 1.00
30mA
6 C6 20 4.0 4.0 Bed Room Sockets 2 1 200/400 0.80
7 C7 20 4.0 4.0 TEL 12 U Cabinet Supply 1 400 0.40
40A
2P 8 C8 20 6.0 4.0 Washing Machine w/o Drier 1 1000 1.00
30mA
9 C9 20 4.0 4.0 Water Heater 1 1500 1.50
40A 10 C10 20 4.0 4.0 Dish Washer 1 1000 1.00
2P 11 C11 20 4.0 4.0 Kitchen Sockets 2 1 2 200/50 0.70
30mA 12 C12 20 4.0 4.0 Gas Detector 1 200 0.20
40A 13 C13 20 4.0 4.0 FCU Living & Bath Room 1 870 0.87
2P 14 C14 Space
100mA 15 C15 Space
TOTAL LOAD
CABLE SIZE : 2X1C.....16 .........mm2,CU/PVC/WIRE..... .1CX16........mm2,Cu,G/Y, PVC,ECC. PER PHASE 8.24

Provide DP Switch + Outlet for Washing Machine TOTAL LOAD : 8.2 KW

1BEDROOM-A[115,216,218,315,317,416,418,722,833,1016,1113]
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL 1BED ROOM Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION
Typical
: Flat
DB No. : : DB - 1B -B-Type Fed From SMDB -L TYPICAL System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A 1P MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. CH HOOD 13A 13A REF FCU IG WIFI SH BELL DW WH WM UNIT KILO WATTS
ROOM/AREA
IN SIZE SIZE KA 8 11 14 22 28 40 50 200 200 400 200 870 50 50 50 50 1000 1500 1000
2 2
Amp. mm mm W W W W W W W W W W W W W W W W W W W
40A 1 C1 10 2.5 2.5 Lighting Circuit Living/Kitchen 1 1 1 2 2 1 1 1 8/11/14/22/28/40/50/200 0.49
2P 2 C2 10 2.5 2.5 Lighting Circuit Toilet/Bedroom 2 1 2 2 2 1 8/11/14/22/28/40/50/200 0.23
100mA 3 C3 Space
40A 4 C4 Space
2P 5 C5 20 4.0 4.0 Living Room Sockets 3 1 200/400 1.00
30mA 6 C6 20 4.0 4.0 Bed Room Sockets 2 1 200/400 0.80
40A 7 C7 20 4.0 4.0 TEL 12 U Cabinet Supply 1 400 0.40
2P 8 C8 20 6.0 4.0 Washing Machine w/o Drier 1 1000 1.00
30mA 9 C9 20 4.0 4.0 Water Heater 1 1500 1.50
40A 10 C10 20 4.0 4.0 Dish Washer 1 1000 1.00
2P 11 C11 20 4.0 4.0 Kitchen Sockets/Ref 2 1 2 200/50 0.70
30mA 12 C12 20 4.0 4.0 Gas Detector 1 200 0.20
40A 13 C13 20 4.0 4.0 FCU Living & Bath Room 1 870 0.87
2P 14 C14 Space
100mA 15 C15 Space
TOTAL LOAD
CABLE SIZE : 2X1C.....16 .........mm2,CU/PVC/WIRE..... .1CX16........mm2,Cu,G/Y, PVC,ECC. PER PHASE 8.19

Provide DP Switch + Outlet for Washing Machine TOTAL LOAD : 8.2 KW

1BEDROOM-B[117,129,230,322,324,329,402,404,502,517,612,802,920]
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL 1BED ROOM Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION
Typical
: Flat
DB No. : : DB - 1B -C-Type Fed From SMDB -L TYPICAL System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A 1P MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. CH HOOD 13A 13A REF FCU IG WIFI SH BELL DW WH WM UNIT KILO WATTS
ROOM/AREA
IN SIZE SIZE KA 8 11 14 22 28 40 50 200 200 400 200 597 50 50 50 50 1000 1500 1000
2 2
Amp. mm mm W W W W W W W W W W W W W W W W W W W
40A 1 C1 10 2.5 2.5 Lighting Circuit Living/Kitchen 1 1 2 2 1 1 1 8/11/14/22/28/40/50/200 0.48
2P 2 C2 10 2.5 2.5 Lighting Circuit Toilet/Bedroom 2 1 2 4 1 8/11/14/22/28/40/50/200 0.28
100mA 3 C3 Space
40A 4 C4 Space
2P 5 C5 20 4.0 4.0 Living Room Sockets 3 1 200/400 1.00
30mA 6 C6 20 4.0 4.0 Bed Room Sockets 2 1 200/400 0.80
40A 7 C7 20 4.0 4.0 TEL 12 U Cabinet Supply 1 400 0.40
2P 8 C8 20 6.0 4.0 Washing Machine w/o Drier 1 1000 1.00
30mA 9 C9 20 4.0 4.0 Water Heater 1 1500 1.50
40A 10 C10 20 4.0 4.0 Dish Washer 1 1000 1.00
2P 11 C11 20 4.0 4.0 Kitchen Sockets 2 1 1 2 200/50 0.70
30mA 12 C12 20 4.0 4.0 Gas Detector 1 200 0.20
40A 13 C13 20 4.0 4.0 FCU Living & Bath Room 1 597 0.60
2P 14 C14 Space
100mA 15 C15 Space
TOTAL LOAD
CABLE SIZE : 2X1C.....16 .........mm2,CU/PVC/WIRE..... .1CX16........mm2,Cu,G/Y, PVC,ECC. PER PHASE 7.96

Provide DP Switch + Outlet for Washing Machine TOTAL LOAD : 8.0 KW

1BEDROOM-C[119,220,319,420,713,909,1006]
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL 1BED ROOM Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION
Typical
: Flat
DB No. : : DB - 1B -D-Type Fed From SMDB -L TYPICAL System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A 1P MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. CH HOOD 13A 13A REF FCU IG WIFI SH BELL DW WH WM UNIT KILO WATTS
ROOM/AREA
IN SIZE SIZE KA 8 11 14 22 28 40 50 200 200 400 200 870 50 50 50 50 1000 1500 1000
2 2
Amp. mm mm W W W W W W W W W W W W W W W W W W W
40A 1 C1 10 2.5 2.5 Lighting Circuit Living/Kitchen 2 1 1 1 2 2 1 1 1 8/11/14/22/28/40/50/200 0.52
2P 2 C2 10 2.5 2.5 Lighting Circuit Toilet/Bedroom 1 1 1 1 2 1 8/11/14/22/28/40/50/200 0.19
100mA 3 Space
40A 4 C4 Space
2P 5 C5 20 4.0 4.0 Living Room Sockets 3 1 200/400 1.00
30mA 6 C6 20 4.0 4.0 Bed Room Sockets 3 1 200/400 1.00
40A 7 C7 20 4.0 4.0 TEL 12 U Cabinet Supply 1 400 0.40
2P 8 C8 20 6.0 4.0 Washing Machine w/o Drier 1 1000 1.00
30mA 9 C9 20 4.0 4.0 Water Heater 1 1500 1.50
40A 10 C10 20 4.0 4.0 Dish Washer 1 1000 1.00
2P 11 C11 20 4.0 4.0 Kitchen Sockets 2 1 2 200/50 0.70
30mA 12 C12 20 4.0 4.0 Gas Detector 1 200 0.20
40A 13 C13 20 4.0 4.0 FCU Living & Bath Room 1 870 0.87
2P 14 C14 Space
100mA 15 C15 Space
TOTAL LOAD
CABLE SIZE : 2X1C.....16 .........mm2,CU/PVC/WIRE..... .1CX16........mm2,Cu,G/Y, PVC,ECC. PER PHASE 8.37

Provide DP Switch + Outlet for Washing Machine TOTAL LOAD : 8.4 KW

1BEDROOM-D[122,223,322,423,522,616,716,815,912,1009,1106,1206,1306,1405]
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL 1BED ROOM Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION
Typical
: Flat
DB No. : : DB - 1B -E-Type Fed From SMDB -L TYPICAL System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A 1P MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. CH HOOD 13A 13A REF FCU IG WIFI SH BELL DW WH WM UNIT KILO WATTS
ROOM/AREA
IN SIZE SIZE KA 8 11 14 22 28 40 50 200 200 400 200 597 50 50 50 50 1000 1500 1000
2 2
Amp. mm mm W W W W W W W W W W W W W W W W W W W
40A 1 C1 10 2.5 2.5 Lighting Circuit Living/Kitchen 2 1 1 1 2 2 1 1 1 8/11/14/22/28/40/50/200 0.52
2P 2 C2 10 2.5 2.5 Lighting Circuit Toilet/Bedroom 1 1 1 1 1 8/11/14/22/28/40/50/200 0.13
100mA 3 C3 Space
40A 4 C4 Space
2P 5 C5 20 4.0 4.0 Living Room Sockets 3 1 200/400 1.00
30mA 6 C6 20 4.0 4.0 Bed Room Sockets 2 1 200/400 0.80
40A 7 C7 20 4.0 4.0 TEL 12 U Cabinet Supply 1 400 0.40
2P 8 C8 20 6.0 4.0 Washing Machine w/o Drier 1 1000 1.00
30mA 9 C9 20 4.0 4.0 Water Heater 1 1500 1.50
40A 10 C10 20 4.0 4.0 Dish Washer 1 1000 1.00
2P 11 C11 20 4.0 4.0 Kitchen Sockets 2 1 2 200/50 0.70
30mA 12 C12 20 4.0 4.0 Gas Detector 1 200 0.20
40A 13 C13 20 4.0 4.0 FCU Living & Bath Room 1 597 0.60
2P 14 C14 Space
100mA 15 C15 Space
TOTAL LOAD
CABLE SIZE : 2X1C.....16 .........mm2,CU/PVC/WIRE..... .1CX16........mm2,Cu,G/Y, PVC,ECC. PER PHASE 7.85

Provide DP Switch + Outlet for Washing Machine TOTAL LOAD : 7.9 KW

1BEDROOM-E[123,124,224,225,301,323,324,424,425,431,516,523,524,530,603,609,610,617,618,624,711,712,717,718,801,804,811,901,903,908,1001,1005,1019,1116,1209,1215,1314,1413]
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL 1BED ROOM Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION
Typical
: Flat
DB No. : : DB - 1B-F-Type Fed From SMDB -L TYPICAL System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A 1P MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. CH HOOD 13A 13A REF FCU IG WIFI SH BELL DW WH WM UNIT KILO WATTS
ROOM/AREA
IN SIZE SIZE KA 8 11 14 22 28 40 50 200 200 400 200 665 50 50 50 50 1000 1500 1000
2 2
Amp. mm mm W W W W W W W W W W W W W W W W W W W
40A 1 C1 10 2.5 2.5 Lighting Circuit Living/Kitchen 2 1 1 1 2 2 1 1 1 8/11/14/22/28/40/50/200 0.46
2P 2 C2 10 2.5 2.5 Lighting Circuit Toilet/Bedroom 1 1 1 2 1 8/11/14/22/28/40/50/200 0.17
100mA 3 Space
40A 4 C4 Space
2P 5 C5 20 4.0 4.0 Living Room Sockets 3 1 200/400 1.00
30mA 6 C6 20 4.0 4.0 Bed Room Sockets 2 1 200/400 0.80
40A 7 C7 20 4.0 4.0 TEL 12 U Cabinet Supply 1 400 0.40
2P 8 C8 20 6.0 4.0 Washing Machine w/o Drier 1 1000 1.00
30mA 9 C9 20 4.0 4.0 Water Heater 1 1500 1.50
40A 10 C10 20 4.0 4.0 Dish Washer 1 1000 1.00
2P 11 C11 20 4.0 4.0 Kitchen Sockets 2 1 2 200/50 0.70
30mA 12 C12 20 4.0 4.0 Gas Detector 1 200 0.20
40A 13 C13 20 4.0 4.0 FCU Living & Bath Room 1 665 0.67
2P 14 C14 Space
100mA 15 C15 Space
TOTAL LOAD
CABLE SIZE : 2X1C.....16 .........mm2,CU/PVC/WIRE..... .1CX16........mm2,Cu,G/Y, PVC,ECC. PER PHASE 7.90

Provide DP Switch + Outlet for Washing Machine TOTAL LOAD : 7.9 KW

1BEDROOM-F[103,201,204,233,332,401,430,432,501,529,531,602,613,623,625,724,825,922,923,1017,1018,1020,1301,1312,1313,1315,1411,1412,1414]
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL 1BED ROOM Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION
Typical
: Flat
DB No. : : DB - 1B-G-Type Fed From SMDB -L TYPICAL System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A 1P MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. CH HOOD 13A 13A REF FCU IG WIFI SH BELL DW WH WM UNIT KILO WATTS
ROOM/AREA
IN SIZE SIZE KA 8 11 14 22 28 40 50 200 200 400 200 665 50 50 50 50 1000 1500 1000
2 2
Amp. mm mm W W W W W W W W W W W W W WIFI W W W W W
40A 1 C1 10 2.5 2.5 Lighting Circuit Living/Kitchen 2 2 1 1 2 2 1 1 1 8/11/14/22/28/40/50/200 0.53
2P 2 C2 10 2.5 2.5 Lighting Circuit Toilet/Bedroom 1 1 1 1 1 1 8/11/14/22/28/40/50/200 0.15
100mA 3 C3 Space
40A 4 C4 Space
2P 5 C5 20 4.0 4.0 Living Room Sockets 2 1 200/400 0.80
30mA 6 C6 20 4.0 4.0 Bed Room Sockets 2 1 200/400 0.80
40A 7 C7 20 4.0 4.0 TEL 12 U Cabinet Supply 1 400 0.40
2P 8 C8 20 6.0 4.0 Washing Machine w/o Drier 1 1000 1.00
30mA 9 C9 20 4.0 4.0 Water Heater 1 1500 1.50
40A 10 C10 20 4.0 4.0 Dish Washer 1 1000 1.00
2P 11 C11 20 4.0 4.0 Kitchen Sockets 2 1 2 200/50 0.70
30mA 12 C12 20 4.0 4.0 Gas Detector 1 200 0.20
40A 13 C13 20 4.0 4.0 FCU Living & Bath Room 1 665 0.67
2P 14 C14 Space
100mA 15 C15 Space
TOTAL LOAD
CABLE SIZE : 2X1C.....16 .........mm2,CU/PVC/WIRE..... .1CX16........mm2,Cu,G/Y, PVC,ECC. PER PHASE 7.74

Provide DP Switch + Outlet for Washing Machine TOTAL LOAD : 7.7 KW

1BEDROOM-G[234,333,433,532,626,725,826]
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL 1BED ROOM Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION
Typical
: Flat
DB No. : : DB - 1B -ADD Type Fed From SMDB -L TYPICAL System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A 1P MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. CH HOOD 13A 13A REF FCU IG WIFI SH BELL DW WH WM UNIT KILO WATTS
ROOM/AREA
IN SIZE SIZE KA 8 11 14 22 28 40 50 200 200 400 200 597 50 50 50 50 1000 1500 1000
2 2
Amp. mm mm W W W W W W W W W W W W W W W W W W W
40A 1 C1 10 2.5 2.5 Lighting Circuit Living/Kitchen 1 1 1 2 2 1 1 1 8/11/14/22/28/40/50/200 0.49
2P 2 C2 10 2.5 2.5 Lighting Circuit Toilet/Bedroom 1 2 2 2 1 8/11/14/22/28/40/50/200 0.21
100mA 3 C3 Space
40A 4 C4 Space
2P 5 C5 20 4.0 4.0 Living Room Sockets 3 1 200/400 1.00
30mA 6 C6 20 4.0 4.0 Bed Room Sockets 2 1 200/400 0.80
40A 7 C7 20 4.0 4.0 TEL 12 U Cabinet Supply 1 400 0.40
2P 8 C8 20 6.0 4.0 Washing Machine w/o Drier 1 1000 1.00
30mA 9 C9 20 4.0 4.0 Water Heater 1 1500 1.50
40A 10 C10 20 4.0 4.0 Dish Washer 1 1000 1.00
2P 11 C11 20 4.0 4.0 Kitchen Sockets 2 1 2 200/50 0.70
30mA 12 C12 20 4.0 4.0 Gas Detector 1 200 0.20
40A 13 C13 20 4.0 4.0 FCU Living & Bath Room 1 597 0.60
2P 14 C14 Space
100mA 15 C15 Space
TOTAL LOAD
CABLE SIZE : 2X1C.....16 .........mm2,CU/PVC/WIRE..... .1CX16........mm2,Cu,G/Y, PVC,ECC. PER PHASE 7.90

Provide DP Switch + Outlet for Washing Machine TOTAL LOAD : 7.9 KW

1BEDROOM-ADD[104,205]
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL 2BED ROOM Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : Typical Level Flat
DB No. : : DB - 2B-A-Type Fed From SMDB - L2 TYPICAL System Voltage : 400/230 V, 50 Hz
Rating of Incomer : 32A TP MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS

OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. CH HOOD 13A 13A REF FCU IG WIFI SH BELL DW WH WM UNIT KILO WATTS
ROOM/AREA
IN SIZE SIZE KA 8 11 14 22 28 40 50 200 200 400 200 50 50 50 50 1000 1200 1000
2 2 R Y B
Amp. mm mm W W W W W W W W W W W W W W W W W W W
1 R1 10 2.5 2.5 Living/Kitchen 2 1 1 1 2 2 1 1 1 8/11/14/22/28/40/50/200 0.52
2 Y1 10 2.5 2.5 Bed Room/Toilets 1 1 1 3 8/11/14/22/28/40/50/200 0.16
40A
3 B1 10 2.5 2.5 Bed Broom Toilet 1 1 3 1 8/11/14/22/28/40/50/200 0.20
4P
100mA 4 R2 Space
5 Y2 Space
6 B2 Space
7 R3 20 4.0 4.0 Living Room Sockets 3 1 200/400 1.00
40A 8 Y3 20 4.0 4.0 Bed Room Sockets 2 1 200/400 0.80
4P 9 B3 20 4.0 4.0 Bed Room Sockets 2 1 200/400 0.80
30mA 10 R4 20 4.0 4.0 Near Main door 1 400 0.40 Tel 12 U Cabinet
11 Y4 Space
12 B4 20 4.0 4.0 Kitchen 1 1000 1.00 Dish Washer
13 R5 20 4.0 4.0 Kitchen 1 1500 1.50 Water Heater
14 Y5 20 4.0 4.0 Washing Machine w/o Drier 1 1000 1.00 w/o Drier
40A 15 B5 20 4.0 4.0 Gas Detector 1 200 0.20 Gas Detector
4P
13 R6 20 Spare
30mA
14 Y6 20 4.0 4.0 Bath Room 1 1500 1.50 Water Heater
15 B6 20 4.0 4.0 Kitchen 2 1 2 200/50 0.70

40A 16 R7 20 4.0 4.0 Spare


4P 17 Y7 20 4.0 4.0 Bath Room 1 597 0.60 FCU-L01-01
100mA 18 B7 20 4.0 4.0 Bath Room 1 132 0.13 FCU-L01-01A
TOTAL LOAD
CABLE SIZE : 4X1C.....16 .........mm2,CU/PVC/WIRE..... .1CX16........mm2,Cu,G/Y, PVC,ECC. PER PHASE 3.42 4.06 3.03

TOTAL LOAD : 10.51 KW

2 BEDROOM[101,127,202,228,327,428,527,601,621,701,720,812,821,918,1014,1111,1211,1311,1401,1410]
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI Location : Al Furjan Dubai
DB REF :TYPICAL 2BED ROOM Owner : Azizi Developments
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : Typical Level Flat
DB No. : : DB - 2B-B-Type Fed From SMDB - L2 TYPICAL System Voltage : 400/230 V, 50 Hz
Rating of Incomer : 32A TP MCCB
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. LTG. LTG. CH HOOD 13A 13A REF FCU IG WIFI SH BELL DW WH WM UNIT KILO WATTS
ROOM/AREA
IN SIZE SIZE KA 8 11 14 22 28 40 50 200 200 400 200 50 50 50 50 1000 1200 1000
2 2 R Y B
Amp. mm mm W W W W W W W W W W W W W W W W W W W
1 R1 10 2.5 2.5 Living/Kitchen 2 1 1 1 2 2 1 1 1 8/11/14/22/28/40/50/200 0.52
2 Y1 10 2.5 2.5 Bed Room/Toilets 1 1 1 3 8/11/14/22/28/40/50/200 0.16
40A
3 B1 10 2.5 2.5 Bed Broom Toilet 1 3 1 8/11/14/22/28/40/50/200 0.19
4P
4 R2 Space
100mA
5 Y2 Space
6 B2
7 R3 20 4.0 4.0 Living Room Sockets 3 1 200/400 1.00
40A 8 Y3 20 4.0 4.0 Bed Room Sockets 2 1 200/400 0.80
4P 9 B3 20 4.0 4.0 Bed Room Sockets 2 1 200/400 0.80
30mA 10 R4 20 4.0 4.0 Near Main door 1 400 0.40 Tel 12 U Cabinet
11 Y4 Space
12 B4 20 4.0 4.0 Kitchen 1 1000 1.00 Dish Washer
13 R5 20 4.0 4.0 Kitchen 1 1500 1.50 Water Heater

14 Y5 20 4.0 4.0 Washing Machine w/o Drier 1 1000 1.00 Washing Machine
40A w/o Drier
4P 15 B5 20 4.0 4.0 Gas Detector 1 200 0.20 Gas Detector
30mA 13 R6 20 Spare
14 Y6 20 4.0 4.0 Bath Room 1 1500 1.50 Water Heater
15 B6 20 4.0 4.0 Kitchen 2 1 2 200/50 0.70

40A 16 R7 20 4.0 4.0 Spare


4P 17 Y7 20 4.0 4.0 Bath Room 1 597 0.60 FCU-L027-01
100mA
18 B7 20 4.0 4.0 Bath Room 1 132 0.13 FCU-L027-01A

CABLE SIZE : 4X1C.....16 .........mm2,CU/PVC/WIRE..... .1CX16........mm2,Cu,G/Y, PVC,ECC. PER PHASE 3.42 4.06 3.02

TOTAL LOAD : 10.50 KW


PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDB -RF LOCATION : ELECT. ROOM RF

FED FORM : LVP-03 / BUSBAR 03

SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB ISO DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)

RYB INCOMER TP 300 35 XLPE/SWA/PVC 1-4Cx185 1Cx95 42.00 42.00 42.00 126.00
OUTGOING

1 RYB1 Elevator 01 TP 63 25 XLPE/SWA/PVC 1-4CX16 1C 16 5.00 5.00 5.00 15.00 300 mA/ELCB
2 RYB2 Elevator 02 TP 63 25 XLPE/SWA/PVC 1-4CX16 1C 16 5.00 5.00 5.00 15.00 300 mA/ELCB
3 RYB3 Elevator 03 TP 63 25 XLPE/SWA/PVC 1-4CX16 1C 16 5.00 5.00 5.00 15.00 300 mA/ELCB
4 RYB4 FAHU 03 TP 100 25 XLPE/SWA/PVC 1-4CX35 1C 16 7.00 7.00 7.00 21.00 100mA/WYE-DELTA
5 RYB5 SMDB-PL TP 125 35 XLPE/SWA/PVC 1-4CX35 1C 16 15.00 15.00 15.00 45.00 Pool provision
6 RYB6 BOOSTER PUMP TP 40 25 XLPE/SWA/PVC 1-4CX10 1C 10 5.00 5.00 5.00 4.00 30 mA/ELCB
TOTAL
TOTAL CONNECTED LOAD PER PHASE 42.00 42.00 42.00 126.00 0

DEMAND FACTOR . 1.00 MAX DEMAND .. 126.00 KW TOTAL CONNECTED LOAD (3PH) 126.00 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI
DETAILS OF CONNECTED LOAD / MAX. DEMAND
MDB REF : MDBE - G
LOCATION : GENERATOR ROOM
FED FORM : LVP- 1/ 450 KVA GENERATOR, PRIME POWER
SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 800 50 XLPE/SWA/PVC 2-4Cx300 2Cx150 #VALUE! 114.63 114.49 347.36
OUTGOING

1 RYB1 DBE -G TP 80 35 XLPE/SWA/PVC 1-4CX25 1C16 12.18 8.62 8.07 28.86


2 RYB2 DBE -L1 TP 40 35 XLPE/SWA/PVC 1-4CX10 1C10 4.95 4.80 5.00 14.75
3 RYB3 DBE -L6 TP 40 35 XLPE/SWA/PVC 1-4CX10 1C10 1.79 1.54 1.96 5.29
4 RYB4 DBE -L11 TP 40 35 XLPE/SWA/PVC 1-4CX10 1C10 1.14 1.51 1.30 3.95
5 RYB5 MCCE-G TP 160 35 XLPE/SWA/PVC 1-4Cx70 1Cx35 26.17 26.17 26.17 78.50
6 RYB6 SMDBE-RF TP 225 35 XLPE/SWA/PVC 1-4Cx120 1Cx50 32.33 32.33 32.33 97.00
7 RYB7 JOCKEY PUMP TP 40 35 XLPE/SWA/PVC 1-4CX6 1Cx6 1.67 1.67 1.67 5.00 ELS+Alarm

8 RYB8 MCCE-P2 TP 200 35 XLPE/SWA/PVC 1-4Cx95 1C 50 24.67 24.67 24.67 74.00


9 RYB9 SMDBE-Tel ( DU Panel ) TP 63 35 XLPE/SWA/PVC 1-4CX16 1C16 5.00 5.00 5.00 15.00
10 RYB10 GSM TP 63 35 XLPE/SWA/PVC 1-4CX16 1C16 5.00 5.00 5.00 15.00
11 RYB11 CBS TP 40 35 XLPE/SWA/PVC 1-4CX6 1C6 3.33 3.33 3.33 10.00
12
118.23 114.63 114.49 347.36 TOTAL
TOTAL CONNECTED LOAD PER PHASE 0

DEMAND FACTOR . 1.00 MAX DEMAND .. 347.4 KW TOTAL CONNECTED LOAD (3PH) 347.36 KW TOTAL BUILD-UP AREA.
Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : MCCE-G LOCATION : ELECT. ROOM GF

FED FORM : MDBE-G

SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)

RYB INCOMER TP 160 35 XLPE/SWA/PVC 1-4Cx70 1Cx35 26.17 26.17 26.17 78.50
OUTGOING

1 RYB1 Smoke Extract Fan 01 TP 40 25 XLPE/SWA/PVC 1-4CX10 1C 10 6.17 6.17 6.17 18.50 ELS+Alarm
2 RYB2 Smoke Extract Fan 02 TP 40 25 XLPE/SWA/PVC 1-4CX10 1C 10 6.17 6.17 6.17 18.50 ELS+Alarm
3 RYB3 Smoke Extract Fan 03 TP 40 25 XLPE/SWA/PVC 1-4CX10 1C 10 6.17 6.17 6.17 18.50 ELS+Alarm
4 RYB4 Make Up Fan 01 TP 40 25 XLPE/SWA/PVC 1-4CX10 1C 10 5.00 5.00 5.00 15.00 ELS+Alarm
5 RYB6 LWPF-03 TP 40 25 XLPE/SWA/PVC 1-4CX10 1C 10 1.33 1.33 1.33 4.00

6 RYB7 LWPF-04 TP 40 25 XLPE/SWA/PVC 1-4CX10 1C 10 1.33 1.33 1.33 4.00

26.17 26.17 26.17 78.50 TOTAL


TOTAL CONNECTED LOAD PER PHASE 0

DEMAND FACTOR . 1.00 MAX DEMAND .. 78.5 KW TOTAL CONNECTED LOAD (3PH) 78.50 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

MCC REF : MCCE -P2 LOCATION : MECH. ROOM P2

FED FORM : MDBE - G

SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
RYB INCOMER TP 200 35 XLPE/SWA/PVC 1-4Cx95 1C 50 24.67 24.67 24.67 74.00
OUTGOING
1 RYB1 Corridor Extract Fan-01 TP 20 25 XLPE/SWA/PVC 1-4CX6 1C 6 2.00 2.00 2.00 6.00 ELS+Alarm
2 RYB2 Corridor Extract Fan-02 TP 20 25 XLPE/SWA/PVC 1-4CX6 1C 6 2.00 2.00 2.00 6.00 ELS+Alarm
3 RYB3 Corridor Make Up Fan-01 TP 20 25 XLPE/SWA/PVC 1-4CX6 1C 6 1.00 1.00 1.00 3.00 ELS+Alarm
4 RYB4 Corridor Make Up Fan-02 TP 20 25 XLPE/SWA/PVC 1-4CX6 1C 6 1.00 1.00 1.00 3.00 ELS+Alarm
5 RYB5 Stair Case Pressure Fan-01 TP 40 25 XLPE/SWA/PVC 1-4CX10 1C 10 2.50 2.50 2.50 7.50 ELS+Alarm
6 RYB6 Stair Case Pressure Fan-02 TP 40 25 XLPE/SWA/PVC 1-4CX10 1C 10 2.50 2.50 2.50 7.50 ELS+Alarm
7 RYB7 Stair Case Pressure Fan-03 TP 40 25 XLPE/SWA/PVC 1-4CX10 1C 10 3.67 3.67 3.67 11.00 ELS+Alarm
8 RYB8 Spare TP 63 25 10.00 10.00 10.00 30.00
TOTAL
Note: VFD controlled motors shall have by Pass of wye-Delta Start controls.
TOTAL CONNECTED LOAD PER PHASE 24.67 24.67 24.67 74.00 0

DEMAND FACTOR . 1.00 MAX DEMAND .. 74.00 KW TOTAL CONNECTED LOAD (3PH) 74.00 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI DETAILS OF CONNECTED LOAD / MAX. DEMAND

SMDB REF : SMDBE -RF LOCATION : ELECT. ROOM RF

FED FORM : MDBE-G

SR. CIRCUIT SP/ CB FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
CKT.NO

NO. FEEDER TP MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT

DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)

RYB INCOMER TP 225 35 XLPE/SWA/PVC 1-4Cx120 1Cx50 32.33 32.33 32.33 97.00
OUTGOING

1 RYB1 Elevator 04 TP 63 25 XLPE/SWA/PVC 1-4CX16 1C 16 5.00 5.00 5.00 15.00 300mA/ELCB


7 RYB2 Corridor Pres Fan 03 TP 32 25 XLPE/SWA/PVC 1-4CX6 1C 6 2.00 2.00 2.00 6.00 ELS+Alarm
8 RYB3 Corridor Extract Fan 03 TP 32 25 XLPE/SWA/PVC 1-4CX6 1C 6 2.00 2.00 2.00 6.00 ELS+Alarm
9 RYB4 Atrium Extract Fan 04 TP 80 25 XLPE/SWA/PVC 1-4CX25 1C 16 12.33 12.33 12.33 37.00 100mA/WYE-DELTA
10 RYB5 2-Lift Press Fan TP 32 25 XLPE/SWA/PVC 1-4CX6 1C 6 3.00 3.00 3.00 9.00 ELS+Alarm
11 RYB6 2-Lift Hoist Fan TP 32 25 XLPE/SWA/PVC 1-4CX6 1C 6 3.00 3.00 3.00 9.00 ELS+Alarm
12 RYB7 OBSTRUCTION LIGHT TP 40 25 5.00 5.00 5.00 15.00 Provisson

TOTAL CONNECTED LOAD PER PHASE 32.33 32.33 32.33 97.00 0

DEMAND FACTOR . 1.00 MAX DEMAND .. 97 KW TOTAL CONNECTED LOAD (3PH) 97.00 KW TOTAL BUILD-UP AREA.

Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT/A
(1 PHASE) (3 PHASE)
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : GEN ROOM
DB No. : : DBE - G Fed From MDBE - G System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 80A TP ISOLATOR
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. EXF 13A FCU BELL WH W KILOWATT
ROOM/AREA

SPLIT
ACU
IN SIZE SIZE KA 10 35.6 20 200 50 S/O 50 1500 UNIT R Y B

Others
2 2
Amp. mm mm W W W W W W W W
1 R1 10 2.5 2.5 Basement Drive way 7 35.6 0.25 CONTROLLED SWITCH
40A 2 Y1 10 2.5 2.5 Basement Pamp Room & generator 6 35.6 0.21 CONTROLLED SWITCH
4P 3 B1 10 2.5 2.5 Basement External Area & Enterance Area 5 3 10/35.6 0.16 CONTROLLED SWITCH
100mA 4 R2 10 2.5 2.5 Basement Drive way 9 35.6 0.32 CONTROLLED SWITCH
5 Y2 10 Spare 35.6 0.04
6 B2 10 2.5 2.5 Basement ETS Pump Room 9 35.6 0.32 CONTROLLED SWITCH
7 R3 10 2.5 2.5 Podium 01 Drive way 6 35.6 0.21 CONTROLLED SWITCH
40A 8 Y3 10 2.5 2.5 Ground LV Room 9 35.6 0.90 CONTROLLED SWITCH
4P 9 B3 10 Spare 35.6 0.04
100mA 10 R4 10 2.5 2.5 Ground Drive way 7 35.6 0.25 CONTROLLED SWITCH
11 Y4 10 2.5 2.5 Ground External Area 12 10 0.12 CONTROLLED SWITCH
12 B4 10 2.5 2.5 Ground Enterance Lobby &Lift Enterance 10 20 0.20 CONTROLLED SWITCH
13 R5 10 2.5 2.5 Ground Drive way & Ramp slope 14 35.6 0.50 CONTROLLED SWITCH
40A 14 Y5 10 2.5 2.5 Ground Retail & Stair Case 01(B.M to PD-02) 13 35.6 0.46 CONTROLLED TIMER SWITCH
4P 15 B5 10 2.5 2.5 Ground Stair Case 02(B.M to PD-02) 10 35.6 0.36 CONTROLLED TIMER SWITCH
100mA 16 R6 10 2.5 2.5 Podium 02 Drive way 11 35.6 0.39 CONTROLLED SWITCH
17 Y6 10 2.5 2.5 Ground Lift (B.M to PD-02) 8 20 0.16 CONTROLLED SWITCH
18 B6 10 2.5 2.5 Ground Lift (B.M to PD-02) 8 20 0.16 CONTROLLED SWITCH
19 R7 10 2.5 2.5 Podium 01 Drive way 15 35.6 0.53 CONTROLLED SWITCH
40A 20 Y7 10 2.5 2.5 Ground Stair Case 03(B.M to PD-02) 9 10 0.09 CONTROLLED TIMER SWITCH
4P 21 B7 10 2.5 2.5 Podium 01 Entrance Lobby & External Area 5 3 10/20 0.11 CONTROLLED SWITCH
100mA 22 R8 10 2.5 2.5 Podium 02 Drive way 9 35.6 0.32 CONTROLLED SWITCH
23 Y8 10 Spare 35.6 0.04
24 B8 10 2.5 2.5 Podium-02 Stair Case External & Enterance Lobby 5 4 10/20 0.13 CONTROLLED SWITCH
25 R9 20 4 4 Ground FCC Room 6 200 1.20 ` RING
26 Y9 20 4 4 Ground FCC Room 3 200 0.60
40A 27 B9 20 4 4 Ground FCC Room 5 200 1.00 RING
4P 28 R10 20 4 4 Basement CCTV Stair Case 03 & Drive way 3 200 0.60
30mA 29 Y10 20 4 4 Basement CCTV Stair Case 01 & Enterance Lobby 3 200 0.60
30 B10 20 4 4 Basement CCTV Stair Case 03 & Drive way 3 200 0.60
31 R11 20 4 4 Ground Enterance Lobby Lift Side 1 200 0.20
40A 32 Y11 20 Spare 200 0.20
4P 33 B11 20 4 4 Ground LV Room side 1 200 0.20
30mA 34 R12 20 4 4 Ground Parking Area Column 5 200 1.00 RING
35 Y12 20 4 4 Ground RMU Room 1 200 0.20
36 B12 20 4 4 Ground RMU Room Isolator 1 200 0.20
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : GEN ROOM
DB No. : : DBE - G Fed From MDBE - G System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 80A TP ISOLATOR
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. EXF 13A FCU BELL WH W KILOWATT
ROOM/AREA

SPLIT
ACU
IN SIZE SIZE KA 10 35.6 20 200 50 S/O 50 1500 UNIT R Y B

Others
2 2
Amp. mm mm W W W W W W W W
37 R13 20 Spare 200 0.20
40A 38 Y13 20 Spare 200 0.20
4P 39 B13 20 4 4 Podium-01 CCTV Stair Case 03 & Drive way 3 200 . 0.60
30mA 40 R14 20 4 4 Podium-02 CCTV Stair Case 03 & Drive way 3 200 0.60
41 Y14 20 4 4 Podium-01 CCTV Drive way & Parking 3 200 0.60
42 B14 20 4 4 Podium-02 CCTV Parking & Drive way 3 200 0.60
43 R15 20 4 4 Podium-01 CCTV Stair Case 03 & Drive way 3 200 0.60
44 Y15 20 4 4 Podium-02 CCTV Stair Case 01 & Entrance Lobby 3 200 0.60
40A 45 B15 20 4 4 Podium-01 CCTV Stair Case 02 & Drive way 3 200 0.60
4P 46 R16 20 4 4 Podium-02 CCTV Stair Case 02 & Drive way 3 200 0.60
30mA 47 Y16 20 Spare 200 0.20
48 B16 20 Spare 200 0.20
49 R17 20 4 4 Spare 3 200 0.60
50 Y17 20 Ground RMU Room,External 3 200 0.60
40A 51 B17 20 4 4 Ground Drive way & Stair CCTV Socket 3 200 0.60
4P 52 R18 20 4 4 Ground LV Room,Parking & Drive way 3 200 0.60
30mA 53 Y18 20 4 4 Ground Stair Case 02 & Drive way External 3 200 0.60
54 B18 20 Ground Stair Case 01,Lift Enterance & lobby 3 200 0.60
55 R19 20 4 4 Ground LV Room & Enterance Lobby 3 200 0.60 ACCESS CONTROL MDL
40A 56 Y19 20 4 4 Ground Stair Case(02,03) & External 3 200 0.60 ACCESS CONTROL MDL
4P 57 B19 20 4 4 Podium-02 Parking Area 2 200 0.40 MD
30mA 58 R20 20 4 4 Podium-02 parking area 3 200 0.60 MD
59 Y20 20 Spare 200 0.20
60 B20 20 4 4 Water Tank (Disel Pump Charger) 1 200 0.20
61 R21 20 4 4 Basement Enterance Lobby 3 200 0.60 ACCESS CONTROL MDL
62 Y21 20 4 4 Basement Stair case(02,03) 2 200 0.40 ACCESS CONTROL MDL
40A 63 B21 20 Spare 200 0.20
4P 64 R22 20 4 4 Podium 01 Entrance Lobby & External Area 3 200 0.60 ACCESS CONTROL MDL
30mA 65 Y22 20 4 4 Podium 01 Stair case(02&03) 2 200 0.40 ACCESS CONTROL MDL
66 B22 20 Spare 200 0.20
67 R23 20 4 4 Podium 02 Enterance Lobby & External Area 3 200 0.60 ACCESS CONTROL MDL
68 Y23 20 4 4 Podium 02 Stair case(02&03) 2 200 0.40 ACCESS CONTROL MDL
40A 69 B23 20 Spare 200 0.20
4P 70 R24 20 Spare 200 0.20
30mA 71 Y24 20 Spare 200 0.20
72 B24 20 Spare 200 0.20
TOTAL LOAD 12.18 8.62 8.07
CABLE SIZE : 1x4C -25mm2 XLPE/SWA/PVC + 1C 16 mm2 CU ECC. PER PHASE

TOTAL LOAD : 28.86 KW


Owner : Azizi Developments
Location : AL FURJAN , DUBAI
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : L2 ROOM
DB No. : : DBE - L1 Fed From MDBE - G System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A TP ISOLATOR
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. EXF 13A FCU CCTV WH UNIT KILOWATT
ROOM/AREA

SPLIT
ACU
IN SIZE SIZE KA 11 48 10 2.2 50 S/O 400 100 1500 R Y B

Others
2
Amp. mm mm2 W W W W W W W W
1 R1 10 2.5 2.5 Lighting Circuit Corridor L1 12 11 0.13
40A 2 Y1 10 2.5 2.5 Lighting Circuit Corridor L2 12 11 0.13
4P 3 B1 10 2.5 2.5 Lighting Circuit Corridor L3 11 11 0.12
100mA 4 R2 10 2.5 2.5 Lighting Circuit Corridor L4 12 11 0.13
5 Y2 10 2.5 2.5 Lighting Circuit Corridor L5 12 11 0.13
6 B2 10 4.0 4.0 Lighting Circuit Kids Light 3 2.2 0.01
7 R3 10 2.5 2.5 Lighting Circuit Corridor L1 16 11 0.18
40A 8 Y3 10 2.5 2.5 Lighting Circuit Corridor L2 16 11 0.18
4P 9 B3 10 2.5 2.5 Lighting Circuit Corridor L3 16 11 0.18
100mA 10 R4 10 2.5 2.5 Lighting Circuit Corridor L4 16 11 0.18
11 Y4 10 2.5 2.5 Lighting Circuit Corridor L5 16 11 0.18
12 B4 20 4.0 4.0 Lighting Circuit Gardev Light 2 2 48/2.2 0.10
13 R5 10 2.5 2.5 Electrical Room L6 4 48 0.19
40A 14 Y5 10 2.5 2.5 Electrical Room L7 4 48 0.19
4P 15 B5 10 2.5 2.5 Electrical Room L8 4 48 0.19
100mA 16 R6 10 2.5 2.5 Electrical Room L9 4 48 0.19
17 Y6 10 2.5 2.5 Electrical Room L10 4 48 0.19
18 B6 Space
19 R7 10 2.5 2.5 CCTV Power Supply L1 3 50 0.15
40A 20 Y7 10 2.5 2.5 CCTV Power Supply L1 2 50 0.10
4P 21 B7 10 2.5 2.5 CCTV Power Supply L1 2 50 0.10
100mA 22 R8 10 2.5 2.5 CCTV Power Supply L2 2 50 0.10
23 Y8 10 2.5 2.5 CCTV Power Supply L2 2 50 0.10
24 B8 10 2.5 2.5 CCTV Power Supply L3 2 50 0.10
25 R9 10 2.5 2.5 CCTV Power Supply L3 2 50 0.10
40A 26 Y9 10 2.5 2.5 CCTV Power Supply L4 2 50 0.10
4P 27 B9 10 2.5 2.5 CCTV Power Supply L4 2 50 0.10
100mA 28 R10 10 2.5 2.5 Space
29 Y10 10 2.5 2.5 CCTV Power Supply L5 2 50 0.10
30 B10 10 2.5 2.5 CCTV Power Supply L5 2 50 0.10
31 R11 20 4.0 4.0 Electrical Room External Area L1 2 200 0.40
40A 32 Y11 20 4.0 4.0 Electrical Room External Area L2 2 200 0.40
4P 33 B11 20 4.0 4.0 Electrical Room External Area L3 2 200 0.40
30mA 34 R12 20 4.0 4.0 Electrical Room External Area L4 2 200 0.40
35 Y12 20 4.0 4.0 Electrical Room External Area L5 1 200 0.20
36 B12 20 4.0 4.0 Space
37 R13 20 4.0 4.0 CPMD 14 200 2.80
40A 38 Y13 20 4.0 4.0 CPMD 14 200 2.80
4P 39 B13 20 4.0 4.0 CPMD 4 200 0.80
100mA 40 R14 Space
41 Y14 Space
42 B14 20 4.0 4.0 CPMD 14 200 2.80
TOTAL LOAD 4.95 4.80 5.00
CABLE SIZE : 1x4C -10mm2 XLPE/SWA/PVC + 1C 10 mm2 CU ECC. PER PHASE

TOTAL LOAD : 14.75 KW


Owner : Azizi Developments
Location : AL FURJAN , DUBAI
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : L2 ROOM
DB No. : : DBE - L6 Fed From MDBE - G System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A TP ISOLATOR
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. EXF 13A FCU CCTV WH UNIT KILOWATT
ROOM/AREA

SPLIT
ACU
IN SIZE SIZE KA 11 48 10 200 50 S/O 400 100 1500 R Y B

Others
2 2
Amp. mm mm W W W W W W W W
1 R1 10 2.5 2.5 Lighting Circuit Corridor L6 9 11 0.10
40A 2 Y1 10 2.5 2.5 Lighting Circuit Corridor L7 9 11 0.10
4P 3 B1 10 2.5 2.5 Lighting Circuit Corridor L8 7 1 11/48 0.13
100mA 4 R2 10 2.5 2.5 Lighting Circuit Corridor L9 22 11 0.24 P
5 Y2 10 2.5 2.5 Lighting Circuit Corridor L10 17 11 0.19
6 B2 Space
7 R3 10 2.5 2.5 Lighting Circuit Corridor L6 15 11 0.17
40A 8 Y3 10 2.5 2.5 Lighting Circuit Corridor L7 14 11 0.15
4P 9 B3 10 2.5 2.5 Lighting Circuit Corridor L8 14 11 0.15
100mA 10 R4 Space
11 Y4 10 2.5 2.5 Lighting Circuit Corridor L9 10 11 0.11
12 B4 10 2.5 2.5 Lighting Circuit Corridor L10 9 11 0.10
13 R5 10 2.5 2.5 Electrical Room L6 4 48 0.14
40A 14 Y5 10 2.5 2.5 Electrical Room L7 4 48 0.19
4P 15 B5 10 2.5 2.5 Electrical Room L8 4 48 0.19
30mA 16 R6 10 2.5 2.5 Electrical Room L9 4 48 0.14
17 Y6 Space
18 B6 10 2.5 2.5 Electrical Room L10 4 48 0.19
19 R7 10 2.5 2.5 CCTV Power Supply L6 2 100 0.20
40A 20 Y7 10 2.5 2.5 CCTV Power Supply L6 2 100 0.20
4P 21 B7 2 2.5 2.5 CCTV Power Supply L7 2 100 0.20
100mA 22 R8 10 2.5 2.5 CCTV Power Supply L7 2 100 0.20
23 Y8 10 2.5 2.5 CCTV Power Supply L8 2 100 0.20
24 B8 10 2.5 2.5 CCTV Power Supply L8 2 100 0.20
25 R9 10 2.5 2.5 CCTV Power Supply L9 2 100 0.20
40A 26 Y9 10 2.5 2.5 CCTV Power Supply L9 2 100 0.20
4P 27 B9 10 2.5 2.5 CCTV Power Supply L10 2 100 0.20
100mA 28 R10 Space
29 Y10 Space
30 B10 10 2.5 2.5 CCTV Power Supply L10 2 100 0.20
31 R11 20 4.0 4.0 Electrical Room External Area L6 1 200 0.20
40A 32 Y11 20 4.0 4.0 Electrical Room External Area L7 1 200 0.20
4P 33 B11 20 4.0 4.0 Electrical Room External Area L8 1 200 0.20
100mA 34 R12 20 4.0 4.0 Electrical Room External Area L9 1 200 0.20
35 Y12 Space
36 B12 20 4.0 4.0 Electrical Room External Area L10 1 200 0.20
TOTAL LOAD 1.79 1.54 1.96
CABLE SIZE : 1x4C -10mm2 XLPE/SWA/PVC + 1C 16 mm2 CU ECC. PER PHASE

TOTAL LOAD : 5.29 KW


Owner : Azizi Developments
Location : AL FURJAN , DUBAI
LOAD DISTRIBUTION SCHEDULE
ELECTRICAL LOADS
PROJECT : B+G+2P+14Typ+ROOF. DHCC- RS DUBAI LOCATION : L7 ROOM
DB No. : : DBE - L11 Fed From MDBE - G System Voltage : 380/220 V, 50 Hz
Rating of Incomer : 40A TP ISOLATOR
RATING SR. CKT MCB CKT ECC FAULT CONNECTED LOADS/POINTS W LOAD PER CKT. REMARKS
OF ELCB NO. NO. RTG WIRE WIRE DUTY LTG. LTG. LTG. LTG. EXF 13A FCU CCTV WH UNIT KILOWATT
ROOM/AREA

SPLIT
ACU
IN SIZE SIZE KA 11 48 10 250 50 S/O 400 100 1500 R Y B

Others
2 2
Amp. mm mm W W W W W W W W
1 R1 10 2.5 2.5 Lighting Circuit Corridor L11 17 11 0.19
40A 2 Y1 10 2.5 2.5 Lighting Circuit Corridor L12 17 11 0.19
4P 3 B1 10 2.5 2.5 Lighting Circuit Corridor L13 15 11 0.17
100mA 4 R2 10 2.5 2.5 Lighting Circuit Corridor L14 15 11 0.17
5 Y2 10 2.5 2.5 Lighting Services Roof 7 48 0.34
6 B2 Space
7 R3 Space
40A 8 Y3 10 2.5 2.5 ELEC,GAR,IT&W.M Room L11 4 48 0.19
4P 9 B3 10 2.5 2.5 ELEC,GAR,IT&W.M Room L12 4 48 0.19
100mA 10 R4 10 2.5 2.5 ELEC,GAR,IT&W.M Room L13 4 48 0.19
11 Y4 10 2.5 2.5 ELEC,GAR,IT&W.M Room L14 4 48 0.19
12 B4 10 2.5 2.5 TEL&MECH Service Room Roof 3 48 0.14
13 R5 10 2.5 2.5 CCTV Power Supply L11 2 100 0.20
14 Y5 10 2.5 2.5 CCTV Power Supply L12 2 100 0.20
40A 15 B5 10 2.5 2.5 CCTV Power Supply L13 2 100 0.20
4P 16 R6 10 2.5 2.5 CCTV Power Supply L14 2 100 0.20
30mA 17 Y6 10 2.5 2.5 CCTV Power Supply Roof 2 100 0.20
18 B6 10 2.5 2.5 CCTV Power Supply Roof 2 100 0.20
19 R7 Space
20 Y7 Space
40A 21 B7 20 4.0 4.0 Electrical Room External Area L11 1 200 0.20
4P 22 R8 20 4.0 4.0 Electrical Room External Area L12 1 200 0.20
30mA 23 Y8 20 4.0 4.0 Electrical Room External Area L13 1 200 0.20
24 B6 20 4.0 4.0 Electrical Room External Area L14 1 200 0.20
TOTAL LOAD 1.14 1.51 1.30
CABLE SIZE : 1x4C -10mm2 XLPE/SWA/PVC + 1C 10 mm2 CU ECC. PER PHASE

TOTAL LOAD : 3.95 KW