You are on page 1of 1

Job Detail Report for FRONT THOR

CARGO SYSTEM\Cargo System, Hydraulic Power Packs && Pipelines\Pipelines && Fittings

Page 1 of 1 Print Date: 07/11/2017

Job Name Check of system pipes and fittings


Job Type Check

CBM Job? This is not a CBM job.

Designer

Equipment Type

Default Interval 3 Month


Description *** ALL NECESSARY SAFETY PRECAUTIONS TO BE OBSERVED***

Manufacturer's Instruction/Maintenance Manual and any relevant Service Bulletins are to


be referred to prior to and during maintenance works.

Check all pipes for leakage or damage.


Check of all pipe securing arrangements. Loose clips should be tightened up and any
missing clips should be replaced.
Check valve packing for leaks.
Clean filters, if provided.
Check fittings for proper operation.
Lubricate where it is relevant. Refer to vessel's Lubrication Chart for type/grade of
grease.
Rectify defects as necessary or record for future action.

When complete report to PMS.

You might also like