Work Done Report for FRONT THOR

Schedule Task : Inspection of mooring wires (M/3)


Mooring Wires

Page 1 of 1 Print Date:14/11/2017

Date this work was done 30-Sep-2017 Due Date 30-Sep-2017


Condition before the work was done Fair

Condition after the work was done Fair

Symptoms observed Scheduled Maintenance

Completion Statement This work took 2 men 2 man hour(s) to complete.

Remarks 3-M Inspected, Quarterly report form TEC-38, send to the Office.

Job Description *** ALL NECESSARY SAFETY PRECAUTIONS TO BE


OBSERVED***

Manufacturer's Instruction/Maintenance Manual and any relevant


Service Bulletins are to be referred to prior to and during
maintenance.

Note: For maintenance details refer to VMS, Safety & Environmental


Procedures, Section 4 "Safe Working Practices", Paragraph 4.5
"Mooring, Anchoring, Towing Operations and Fire Wires", Item 4.5.3
"Maintenance".

All mooring ropes and wires are to be thoroughly inspected at three


months interval. Wire ropes are to be lubricated during this
inspection using a recognised wire rope lubricant. On NO account
should home-made lubricants be used as these can lead to pollution
claims against the vessel.
Particular attention must be made to ensure that lubricant is
penetrating through the inner layers to prevent internal corrosion that
will result in failure of the wire.
For type of Lubricant refer to Ship's Lubrication Chart.
Note: All wires and ropes stowed on drums must have canvas
covers available for use at all times when the vessel is at sea to
protect them from the effects of weather, sea and sunlight.