You are on page 1of 5
© Bee power 2017 Outage Unit 1 EMJ Execution Plan © BISEeMernET © SESE PEGI + “Operation Shut down ‘2 15/10/60) 2 Maintenance Window 1 15/10/60 = ‘Water and steam system inspection 18/10/60 s Boiler Overhaul 8 15/10/60 « Boiler water wall clean inside furnance 1 15/10/60 « Cutting stot (hole) and clearing accumulation 3 16/10/60 ash in penthouse for winch installation « Install scaffolding 100% 6.21 days 9 16/10/60 7 Sand Blasting for internal boiler tube 100% © 7.08days 9 22/10/60 « Boiler internal inspection confirm the damage 90% Tdays 9 29/10/60 ‘condtion after blasting « Boiler pressure part inspection and repair 16% ©7207 da... a 18/10/60 m ‘ry RH tube replacement 47% 72.07 da. 18/10/60 = Preparation Work 100% 2.67 days 0 15/10/60 = ‘Scaffolding Installation - Outside inlet Heade 100% day a 15/10/60 w Remove of insulation and Lagging at inlet 100% © 2days.— 3 16/10160 header up to top cutting point vo Remove skin casing and seal box atinlet H100% 7days 2 47/10/60» 24/10/60, a2 Remove Skin Casing at inlet Header 100% © Gdays 17/10/60 23/10/60 x Right Side 100% —— 2days 0 17/10/60 w 19/1060 vor Left Side. 100% —— 2days 9 17/10/60 20/10/60 ves Front Side 100% 4 days 19/10/60 29/1060 Te ——— ena Sareory ' ' cme! tert Tove EE Sony — crea Sot Pre Samay reo — estone . a ee pt: Bicreatgesrrunes | Sammary reste tone ‘eters atone —a Pras rarmes urapoin | Rated Up Minton rane ntinaone oes tne rahe Sina eouae nay us Manat ae 1 1 mopese — © Bee power 2017 Outage Unit 1 EMJ Execution Plan 6 Remove Seal box at Inlet Header 100% Says 21/10/60 9 24/10/60 vor Right Side 100% iday # 21/1060 a 22/1060 x Left Side 100% Yday 9 22/1060 3 23/1060 0 Front Side 100% Aday 223/1060 9 24/1060 vo Remove of refractory for try RH inlet 100% © 4days323/10/60 «1 27/10/60 header tube penetration part an Right Side 100% Says 2 23/10/60 26/1060 2 Lot Side 100% Says 23/10/60 w 26/10/60 8 Front Side 100% days 2 24/1060 27/1060 ws Setting of temporary Support for try RH 100% Sdays 9 22/10/60 1 25/10/60 Inlet header fixing "before tube cutting v6 Right Side - 12 PCS. 100% Aday 9 22/1060 3 23/1060 ww Let Side- 12 PCs 100% Aday 922/10'60 3 23/1060 ve Front Side - 24 PCS. 100% Aday 9 24/10/60» 25/1060 we Remove stopper from top level -remaining 100% 17days 323/10/60 Ww 8/11/60, on EL 447180, = Right Side - 148 points 100% — 1Sdays 323/10160 a 7/1160 ma Let Side- 117 points 100% —15days 2510160 wavtv60 = Front Side - 225 points 100% —1Sdays 25/10/60 9/1160 = ‘Temporary winch setting for try RH tube lii80% 7.54days 23/10/60 30/10/60 we Install temporary support at Roof Housing 100% 2 days 23/10/60 w 25/10/60 % Install temporary winch at Boiler Inside 67% ‘day 0 29/10/60» 30/10/60 bl Install temporary winch - Left side 100% Yday 9 29/1060 = a0/1060 wr Install temporary winch - Right Side 100% ‘day 9 29/1060 3 30/1060 va Install temporary winch - Front Side 0% Aday 2 29/10/60 3 30/1060 Te ——— Secor Manat Sear cme! tert Tove EE Sony crea Sot Pre Samay reo estone . a ee ont crow soruns | Semen —_— ——— breintne Pras rarmes urapoin | Rated Up Minton rane ntinaone oes tne Manat ae 1 1 mopese © Bee power 2017 Outage Unit 1 EMJ Execution Plan a RH Tube Cutting(iry RH inletheader) 100% — 10days w26/1060 4/11/60, = Right Side - 145 Joints 100% — 10days 25/10/60 4/1160 ca Loft Side - 148 Joints 100% — 10days 25/10/60 a 4/1160 2 Front Side - 297 Joints 100% — 20days 25/10/60 a 14/1160 = RH Tube Beveling (try RH inlet header) 0% 20days 27/10/60 16/11/60, we Right Side - 145 Joints o% 1Odays a 27/10160 3 6/11/60 185 Lof Side - 145 Joints o% 1Odays a 27/1060 2 6/11/60 8 Front Side - 297 Joints o% 2O0days 27/10/60 w 16/11/60, “or Cutting try RH tube (Fumace inside - BottcO% 30days a 20/10/60 a 28/11/60, * Cuting try RH tube (Fumace Inside - Top) 0% 1Sdays 30/10/60 9 14/1160 ~ Right Side - 145 Joints 1Odays 30/1060 ww 9/11/60 e Loft Side - 148 Joints oe 1Odays 330/10160 9/11/60 “ Front Side - 297 Joints o% 1Sdays 30/1060 a 14/11/60 ve Remove stopper bottom side O% 1Sdays 30/10/60 9 14/1460 +0 Right Side - 37 PCS. o% 1Odays 30/1060 ww 9/11/60 be Lot Side- 37 POS o% 1Odays 30/1060 w 9/11/60 1 Front Side - 75 PCS. o% 1Sdays 30/1060 a 14/11/60 ve ‘Tube Remove to outside o% 30days 2 3010/60 w 29/11/60, “ ‘Tube Beveling (Fumace inside) 0% 30days 9 30/10/60 29/11/60, 16 Right Side - 145 Joints o% 3O0days 3 30/10/60 w 29/11/60, 1 Loft Side - 145 Joints o% BOdays 2 30/10/60 29/11/60, “= Front Side - 297 Joints o% 30days 3 3010/60 29/11/60, ot Now try RH tube Carry in Boller o% 30days 3 30/10/60 29/11/60, 12 Fit up and welding try RH Tube Front Side 0% STdays — a4ltt/60 3 11/12/60, 594 Joints Te terre Seon Nan Sema cme! tert Tove EE Sony crea Sot Pre Samay reo estone . a ee ont crow soruns | Semen —_— - ‘eters atone Pras rarmes urapoin | Rated Up Minton rane ntinaone oes tne Manat ae 1 1 mopese © Bee power 2017 Outage Unit 1 EMJ Execution Plan 9 ‘Top Level (inside) - 297 Joints o% 37 days a 4/11/60 11/12/60 ie Bottom Level (Outside) - 297 Joints o% 37 days 4/11/60 9 11/12/60 “= Fit up and welding try RH Tube Right Side 0% ST days 4/1/60 9 11/12/60 290 Joints vs “Top Level (inside) - 145 Joints o% B7 days a 4/11/60 9 11/12/60 ww Bottom Level (Outside) - 145 Joints o% 37 days 4/11/60 3 11/12/60, 8 Fit up and welding try RH Tube Left Side : 0% S7daysa4ittveo 9 14/42160 290 Joints 0 “Top Level (inside) - 145 Joints o% 7 days 4/11/60 9 11/12/60 0 Bottom Level (Outside) - 145 Joints o% 37 days 4/11/60 9 11/12/60 vet Inspection Nozzle 0% © 264days w30/11/60 2 26/12/60 2 Inspection Hole (RH Inlet HDR) Cutting 0% days 30/11/60 «2/12/60 1 HOR Inside Cleaning / Bore scope inspect 0% \day 9 24/1260 3 25/12/60 wae Fit up and welding fer Inspection nazzle end 0% Aday 328/12160 9 26/12/60 ‘cap by PT Test we Skin casing reinstallation (remainning for 0% ‘days we/t2"60 9 17/12/60 ‘observation port- before hydrostatic test) Right Side o% iidays 6/1260 a 17/12/60 ca Lot Side o% ‘days w6/12160 a 17/12/60 18 Front Side o% ‘tdays 6/1260 a 17/12/60 1 Installation Refractory (remainning for 0% 1Bdays 1/12/60 0 17/12160 ‘observation port - before hydrostatic test) 0 Righ Side - 1 m3 (Approx.) 0% Adays a 11260 2 5/1260 mm Left Side 1 m3 (Approx) 0% Adays a 1/1260 2 5/1260 ™ Front Side - 2 m3 (Approx) o% days a 1/1260 7/12/60 Te a Sooo Man Sea cme! tert Tove EE Sony crea Sot Pre Samay reo estone . Cots ED Scere To pt: Bicreatgesrrunes | Sammary reste tone ——— breintne Preared: aromee Kuaratgoin ood Up Mietone . trace Miectore esse Minne Manat ae 1 1 mopese © Bee power 2017 Outage Unit 1 EMJ Execution Plan 8 ‘Skin casing reinstallation for observation pO% 2days 9 18/12/60 v1 20/12/60 m Insulation Lagging Restoration O% 2days 2 19/12/60 w20/1Z160 ES vs Scaffolding Dismantle o% 2days w20/12/60 22/1260 ES ve ‘ty RH bypass line pipe 8% —6233da. w 18/1060 20/1260 BL “ ‘Stub tube replacement 19% 68.78da.. 16/10/60 24/12/60 = Boiler Testing 0% «4.33 days Ww 14/12/60 BL 1 Remove ecaffolding 0% days 3 18/12/60 aL 20 Operation Start Up Plant O% —1.04days ot 16/12/60 210 Main Turbine actual MOST test 0% —O6Sdays 9 26/12/60 Te a Sooo Man Sea ' ' cme! tert Tove EE Sony — crea Sot Pre Samay reo — estone . Cots ED Scere To pt: Bicreatgesrrunes | Sammary reste tone —— ermininaore —a Preared: aromee Kuaratgoin ood Up Mietone . trace Miectore esse Minne eR i Sma eouae nay us ne aewane © Manat ae 1 1 mopese — RoteUp Poa? es Ost mine =

You might also like