ANALISIS HIDROLOGICO

Construccion Sistema de Riego Cairoma


CALCULO DEL COEFICIENTE DE ESCURRIMIENTO

1. Mtodo de los recursos hdricos 0.0362

Precicitacin media anual Pma = 743.7 mm


Parmetro del suelo - cobertura k= 0.15
Pradera permanente 0.30
Pastizal > 75% cubierto 0.28
Pradera permanente 0.30
0.00
0.00
0.00
Coeficiente escorrenta, si k< 0.15 C=K(Pma -250)/2000 C= 0.036 Usar
Coeficiente escorrenta, si k> 0.15 C=K(Pma -250)/2000+(k-0.15)/1.5 C= 0.03 No usar

2. Metodo servico de conservacion de suelos

Precipitacin mxima en 24 hrs P24h = 30.645 mm


Factor topografa 0.1
Factor suelos 0.1 0.87
Factor cobertura 0.2
Topografa llana 0.4 0.50
Topografa ondulada 0.5
Topografa accidentada 0.6
Factor s/area de cultivo, precipitaicn, tipo de suelo 0.5
Coeficiente de Escorrenta C= 0.22

3. Metodo de Prevert

Area de la cuenca A= 5.47 km2


pendiente Textura del suelo %
Uso del suelo C' C C prom
% L - Are L -Arc Arc Area
0-5 0.1 0.3 0.4 0.27 0 0.000
Bosque 5 - 10 0.25 0.35 0.5 0.37 10 3.667
10 - 30 0.3 0.4 0.6 0.43 5 2.167
> 30 0.32 0.42 0.63 0.46 0 0.000
0-5 0.15 0.35 0.45 0.32 20 6.333
Pastizal 5 - 10 0.3 0.4 0.55 0.42 20 8.333
0.43
10 - 30 0.35 0.45 0.65 0.48 30 14.500
> 30 0.37 0.47 0.68 0.51 15 7.600
0-5 0.3 0.5 0.6 0.47 0 0.000
Cultivos agrcolas 5 - 10 0.4 0.66 0.7 0.59 0 0.000
10 - 30 0.5 0.7 0.8 0.67 0 0.000
> 30 0.53 0.74 0.84 0.70 0 0.000
0.4725 100
4. Formula de Nadal

Area de la cuenca A= 5.47 km2


Precipitacin media anual P= 743.7 mm
Factor de extensin de la cuenca k1 = 2.6
Factor de la lluvia media anual k2 = 0.5
Factor de la pendiente y de la permeabilidad del suelo k3 = 1.3
Coeficiente de escorrenta C = 0.25 x k1 x k2 x k3 C= 0.42

Coeficiente de escorrenta promedio C= 0.28


CALCULO HIDROLOGIA
PROYECTO: Construccion Sistema de Riego Cairoma Longitud 6730'10.05"O
CUENCA: Cuchumocoya RIO: Latitud 1650'43.32"S
PRECIPITACIONES MENSUALES (mm) Y ESCORRENTIA ANUAL (m3) PERIODO UTILIZADO 1996-2015 Altitud 4518
MAXIMA AREA DESCARGA
AO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ANUAL DIARIA "C" CUENCA ANUAL
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (km2) (m3)
1996 129.8 99.3 106.9 54.4 14.4 47.5 16.9 46.5 45.6 48.6 88.8 95.4 794.1 35.2 0.28 5.47 53912.32 1
1997 112.3 214.1 154.7 55.0 25.8 15.7 0.0 46.3 97.9 64.8 31.4 149.2 967.2 47.5 0.28 5.47 72751.00 2
1998 145.0 117.6 89.5 64.4 0.9 27.3 0.0 75.1 64.1 87.4 79.2 72.0 822.5 46.8 0.28 5.47 71678.88 3
1999 150.0 140.9 199.2 24.3 34.4 7.7 34.4 2.5 44.9 31.4 53.4 59.1 782.2 39.8 0.28 5.47 60957.68 4
2000 188.2 130.9 121.7 19.2 7.9 69.8 19.9 42.5 74.5 94.5 34.8 58.1 862.0 39.3 0.28 5.47 60191.88 5
2001 216.7 201.3 97.4 61.4 20.2 1.9 25.2 33.5 60.8 72.8 45.5 58.4 895.1 30.5 0.28 5.47 46713.80 6
2002 40.6 125.8 123.5 95.6 30.8 34.8 87.8 34.6 61.1 73.2 45.7 58.7 812.2 38.1 0.28 5.47 58353.96 7
2003 122.8 128.4 84.9 34.7 26.8 9.8 47.9 35.3 36.7 66.2 58.2 170.6 822.4 31.2 0.28 5.47 47785.92 8
2004 141.2 118.2 43.9 40.1 51.5 36.6 69.6 57.5 10.8 32.9 70.0 83.6 755.9 33.6 0.28 5.47 51461.76 9
2005 134.5 176.2 73.3 70.0 2.3 0.0 62.6 6.9 130.9 87.4 76.7 157.5 978.3 48.6 0.28 5.47 74435.76 10
2006 159.6 125.3 59.0 54.2 4.2 4.4 0.0 40.2 5.8 50.8 90.9 116.1 710.5 27.4 0.28 5.47 41965.84 11
2007 114.2 84.6 72.2 22.9 24.6 13.1 20.2 19.5 5.9 51.9 92.8 118.5 640.4 27.3 0.28 5.47 41812.68 12
2008 116.6 86.4 73.7 23.4 25.1 13.4 20.6 19.9 6.0 53.0 94.8 121.0 653.9 27.4 0.28 5.47 41965.84 13
2009 119.0 88.2 75.3 23.9 25.6 13.7 21.1 20.3 6.2 33.0 39.8 58.5 524.5 21.5 0.28 5.47 32929.40 14
2010 106.0 83.9 45.2 8.8 17.9 11.0 26.0 37.3 0.0 50 0.0 90.6 476.7 19.3 0.28 5.47 29559.88 15
2011 102.7 119.9 107.2 10.8 4.3 14.7 40.2 14.6 37.4 10.7 13.7 149.3 625.5 20.4 0.28 5.47 31244.64 16
2012 97.8 128.5 67.9 72.3 0.0 0.0 36.1 0.0 0.0 39.0 53.0 94.1 588.7 19.5 0.28 5.47 29866.20 17
2013 148.9 128.4 49.2 9.5 27.7 47.9 0.0 37.9 27.0 107.3 35.2 88.2 707.2 19.5 0.28 5.47 29866.20 18
2014 185.7 106.4 11.9 0.0 45.3 23.6 14.5 8.5 65.1 43.4 25.7 83.8 613.9 19.5 0.28 5.47 29866.20 19
2015 185.9 104.1 124.4 60.4 27.0 0.0 14.3 45.8 45.6 48.6 88.8 95.4 840.3 20.5 0.28 5.47 31397.80 20
MAX 216.7 214.1 199.2 95.6 51.5 69.8 87.8 75.1 130.9 107.3 94.8 170.6 48.6 74,435.76
MIN 40.6 83.9 11.9 0.0 0.0 0.0 0.0 0.0 0.0 10.7 0.0 58.1 19.3 29,559.88
MEDIA 135.9 125.4 89.0 40.3 20.8 19.6 27.9 31.2 41.3 57.3 55.9 98.9 743.7 30.6 0.28 5.47 46,935.88
PRECIPITACION PROMEDIO ANUAL (100%) [mm]
AO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ANUAL CUENCA "C" AREA APORTE
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (km2) (m3)
n 135.9 125.4 89.0 40.3 20.8 19.6 27.9 31.2 41.3 57.3 55.9 98.9 743.7 Cuchumocoya 0.28 5.47 1,139,014.17
PRECIPITACION ESPERADA DURANTE CUALQUIER AO (75% Pmedia anual) [mm]
AO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ANUAL CUENCA C AREA APORTE
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (km2) (m3)
n 101.9 94.1 66.8 30.2 15.6 14.7 20.9 23.4 31.0 43.0 41.9 74.2 557.76 Cuchumocoya 0.28 5.47 854,260.63
CAUDALES Y VOLMENES MEDIOS MENSUALES ESCURRIDOS
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ANUAL CUENCA C AREA APORTE
n mes 31 28 31 30 31 30 31 31 30 31 30 31 365 (km2) (m3)
Q (l/s) 58.27 59.55 38.19 17.84 8.94 8.70 11.95 13.40 18.31 24.59 24.78 42.42 27.09
Cuchumocoya
V (m )
3 156082 144070 102291 46250 23937 22562 32007 35885 47461 65866 64235 113614 854261 0.28 5.47 854,260.63
CAUDAL ECOLOGICO
Q ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ANUAL CAUDAL ECOLOGICO
Q (l/s) 5.83 5.96 3.82 1.78 0.89 0.87 1.20 1.34 1.83 2.46 2.48 4.24 32.70 0.1
CAUDAL UTIL POR NEVADO
Q ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ANUAL
Q (l/s) 14.18 15.44 15.44 12.41 12.01 14.18 12.01 12.01 17.09 17.16 21.27 18.87 182.07
CAUDAL NETO UTILIZABLE EN EL PROYECTO
Q ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ANUAL
Q UTIL (l/s) 66.63 69.04 49.81 28.47 20.05 22.02 22.76 24.07 33.57 39.29 43.58 57.05 476.33
Caudal Aforado Rio Luribay Cuchumocoy(l/s) CAUDAL AFORADO EN MES DE FEBRERO
Q (l/s) -- xxxx -- -- -- -- -- -- -- -- -- -- 89.11 L/S
CALCULO HIDROLOGIA
PROYECTO: Construccion Sistema de Riego Cairoma Longitud 6730'10.05"O
CUENCA: Cuchumocoya RIO: Latitud 1650'43.32"S
PRECIPITACIONES MENSUALES (mm) Y ESCORRENTIA ANUAL (m3) PERIODO UTILIZADO 1996-2015 Altitud 4518

PRECIPITACION PROMEDIO, MINIMA Y MAXIMA

250.0

200.0

150.0

100.0

50.0

0.0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
MAX PROM MIN

CORRELACIN DE SERIES
AO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC CORRELACION (%)
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
COEF. DE 100.00%
1996 129.8 229.1 336.0 390.4 404.8 452.3 469.2 515.7 561.3 609.9 698.7 794.1 CORR. 98.29%
99.00%
1997 112.3 326.4 481.1 536.1 561.9 577.6 577.6 623.9 721.8 786.6 818.0 967.2 98.55% 98.29%
1998 145.0 262.6 352.1 416.5 417.4 444.7 444.7 519.8 583.9 671.3 750.5 822.5 98.08% 98.29% 98.29%
98.00%

1999 150.0 290.9 490.1 514.4 548.8 556.5 590.9 593.4 638.3 669.7 723.1 782.2 94.24% 98.29%
97.00%
2000 188.2 319.1 440.8 460.0 467.9 537.7 557.6 600.1 674.6 769.1 803.9 862.0 95.83% 98.29%
2001 216.7 418.0 515.4 576.8 597.0 598.9 624.1 657.6 718.4 791.2 836.7 895.1 98.57% 96.00% 98.29%
2002 40.6 166.4 289.9 385.5 416.3 451.1 538.9 573.5 634.6 707.8 753.5 812.2 98.30% 98.29%
95.00%
2008 116.6 203.0 276.7 300.1 325.2 338.6 359.2 379.1 385.1 438.1 532.9 653.9 95.00% 98.29%
2009 119.0 207.2 282.5 306.4 332.0 345.7 366.7 387.1 393.2 426.2 466.0 524.5 97.31% 94.00% 98.29%
2010 106.0 189.9 235.1 243.9 261.8 272.8 298.8 336.1 336.1 386.1 386.1 476.7 98.57% 98.29%
93.00%
2011 102.7 222.6 329.8 340.6 344.9 359.6 399.8 414.4 451.8 462.5 476.2 625.5 98.46% 98.29%
2012 97.8 226.3 294.2 366.5 366.5 366.5 402.6 402.6 402.6 441.6 494.6 588.7 98.29% 92.00% 98.29%
2013 148.9 277.3 326.5 336.0 363.7 411.6 411.6 449.5 476.5 583.8 619.0 707.2 95.27% 98.29%
91.00%
2014 185.7 292.1 304.0 304.0 349.3 372.9 387.4 395.9 461.0 504.4 530.1 613.9 99.30% Aos
1 99 7 1 9 9 8 1 9 99 2 00 0 20 0 1 20 0 2 2 0 08 2 00 9 2 01 0 20 1 1 2 0 12 2 0 13 2 01 4
98.29%
2015 185.9 290.0 414.4 474.8 501.8 501.8 516.1 561.9 607.5 656.1 744.9 840.3 97.15%
CALCULO HIDROLOGIA
PROYECTO: Construccion Sistema de Riego Cairoma Longitud 6730'10.05"O
CUENCA: Cuchumocoya RIO: Latitud 1650'43.32"S
PRECIPITACIONES MENSUALES (mm) Y ESCORRENTIA ANUAL (m3) PERIODO UTILIZADO 1996-2015 Altitud 4518

Q = 35.000 lt/seg Diciembre 98.906923 0


Caudal 363.17581 10.85
Enero 135.88 14.42 38.92 39.24 39.12 #REF! 0.10 #REF! 362.08 377.57 11.28
Febrero 125.42 13.31 37.81 38.13 38.01 #REF! 0.10 #REF!
Marzo 89.05 9.45 33.95 34.27 34.15 #REF! 0.10 #REF!
Abril 40.26 4.27 28.77 29.09 28.97 #REF! 0.10 #REF!
Mayo 20.84 2.21 26.71 27.03 26.91 #REF! 0.10 #REF!
Junio 19.64 2.09 26.59 26.91 26.79 #REF! 0.10 #REF!
Julio 27.86 2.96 27.46 27.78 27.66 #REF! 0.10 #REF!
Agosto 31.24 3.32 27.82 28.14 28.02 #REF! 0.10 #REF!
Septiembre 41.32 4.39 28.89 29.21 29.09 #REF! 0.10 #REF!
Octubre 57.34 6.09 30.59 30.91 30.79 #REF! 0.10 #REF!
Noviembre 55.92 5.94 30.44 30.76 30.64 #REF! 0.10 #REF!
Diciembre 98.91 10.50 35.00 35.00 35.00 #REF! 0.10 #REF!
372.95 376.47 375.15 #REF! 33,857.57

CAUDAL EN EPOCA SECA [lt/seg]: 26.59


CAUDAL EN EPOCA LLUVIA [lt/seg]: 38.92
VOLUMEN EN EPOCA SECA [m3]: 613766.01

35.000 Q = 0.000 lt/seg Diciembre 98.906923


Caudal
Enero 135.88 0.00 0.00 0.10 #REF! 0.10 #REF!
Febrero 125.42 0.00 0.00 0.10 #REF! 0.10 #REF! 39,489.12
Marzo 89.05 0.00 0.00 0.10 #REF! 0.10 #REF!
Abril 40.26 0.00 0.00 0.10 #REF! 0.10 #REF!
Mayo 20.84 0.00 0.00 0.10 #REF! 0.10 #REF!
Junio 19.64 0.00 0.00 0.10 #REF! 0.10 #REF!
Julio 27.86 0.00 0.00 0.10 #REF! 0.10 #REF!
Agosto 31.24 0.00 0.00 0.10 #REF! 0.10 #REF!
Septiembre 41.32 0.00 0.00 0.10 #REF! 0.10 #REF!
Octubre 57.34 0.00 0.00 0.10 #REF! 0.10 #REF!
Noviembre 55.92 0.00 0.00 0.10 #REF! 0.10 #REF!
Diciembre 98.91 0.00 0.00 0.000 #REF! 0.10 #REF!
0.00 1.10 #REF!

CAUDAL EN EPOCA SECA [lt/seg]: 0.00


CAUDAL EN EPOCA LLUVIA [lt/seg]: 0.00
VOLUMEN EN EPOCA SECA [m3]: 0.00

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL APORTE NEVADO
APORTES POR DESHIELO
Area/ km2 5.47
*Desh anual (mm) 900.00
Aporte agua m3 4,923,000.00
**Fact corr. Temp 6.50 C/km altitud
JUN JUL AGO SEP
REGISTRO
30 31 31 30
Temp (C)*** 4.66 4.27 5.01 5.56
Temp (C) nevados 8.9 9.2 10.3 11.5
Estandarizado T 18.80 19.10 20.20 21.40
Estandar das*T 564.00 592.10 626.20 642.00
Ponderado 7.11% 7.46% 7.89% 8.09%
Aporte Bruto (m3) 164,100.00 184,612.50 184,612.50 143,587.50
Descarga (m3) 45,948.00 51,691.50 51,691.50 40,204.50
Aporte (m3) 22,974.00 25,845.75 25,845.75 20,102.25
Aporte PN (l/s) 17.73 19.30 19.30 15.51
CAUDAL ECO (L/S) 3.55 3.86 3.86 3.10
CAUDAL UTIL (L/S) 14.18 15.44 15.44 12.41
* Deshielo anual de glaciares entre 600 a 1200 mm, segn estudios del investigador Eduardo Martinez (revista tendencias, sep
** Sendia, Perez, 2006. Fundamentos de meteorologa
*** Temperatura media mensual Estacin meteorologica Chorocona (1996 - 2015)

36758.4 41353.2 41353.2 32163.6


APORTES POR DESHIELO

OCT NOV DIC ENE FEB MAR ABR


31 30 31 31 28 31 30
6.53 7.09 7.04 6.72 6.70 6.73 6.54
11.9 13.5 13.6 13.6 13.4 13.2 12.2
21.80 23.40 23.50 23.50 23.30 23.10 22.10
675.80 702.00 728.50 728.50 652.40 716.10 663.00
8.52% 8.85% 9.18% 9.18% 8.22% 9.03% 8.36%
143,587.50 164,100 143,588 143,588 184,613 205,125 246,150
40,204.50 45,948.00 40,204.50 40,204.50 51,691.50 57,435.00 68,922.00
20,102.25 22,974.00 20,102.25 20,102.25 25,845.75 28,717.50 34,461.00
15.01 17.73 15.01 15.01 21.37 21.44 26.59
3.00 3.55 3.00 3.00 4.27 4.29 5.32
12.01 14.18 12.01 12.01 17.09 17.16 21.27
Eduardo Martinez (revista tendencias, septiembre 2004).

57.270665323 0.2 0.65


0
0 57.270665323
32163.6 36758.4 32163.6 32163.6 41353.2 45948 55137.6
MAY ANUAL
31 365 Altitud
5.67 6.04 4787 estandarizado
10.8 11.84 5567 9.900
20.70 260.90
641.70 7,932.30
8.09% 1.00 100% 100.00%
225,637.50 2,133,300
63,178.50 597,324 C Eficiencia:
31,589.25 298,662 0.26 0.5
23.59 227.58
4.72 45.52 0.2 Q Ecologico
18.87 182.07 182.07

50542.8 5741691.371
ANALISIS HIDROLOGICO
PROYECTO: Construccion Sistema de Riego Cairoma
CAUDALES MEDIOS MENSUALES Y ANUALES DE LA MICROCUENCA
DATOS: APORTE POR PRECIPITACION MEDIA MENSUAL

JUN JUL AGO SEP OCT NOV DIC ENE FEB MAR ABR MAY ANUAL
REGISTROS
30 31 31 30 31 30 31 31 28 31 30 31 365
Precip. Esperada Anual (mm) 19.6 27.9 31.2 41.3 57.3 55.9 98.9 135.9 125.4 89.0 40.3 20.8 743.68

Aporte Bruto (m3) 107439 152416 170881.49 226005.4 313646.2 305880.84 541020.9 743248.547 686049.84 487098.15 220236.64 113984 4067907.77

Descarga (m3) 30083 42677 47847 63282 87821 85647 151486 208110 192094 136387 61666 31916 1139014

Aporte (m3) 22562.3 32007 35885 47461 65866 64235 113614 156082 144070 102291 46250 23937 854261

Aporte Pp (l/s) 8.70 11.95 13.40 18.31 24.59 24.78 42.42 58.27 59.55 38.19 17.84 8.94 27.09

Vol ecologico (m3) 2256 3201 3589 4746 6587 6423 11361 15608 14407 10229 4625 2394 85426

Q ecolgico (l/s) 0.87 1.20 1.34 1.83 2.46 2.48 4.24 5.83 5.96 3.82 1.78 0.89 2.71

Vol Derechos Terceros (m3 ### ### 25837.28 34172.01 47423.30 46249.18 81802.36 112379.18 ### 73649.24 33299.78 ### 615067.65

Q Derechos Terceros (l/s) 6.27 8.60 9.65 13.18 17.71 17.84 30.54 41.96 42.88 27.50 12.85 6.43 19.50

Aporte Neto (m3) 4061 5761 6459 8543 11856 11562 20451 28095 25933 18412 8325 4309 153767

Caudal neto (l/s) 1.57 2.15 2.41 3.30 4.43 4.46 7.64 10.49 10.72 6.87 3.21 1.61 4.88

19.09

Distribucin de la Aportacin Media Mensual (m3)


180000

160000

140000
APORTE APORTE NETO

120000 CAUDAL ECOLOGICO

100000

80000

60000

40000

20000

0
JUN JUL AGO SEP OCT NOV DIC ENE FEB MAR ABR MAY
ANALISIS HIDROLOGICO
PROYECTO: Construccion Sistema de Riego Cairoma
CUENCA: Cuchumocoya
AREA DE LA CUENCA: 5.47 PRECIPITACIONES MAXIMAS EN 24 Hrs. [mm]
Fuente: SERVICIO NACIONAL DE METEOROLOGIA (SENAMHI) PERIODO INFORMADO: 1995-2014
ESTACION CLIMATICA: Luribay PERIODO UTILIZADO: 1995-2014

MAX. MIN.
AO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC EN 24 Hrs. EN 24 Hrs. PROM.

1995 12.8 8.9 13.8 3.8 0.7 0.0 1.2 10.6 3.7 0.0 3.1 16.2 16.2 0.0 6.2
1996 14.2 4.3 3.2 10.8 2.4 2.1 8.4 6.5 5.2 1.7 27.6 20.5 47.5 1.7 8.9
1997 16.4 14.2 16.9 4.8 4.1 0.0 0.0 2.9 12.8 10.8 2.2 5.8 16.9 0.0 7.6
1998 11.5 13.5 14.2 7.7 0.0 13.8 0.0 6.6 5.6 9.4 14.3 0.0 14.3 0.0 8.1
1999 20.4 18.3 19.6 2.8 0.0 0.0 7.6 0.0 10.3 5.7 6.8 17.8 20.4 0.0 9.1
2000 27.6 20.5 19.3 0.0 1.2 3.8 0.0 9.1 0.0 18.2 0.0 15.6 27.6 0.0 9.6
2001 12.8 13.8 10.6 4.7 1.0 3.9 3.7 15.3 8.8 9.5 5.6 9.2 15.3 1.0 8.2
2002 18.7 9.7 9.8 4.4 5.8 0.8 8.6 2.6 4.7 9.2 6.5 18.2 18.7 0.8 8.3
2003 14.1 26.5 6.7 6.2 0.0 0.0 0.0 4.6 8.0 2.0 4.9 16.1 26.5 0.0 7.4
2004 18.2 9.7 4.5 3.2 1.6 1.5 6.1 6.2 1.5 5.2 7.8 20.0 20.0 1.5 7.1
2005 30.2 24.6 7.9 2.2 0.0 0.0 2.1 0.0 7.8 3.8 15.5 13.2 30.2 0.0 8.9
2006 27.6 20.5 8.1 6.1 0.0 0.0 0 5.8 3.2 22.0 13.2 17.8 27.6 0.0 10.4
2007 21.6 17.3 19.4 1.2 3.3 12.3 0.0 0.0 5.3 4.3 17.9 19.2 21.6 0.0 10.2
2008 19.7 9.7 8.8 0.9 13.4 3.1 0.0 3.4 7.4 9.1 7.8 32.6 32.6 0.0 9.7
2009 6.0 11.1 7.5 2.5 8.3 0.0 2.0 0.0 1.2 0.0 18.7 15.2 18.7 0.0 6.0
2010 10.0 30.5 0.0 0.0 16.3 0.0 5.0 0.0 5.4 6.5 0.0 45.0 45.0 0.0 9.9
2011 8.4 20.0 16.0 5.1 0.0 0.0 3.5 0.0 1.2 7.0 5.3 31.2 31.2 0.0 8.1
2012 28.3 19.3 25.4 1.5 0.0 0.0 0.0 0.0 0.0 9.0 4.0 14.0 28.3 0.0 8.5
2013 9.4 7.0 3.0 0.0 5.0 6.0 0.0 6.8 3.1 4.0 5.0 10.3 10.3 0.0 5.0
2014 12.3 16.3 4.8 7.6 6.1 0.0 1.6 1.5 8.0 0.0 28.1 17.5 28.1 0.0 8.7
MAX 30.2 30.5 25.4 10.8 16.3 13.8 8.6 15.3 12.8 22.0 28.1 45.0
MIN 6.0 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
MEDIA 17.0 15.8 11.0 3.8 3.5 2.4 2.5 4.1 5.2 6.9 9.7 17.8 99.5
ANALISIS HIDROLOGICO
PROYECTO: Construccion Sistema de Riego Cairoma
CUENCA: Cuchumocoya
AREA DE LA CUENCA: 5.47 PRECIPITACIONES MAXIMAS EN 24 Hrs. [mm]
Fuente: SERVICIO NACIONAL DE METEOROLOGIA (SENAMHI) PERIODO INFORMADO: 1995-2014
ESTACION CLIMATICA: Luribay PERIODO UTILIZADO: 1995-2014

PRECIPITACION MEDIA MENSUAL PRECIPITACION MAXIMA ANUAL EN 24 HORAS

Precipitaciones (mm)
Precipitaciones (mm)

50.0
20.0

45.0
18.0

40.0
16.0

35.0
14.0

30.0
12.0

25.0
10.0

20.0
8.0

15.0
6.0

10.0
4.0

5.0
2.0

0.0
95
96
97
98
99
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
0.0
19
19
19
19
19
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
Meses Aos
ANALISIS HIDROLOGICO

PROYECTO: Construccion Sistema de Riego Cairoma


CALCULO DE COEFICIENTES DE LLUVIA MAXIMA PARADIFERENTES PERIODOS DE RETORNO

PROCEDIMIENTO: E. F. SCHULZ - PROBLEMS IN APPLIED PROBABILIDAD EN BASE A LOG PEARSON TYPE III DISTRIBUTION
HYDROLOGY CONVERSION LLUVIA DIARIA A LLUVIA EN 24 HORAS = 1.13

LLUVIA LLUVIA
N AO MAXIMA MAXIMA
(n) DIARIA EN 24 hr Pi LogPi LogPi-LogP LogPi-LogP)^2 (LogPi-LogP)^3
(mm) (mm)
1 1996 35.2 39.8 1.60 0.08248 0.00680
2 1997 47.5 53.7 1.73 0.21263 0.04521
3 1998 46.8 52.9 1.72 0.20618 0.04251
4 1999 39.8 45.0 1.65 0.13582 0.01845
5 2000 39.3 44.4 1.65 0.13033 0.01699
6 2001 30.5 34.5 1.54 0.02024 0.00041
7 2002 38.1 43.1 1.63 0.11686 0.01366
8 2003 31.2 35.3 1.55 0.03009 0.00091
9 2004 33.6 38.0 1.58 0.06228 0.00388
10 2005 48.6 54.9 1.74 0.22257 0.04954
11 2006 27.4 31.0 1.49 -0.02631 0.00069
12 2007 27.3 30.8 1.49 -0.02790 0.00078
13 2008 27.4 31.0 1.49 -0.02631 0.00069
14 2009 21.5 24.3 1.39 -0.13162 0.01733
15 2010 19.3 21.8 1.34 -0.17851 0.03186
16 2011 20.4 23.1 1.36 -0.15443 0.02385
17 2012 19.5 22.0 1.34 -0.17403 0.03029
18 2013 19.5 22.0 1.34 -0.17403 0.03029
19 2014 19.5 22.0 1.34 -0.17403 0.03029
20 2015 20.5 23.2 1.36 -0.15231 0.02320

TOTALES 612.90 692.58 30.34 .000.000000000004 0.38761

Mean = 34.6 SUM(LogPi) = 30.34283 "A" = 0.38761 "B" =

____
Log P = 1.51714 Log Std Dev = SlogP = 0.14283 "C" =

Log Coef Skew =

FORMULAS:
____
1.- Log mean = Log P = SUM(Log Pi)/N
____
SUM(LogPi-LogP)^2 "A"
2.- Log Std Dev = SlogP = SQRT ---------------------------------- --------
N-1 N-1
____
N*SUM(LogPi-LogP)^3 "B"
3.- Log Coef Skew = glogP = -------------------------------------- = --------
(N-1)(N-2)(SlogP)^3 "C"
ANALISIS HIDROLOGICO

x Pdiaria

(LogPi-LogP)^3

0.00056
0.00961
0.00877
0.00251
0.00221
0.00001
0.00160
0.00003
0.00024
0.01103
-0.00002
-0.00002
-0.00002
-0.00228
-0.00569
-0.00368
-0.00527
-0.00527
-0.00527
-0.00353

0.00550

0.11006

0.99651

0.11045
ANALISIS HIDROLOGICO

PROYECTO: Construccion Sistema de Riego Cairoma


DETERMINACION DEL COEFICIENTE "K" PARA LOG PEARSON
FUENTE: PROBLEMS IN APPLIED HYDROLOGY (E.F. Schulz)

INTERVALO DE RECURRENCIA EN AOS


Coef.Skew 2 5 10 25 50 100 200 500 1000
(glogP) PROBABILIDAD PORCENTUAL DE OCURRENCIA
50 20 10 4 2 1 0.5 0.2 0.1

3.0 -0.396 0.420 1.180 2.278 3.152 4.051 4.970 6.110 7.250
2.5 -0.360 0.518 1.250 2.262 3.048 3.845 4.652 5.626 6.600
2.2 -0.330 0.574 1.284 2.240 2.970 3.705 4.444 5.322 6.200
2.0 -0.307 0.609 1.302 2.219 2.912 3.605 4.298 5.104 5.910
1.8 -0.282 0.643 1.318 2.193 2.848 3.499 4.147 4.904 5.660
1.6 -0.254 0.675 1.329 2.163 2.780 3.388 3.990 4.690 5.390
1.4 -0.225 0.705 1.337 2.128 2.706 3.271 3.828 4.469 5.110
1.2 -0.195 0.732 1.340 2.087 2.626 3.149 3.661 4.241 4.820
1.0 -0.164 0.758 1.340 2.043 2.542 3.022 3.489 4.015 4.540
0.9 -0.148 0.769 1.339 2.018 2.489 2.957 3.401 3.898 4.395
0.8 -0.132 0.780 1.336 1.998 2.453 2.891 3.312 3.781 4.250
0.7 -0.116 0.790 1.333 1.967 2.407 2.824 3.223 3.664 4.105
0.1104 -0.016 0.849 1.304 1.802 2.124 2.417 2.687 2.968 3.250
0.6 -0.099 0.800 1.328 1.939 2.359 2.755 3.132 3.546 3.960
0.5 -0.083 0.808 1.323 1.910 2.311 2.686 3.041 3.428 3.815
0.4 -0.066 0.816 1.317 1.880 2.261 2.615 2.949 3.310 3.670

0.3 -0.050 0.824 1.309 1.849 2.211 2.544 2.856 3.191 3.525
0.2 -0.033 0.830 1.301 1.818 2.159 2.472 2.763 3.072 3.380
0.1 -0.017 0.836 1.292 1.785 2.107 2.400 2.670 2.953 3.235
0.0 0.000 0.842 1.282 1.751 2.054 2.326 2.576 2.833 3.090
-0.1 0.017 0.846 1.270 1.716 2.000 2.252 2.482 2.716 2.950
-0.2 0.033 0.850 1.258 1.680 1.945 2.178 2.388 2.599 2.810
-0.3 0.050 0.853 1.245 1.643 1.890 2.104 2.209 2.442 2.675
0.1104 0.044 0.852 1.250 1.657 1.911 2.132 2.212 2.469 2.725
-0.4 0.066 0.855 1.231 1.606 1.834 2.029 2.201 2.371 2.540
-0.5 0.083 0.856 1.216 1.567 1.777 1.955 2.108 2.254 2.400
-0.6 0.099 0.857 1.200 1.528 1.720 1.880 2.016 2.146 2.275
-0.7 0.616 0.857 1.183 1.488 1.663 1.806 1.926 2.038 2.150
-0.8 0.132 0.856 1.166 1.448 1.606 1.733 1.837 1.936 2.035
-0.9 0.148 0.854 1.147 1.407 1.549 1.660 1.749 1.830 1.910
-1.0 0.164 0.852 1.128 1.366 1.492 1.588 1.664 1.732 1.800
-1.2 0.195 0.844 1.086 1.282 1.379 1.449 1.501 1.563 1.625
-1.4 0.225 0.832 1.041 1.198 1.270 1.318 1.351 1.408 1.465
-1.6 0.254 0.817 0.994 1.116 1.166 1.197 1.216 1.248 1.280
-1.8 0.282 0.799 0.945 1.035 1.069 1.087 1.097 1.114 1.130
-2.0 0.307 0.777 0.895 0.959 0.980 0.990 0.995 0.998 1.000
-2.2 0.330 0.752 0.844 0.888 0.900 0.905 0.907 0.909 0.910
-2.5 0.360 0.711 0.771 0.793 0.798 0.799 0.800 0.801 0.802
-3.0 0.396 0.636 0.660 0.666 0.666 0.667 0.667 0.668 0.668
ANALISIS HIDROLOGICO

PROYECTO : Construccion Sistema de Riego Cairoma


CALCULO DE LLUVIAS MXIMAS PARA DIFERENTES PERODOS DE RETORNO
DESAGREGACIN DE PRECIPITACIONES MAXIMAS DE 24 HORAS

glogP SlogP LogP C A (Km2) DESAGREGACION DE PRECIPITACIONES


0.11045 0.14283 1.51714 0.28 5.47 MAXIMAS DE 24 HORAS
TIEMPO DE PRECIPITACION

TIEMPO PROBABILIDAD FACTOR DE (Ktr*SlogP) LogPtr Lluvia mxima PRECIPIT. 1 H de 24 H 6 H de 24 H 12 H de 24 H


RECURRENCIA RECURRENCIA CURVA SKEW diaria Ptr
Tr (Ptr) (Ktr) [SlogP*(3)] [LogP + (4)] [Antilog(5)] [Qtr/(C*A)] [f] [f] [f]
(aos) (%) (tablas) (mm) (mm) 0.44 0.72 0.86
(1) (2) (3) (4) (5) (6) (mm) (mm) (mm)

2 50.00 0.04403 0.00629 1.52343 33.4 0.02179 0.010 0.016 0.019

5 20.00 0.85225 0.12173 1.63887 43.5 0.02843 0.013 0.020 0.024

10 10.00 1.25022 0.17857 1.69571 49.6 0.03240 0.014 0.023 0.028

25 4.00 1.65681 0.23664 1.75378 56.7 0.03704 0.016 0.027 0.032

50 2.00 1.91090 0.27293 1.79007 61.7 0.04027 0.018 0.029 0.035

100 1.00 2.13199 0.30451 1.82165 66.3 0.04330 0.019 0.031 0.037

200 0.50 2.21199 0.31594 1.83308 68.1 0.04446 0.020 0.032 0.038

500 0.20 2.46868 0.35260 1.86974 74.1 0.04837 0.021 0.035 0.042

1000 0.10 2.72537 0.38926 1.90641 80.6 0.05263 0.023 0.038 0.045
ANALISIS HIDROLOGICO
PROYECTO : Construccion Sistema de Riego Cairoma
HIDROGRAMA METODO DEL SOIL CONSERVATION SERVICE NEH 4
HYDROLOGY - Cap. 21 Design Hydrographs p.21.49 a 21.59 (1972)
INFILTRACIN POTENCIAL, S (mm) S = (1000/CN)-10
TIEMPO DE CONCENTRACION, Tc (min) Tc = (L0,8*(S+1)0,7/1900)( s0,5/0,6)
ESCORRENTA, Q (mm) Q = (P-0.2S)^2/(P+0.8S)
CAUDAL UNITARIO PICO qp = 484xA/Tp rev
TIEMPO AL PICO DEL HIDROGRAMA, Tp (hr) Tp = 0,7 Tc

LONGITUD DE RECORRIDO 184154 m 604025 pies


DIFERENCIA DE ALTURAS 3320 m 10890 pies
PERIODO DE RETORNO 50 aos 50 aos
PENDIENTE, s 1.80 %
AREA DE LA CUENCA, A 5.47 km2 2.11 mi2
NUMERO DE CURVA, CN 70.00
PRECIPITACION, P = 0.03 mm 0.00 plg
INFILTRACIN POTENCIAL, S = 4.3 plg
FAMILIA DE HIDROGRAMA (segn lluvia P y N CN) N 4
TIEMPO DE CONCENTRACION, Tc (hr) 1908.04 min 31.80 hr
FACTOR N CURVA CN S = (1000-10CN)/CN 4.3E+00
ESCORRENTIA, Q = (P-0.2S)2/(P+0.8S) = 5.4 mm 0.21 plg
DURACION DEL EXCESO DE PRECIPITACION, To (hr) 2.00 hr
TIEMPO AL PICO DEL HIDROGRAMA, Tp (hr) 22.26 hr
To/Tp (CALCULADO) 0.09
To/Tp (CORREGIDO) 1.00
TIEMPO REV. AL PICO DEL HIDROGRAMA, Tp rev (hr) 2.00 hr
CAUDAL UNITARIO PICO, qp 14.5 m3/seg 511.3 p3/seg
CAUDAL PICO Q(qp) 3.1 m3/seg 109.2 p3/seg

No t/Tp t qc/qp Q Q
hrs cfs m3/s
1 0.00 0.00 0.000 0.000 0.000
2 0.28 0.56 0.051 5.571 0.158
3 0.56 1.12 0.220 24.033 0.681
4 0.84 1.68 0.490 53.528 1.517
5 1.12 2.24 0.738 80.619 2.285
6 1.40 2.80 0.830 90.669 2.569
7 1.68 3.36 0.751 82.039 2.325
8 1.96 3.92 0.573 62.595 1.774
9 2.24 4.48 0.392 42.822 1.214
10 2.52 5.04 0.259 28.293 0.802
11 2.80 5.60 0.174 19.008 0.539
12 3.08 6.16 0.118 12.890 0.365
13 3.36 6.72 0.079 8.630 0.245
14 3.64 7.28 0.053 5.790 0.164
15 3.92 7.84 0.036 3.933 0.111
16 4.20 8.40 0.025 2.731 0.077
17 4.48 8.96 0.017 1.857 0.053
18 4.76 9.52 0.011 1.202 0.034
19 5.04 10.08 0.006 0.655 0.019
20 5.32 10.64 0.003 0.328 0.009
21 5.60 11.20 0.001 0.109 0.003
22 5.88 11.76 0.000 0.000 0.000
23
24
25
26
27
28
29
30
31
32
33
34
CAUDAL (m^3/s)

3.000
HIDROGRAMA DE CRECIDAS

2.569
2.500

2.000

1.500
6 2.569

1.000

0.500

0.000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 TIEMPO
15 16 (HORAS)
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
ALMACENAMIENTO ACTUAL Y FUTURO

PROYECTO: Construccion Sistema de Riego Cairoma


CURVAS ALTURA-AREA Y ALTURA-VOLUMEN

AREA VOLUMEN VOLUMEN ALTURA VOLUMEN ALMACEN.


COTA AREA MEDIA DISTANCIA MEDIO ACUMULADO UTIL CRECIDAS
(M2) (M) (M3) (M3) (M) (M3) (M3)

4194.30 4024.42 0.0 0.00


4078.93 0.18 713.81
4194.48 4133.45 713.8 0.18 713.8
4187.96 0.18 732.89
4194.65 4242.48 1446.7 0.35 1446.7
4359.41 0.33 1453.14
4194.98 4476.35 2899.8 0.68
4593.28 0.33 1531.09
4195.32 4710.22 4430.9 1.02
4827.15 0.33 1609.05
4195.65 4944.08 6040.0 1.35
5061.02 0.33 1687.01
4195.98 5177.95 7727.0 1.68
5294.89 0.33 1764.96
4196.32 5411.82 9492.0 2.02
5528.75 0.33 1842.92
4196.65 5645.69 11334.9 2.35 9888.2
5684.67 0.11 631.63 631.63
4196.76 5723.65 11966.5 2.46
5762.62 0.11 640.29 1271.92
4196.87 5801.60 12606.8 2.57
5840.58 0.11 648.95 1920.87
4196.98 5879.56 13255.7 2.68
5918.54 0.11 657.62 2578.49
4197.09 5957.51 13913.4 2.79
5996.49 0.11 666.28 3244.77
4197.21 6035.47 14579.6 2.91
6074.45 0.11 674.94 3919.71
4197.32 6113.43 15254.6 3.02
6152.40 0.11 683.60 4603.31
4197.43 6191.38 15938.2 3.13
6230.36 0.11 692.26 5295.57
4197.54 6269.34 16630.4 3.24
6308.32 0.11 700.92 5996.49
4197.65 6347.29 17331.4 3.35 5996.5

T O T A L 17331.37
ALMACENAMIENTO ACTUAL Y FUTURO

PROYECTO: Construccion Sistema de Riego Cairoma


CURVAS ALTURA-AREA Y ALTURA-VOLUMEN

CAPACIDAD DEL EMBALSE 15,885 #REF!


VOLUMEN UTIL EMBALSE #REF! #REF!
VOLUMEN MUERTO 1,447 #REF!

CURVA ALTURA - VOLUMEN


ALTURA (msnm)

4198.00

4197.00
4196.65

4196.00

4195.00

4194.00

4193.00

4192.00
0 .0 .0 .0 .0 0 0 0 0 0 0
0. 00 00 00 00 0. 0. 0. 0. 0. 0.
20 40 60 80 00 00 00 00 00 00
10 12 14 16 18 20

VOLUMEN (M3)

CURVA ALTURA - AREA


ALTURA (msnm)

4198.00

4197.50

4197.00

4196.50

4196.00

4195.50

4195.00
0 0 0 00 0 0 0 0 0
.0 .0 .0 . .0 .0 .0 .0 .0
00 00 00 00 00 00 00 00 00
50 52 54 56 58 60 62 64 66

AREA (M2)
CURVA VOLUMEN ALMACENADO - DESCARGA

PROYECTO: Construccion Sistema de Riego Cairoma


BASADO EN EL LIBRO "APPLIED HYDROLOGY"
de V.T. CHOW et al. McGraw Hill 1988. Pag 249
COTA VERTEDERO 4,196.65 m
VOLUMEN VERTEDERO 9,888.17 m3
COTA CERO VOLUMEN 4,194.30 m
COEFICIENTE DE DESCARGA 2.2
LONGITUD VERTEDERO 2.00 m
LONGITUD EFECTIVA 1.70 m
INTERVALO DE TIEMPO (hr) 0.28 hr

COTA ALTURA CAUDAL ALMACENAMIENTO (2S/t + Q)


"H" "Q" "S"
m m m3/s m3 m3/s
4196.65 2.35 0.00 0.00 0.00
4196.76 2.46 0.14 631.63 1.39
4196.87 2.57 0.39 1271.92 2.92
4196.98 2.68 0.72 1920.87 4.53
4197.09 2.79 1.11 2578.49 6.22
4197.21 2.91 1.55 3244.77 7.99
4197.32 3.02 2.04 3919.71 9.81
4197.43 3.13 2.57 4603.31 11.70
4197.54 3.24 3.13 5295.57 13.64
4197.65 3.35 3.74 5996.49 15.64

(2S/t + Q) Caudal PARA TRANSITO


ALMACENAMIENTO
"Q"
m3/s m3/s
4.00
0 0.00
1 0.14
3 0.39
Caudal (Q=m3/seg)

3.50 5 0.72
6 1.11
8 1.55
10 2.04
3.00 12 2.57
14 3.13
16 3.74

2.50

2.00

1.50

1.00

0.50

0.00
0 1 3 5 6 8 10 12 14 16

Funcin de Trnsito
HIDROGRAMAS DE ENTRADA Y DE SALIDA (APORTES DISGREGADOS)
METODO DEL EMBALSE A NIVEL

PROYECTO: Construccion Sistema de Riego Cairoma Coef. Descarga 2.20


BASADO EN EL LIBRO "APPLIED HYDROLOGY" Long. Vertedero 2.00
de V.T. CHOW et al. McGraw Hill 1988. Pag 249 Long. Efectiva 1.70
DURACION DEL EVENTO 6 HORAS Y PERIODO DE RETORNO 500 AOS
COTA INICIAL NIVEL DE AGUA (m) 4196.65

INTERVALO TIEMPO (2S/t + Q) Caudal HIDROGRAMA HIDROGRAMA COTA


0.28 hr "Q" ENTRADA, Ij (Ij + Ij+1) (2Sj/t - Qj) (2Sj+1/t + Qj+1) SALIDA, Qj VERTEDERO
hr m3/s m3/s m3/s m3/s m3/s (m)
(1) (2) m3/s m3/s (3) (4) (5) (6) (7) (8)
1 0.000 0 0.00 0.000 0.00
2 0.560 1 0.14 0.158 0.16 0.13 0.16 0.02 0.05
3 1.120 3 0.39 0.681 0.84 0.77 0.97 0.10 0.09
4 1.680 5 0.72 1.517 2.20 2.38 2.97 0.30 0.18
5 2.240 6 1.11 2.285 3.80 4.95 6.18 0.62 0.30
6 2.800 8 1.55 2.569 4.85 7.85 9.80 0.98 0.41
7 3.360 10 2.04 2.325 4.89 10.21 12.75 1.27 0.49
8 3.920 12 2.57 1.774 4.10 11.46 14.31 1.42 0.53
9 4.480 14 3.13 1.214 2.99 11.57 14.45 1.44 0.53
10 5.040 16 3.74 0.802 2.02 10.88 13.59 1.35 0.51
11 5.600 0.539 1.34 9.79 12.22 1.22 0.47
12 6.160 0.365 0.90 8.57 10.69 1.06 0.43
13 6.720 0.245 0.61 7.35 9.18 0.91 0.39
14 7.280 0.164 0.41 6.21 7.76 0.77 0.35
15 7.840 0.111 0.28 5.20 6.49 0.65 0.31
16 8.400 0.077 0.19 4.31 5.39 0.54 0.27
17 8.960 0.053 0.13 3.56 4.44 0.44 0.24
18 9.520 0.034 0.09 2.92 3.65 0.36 0.21
19 10.080 0.019 0.05 2.38 2.97 0.30 0.18
20 10.640 0.009 0.03 1.93 2.41 0.24 0.16
21 11.200 0.003 0.01 1.56 1.94 0.19 0.14
22 11.760 0.000 0.00 1.25 1.56 0.16 0.12
23 0.000 0.000 0.00 1.00 1.25 0.12 0.10
24 0.000 0.000 0.00 0.80 1.00 0.10 0.09
25 0.000 0.000 0.00 0.64 0.80 0.08 0.08
26 0.000 0.000 0.00 0.51 0.64 0.06 0.07
27 0.00 0.41 0.51 0.05 0.06

Tiempo Hidrograma Hidrograma


t Entrada Salida
(hr) (Q=m3/seg) TRANSITO
(Q=m3/seg) DE AVENIDAS
2.57 1.44
3.0000
Caudal (Q=m3/seg)

0 0.00 0.00
0.56 0.16 0.02 X Y
1.12 0.68 0.10 2.8000 2.5694 2.569 m3/seg
1.68 1.52 0.30 4.4800 1.4380 1.438 m3/seg
2.24 2.28 0.62
2.80 2.57 0.98 2.8
2.5000 3.36 2.32 1.27
3.92 1.77 1.42
4.48 1.21 1.43797 4.48
5.04 0.80 1.35231
5.60 0.54 1.22
6.16 0.37 1.06
2.0000 6.72 0.24 0.91
7.28 0.16 0.77
7.84 0.11 0.65
8.40 0.08 0.54
8.96 0.05 0.44
9.52 0.03 0.36
1.5000 10.08 0.02 0.30
10.64 0.01 0.24
11.20 0.00 0.19
11.76 0.00 0.16
0.00 0.00 0.12
0.00 0.00 0.10
0.00 0.00 0.08
1.0000 0.00 0.00 0.06
HIDROGRAMA DE E NTRA DA
HIDROGRAMA DE S A LIDA

0.00 0.00 0.05 2.569 m3/seg


1.438 m3/seg

0.00 0.00 0.04


0.00 0.00 0.03
0.00 0.00 0.03
0.00 0.00 0.02
0.5000 0.00 0.00 0.02
0.00 0.00 0.01
0.00 0.00 0.01
0.00 0.00 0.01
0.00 0.00 0.01
0.00 0.00 0.01
0.0000 0.00 0.00 0.00
0.00 0.00 0.00
0 20.00 0.00 4 0.00 6 8 10 12 14
0.00 0.00 0.00 Tiempo (t=horas)
0.0000
0 2 4 6 8 10 12 14
Tiempo (t=horas)