elo sets Qatar General Electricity & Water Corporation
‘Technical Affairs - Electricity Projects Department
DESIGN MODIFICATION REQUEST
CONTRACT NO. :....643A/2014
CONTRACTOR. ....Siemens WLL FCR No : FCR-ASS-01-0004
CONSULTANT... Energoprojekt Date: 09/03/2017
‘SUBSTATION NAME: .....Al Shakhama
MODIFICATION REQUESTED BY: ....... Siemens WLL
SIGNATURE:
Details of Requested Modification:
Steel Frame details for 400kV GIB crossing are updated based on GIS Manufacturer design for GIB support.
‘Affected drawings:
1. 403355-013-01 -Double Sliding Support along with revised Frame Drawing.
2. PH12-3A-13-01-0015 (Sheet-2)
Received By: onsnineinmnemenemnnnnnnn | Requested By: Stevan 4 jemens)
ZU
yw
Originator Signature:
Contractor Si
Remarks:
Availability of Modified Drawings / Documents at site: M/Yes [] No
Contractor KAHRAMAA
Modification Done & Checked By: Modification Verified & Tested By:
Consultant: Ere
Name: \VO
Signature:
Name:
Signature:
ate: APIO Lal}
KAHRAMAA Representative:
Name:
Date:
‘Signature: ro
Unrestricted | ceo]
imestricted | tgs 15.08.2012 Page 1 of 1Iq PI}
pee
wi
* my
— Bh
|» | ea
__| —» __}
3D-overview
wo
corrosion protection: hot dip galvan. ace. DIN EN ISO 146%
delivery: (1)E50115-A9777-B275 5 x
song ppt
["“4oasss-013 |
i
=150