You are on page 1of 7

1

GOVERNMENT OF NEPAL
MINISTRY OF URBAN DEVELOPMENT
DEPARTMENT OF URBAN DEVELOPMENT & BUILDING CONSTRUCTION
DIVISION OFFICE ,ILAM
BILL OF QUANTITIES (BOQ )
Project :- ("+u];f+#" gd"gf Plss[t ljsf; sfo{s|d cGtu{t ;fd"bflos xn lgdf{)f sfo{
Site :- ("+u];f+#", tfKn]h"+u
Name of Work- one storey Load bearing structure building construction with C.G.I. Roofing
A The Rate quoted here under shall be inclusive of:
1. Supplying the materials along with accessories to the site.
2. Fixing and erecting them in position as per general practices, specifications and instructions of Site Engineer.
3. Tests and maintenance upto the period , specified in the agreement.
B The itemwise Rate should be quoted without VAT
Total Rate per unit
S.N Description Unit Amount Remarks
quantity In Figures In Words
A Civil Construction Work
1 Site clearance work including cutting &
uprooton shrubs, thick herbs & vegetables,
top soil cutting & removal of waste as per
instruction sqm 600.000
2 Earth work in Excavation in foundation
(Hard soil) for lift up to1.5 M. including
timbering, pumping out water from the
foundation trench, stacking the soil 0.90 M.
minimum from the edge of foundation, filling
the excavated clean & grubb of soil in
foundation trench & disposing the excess soil
upto a lead of 30.00 M. as per instruction &
specification complete work cum 317.173
3 Hard rock cutting without chiselling for ground
levelling & foundation as per instruction &
specification complete work cum 55.972
4 Stone Soling finishing to approved level, line
and dimensions as per instruction &
specification complete work cum 26.369
5
Plain Cement Concrete ( 1.3.6.) M10 in
foundation with cement, sand and aggregate
including mixing, laying, finishing to approved
level, line and dimensions and curing as per
instruction & specification complete work cum 5.771

Signature/Stamp:-
2

GOVERNMENT OF NEPAL
MINISTRY OF URBAN DEVELOPMENT
DEPARTMENT OF URBAN DEVELOPMENT & BUILDING CONSTRUCTION
DIVISION OFFICE ,ILAM
BILL OF QUANTITIES (BOQ )
Project :- ("+u];f+#" gd"gf Plss[t ljsf; sfo{s|d cGtu{t ;fd"bflos xn lgdf{)f sfo{
Site :- ("+u];f+#", tfKn]h"+u
Name of Work- one storey Load bearing structure building construction with C.G.I. Roofing
A The Rate quoted here under shall be inclusive of:
1. Supplying the materials along with accessories to the site.
2. Fixing and erecting them in position as per general practices, specifications and instructions of Site Engineer.
3. Tests and maintenance upto the period , specified in the agreement.
B The itemwise Rate should be quoted without VAT
Total Rate per unit
S.N Description Unit Amount Remarks
quantity In Figures In Words
6
P.C.C. M15 (1:2:4) for R.C.C. work in
foundation, columns, beams,slabs, lintels
etc.with cement sand and stone ballast
including mixing with concrete
mixture,compacting the concrete with vibrator
machine,lying,finishing to approved level lines
and dimensions and curing as per instruction
& specification complete work cum 20.642
7
Tor steel / TMT. reinforcement bar tested
including straightening, cleaning, cutting,
bending and fixing in position with 20 B.G.
annealed binding wire as per drawing and as
per instruction & specification complete work kgs 2268.555
8 Formwork shuttering, centering with
approved materials for all Type of concrete
works necessary propping, scaffolding,
staging, supporting inclusive wedging and
cutting holes for utilization work till the
support is fully unyielding nett as per
instruction & specification complete work sqm 92.344
9 Random rubble stone masonry works in
cement sand mortar 1:6 in foundation &
retaining wall in line level with cleaning &
wetting stones , packing the joints & curing
the work all complete as per specification &
instruction of site engineer cum 98.688

Signature/Stamp:-
3

GOVERNMENT OF NEPAL
MINISTRY OF URBAN DEVELOPMENT
DEPARTMENT OF URBAN DEVELOPMENT & BUILDING CONSTRUCTION
DIVISION OFFICE ,ILAM
BILL OF QUANTITIES (BOQ )
Project :- ("+u];f+#" gd"gf Plss[t ljsf; sfo{s|d cGtu{t ;fd"bflos xn lgdf{)f sfo{
Site :- ("+u];f+#", tfKn]h"+u
Name of Work- one storey Load bearing structure building construction with C.G.I. Roofing
A The Rate quoted here under shall be inclusive of:
1. Supplying the materials along with accessories to the site.
2. Fixing and erecting them in position as per general practices, specifications and instructions of Site Engineer.
3. Tests and maintenance upto the period , specified in the agreement.
B The itemwise Rate should be quoted without VAT
Total Rate per unit
S.N Description Unit Amount Remarks
quantity In Figures In Words
10
Preparation & fixing of seasoned Local Hard
wood chaukhat for Door, window & ventilation
with necessary hold fast screws as per
specification &instruction of site Egineer cum 1.371
11 Preparation,supply & fixing of seasoned Local
Hard wood 38*100 mm framed panelled
shutter for door with necessary hinges,tower
bolts, locking sets, screws, nails ,nut bolts all
completeas per specification &instruction of
site Egineer sqm 9.800
12
Preparation,supply & fixing of seasoned Local
Hard wood 38*75 mm framed 4 mm glass
fixed with wooden beat fully glazed window
shutter with necessary hinges,tower bolts,
screws, nails all complete as per specification
& instruction of site Egineer sqm 23.912
13 M.S Grill 5x20mm work of approved quality
and manufacture fixing in position as per
instruction & specification complete work sqm 21.794
14 Earth Back filling in foundation trenches &
Floor in 15 c.m. layers with water sprinking &
compaction as per speciication and
instruction all complete cum 33.925

Signature/Stamp:-
4

GOVERNMENT OF NEPAL
MINISTRY OF URBAN DEVELOPMENT
DEPARTMENT OF URBAN DEVELOPMENT & BUILDING CONSTRUCTION
DIVISION OFFICE ,ILAM
BILL OF QUANTITIES (BOQ )
Project :- ("+u];f+#" gd"gf Plss[t ljsf; sfo{s|d cGtu{t ;fd"bflos xn lgdf{)f sfo{
Site :- ("+u];f+#", tfKn]h"+u
Name of Work- one storey Load bearing structure building construction with C.G.I. Roofing
A The Rate quoted here under shall be inclusive of:
1. Supplying the materials along with accessories to the site.
2. Fixing and erecting them in position as per general practices, specifications and instructions of Site Engineer.
3. Tests and maintenance upto the period , specified in the agreement.
B The itemwise Rate should be quoted without VAT
Total Rate per unit
S.N Description Unit Amount Remarks
quantity In Figures In Words
15
Plain Cement Concrete ( 1:2:4) M15 in Floor
& top roof with cement, sand and aggregate
including mixing, laying, finishing to approved
level, line and dimensions and curing as per
instruction & specification complete work cum 7.412
16
38 mm th. Plain Cement Concrete ( 1:2:4)
screeding work for Flooring Including
Cement Punning all complete as per
speciication and instruction all complete work sqm 109.323
17
20 mm thick cement sand plaster(1:4) on
walls of good finish including racking the
joints, wetting the surface & curing the work
as per specification & direction all complete. sqm 151.107
18
3mm th. 1:1 cemcnt punning with 12.5mm th.
(1:4) Cement Sand Plaster & curing the work
as per specification & direction all complete. sqm 38.112
19
Flush or Roll pointing work (1:3) cement sand
mortar on stone masonry & curing the work
as per specification & direction all complete. sqm 169.389
20
Supplying , fixing in position,welding
,fabrication and erection of Medium class
M.S pipe for roof trus including MS Plate,nut-
bolts and one coat primer all complete as per
specification, drawings and specification kgs 3071.527

Signature/Stamp:-
5

GOVERNMENT OF NEPAL
MINISTRY OF URBAN DEVELOPMENT
DEPARTMENT OF URBAN DEVELOPMENT & BUILDING CONSTRUCTION
DIVISION OFFICE ,ILAM
BILL OF QUANTITIES (BOQ )
Project :- ("+u];f+#" gd"gf Plss[t ljsf; sfo{s|d cGtu{t ;fd"bflos xn lgdf{)f sfo{
Site :- ("+u];f+#", tfKn]h"+u
Name of Work- one storey Load bearing structure building construction with C.G.I. Roofing
A The Rate quoted here under shall be inclusive of:
1. Supplying the materials along with accessories to the site.
2. Fixing and erecting them in position as per general practices, specifications and instructions of Site Engineer.
3. Tests and maintenance upto the period , specified in the agreement.
B The itemwise Rate should be quoted without VAT
Total Rate per unit
S.N Description Unit Amount Remarks
quantity In Figures In Words
21 Supplying & fixing 0.41mm (Red) coloured
C.G.I.Sheet roof cover with necessary nails,
hooks, washer all complete as per
specification & instruction of site engineer sqm 211.800
22 Supplying & fixing 0.28mm (Red) coloured
Ridge Coverwith necessary nails, hooks,
washer all complete as per specification &
instruction of site engineer rm 35.460
23 Supply Preparation & fixing 25 mm th sal
wood eaves board as per specification &
instruction of site engineer sqm 13.386
B Provisional Sum
1 Preparation of as built Architetectural,
Sanitary & Electrical drawing as per
instruction all complete. P.S 1.000 18000.00 Not to be Filled By The contractor

Signature/Stamp:-
6

GOVERNMENT OF NEPAL
MINISTRY OF URBAN DEVELOPMENT
DEPARTMENT OF URBAN DEVELOPMENT & BUILDING CONSTRUCTION
DIVISION OFFICE ,ILAM
BILL OF QUANTITIES (BOQ )
Project :- ("+u];f+#" gd"gf Plss[t ljsf; sfo{s|d cGtu{t ;fd"bflos xn lgdf{)f sfo{
Site :- ("+u];f+#", tfKn]h"+u
Name of Work- one storey Load bearing structure building construction with C.G.I. Roofing
A The Rate quoted here under shall be inclusive of:
1. Supplying the materials along with accessories to the site.
2. Fixing and erecting them in position as per general practices, specifications and instructions of Site Engineer.
3. Tests and maintenance upto the period , specified in the agreement.
B The itemwise Rate should be quoted without VAT
Total Rate per unit
S.N Description Unit Amount Remarks
quantity In Figures In Words
2

(a) Insurance premium for the work, plant and


materials damage for contract work for all risk
including Riot,Strike, Damage,Malicious
damage and Terrorism for contract work of 1
years + 1 year Maintenance period.,(b)
Insurance premium for the insurance of
owner and consultant staff (named) Rs.
10,00,000.00 per person for 8 persons with
unlimited number of occurances for two
years.,(c) Insurance Premium for construction
equipments and machines with value of
Rs.2,00,000.00 for 1 years.,(d) Insurance
Premium for third party liability personal only
per person Rs.2,00,000.00 for 8 persons for 2
years with unlimited number of occurance. P.S 1.000 72857.72 Not to be Filled By The contractor
3 Carrying out diferrent laboratory tests of
construction material like cement, rod, bricks,
sand, aggregate, filling materials, concrete
cubes etc. during construction work as per
specification and direction. P.S 1.000 13000.00 Not to be Filled By The contractor
4 Fixing at site a display board( 750 x 1000 mm P.S 1.000 3000.00 Not to be Filled By The contractor
5 Office Room Hiring,Bed Complate 1
set,Wardrobe 1 no.,Office Table 1 no.,Chair
& Cushion 3 no. ,Regular Operating cost of
site office month 12.000 3000.00 Not to be Filled By The contractor

Contractor's Firm:- Total Amount NRs.:-

Signature/Stamp:-
7

GOVERNMENT OF NEPAL
MINISTRY OF URBAN DEVELOPMENT
DEPARTMENT OF URBAN DEVELOPMENT & BUILDING CONSTRUCTION
DIVISION OFFICE ,ILAM
BILL OF QUANTITIES (BOQ )
Project :- ("+u];f+#" gd"gf Plss[t ljsf; sfo{s|d cGtu{t ;fd"bflos xn lgdf{)f sfo{
Site :- ("+u];f+#", tfKn]h"+u
Name of Work- one storey Load bearing structure building construction with C.G.I. Roofing
A The Rate quoted here under shall be inclusive of:
1. Supplying the materials along with accessories to the site.
2. Fixing and erecting them in position as per general practices, specifications and instructions of Site Engineer.
3. Tests and maintenance upto the period , specified in the agreement.
B The itemwise Rate should be quoted without VAT
Total Rate per unit
S.N Description Unit Amount Remarks
quantity In Figures In Words

Seal:- Tottal Amout in Words:-

Propriter's Name :- 13% VAT

Address :- Grand ToTal:-

Telephone:- Mobile :-

Signature :-

Date :-

Signature/Stamp:-