FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE DESCRIPTION
PROJECT/JOB NO. 002
PROJECT/JOB NAME NISSEN HUT
CLIENT NAME ND
SITE NAME ND
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME MAT_FOUND
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 1

FOUNDATION LISTS
Group Name No. Description No. Description
RAFTBASE 1 F3

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 2

CONTENTS

1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
4.2 CHECK OF OVERTURNING MOMENT
4.3 CHECK OF CONTACT PRESSURE

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 3

1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code British Standard (BS-8110)
Horizontal Force for Wind AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-02]
Horizontal Force for Seismic AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-95]
Unit System Input : SI, Output : SI, Calculation Unit : SI

1.2 MATERIALS & UNIT WEIGHT


Items Value
2
Concrete (fck : compressive strength) 25.000 N/mm
Lean Concrete (Lfck : compressive strength) 0.000 N/mm2
Reinforcement (T8 ~ T40 , yield strength) 410.000 N/mm2
Reinforcement (R8 ~ , yield strength) 410.000 N/mm2
Rs (Soil unit weight) 100.000 kN/m3
Rc (Concrete unit weight) 25.000 kN/m3
Es (Steel Modulus of Elasticity) 200.000 kN/mm2
Ec (Concrete Modulus of Elasticity) 32.000 kN/mm2

- Soil Capacity
Items Value
Soil Name Unit-01
Footing List F3
Qa (Soil Bearing Capacity) 100 kN/m2
Buoyancy Not Consider
WL (Water Label from the EL = 0) 0 mm
FD (Frost Depth from the EL = 0) 0 mm
Internal Friction Angle 30
Passive Soil Pressure Not Consider

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items Description
Allowable Increase of Soil (Wind) 33.33 %
Allowable Increase of Soil (Seismic) 33.33 %
Allowable Increase of Soil (Test) 20 %
Safety factor against overturning for OVM1(FO1) 1.5
Safety factor against overturning for OVM2(FO2) 1.7
Safety factor against overturning for OVM3(FO3) 1.8
Safety factor against overturning for OVM4(FO4) 2.1
Safety factor against sliding for the SL1(FS1) 1.5

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 4

Safety factor against sliding for the SL2(FS2) 1.6


Safety factor against sliding for the SL3(FS3) 1.7
Safety factor against sliding for the SL4(FS4) 1.8
Friction factor () 0.35

1.4 LOAD COMBINATION


Index Load Case Name Load Case Description
1 SW SELF WEIGHT
2 DL DEAD LOAD

Comb . ID Load Combination for stability


1000 1.0 SW + 1.0 DL
Comb . ID Load Combination for Reinforcement
2000 1.4 SW + 1.4 DL

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017 Page 5

2. DRAWING REFERENCE DWGS


NO. DWG NO. DWG TITLE

NOTES
* OUTPUT UNIT : mm

A01

01 1 2 3 4 5 6 7 8 9 10 11
F3
NISSEN HUT PROJECT

FOUNDATION LOCATION PLAN


MAT_FOUND

SQUAD CHECK
Y PROCESS PIPING VESSELS STRUCT. ELEC. INST.

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN 002

Copyright
You (c) GS
created E&C.
this All Rights
PDF from Reserved
an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

NO

*
CL FOOTING
CL FOOTING

25600
425 2250
2500x9 425
600x2
1200

1 2 3 4 5 6 7 8 9 10 11

FOUNDATION PLAN

SQUAD CHECK
SCA

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


A

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

NO

CL FOOTING

TOP BOTTOM

TYP.
T12@200

T12@200
50
T16@200
T16@200

REINFORCEMENT PLAN

SQUAD CHECK
SCA

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


A

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

1 2 3 4 5 6 7 8

500
500
1 2 3 4 5 6 7 8 9 10 11

ELEVATION

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017 F3 Item No.

1 2
300 300 300
50 50
112.5 112.5 112.5 112.5
TYP. TYP.
75 75

112.5

112.5
300

300

300
75

75
112.5

112.5
T12 T12

8-T16 8-T16 8-T16


75 PR.

75 PR.

75 PR.
30 GR.

30 GR.

30 GR.
75

75
T12 100

T12 100
400

400

400
100 @200

100 @200
T16 T16 T16

4 5
300 300 300
50 50
112.5 112.5 112.5 112.5
TYP. TYP.
75 75
112.5

112.5
300

300

300
75

75
112.5

112.5
T12 T12

8-T16 8-T16 8-T16


75 PR.

75 PR.

75 PR.
30 GR.

30 GR.

30 GR.
75

75
T12 100

T12 100
400

400

400
100 @200

100 @200

T16 T16 T16

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017 F3 Item No.

7 8
300 300 300
50 50
112.5 112.5 112.5 112.5
TYP. TYP.
75 75

112.5

112.5
300

300

300
75

75
112.5

112.5
T12 T12

8-T16 8-T16 8-T16


75 PR.

75 PR.

75 PR.
30 GR.

30 GR.

30 GR.
75

75
T12 100

T12 100
400

400

400
100 @200

100 @200
T16 T16 T16

10 11
300 300
50 50
112.5 112.5 112.5 112.5
TYP. TYP.
75 75
112.5

112.5
300

300
75

75
112.5

112.5
T12 T12

8-T16 8-T16
75 PR.

75 PR.
30 GR.

30 GR.
75

75
T12 100

T12 100
400

400
100 @200

100 @200

T16 T16

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 12

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name F3
Ft. Type MAT
Area 30.720 m2
Ft. Thickness 500.00 mm
Ft. Volume 15.360 m3
Ft. Weight 384.000 kN
Soil Height 500.00 mm

25600 Soil Volume 14.964 m3

300 300
300300
300300
300300
300300
300300
300300
300300
300300
300300
300 300 Soil Weight 1496.400 kN
1200

1 2 3 4 5 6 7 8 9 10 11 Buoyancy Not Consider


Self Weight (except Pr.SW) 1880.400 kN

500
400
500

The Origin coordinate


The Center of gravity (0.06,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F3 All Direct 15.360 m 14.964 m 9.900 kN

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


2
S1 30.720 m 384.000 kN 1496.400 kN 1890.300 kN

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
Unit( Length : mm , Weight : kN , Area : m2 )
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
1 Rectangle 300.000 300.000 400.000 0.090 0.900 -12375.000 0.000
2 Rectangle 300.000 300.000 400.000 0.090 0.900 -9875.000 0.000
3 Rectangle 300.000 300.000 400.000 0.090 0.900 -7375.000 0.000
4 Rectangle 300.000 300.000 400.000 0.090 0.900 -4875.000 0.000
F3
5 Rectangle 300.000 300.000 400.000 0.090 0.900 -2375.000 0.000
6 Rectangle 300.000 300.000 400.000 0.090 0.900 125.000 0.000
7 Rectangle 300.000 300.000 400.000 0.090 0.900 2625.000 0.000
8 Rectangle 300.000 300.000 400.000 0.090 0.900 5125.000 0.000

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 13

9 Rectangle 300.000 300.000 400.000 0.090 0.900 7625.000 0.000


10 Rectangle 300.000 300.000 400.000 0.090 0.900 10125.000 0.000
11 Rectangle 300.000 300.000 400.000 0.090 0.900 12375.000 0.000

3.3 LOAD CASE


Fz
Fy
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are based
My on the right hand rule.
Fx
Mx

Index Load Case Name Load Case Description


1 SW SELF WEIGHT
2 DL DEAD LOAD

Unit( kN , kN-m )
Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0 0 -0.9 0 0
1
2 25 0 -70 0 0
1 0 0 -0.9 0 0
2
2 25 0 -70 0 0
1 0 0 -0.9 0 0
3
2 25 0 -70 0 0
1 0 0 -0.9 0 0
4
2 25 0 -70 0 0
1 0 0 -0.9 0 0
5
2 25 0 -70 0 0
1 0 0 -0.9 0 0
6
F3 2 25 0 -70 0 0
1 0 0 -0.9 0 0
7
2 25 0 -70 0 0
1 0 0 -0.9 0 0
8
2 25 0 -70 0 0
1 0 0 -0.9 0 0
9
2 25 0 -70 0 0
1 0 0 -0.9 0 0
10
2 25 0 -70 0 0
1 0 0 -0.9 0 0
11
2 25 0 -70 0 0
Footing SW 0.000 0.000 -1880.400 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 14

3.4 LOAD COMBINATION


In Pier Top In Footing Bottom In Footing Bottom Center
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight, Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.4.1 Load Combination in Pier Top (Without SW)


Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
1000 25.000 0.000 -70.000 0.000 0.000
1
2000 35.000 0.000 -98.000 0.000 0.000
1000 25.000 0.000 -70.000 0.000 0.000
2
2000 35.000 0.000 -98.000 0.000 0.000
1000 25.000 0.000 -70.000 0.000 0.000
3
2000 35.000 0.000 -98.000 0.000 0.000
1000 25.000 0.000 -70.000 0.000 0.000
4
2000 35.000 0.000 -98.000 0.000 0.000
1000 25.000 0.000 -70.000 0.000 0.000
5
2000 35.000 0.000 -98.000 0.000 0.000
1000 25.000 0.000 -70.000 0.000 0.000
F3 6
2000 35.000 0.000 -98.000 0.000 0.000
1000 25.000 0.000 -70.000 0.000 0.000
7
2000 35.000 0.000 -98.000 0.000 0.000
1000 25.000 0.000 -70.000 0.000 0.000
8
2000 35.000 0.000 -98.000 0.000 0.000
1000 25.000 0.000 -70.000 0.000 0.000
9
2000 35.000 0.000 -98.000 0.000 0.000
1000 25.000 0.000 -70.000 0.000 0.000
10
2000 35.000 0.000 -98.000 0.000 0.000
1000 25.000 0.000 -70.000 0.000 0.000
11
2000 35.000 0.000 -98.000 0.000 0.000

3.4.2 Load Combination in Footing Bottom (With Pier SW)


Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
F3 1000 25.000 0.000 -70.900 0.000 22.500
1
2000 35.000 0.000 -99.260 0.000 31.500
1000 25.000 0.000 -70.900 0.000 22.500
2
2000 35.000 0.000 -99.260 0.000 31.500
1000 25.000 0.000 -70.900 0.000 22.500
3
2000 35.000 0.000 -99.260 0.000 31.500
4 1000 25.000 0.000 -70.900 0.000 22.500

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 15

2000 35.000 0.000 -99.260 0.000 31.500


1000 25.000 0.000 -70.900 0.000 22.500
5
2000 35.000 0.000 -99.260 0.000 31.500
1000 25.000 0.000 -70.900 0.000 22.500
6
2000 35.000 0.000 -99.260 0.000 31.500
1000 25.000 0.000 -70.900 0.000 22.500
7
2000 35.000 0.000 -99.260 0.000 31.500
1000 25.000 0.000 -70.900 0.000 22.500
8
2000 35.000 0.000 -99.260 0.000 31.500
1000 25.000 0.000 -70.900 0.000 22.500
9
2000 35.000 0.000 -99.260 0.000 31.500
1000 25.000 0.000 -70.900 0.000 22.500
10
2000 35.000 0.000 -99.260 0.000 31.500
1000 25.000 0.000 -70.900 0.000 22.500
11
2000 35.000 0.000 -99.260 0.000 31.500

3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads
F3 1000 275.000 0.000 -2660.300 0.000 327.185 12830.0 , 600.0

Load Combination of Ultimate Condition


- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name Sec.Na L.Comb. Fx Fy Fz Mx My C.G. of Loads
F3 S1 2000 385.000 0.000 -3724.420 0.000 458.058 12837.6 , 600.0

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 16

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
Fz + P.F Fz + P.F
Formula : ( or ) > Fs -> OK (Uni-Axial)
Fx Fy
P.F = Passive Force (apply only in case checked passive force, mark by P ) Unit ( kN )
Ft.Name Dir. L.Comb. ( Fz + P.F) / Fx or ( Fz + H.P.F) / Fy Fs(i) Result
X 1000 0.35 2660.3 / 275 = 3.39 1.6 OK
F3
Y 1000 Fy = 0 , Then N/A 1.6 OK

4.2 CHECK OF OVERTURNING MOMENT


Formula : (Mry / Moy or Mrx / Mox) > OVM(i) -> OK Unit ( kN-m )
Ft.Name Dir. L.Comb. Mry / Moy = OVM or Mrx / Mox = OVM OVM(i) Result
X 1000 34051.68 / 327.18 = 104.07 1.7 OK
F3
Y 1000 Mo = 0 , Then N/A 1.7 OK

4.3 CHECK OF CONTACT PRESSURE


4.3.1 Contact Pressure Formula
'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel

Fz My X(i) Mx Y(i)
q1,q2 = or
Af Iy Ix
if q1 or q2 < 0 , than q1 and q2 will be recalculated
by following formula
L
q(x) width(x) X dx
Px = 0 L
0
q(x) width(x) dx
L
P= 0
q(x) width(x) dx

4.3.2 Input Data


2 4 4
Ft.Name Af (m ) Fl (m ) Fw (m ) Ix (m ) Iy (m )
F3 30.720 25.600 1.200 3.6864 1677.7220

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 17

4.3.3 Pressure Check


- Qa = Soil bearing capacity
- Uc = Uplift Allowable capacity
- X-Direction (Uni-Axial) Unit( kN , kN-m , kN/m2 )
Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result
F3 1000 84.101 89.093 0.000 25.600 89.1 100.0(gross) 100 % OK

- Y-Direction (Uni-Axial) Unit( kN , kN-m , kN/m2 )


Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result
F3 1000 86.597 86.597 0.000 1.200 86.6 100.0(gross) 100 % OK

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 18

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
Q = Fz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

5.1.1 Data Unit( mm , kN , kN-m )


Ft.Name Sec.Na Dir. L.Comb. Fl or Fw Sl or Sw Fz M Q
S1 X 2000 25600.00 1200.00 3724.420 458.06 1091.860
F3
S1 Y 2000 1200.00 25600.00 3724.420 0.000 1091.860

5.1.2 Design Parameters


Yield Strength - T8 ~ T40 : fy1 , R8 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
f_clb : Clear Cover for bottom of footing reinforcement
Loc. : Location of Critical Point from left side of footing

Unit(N/mm2,mm)
fck fy1 fy2 f_cl f_clt f_clb
25.00 410.00 410.00 50.0 50.0 80.0

5.2 REQUIRED REINFORCEMENT


5.2.1 Reinforcement Formula
- Shrinkage and temperature reinforcement (BS 8110. Part1. Table 3.25)
As1 = fac b h
fy = 250 N/mm2 , fac = 0.0024
fy = 460 N/mm2 , fac = 0.0013
- Design formula BS CODE 3.4.4.4
K' = 0.156 where redistribution does not exceed 10%
[Mux or Muy]
K=
bd2fcu
If K <= K' , compression reinforcement is not required.
K
z = d ( 0.5 + 0.25 - ) but not greater than 0.95d
0.9
M
As2 =
0.95fyz
M
f'y = 500 MPa = > As2 =
0.87fyz
If Sleected As{Max(As1,As2)} < Using As , then OK!!

The moment for reinforcement design is calculated at face of pier per any section.
The temperature and shrinkage steel is considered in the bottom layer only.

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 19

Where ,
Mux or Muy = design ultimate moment, d=effective depth, fcu(fck) = strength of concrete
fy = strength of reinforcement, z = lever arm, b = width of then setcion
If Selected As < Using As, then OK!!

5.2.2 Check of Footing Reinforcement


Footing Name : F3 GroupType : Mat_Foundation
- X direction (All Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

2000 top 7 - T12 @ 200 1.449 1.200 444.000 791.681


S1
2000 botom 7 - T12 @ 200 3.075 1.200 414.000 791.681

Sec.Nam L.Comb. Mu (kN-m) K z (mm)


2000 top 61.216 0.010351 421.80
S1
2000 bottom 65.762 0.012789 393.30

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
Using As(mm )
2
Select As(mm )
2
Result
2000 top 390.000 372.607 791.681 390.000 OK
S1
2000 bottom 390.000 429.283 791.681 429.283 OK

- Y direction (All Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

2000 top 129 - T16 @ 200 0.600 25.600 430.000 25936.990


S1
2000 botom 129 - T16 @ 200 0.750 25.600 400.000 25936.990

Sec.Nam L.Comb. Mu (kN-m) K z (mm)


2000 top - - 408.50
S1
2000 bottom 314.243 0.003069 380.00

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
Using As(mm )
2
Select As(mm )
2
Result
2000 top 8320.000 0.000 25936.990 8320.000 OK
S1
2000 bottom 8320.000 2123.120 25936.990 8320.000 OK

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 20

Title

Bending Moment Diagram


Foundation name Section name Direction L/C ID
F3 S1 X 2000
25600
Analysis Method
Conventional Rigid Method with reaction (Method 1)

1200
Fz My Moment intia
-3724.420 kN 458.058 kN-m 1677.7220 m4
Area Contact Area Critical Point Method
30.720 m2 30.720 m2 (100 %) Critical Max Point
Critical Value
Mubottom = 65.762 kN-m , Mutop = -61.216 kN-m

6 05
5

0
92

42

92

2517
49

755

25

25

42

92

42
5

32902

15

17

20

22

25
42

14

54

79

10

12
0

[ mm ]

[Loading]

[ kN , kN/m ]

141.43 142.25 143.07 143.89 144.71 145.52 146.34 147.16 147.98 148.8 149.54
141.29 149.68

[B.M.D] [ kN-m ]

-90.4
-67.8 -61.22
-46.02 -40.07
-45.2
-22.6 -5.8
5.36
-3.48 -2.13 -5.69 -2.51 -1.75 -2.43 -2.82 -2.45 -2.56 -2.55 -2.64 -2.21 -2.68 -3.46 -2.59 1.15 -5.62 -3.93
5.67
0 12.76 9.07 13.51
22.6
45.2 47.01
47.9 52.16
52.43 51.38
51.35 51.99
52.03 52.09
52.13 52.91
52.71 51.59
51.75
62.5 55.97
57.87
65.76 70.14
67.8 76.11 75.05 75.9 76.1 77.02 75.7 82.61
90.4
90.4

[B/L.M.D] [ kN-m / m ]

-75.3
-56.5 -51.01
-38.35 -33.39
-37.7
-18.8 -4.83
4.47
-2.9 -1.77 -4.74 -2.1 -1.46 -2.03 -2.35 -2.04 -2.13 -2.12 -2.2 -1.84 -2.24 -2.89 -2.16 0.96 -4.68 -3.28
4.73
0 10.64 7.56 11.26
18.8
37.7 39.18
39.92 43.47
43.69 42.82
42.79 43.33
43.36 43.41
43.44 44.09
43.92 42.99
43.12
52.09 46.64
48.23
54.8 58.45
56.5 63.43 62.54 63.25 63.42 64.18 63.08 68.84
75.34
75.3

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 21

Title

Bending Moment Diagram


Foundation name Section name Direction L/C ID
F3 S1 Y 2000
25600
Analysis Method
Conventional Rigid Method with reaction (Method 1)

1200
Fz Mx Moment intia
-3724.420 kN 0.000 kN-m 3.6864 m4
Area Contact Area Critical Point Method
30.720 m2 30.720 m2 (100 %) Critical Max Point
Critical Value
Mubottom = 314.243 kN-m , Mutop = 0 kN-m

00
0

0
75
45

12
0

[ mm ]

[Loading]

[ kN , kN/m ]

3103.64 3103.64

[B.M.D] [ kN-m ]

-314.2
-235.7
-157.1
-78.6
2.01 2.01
0
78.6
157.1
235.7
314.24
314.2

[B/L.M.D] [ kN-m / m ]

-12.3
-9.2
-6.1
-3.1
0.08 0.08
0
3.1
6.1
9.2
12.27
12.3

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 22

5.3 ONE WAY SHEAR FORCE


5.3.1 One-Way Shear Formula
100As 1/3 400 1/4
- Vc = ( 0.79 (
Bd
) (
d
) ) / m

- Shear failure at Section without shear reinforcement will occur on a plane inclined
at an angle of about 30 to the horizontal
- The enhancement of Shear Strength may be taken into account in the design of section near a support by
d
increasing the design concrete shear stress, Vec = Vc ( 2 ).
av
Where,
- The uniform load or Principal load is located farther than 2d from the face of support
Not Consider the enhancement of shear strength (Vec = Vc)
- The uniform load or Principal load is not located farther than 2d from the face of support
2d
Consider the enhancement of shear strength ( Vec = Vc ( ) , av = d )
av

- Vec 0.8 fcu 5 N/mm2


Where,
100As
should not be taken as greater than 3,
Bd
As = Min [As.[x].bot,As.[y].bot]
400
should not be taken as less than 1
d
m = 1.25 ( Shear strength without shear reinforcement )
For characteristic concrete strengths greater than 25 N/mm2, then Vc may be multiplied by (fcu/25)1/3.
The value of fcu should not be taken as greater than 40 N/mm2.
Vu
-V=
bd
- V <= Vec , then OK!!

5.3.2 Check of One-Way Shear


Footing Name : F3 GroupType : Mat_Foundation PileType : False

Unit : mm

25600
1200

1164

1 2 3 4 5 6 7 8 9 10 11

2361

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 23

- X direction One-Way Shear (All Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) B (mm) As (mm )
2
Pt
S1 2000 2361 414 1200 791.68 0.15936

Sec.Nam L.Comb. Vc (N/mm )


2
Vec (N/mm )
2
V (N/mm )
2
Result
S1 2000 0.396 0.791 0.258 OK
- Y direction One-Way Shear (All Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) B (mm) As (mm )
2
Pt
S1 2000 1164 400 25600 25936.99 0.25329

Sec.Nam L.Comb. Vc (N/mm )


2
Vec (N/mm )
2
V (N/mm )
2
Result
S1 2000 0.462 0.923 0.011 OK

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 24

Title

Shear Force Diagram


Foundation name Section name Direction L/C ID
F3 S1 X 2000
25600
Analysis Method
Conventional Rigid Method with reaction (Method 1)

1200
Fz My Moment intia
-3724.420 kN 458.058 kN-m 1677.7220 m4
Area Contact Area Critical Point Method
30.720 m2 30.720 m2 (100 %) Critical Max Point
Critical Value
Vu = 128.366 kN

6 05
5

0
92

42

92

2517
29 1
25

25

25

42

92

42
5

15

17

20

22

25
42

23

54

79

10

12
0

[ mm ]

[Loading]

[ kN , kN/m ]

141.43 142.25 143.07 143.89 144.71 145.52 146.34 147.16 147.98 148.8 149.54
141.29 149.68

[S.F.D] [ kN ]
208.52
208.5 187.23 170.39 181.9 180.11 181.91 182.67 183.98 184.11 188.42
148.9 160.29 158.38 160.05 160.69 161.95 161.95 166.15
156.4 128.37 137.24
100.79 98.54 99.87 100.17 101.05 100.72 104.57 114.8
104.3 89.74
60.08 53.03
52.1 38.82
0
-41.1
-52.1 -66.26
-105.96 -96.06 -99.43 -99.22 -100.05 -100.32 -101.75 -99.02 -114.34
-104.3-124.88
-164.88 -155.35 -159.07 -159.2 -160.37 -160.98 -162.7 -160.31
-156.4 -176.04
-208.5

[S/L.F.D] [ kN / m ]
173.77
173.8 156.02 141.99 151.59 150.09 151.59 152.22 153.32 153.42 157.02
124.08 133.58 131.98 133.38 133.91 134.96 134.96 138.45
130.3 106.97 114.37
84 82.12 83.23 83.47 84.21 83.93 87.14 95.67
86.9 74.78
50.06 44.19
43.4 32.35
0
-34.25
-43.4 -55.22
-88.3 -80.05 -82.86 -82.69 -83.38 -83.6 -84.79 -82.52 -95.28
-86.9-104.07
-137.4 -129.46 -132.56 -132.67 -133.64 -134.15 -135.59 -133.6
-130.3 -146.7
-173.8

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 25

Title

Shear Force Diagram


Foundation name Section name Direction L/C ID
F3 S1 Y 2000
25600
Analysis Method
Conventional Rigid Method with reaction (Method 1)

1200
Fz Mx Moment intia
-3724.420 kN 0.000 kN-m 3.6864 m4
Area Contact Area Critical Point Method
30.720 m2 30.720 m2 (100 %) Critical Max Point
Critical Value
Vu = -111.732 kN

64
00
0

0
75

11
45

12
0

[ mm ]

[Loading]

[ kN , kN/m ]

3103.64 3103.64

[S.F.D] [ kN ]
1396.64
1396.6
1047.5
698.3
349.2 111.73
0 -111.73
-349.2
-698.3
-1047.5
-1396.6

[S/L.F.D] [ kN / m ]
54.56
54.6
40.9
27.3
13.6 4.36
0 -4.36
-13.6
-27.3
-40.9
-54.6

Copyright (c) GS E&C. All Rights Reserved

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
10/9/2017

Project Na. : NISSEN HUT


Calculation Sheet
of Project No. : 002

Foundation Client : ND Page 26

5.4 TWO WAY SHEAR FORCE


5.4.1 Two-Way Shear Formula
Vu = N Shade Ratio
100As 1/3 400 1/4
(
Vc1 = 0.79 (
Bd
) (
d
) ) / m

Vc2 = 0.8 fcu


Vc3 = 5 N/mm2
Vu
V=
b0 d
Vc = Min( Vc1 , Vc2 , Vc3)
N
Vcc = , ( bpier = column perimeter )
bpier d
V Vc and Vcc Min( Vc2 , Vc3 ) , then OK
Where,
Footing Area - Punching Area
Shade Ratio =
Footing Area
100As
should not be taken as greater than 3 , As = Min [As.[x].bot,As.[y].bot]
b0 d
400
should not be taken as less than 1
d
m = 1.25 ( Shear strength without shear reinforcement )
For characteristic concrete strengths greater than 25 N/mm2, then Vc may be multiplied by (fcu/25)1/3.
The value of fcu should not be taken as greater than 40.

5.4.2 Check of Two-WayShear

Ft.Name F3 Punching Area 1.435 106 mm2

Pr.Name 1 Ratio Shade 0.953

Shape Rectangle Vc1 0.343 N/mm2

25600 L.Comb. 2000 Vc2 4.000 N/mm2


1200

1 2 3 4 5 6 7 8 9 10 11 Pl 300 mm Vc3 5.000 N/mm2

Pw 300 mm Vc 0.343 N/mm2

bo / d 1200 / 414 mm V 0.190 N/mm2

Vcc 0.200 N/mm2 Result OK