You are on page 1of 6

LISTA DE INSUMOS DEL PRESUPUESTO

PROYEC
TO
ETAPA COMPONENTE 4: DISPOSICION FINAL
4.0
PROPIET MUNICIPALIDAD DISTRITAL DE ASILLO
ARIO
UBICACI DPTO:PUNO PROV:AZANGARO DIST:ASILLO LOC:ASILLO
ON
FECHA 01/08/2017
PROYEC
Ind. Descripcin Unid. Cantidad Costo Total
TO
MANO 68,026.23
DE
47 OFICIAL HH 2,341.91 4.94 11,569.06
OBRA
47 PEON HH 9,420.31 4.29 40,413.11
47 OPERADOR DE EQUIPO PESADO HH 496.50 6.05 3,003.82
47 OPERARIO HH 2,100.01 6.05 12,705.08
47 TOPOGRAFO HH 11.60 6.05 70.20
47 OPERADOR DE EQUIPO LIVIANO HH 11.95 6.05 72.28
47 JARDINERO HH 39.00 4.94 192.68
MATERI 199,208.31
ALES
2 CLAVOS PARA MADERA C/C 2" kg 31.53 4.80 151.36 4.08 27.45
2 ALAMBRE DE PUAS PARA CERCO (CAMBIAR POR COCADA 1 1/2" rll 16.78 40.00 671.17
2 SERVICIO)
ALAMBRE NEGRO RECOCIDO BWG # 08 kg 27.77 3.65 101.38
2 CLAVOS PROMEDIO kg 15.65 3.65 57.14
2 TUBO CUADRADO NEGRO DE 4" X 4" X 6.0 mm und 23.22 178.00 4,132.73 14 unidades
2 CLAVOS PARA MADERA C/C 1" kg 0.27 4.00 1.08
2 CLAVOS PARA MADERA S/C 1" kg 2.58 4.80 12.39
2 CLAVOS PARA CEMENTO DE ACERO CON CABEZA DE 3/4" und 2.00 7.00 14.00 14.00 0.00
2 PERNO HEXAGONAL DE 3/4" x 6" inc/ TUERCA Y ARANDELA und 12.00 9.80 117.60 117.60 0.00
2 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.36 4.80 1.74
4 CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg 64.37 4.00 257.49 0.14 64.23
4 MALLA HEXAGONAL PARA GALLINERO 3/4" m 840.00 1.75 1,470.00 SI CHIMENEA
4 ARENA FINA m 0.33 40.00 13.21
5 ARENA GRUESA m 3.46 35.00 121.19
5 AFIRMADO m 1.63 30.00 48.91
5 PIEDRA MEDIANA DE 6" m 8.75 60.00 525.00
5 PIEDRA CHANCADA DE 1/2" - 3/4" m 3.42 60.00 205.06
7 PIEDRA CHANCADA 1/2" m 3.28 70.00 229.63
7 PIEDRA GRANDE m 77.20 50.00 3,859.80
13 YESO bol 14.98 14.00 209.66
21 CEMENTO PORTLAND TIPO I (42.5 kg) bol 636.34 24.00 15,272.27 28.80 15,243.47
26 CERRADUJA EXTERIOR DE DOS GOLPES und 1.00 59.00 59.00
26 BISAGRA DE HIERRO DE 4" (PUERTA CERCO) und 4.00 9.00 36.00
26 CERROJO 6" HECHIZO (PUERTA CERCO PERM) und 1.00 30.00 30.00
26 CANDADO FORTE 50mm und 1.00 65.00 65.00
26 BISAGRA CAPUCHINA PLOMA 3" x 3" (CASETA DE CONTROL) par 3.00 12.00 36.00
30 WINCHA und 4.28 7.00 29.95
30 GEOMEMBRANA PLASTICA 1.00 - 2.00mm m 2,334.20 17.00 39,681.40 SI CELDAS
30 GEOMEMBRANA IMPERMEABILIZANTE 1.00 - 2.00mm m 172.99 16.00 2,767.80 SI LIXIVIADO
31 ESTACAS DE MADERA TORNILLO TRATADA p 12.45 4.80 59.75
34 Gasolina de 84 octanos gln 7.00 14.00 97.95
37 PICO CON MANGO pza 8.00 35.00 280.00
37 LAMPAS PLANAS pza 8.00 32.00 256.00
37 ZAPA 2 PUNTAS DE 4 LBS und 8.00 35.00 280.00
37 RASTRILLO METALICO pza 8.00 19.80 158.40
38 HORMIGON (PUESTO EN OBRA) m 26.77 25.00 669.22 12.00 657.22
39 CILINDRO METALICO DE 55 GALONES und 1.00 85.00 85.00
39 AGUA m 15.01 5.00 75.06
39 ACEITE PARA MOTOR SAE-30 gln 0.06 70.00 4.53
39 GRASA lb 0.05 10.00 0.50
39 LIJA PARA MADERA und 0.34 2.00 0.69
39 ARBUSTOS O GRASS bol 37.18 10.00 371.80
39 LONA PLASTIFICADA m 2,184.00 17.00 37,128.00
39 PLANTA DE TALLO CORTO und 72.00 5.00 360.00
39 LIJA PARA MADERA und 1.75 1.50 2.63
39 CARRETILLA pza 8.00 188.00 1,504.00
39 COLA SINTETICA gln 0.13 20.00 2.64
39 COMPACTADOR MANUAL pza 2.00 15.00 30.00
40 ARCILLA IMPERMEABILIZANTE m 958.48 20.00 19,169.54 EN EJEC.
42 PRESERVANTE DE MADERA gln 0.25 75.00 18.75
43 MADERA TORNILLO p 7,524.25 5.60 42,135.78 1,319.67 6,204.58
43 MADERA EUCALIPTO ROLLIZO 3" x 3m (CERCO METAL) pza 1,258.44 12.00 15,101.28 PARA CERCO PERM
43 MADERA EUCALIPTO ROLLIZO 5" (OJO CAMBIAR POR MADERA 4" O TUBO m 140.00 9.00 1,260.00 PARA CHIMENEA
43 CUADRADO)
MADERA PARA ENCOFRADO (LISTONES Y TABLAS) p 368.64 4.00 1,474.56
43 MADERA PINO (REGLAS) p 0.48 4.00 1.90
44 ESTACA DE MADERA p 19.29 2.80 54.00
44 TRIPLAY DE 4' x 8' x 6 mm m 20.16 17.36 349.98 349.98 0.00
44 CASETA DE MADERA TORNILLO ADICIONAL TECHADA m 20.00 100.00 2,000.00
44 MADERA CEDRO p 9.35 7.00 65.45
45 MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO p 6.02 5.60 33.71
46 MALLA HEXAGONAL CODADA 1 1/2" (PUERTA CERCO) m 3.00 1.20 3.60 SERVICIO
54 BARNIZ MARINO gln 5.42 70.00 379.55
54 TAPAPOROS DE MADERA ACABADA C/BARNIZ O LACA gln 0.30 58.50 17.30
54 PINTURA ESMALTE SINTETICO gln 1.00 45.50 45.50
61 PLANCHA GALVANIZADA DE 1/16" (POZA LIXIVIADO) m 107.10 50.00 5,355.00
61 LAMINA ACERO CORRUGADO 0.80x1.80x2mm(CAS CONTROL) m 8.92 15.43 137.57
65 FIERRO GALVANIZADO DE 2"x 6.40m und 0.50 74.12 37.06 SI QUEMADOR
79 VIDRIO TRANSPARENTE INCOLOR DOBLE p 11.84 2.00 23.68
EQUIPO 102,954.79
37 Herramientas Manuales %MO 2.64 68,026.20 1,799.21
48 EQUIPO DE CORTE Y SOLDEO HM 2.00 15.00 30.00
48 MEZCLADORA DE CONCRETO DE 9 - 11 p3 HM 33.07 52.50 1,736.38
48 ANDAMIO DE METAL y/o MADERA HM 18.43 2.00 36.86
48 CAMION PLATAFORMA 4x2 122HP 8 TON. HM 16.00 80.00 1,280.00
48 CAMION SEMITRAYLER 6x4 330 HP 35 TON. HM 16.00 150.00 2,400.00
48 CAMION VOLQUETE 4 x 2 140-210 HP 6 m3 HM 16.00 90.00 1,440.00
48 SIERRA CIRCULAR HM 0.22 8.00 1.76
48 CEPILLADORA ELECTRICA HM 0.44 20.00 8.80
49 NIVEL TOPOGRAFICO CON TRIPODE HE 48.20 20.00 964.03
49 TEODOLITO HM 48.20 40.00 1,928.06
49 RETROEXCAVADORA S/LLANTAS 62 HP 1 YD3 HM 289.97 120.00 34,796.43
49 COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP HM 1,335.98 15.00 20,039.69
49 VIBRADOR DE CONCRETO DIA 33.39 30.00 1,001.82
49 CARGADOR SOBRE LLANTAS DE 80-95 HP 1.5-1.75 yd3 HM 141.97 250.00 35,491.75
SUB- 87,131.42
CONTR
39 SC. CONFECCION E INSTALACION DE LA ESTRUCTURA METALICA gbl 1.00 42,484.87 42,484.87
ATOS P/COBERTURA (segun plano celda N01)
39 ELABORACION DEL ESTUDIO DE IMPACTO AMBIENTAL PARA gbl 1.00 10,000.00 10,000.00
DISPOSICION FINAL
39 SC. CONFECCION E INSTALACION DE LA ESTRUCTURA METALICA gbl 1.00 32,675.55 32,675.55
P/COBERTURA (segun plano celda N01)
39 VIATICOS Y ESTADIA PARA GESTION und 3.00 640.00 1,920.00
39 FLETE TRANSPORTE LOCAL kg 51.00 1.00 51.00
TOTAL: 457,320.74
DESCRIPCION UNIDADCANTIDAD PRECIO UNIT
1 CLAVOS PARA MADERA C/C 2" kg 31.53 30.00 4.80
2 ALAMBRE DE PUAS PARA CERCO (CAMBIAR POR COCADA 1 1/2" SE rll 16.78 SERVICIO 40.00
3 ALAMBRE NEGRO RECOCIDO BWG # 08 kg 27.77 30.00 3.65
4 CLAVOS PROMEDIO kg 15.65 3.65
5 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.36 20.00 4.80
6 CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg 64.37 40.00 4.00
7 CERRADUJA EXTERIOR DE DOS GOLPES und 1.00 1.00 59.00
8 BISAGRA DE HIERRO DE 4" (PUERTA CERCO) und 4.00 SERVICIO 9.00
9 CERROJO 6" HECHIZO (PUERTA CERCO PERM) und 1.00 SERVICIO 30.00
10 CANDADO FORTE 50mm und 1.00 1.00 65.00
11 BISAGRA CAPUCHINA PLOMA 3" x 3" (CASETA DE CONTROL par 3.00 SERVICIO 12.00
12 WINCHA und 4.28 4.00 7.00
13 PICO CON MANGO pza 8.00 8.00 35.00
14 LAMPAS PLANAS pza 8.00 8.00 32.00
15 ZAPA 2 PUNTAS DE 4 LBS und 8.00 8.00 35.00
16 RASTRILLO METALICO pza 8.00 8.00 19.80
17 CILINDRO METALICO DE 55 GALONES und 1.00 1.00 85.00
18 CARRETILLA pza 8.00 8.00 188.00
19 COMPACTADOR MANUAL pza 2.00 2.00 15.00
20 LIJA PARA MADERA und 0.34 6.00 2.00
21 LIJA PARA MADERA und 1.75 1.50
22 PINTURA ESMALTE SINTETICO gln 1.00 1.00 45.50
23 PRESERVANTE DE MADERA gln 0.25 0.25 75.00
24 BARNIZ MARINO gln 5.42 5.00 70.00
25 TAPAPOROS DE MADERA ACABADA C/BARNIZ O LACA gln 0.30 58.50
26 CEMENTO PORTLAND TIPO I (42.5 kg) bol 400.00 24.50

1 PLANCHA GALVANIZADA DE 1/16" (POZA LIXIVIADO) m 107.10 107.00 50.00


2 LAMINA ACERO CORRUGADO 0.80x1.80x2mm(CAS C m 8.92 SERVICIO 15.43

1 ESTACAS DE MADERA TORNILLO TRATADA p 12.45 30.00 4.80


2 ESTACA DE MADERA p 19.29 2.80
3 MADERA TORNILLO p 5,000.00 5.60
4 MADERA EUCALIPTO ROLLIZO 3" x 3m (CERCO METAL pza 1,258.44 SERVICO 12.00
5 MADERA EUCALIPTO ROLLIZO 5" (OJO CAMBIAR POR MADERA 4" m 140.00 9.00
6 MADERA PARA ENCOFRADO (LISTONES Y TABLAS) p 368.64 170.00 4.00
7 MADERA TORNILLO INCLUYE CORTE PARA ENCOFRAD p 6.02 5.60
8 MADERA PINO (REGLAS) p 0.48 2.00 180.00
9 TRIPLAY PLN 7 8.00 80

1 CASETA DE MADERA TORNILLO ADICIONAL TECHADA m 20.00 SERVICIO 100.00

1 ARENA FINA m 0.33 40.00


2 ARENA GRUESA m 3.46 35.00
3 AFIRMADO m 1.63 30.00
4 PIEDRA MEDIANA DE 6" m 8.75 1 volquet 60.00
5 PIEDRA CHANCADA DE 1/2" - 3/4" m 3.42 60.00
6 PIEDRA CHANCADA 1/2" m 3.28 70.00
7 PIEDRA GRANDE m 77.20 5 volquet 50.00
8 YESO bol 14.98 14.00
9 HORMIGON (PUESTO EN OBRA) m 26.7689 2 volquet 25.00
10 AGUA m 15.0128 5 75.06

1 TUBERIA PVC D=4"x6m C-10 pza 42 120


2 YEE DOBLE PVC D=4" und 12 28
3 TEE SIMPLE PVC D=4" und 2 25
4 PEGAMENTO PARA PVC gln 2 185
COSTO
151.36
671.17
101.38
57.14
1.74
257.49
59.00
36.00
30.00
65.00
36.00
29.95
280.00
256.00
280.00
158.40
85.00
1,504.00
30.00
0.69
2.63
45.50
18.75
379.55
17.30
9,800.00

5,355.00
137.57

144.00
54.00
28,000.00
15,101.28
1,260.00
680.00
33.71
360.00
640.00

2,000.00

13.21
121.19
48.91
525.00
205.06
229.63
3859.80
209.66
669.22

5040
336
50