Professional Documents
Culture Documents
Intelsat 902 will be the 19th Intelsat satellite launched to date by Ariane.
Built by Space Systems/Loral in Palo Alto, California, it will be positioned
at 62 degrees East. Intelsat 902 joins the Intelsat fleet of satellites provid-
ing Internet, broadcast, telephony and corporate network solutions ser-
vices for Europe, sub-Saharan Africa, Central Asia, the Far East and
Australia.
The first series 9 satellite, Intelsat 901, was launched by Arianespace
Flight 141 on June 9.
For Flight 143, Arianespace will use an Ariane 44L, the version fitted with
four liquid-propellant strap-on boosters.
Annexes
1 - Flight 143 key personnel.
2 - Launch environment conditions.
3 - Synchronized sequence.
4 - ARIANESPACE orderbook.
5 - ARIANESPACE, ESA and CNES.
Liftoff of Flight 143 using an ARIANE 44L is now scheduled for Thursday, August 30,at the
opening of the following launch window:
Heures du lancement
GMT Paris Time Tokyo Time Washington Time Kourou Time
From 06:46 am 08:46 am 15:46 pm 02:46 am 03:46 am
to 07:46 am 09:46 am 16:46 pm 03:46 am 04:46 am
on August 30, 2001 August 30, 2001 August 30, 2001 August 30, 2001 August 30, 2001
Erratum: To read p7, Payload section, 72 C-band transponders (36MHz equivalent units)
and 22 Ku-band transponders (36 MHz equivalent units).
The final launch countdown runs through all the final launcher and satellites related
operations. It configures the vehicle and its payload for ignition of the first stage and PAL
engines at the selected launch time, as soon as possible within the launch window authorized
by the spacecraft.
A synchronized sequence (see Appendix 3), controlled by the Ariane ground check-out
computers, starts at H0 - 6mn and concludes the countdown.
Should a hold in the countdown delay the H0 time beyond the launch window, the launch
is postponed to (in days) : D + 1 or D + 2 (or later) depending on the source of the problem
and the time to resolve it.
Time Events
– 12h 30 mn 00 s Start of final countdown.
– 5h 35 mn 00 s Start of gantry withdrawal.
– 3h 35 mn 00 s Start of the 3rd stage filling operations with liquid hydrogen and liquid oxygen.
– 1h 5 mn 00 s Activation of launcher telemetry, radar transponders, telecommand.
– 6 mn 00 s “Green status for all systems” to authorize :
start of synchronized launch sequence
– 3 mn 40 s Spacecraft switched to on-board power (latest time).
– 1 mn 00 s Launcher equipment switched to on-board batteries.
– 09 s Inertial platform released.
– 05 s Release command to cryogenic arms retraction system.
Typical trajectory for standard geostationary transfer orbit and ground station visibility
Orbite de transfert
Geostationary transfer orbit
Extinction du 3e étage
Third stage burnout
Séparation Séparation
du 1er satellite du 2e satellite
Separation Separation
200 km of first satellite of second satellite
Séparation
du 2e étage
Second stage
separation
150 km
Largage
de la coiffe
Fairing jettison 100 km
Séparation du
1er étage
First stage
separation 50 km
Largage des
propulseurs
Booster jettison
Separation 1/2
Viking (Snecma moteurs)
1/2 interstage
UH25 Tank
Liquid strap-on
booster - Pal (Astrium)
• 19 m length,
• 2,2 m diameter,
• 4,5 T
Prime contractor : Arianespace
Industrial Architect : Mass lift-off : 486 metric tons
EADS launch vehicles Thrust at lift-off : 5440 kN
Customer Intelsat
Prime contractor Space Systems/Loral in Palo Alto (California)
Mission Internet, broadcast, telephony and corporate network solutions
Susan GORDON
Corporate Communications Director
Tél. : +1 202 944 6890 – Fax : +1 202 944 7890
e-mail : susan.gordon@intelsat.com
+ 9 ATV launches
International
• Intelsat
• New Skies Asia
• Stellat • Australia
• Worldspace • India
• Japan
Europe • Thailand / Laos
• ESA
• Eumetsat 9 8
• Eutelsat Americas
• France 9 • Canada
• Luxembourg 13
3 1 • USA
Most of the world’s commercial satellite operators have contracted to launch at least one payload with Arianespace.
This record is the result of our company’s realistic cost-effective approach to getting satellites into orbit.