You are on page 1of 1

NOTES :

1. DO NOT SCALE FROM THIS DRAWING


2. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS NOTED
OTHERWISE.
3. ALL DIMENSIONS TO BE VERIFIED ON SITE AND APPROVED BY THE ENGINEER.
4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL RELEVANT :
ARCHITECTURAL, STRUCTURAL, MECHANICAL & ELECTRICAL DRAWINGS AND
RELEVANT SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCIES ARE TO BE
BROUGHT TO THE ATTENTION OF THE ENGINEER AND RESOLVED BEFORE
COMMENCEMENT OF ANY WORK.
5. BCJ. DENOTES BLOCK WORK CONTROL JOINT.
6. WALL TIES TO BE PLACED AT 600mm VERTICAL SPACING 1000mm HORIZONTAL
SPACING(STAGGERED).
7. ALL DETAILS SHOWN ARE FOR NON LOAD BEARING BLOCK WORK (UNO)

126

FHC
LEGEND :

686
STRUCTURAL CONCRETE WALL / COLUMN
MIRROR BY OTHERS
CMU HOLLOW BLOCK WALL 100x400x400mm

CMU HOLLOW BLOCK WALL 200x400x400mm

MIRROR BY OTHERS

1000
BOWL BY OTHERS 18MM THK CORIAN TOPS (12MM+6MM),
18MM THK. MDF STRIP BACKING

244
770
18MM THK CORIAN SHT. LEGEND
SIDE FACIA (12MM+6MM),
30x30x1.5MM GAL. 18MM THK. MDF STRIP BACKING CEILING FIXTURE
STEEL TUBE FRAME

D1

18MM THK CORIAN TOPS (12MM+6MM), D2

D3 REFERENCE:
0.00 = 13.25
COORDINATION
CHECKED SIGNATURE DATE

ARCHITECTURAL A

INTERIOR DESIGN ID

CIVIL- STRUCTURAL CS

EXTERNAL WORKS EX

PLUMBING P

FIRE FIGHTING F

18MM THK CORIAN TOPS (12MM+6MM), 18MM THK. MDF MECHANICAL M

BOWL BY OTHERS 18MM THK. MDF STRIP BACKING STRIP BACKING ELECTRICAL E

RAMBOLL R

REVISION
04
30x30x1.5MM GAL.
18MM THK CORIAN TOPS (12MM+6MM), 03
STEEL TUBE FRAME
18MM THK. MDF STRIP BACKING 02
BOWL BY OTHERS 01 REVISED AS PER COMMENTS 22/02/2017 B.ALI
WOOD SCREW 00 ISSUED FOR APPROVAL 15/02/2017 MA/MK
ELECTRICAL WALL FIXTURE
NO. REVISION DESCRIPTION DATE BY

DESIGN DRAWING REFERENCES


30x30x1.5MM GAL. NO. DRAWING NUMBER DRAWING TITLE REV. DATE

STEEL TUBE FRAME 01 MOIHQ-RME-B01-ARC-DWG-2710 WASHROOM DETAILS BASEMENT 02 03/02/2016


02 MOIHQ-ESC-B01-ELL-SHD-1090 LIGHTING PLAN FOR BASEMENT
FINISHES
03 MOIHQ-ESC-B01-MAC-SHD-2096 AIR CONDITIONING LAYOUT PLAN BASEMENT 00 23/01/2017
30x30x1.5MM GAL.
04 MOIHQ-ESC-B01-MVE-SHD-2096 VENTILATION LAYOUT PLAN BASEMENT 00 23/01/2017
STEEL TUBE FRAME F303
05 MOIHQ-ESC-B01-EFA-SHD-1090 FIRE ALARM OVER ALL LAYOUT PLAN BASEMENT 00 26/07/2016

M10x100 ANCHOR BOLT +13.25 FFL. F401 PROJECT KEY PLAN :


FIN. FLR. LN. B15A
B15B
B15C
W401
M10x100 ANCHOR BOLT B17
B10 HELIPAD
J302 B11
B16
B01
J303 GP2

B07 B06

C003
B14
C005 E
1
2
3
4
5
6

B12

E
D

RAMP
UP
B

A B

1
3 4
5

6
B15F
B15E B15D
FIXTURES
BUILDING KEY PLAN :

M10x100 ANCHOR BOLT


ARC-2710

ARC-2710

FHC
G

SW13 SW13

1483 100 1500 100 1500 100 1500


18MM THK CORIAN TOPS (12MM+6MM),
200

1483
1500 1500 1500 18MM THK. MDF STRIP BACKING
SW21
DADO
265

PROJECT:
238

211
212

SW30
C C
SW32 L L 325
401 401
4MM WIDE x 4MM DEPTH MINISTRY OF INTERIOR
390 SW40
370
SW13 C
L C
L
C
L
C
L
HEADQUARTERS BUILDING JEDDAH
SW13
SW30
1564

750 750 CLIENT/OWNER:


1807

SW32
1776
1828

1739

1811

SW40
529
318 529 529 SW21 KINGDOM OF SAUDI ARABIA
MINISTRY OF INTERIOR
F401




F401

SOP SOP SOP SOP

SW31
415

414

414

414

CONSULTANT (ENGINEERS):
562 800 100 600 800 100 600 800 100 600 800 100
600

P.O. Box 14211 Riyadh 11424, Kingdom of Saudi Arabia


100

F303 F303 F303 F303


Tel: +966 11 200 2505 / 2506, Fax : +966 11 200 2507
596 800 800 800 800 800 800 800 100
197

www.archen.com
476

4521
200

MAIN CONTRACTOR:
SOP
E 03 E
200

293
2

ARC-2710 ARC-2700 ARC-2710


1229

2
1199

200

1982

640
200
2

TOILET
FCO
B081
18MM THK CORIAN SHT. LEAD CONSULTANT:
200
2

FRONT FACIA (12MM+6MM),


2610
200
2

F303
F401
18MM THK. MDF STRIP BACKING RAMBOLL Middle East Limited
P.O.Box 116921
2 2
2

Dubai, U.A.E
200

2 2 2 Tel : 00 971 4 3343616


ARC-2710 2 ARC-2710 Fax : 00 971 4 3343617
www.ramboll-mea.com

F 200 200 200 200 200 200 200


1842 F
F303

99 SUB-CONTRACTOR
1411

30x30x1.5MM GAL.
1000

1000

J302
AL BAYAN FACTORY CO.
SW40 600 900 900 900 571 STEEL TUBE FRAME Metal & Wooden Works
SW01
P.O. Box 49854 Riyadh 11513 K.S.A.
599
594

SW37 Tel. no. 2658885 Fax. no. 2658880


1338 600 900 SW20 E-mail: info@albayanf.com
170

SW38 150
SW36 BUILDING NAME:
503

900 900 900 1021


MINISTER'S BUILDING (B01)
6768

SHOP DRAWINGS / ARCHITECTURAL


SW32 DRAWING TITLE:
ARC-2710

ARC-2710

WASHROOM BASEMENT - B081 VANITY


H
G

ENLARGED PLAN, SECTIONS, DETAILS


0 B01-BASEMENT-BO81
DATE 15/02/2017
CHECKED BY: R.H
SCALE 1:25
SHEET SIZE A0
REVIEWED BY: F.SH
REVISION 00
DRAWING No.

MOIHQ ABF B01 ARC SHD 2710 00


PROJECT CODE ORIGINATOR AREA/BUILDING DISCIPLINE DOC TYPE SEQUENCE NO. REV.

You might also like