You are on page 1of 27

ABSTRACT

A study on BMWs global


supply chain network along
with a SWOT analysis

SACHIN MATHEWS
Supply Chain Planning and
Design

ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS

PRODUCTION DISTRIBUTION - SOURCING

STRATEG IES AND MECHANISMS


ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

Table of Contents

Sl No. Title Page No


Executive Summary 2

1. Introduction 3

2. Designing the Automobile Supply Chain 4

3. BMW Case Study 5

3.1 BMW's Corporate Strategy 6

3.2 BMW's Supply Chain 6

3.3 Supplier Network and Management 7

3.4 Design and Production 13

3.4.1 Build-to-Order Mechanism 14

3.4.2 Value Added Production System 15

3.5 Distribution Network 17

3.6 Reverse Logistics Network 19

3.7 Environmental Sustainability 20

4. S.W.O.T Analysis of BMW's Supply Chain 21

5. Recommendations 22

6. Conclusion 23

7. References 24

1
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

Executive Summary

The objective of this paper is to study and analyse the BMWs Global Supply Chain and
identify the key factors that make them a globally recognized brand. The paper makes an
explorative study of the BMWs supply chain and highlights its core supply chain strategies
that gives an overview of latest trends taking place in the supply chain planning and design
practices of the firm's Global supply chain network.

For the literature review firstly look at the key aspects of the automobile supply chain and ho w
they differ from other chains in terms of the processes involved in planning and design. We
then focus on the BMW supply chain and analyse the important parts of chain that includes the
supplier selection and sourcing mechanisms, design and production, distribution and reverse
logistics network. The paper also look into BMWs practices to achieve environme nta l
sustainability. Finally based on our research we carry out a S.W.O.T analysis highlighting the
main strengths that is attributed to their success, the kind of weakness and threats accompanied
with their chain and the opportunities of the company's supply chain to reach higher levels of
performance.

For the purpose of our research we mainly concentrated on the Groups website where all their
activities associated with supply chain are adequately described. However we also used articles
from leading journals in supply chain management, production, economics and logistics to
explain concepts used in BMWs up-stream and down-stream chain. Concepts such as value
added production system, build to order chains, just-in-time, just in sequence, direct delivery,
cross docking and other aspects associated with BMWs chain are all dealt with. Expert views
from the industry are also consider in our study in order to get a more balanced opinion on their
supply chain. Based on industry best practices and expert views we formulate our
recommendations to the firm to overcome the threats and weaknesses of the supply chain
network and reach greater performance levels.

2
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

Introduction

"The Car is only as good as the Journey you make"

Though the statement can be perceived in different ways, the journey, the BMW Group took
over the years to reach where it is today is what is elucidated in this paper. We take this journey
of manufacturing the BMW car from idea generation to concept formulation and design, from
there to production and finally to the customer. We look into the key aspect of BMW supply
chain, from raw materials source to final product as well as the reverse logistics network.

The automobile industry is complex, highly competitive and is characterized by highly volatile
demand environment with constantly changing customer taste and preferences. In order to
sustain automobile manufacturers need to constantly change their strategies with the changing
times. Continuous improvement and innovation have become increasingly critical in order to
survive in such an environment. Every component in the automobile chain is equally important
and must be carefully planned and implemented in order to achieve higher performance and
gain competitive advantage. As Wolfgang Rudorfer, head of logistics and planning in BMW
plainly put it the whole system depends on the weakest element in the chain and hence it is
imperative to keep the whole chain in mind while planning and designing the supply chain
network and core strategies.

In this paper we analyse BMWs global supply chain and how their strategies with respect to
chain have made them a globally respected brand. We concentrate on supply chain up-stream
and down-stream components such as sourcing strategies, purchasing and procurement,
supplier network and management, production, distribution and reverse logistics. We dont go
into details in other areas like marketing or financial strategies which have also contributed to
the firms success. We illustrate concepts by looking into some of the management practices
of BMW and describe the main reason for the success of their global supply chain by carrying
out an S.W.O.T analysis. Finally, we give our views and recommendations based on our
research and other best practices followed by top firms that can enable the BMW group to
achieve greater results and take their quality to the next level.

3
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

2. Designing the Automobile Supply Chain

Figure 1. Automobile Supply Chain, Source - (Thomas 2013)

The Automobile supply chain is characterized by complex franchise network of suppliers (tier1
to tier3), manufactures, dealers, distributors and logistics providers as shown in Figure1 (Ambe
2010). The car itself is a product of great complexity where myriad of components are brought
together in a precise manner. (Thomas 2013) points out that a typical car would be made of
about 20000 parts and 10000 key components. In addition to this every automobile
manufacturer sells multiple models which require periodic up gradation. The automobile
supply chain hence must have a robust and flexible production line, an effective supplier and
distribution network along with responsive sales and customer care department. The quality
and delivery of supplies is critical aspect of auto chains and there needs to be an effective and
holistic approach in the selection and evaluation of suppliers. The sourcing mechanisms in
place must be able to deliver to the firm's specific requirements. The production line that is
usually built to last the complete product cycle (which is typically about 6 to 8 yrs.) must be
capable to handle the changes in demand. For this an effective and flexible universal production
line, one which can handle different models at the same time as well as one which can be
upgraded has become a competitive necessity. And finally the distribution network both up-
stream and down-stream has to be carefully planned which is critical to the success of an

4
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

automobile chain. While framing the supply chain strategy the three important aspects
described by (Taylor 2004), (Fawcett 2007) & (Hines 2006) are understanding the customer
and degree of uncertainty, understanding the supply chain capabilities, evaluating alternatives
and selecting the appropriate optimum design of the supply chain. In the next section we see
how BMW goes about doing this.

3. BMW Case Study

Figure 2: Brand Identity, Source - (Gallagher 2012)

Founded in 1916, Bayerische Motoren Werke AG (BMW) is a German automobile, motorcycle


and engine manufacturing company, headquartered in Munich, that is recognized world over
for its reputation for quality and efficiency in the premium category which includes three main
brands - BMW, MINI and Rolls-Royce shown figure 2. BMW vehicles are characterized by
exceptional design, light weight construction, and eco-friendly technologies such as electric
drive to name a few. This along with their innovation and continuous improvement througho ut
their supply chain has enabled them to capture the substantial market share in the premium
segment not only in Europe and America but also in developing countries like India and China.

5
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

3.1 BMW Corporate Strategy

The corporate philosophy that is followed in the organization was made by the employees
themselves, known as "customer oriented action" or abbreviated as "KDH" in German. As
(Negi 2011) describes it, this philosophy anchors the goals of achieving perfect results and
optimum quality right from the beginning stage of the production cycle along with
implementing continuous improvement practices throughout the chain. The firms vision to
achieve sustainability and competitive advantage revolves around four core principles of
growth, shaping the future, profitability and access to new technologies and customers as
shown in figure 3. The main objective of its supply chain activities is to deliver these goals and
achieve competitive advantage.

Figure 3: BMW's Core Principles, Source - (BMW Group, 2014)

3.2 BMW's Supply Chain


BMW's supply chain process starts with customer and ends with the customer (Ambe 2010). It
uses a build to order system along with mass customization strategy to deliver cars as per
customer requirements. Once a customer makes a request, it is captured in a central database.

6
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

Using mySAP various details such as customer preferences, cost involved, lead times are
communicated on a real time basis along the corresponding supply network that reduces order-
to-delivery time, helps in tracking and tracing of materials, demand planning and improves the
inventory accuracy across the plant (Ambe 2010). With the use of such integrated technologies
amongst its suppliers, manufacturers and distributors the firm is able to deliver the customized
car to its customer with lesser lead times. The key process, strategies and participants involved
in the chain are briefly explained next sections.

3.3 Supplier Network and Management

Figure 4: BMW Group Purchase Volumes, Source - (BMW Group, 2014)

The firm has a huge supplier network comprising of more than 12000 suppliers in 70 countries
(BMW Group, 2014). As shown in figure 4, the percentage of purchasing volumes mainly
comes from Germany and rest of Western Europe. The firms purchasing division is responsible
for selection, validation, evaluation, quality assurance of supplied goods and services while
ensuring sustainability is achieved throughout the value chain. In order to achieve this they
firstly train their employees extensively on the desired levels quality and sustainability and how
to go about achieving them. The central purchasing headquarters is in Munich. However the
firm operates a number of IPOs (International Purchasing Offices) who locate, validate and

7
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

evaluate local suppliers for both their local production needs and international production
network. As mentioned in (BMW Group, 2014), there are two areas in particular that firm
concentrates on, one is managing and minimising risks across the chain and secondly utilis ing
opportunities and leveraging potential through continuous improvement practices together with
their suppliers (discussed in section 3.3.3).

3.3.1 Sourcing Mechanisms

BMW were being affected by exchange rates despite having good sales revenue. As per reports
the negative effects of exchange rates totalled to be about 2.4 billion from 2005 to 2009 (Xu
Bin 2012). To tackle this challenge the firm used the "natural hedging strategy" where money
is spent in the same currency where sales happens. It established factories in countries where
they were selling their products. Also it's sourcing is done by moving towards these respective
sales market also known as "local sourcing". Both these helped in the value creation process.
The firm has benefited from penetrating to newer, developing markets such as India where its
aiming at sourcing more than half of its components locally (Deccan Herald 2015). This has
helped it its pricing strategy, making it more competitive. As suggested by (James 2013) the
significant price difference achieved by BMW have enabled them to have more variety in the
production line and bring more agility in their supply chain network. He also enlightens other
benefits of their local sourcing such as quicker response times due availability of the resource
locally, especially when there is a "sudden surge in demand" or surprise deadline. There are
various other advantages of local sourcing such as better waste management. The wasteful
products from their business can be valuable commodity to other business locally (discussed
later in environmental sustainability section).

The firm uses advanced e-sourcing technologies such as ASTRAS eRFX software (Allocatio n
Network, 2014). It has a central interface called the M portal that controls all process in the
BMW group. The e-sourcing constitutes of four phases. First phase deals with request
preparation where various inputs are revived form the departments like R&D, logistics, cost
engineering etc. after which documents and specifications are created considering existing
contracts and bidder information. In phase 2 once all specifications are received, suppliers are
invited to submit their bids which are evaluated and classified into group specific request along
with cost analysis structures. This is then fed into ASTRAS where comparison are made. The
8
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

third phase constitutes of rating and rounds of negotiation under the guidance of the purchasing
team. Finally the fourth phase deals with final evaluation and award rating of the supplier after
which these supplier selection process is closed in the M portal. The framework of the supplier
system is discussed in the next section.

3.3.2 Supplier Selection and Purchasing

Some of the key aspects (Milne 2009) mentions while framing the supplier system are building
a constant communication channel, having the right supplier rating system, using dual or
multiple sourcing strategies and knowing your supplier's supplier. If you analyse BMW's
supplier selection and purchasing processes these aspects are more than effectively carried out.
Firstly the purchase and procurement of production materials from suppliers are based on ISO
9000 and ISO/TS 16949 that ensures quality standards are met throughout the supply chain. In
addition as part of their global strategy BMW joined the "Global Compact Practice" group in
2003 and have extended those practices to their suppliers along with their sub-suppliers. As
mentioned earlier achieving sustainability, is carried out on every part of every part of the
supply chain including, its procurement process. The (BMW Group, 2008) report describes the
quality assurance procedure for the supplied parts and the circumstances under which these
procedure have to be implemented. The key parameters used in supplier selection that are
described in the report include, product innovation, product quality and robustness in
production, delivery capability and on-time delivery, value creation and sub-contractor
management. They are selected and evaluated in different phases based on the scope of service
or type of supplier (concept suppliers, series development suppliers & market suppliers) as
shown in figure 5. The concept supplier develop the technical concept and nomina ted
approximately 38 months before series production. The series development suppliers are
nominated before 30 months and the market suppliers who supply standard parts for the series
are nominated 15 months before. Each new potential supplier as well those planning to change
their product or processes in any way must adhere to the BMW group sustainability
requirement.

9
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

Figure 5: Type of Suppliers, Responsibility and Schedules, Source - (BMW Group, 2008)

More than 50 percent of the components including door panels, front and rear axles and exhaust
systems are brought in by the suppliers in a "just in time", just in sequence(JIT/S) process to
the right point in the assembly line. This not only helps the firm to save space and minimize
stocks (both in transit stocks and facilities stock) but also helps reducing the total cost of
production. Typically there is only about one and half hours of stock on the assembly line at
any given point of time. (Ogle 2013) reports that approximately 75 percent of the sourcing
volume is sourced by JIT/JIS and further divided as 90 percent from JIS and 10 percent from
JIT. This is achieved through the supply mechanisms explained in figure 6. There are no
intermediate stocking points and supplies are delivered directly to the assembly stock.

As discussed earlier once the data is captured using mySAP, the custom-configured
manufacturing order which includes all relevant data on the parts necessary to build the car,
are sent from BMWs planning system to the appropriate suppliers (Ambe 2010). There are
two schedules involved in the purchasing mechanism, one is the long-horizon forecasts and
the short-horizon JIT/JIS delivery schedules.

10
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

Figure 5: Purchasing Mechanisms, Source - (Bartow 2007)

Figure 6: Supply Mechanisms to BMW Plants, Source - (Bartow 2007)

11
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

As shown in figure 5, the long-term requirement is typically done in 4 month widow which
typically constitutes of standard vehicle components or those part of a special vehicle program.
The short term requirements are purchased within 3 week window. Once a FAB (precise
request) is received, the supplies arrive based on the evenly distributed customer order. The
actual assembly date may differ from the SWET dates (received target goods receipt date). The
main control sends a TACHO message (every 15 minutes) which gives the current status of the
production (ERP Champs 2012). The arrived parts are then allocated based on the SPAB
(sequential request) into corresponding points in the assembly line (Bartow 2007). These
purchasing and supply mechanisms provides robustness and cost saving for the firm.

3.3.3 Cooperation and Collaboration with its Suppliers

Maintaining good relationships with the supplier is vital for any car manufacturer more so for
a firm like BMW, whose supply chain is a lot dependent on responsiveness and quality of the
supplies. As the firm uses the "Just-in time" and "Just-in-sequence" mechanisms, collaborating
and communicating on a real time basis becomes an absolute necessity. Accurate and timely
information is a key aspect of a managing and controlling a supply chain. As pointed out by
(Chopra 2013) this information gets distorted as you move across the chain, upstream from
customer or retailer to the source of raw materials which causes the bullwhip effect. This can
be either due to conflicting views on the objective, or due to delays because of the sheer
complexity of the network. BMW negates this by integrating advanced technologies and IT
systems such as EDI (for larger suppliers) and mySAP while ensuring that it is developed
alongside with its suppliers ( in some case tier 2 suppliers ) and distributors (Ambe 2010). In
addition (Sabel 1989) points out that the BMWs emphasis on collaboration has turned the in-
house manufacturing into a strategic learning process to explore boundaries beyond its direct
expertise. The firm as well as its suppliers has benefited from the mutual knowledge transfer ,
for example participation with Cecigram in France for new production technologies and Leowe
opta for electronics way back in 90s. The supplier network in North America is tied together
by its Process development centre that works together with suppliers. The group plays crucial
role in the development of its suppliers. Even in newer markets such as India and China the
firm enjoys a personal connection with its local suppliers which is a tremendous asset. The firm

12
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

benefits from understanding the local requirement more comprehensively and make
appropriate strategic changes in the decision making process.

3.4 Design and Production

Figure 7: Change in Production Strategies, Source - (Henry 2009)

The automobile industry has seen a lot of changes since its inception. The emphasis has shifted
from a mass production system in the early part of the 20th century to a lean production system
in the 1990s (seen in the TPS-Toyota Production System) and now to a more demand driven
process over the last decade (Zhan 2006). Earlier the norm was "built-to-stock" where the stock
is produced to a fixed schedule based on expected demand and where enough units are built
keeping the car manufacturer's warehouse capacity in mind. This typically was the case for
most automobile manufacturing firms in order to achieve "economies of scale" for the
continuous production of the same product as producing in large numbers would help in
reducing "per unit cost" of the vehicle. However times have changed and the ability to deliver
customized cars while maintaining shorter delivery times are increasingly gaining importance,
especially in the premium segment. In addition there also runs a risk of "diseconomies of scale"

13
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

i.e. after a certain point where the optimum capacity is reached (also known as the "break-even-
point"), results in cost escalation with increase in production. Manufacturers need to strike the
right balance and must be able to be flexible with changes in demand which is a key
requirement in the volatile environment seen in the automobile industry. The production
planning in BMW revolves more around the "pull" mechanism where customer demand rather
than forecasting drives the production cycle (QAD 2005). It achieved through Build-to-order,
just in time and just in sequence process which is discussed next.

3.4.1 Build -To-Order Supply Chain (BOSC)

Figure 8 - BMW's Build-To-Order Strategy, Source - (Bartow 2007)

The market environment in today's world is quite diverse and fast paced with ever changing
needs of the customer. Globalization and rapid changes in technology have enabled automobile
manufacturers to have larger product range in order to capture all kinds of market. This sheer
complexity in the product range as well as customizing products to cater to the specific needs
of the customer pose challenges to production managers. To tackle this, auto firms like BMW
are increasingly adopting the "designing to defer product differentiation" strategy where the
final configuration of a product is postponed as much as possible. In BMW, the production
"follows the market" which uses a "build-to-order" mechanism for their production. It addition
(Treville 2004) explains how BMW uses the partial demand information arrived from the BTO
14
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

in full filling its forecast mechanisms for advanced production in case of production shutdowns.
Table1 shows the keys aspects that differentiates BOSC with traditional supply chains. It
leverages the advantages of technologies and outsourcing to cater to the specific needs of the
customer with quick response times. The "Customer-Oriented Sales and Production Process"
COSP or KOVP abbreviated in German where the customer and not the car planned by the
firm defines the production process (BMW Group, 2013). It gives the customer a whole new
range of services like simple online processes that is effectively used by participants in the
supply chain in achieving clarity, flexibility and on time delivery. The BOSC in BMW is so
effective that it enables customers to make changes six days prior to delivery of the vehicle
which includes even a change in colour (Gunasekarana 2005). Through this BMW is able to
achieve higher level of responsiveness and customer satisfaction. The author also elucidates
other aspects captured within this mechanism such as holding zero inventory on finished goods
as well as work-in-process inventories.

Table1 - Key aspects of Traditional and Build-to-order supply chains, Source - (Deloitte Consulting, 2004)

15
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

3.4.2 Value Added Production System

In 2006, BMW implemented the "value added production system" throughout the group, that
tries to get the most out of the process involved from supplier to dealer, right from product
inception, through development, production and distribution (BMW Group, 2015). The focus
is to minimize waste, reduce total costs through its "leagile" concept (Naylor 1999) or "lean
and agile" production system while ensuring optimum quality is never compromised. Being
lean does not necessarily have to conflict with keeping the supply chain running. In BMW the
lean processes is more aimed at discovering problems earlier and accurately, take measures
and to provide quicker responses (Ogle 2013). However (Swiecki 2008) points out that due to
the volatility in the business environment, being lean is not just good enough. The two aspects
of the lean strategy - value-stream-mapping where each link in the chain drives value to the
next along with the 5's ( Sort, Simplify, Sweep, Standardize & Sustain ) is coupled with agile
strategy that gives greater flexibility and responsiveness to BMW supply chain. The firm
achieves this by staying abreast with the latest technologies that are tailored to deliver quality
cars to its customers. It allows them to provide quick responses to changes in customer demand,
supports rapid product launches even in cases of unplanned products (Elkins 2004). As a result
of the VPS activity the firm was able to achieve reduction of rework and per scrap while it
improved the efficiency per unit, product quality and operating cost structure.

In terms of design, which revolves around knowing you customer well is one of the main
differentiators of the BMW brand. Its elaborate customer centric process helps in identifying
the core requirements which drives the innovation processes and newer technologies. The latest
design technologies are developed keeping the end user in mind, technologies such as dynamic
stability control (DSC) and 50:50 weight distribution between front and rear axles giving
perfect balance of performance, precision and driving pleasure. The cars itself boasts of cutting-
edge technologies such as precise navigation systems, car memory and key memory, climate
control and other telematics, information displays and sensors making it a complete driving
machine. The firm has made lot of improvements both in terms of its production design as well
as the car itself. The recent ground-breaking innovation was the use of light weight carbon fibre
also known as CFRP (carbon-fibre-reinforced plastic). This along with the Life Drive

16
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

concept helped in reducing production times by half compared to those built on conventio na l
lines especially considering the scale at which it is used.

3.5 Distribution System

Figure 9: BMWs Global Outbound Logistics Network, Source - (WWL, 2012)

The distribution strategies revolve around the demand which are periodically evaluated. The
main idea is to unload in ports where most of their customers reside, which helps in the
reduction of lead times (Ogle 2013). Although this can be an expensive affair the firm is always
looking for ways to optimize its distribution network through their build for distribution
projects. The materials steering department handles all the inbound transport which constantly
in touch with BMW facilities, suppliers and purchasing departments.

The outbound distribution have multiple configurations based on the location and demand and
uses storage facilities both on-site and off-site. The delivery mechanisms can either be direct
delivery to the customer, or through dealers (showrooms), or including the distributors in the
chain as shown in the figure 10.

17
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

Figure 10: Distribution Mechanisms

In some regions like North America it more centralized and use central stocking points which
has its own advantages (Kurylko 2012). Here the cars allocated to the dealers goes into a central
pool instead of shipping all the cars and BMW pays for the storage costs until the dealer gets a
buyer. This helps stores to save on floor planning and cost associated with transporting
swapped vehicles. Significant saving are made on the transportation cost and also allows the
dealers to choose from bigger pool which is one the most important benefit, keeping the end
customer in mind. The firm also uses cross-docking facilities, for example in Bavarian Wrth
an der Isar, Germany that helps to reduce traffic within plants and optimize transportation costs
(Ogle 2013). In its Rosslyn plant in Pretoria, South Africa, the assembled car is taken to the
warehouse (distribution centre) first and then transported to the dealers from where the
customers collects it (Kaps 2006). In the year 2013, close 260,000 vehicles have been delivered
to the customers which was a 7.1 percent increase from the previous year (Ogle 2013). The
growth mainly came from Britain, Ireland and Russia where sales climbed in 26 to 28 percent
range. (Ogle 2013) points out that this was mainly due BMWs efficient supply chain network,
particularly the distribution network.

18
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

3.6 Reverse Logistics Network

Figure 11: Generic Forward and Reverse Logistics Framework, Source - (Tonanont 2008)

In recent years reverse logistics has become an important aspect of the supply chain and firms
are leveraging it to gain competitive advantage. Reverse logistics encompasses all operations
that relate to the reuse of finished goods as well those surplus materials used in the forward
chain. As shown in the figure 11, there are various points in the chain other than the used
product from the consumer from which materials can be reused. In order to design the reverse
logistics framework, firstly the drivers needs to be identified. Most common drivers include
savings on raw material and energy, customer satisfaction, emission reduction. However as
pointed out by (Joesph 2014) reverse logistics can be an effective cost control mechanism.

BMW has competent reverse logistics framework unlike many other automobile manufacture rs
where reusable, re-manufacturable and recyclable automobile components are effective ly
utilized. As per (BMW Group, 2014) report, in the production cycle itself, the firm uses a
closed-loop mechanism where any viable residual materials are used on the same machine.
The firm also has the post-industry- loop mechanism where used materials such as sheet metal
scraps, old plastic containers etc. are recycled back into production. As reported by
(Somasekhar 2002) in Germany once a car complete 12-15 years it is must that the owner

19
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

handover the car to the manufacturer or an authorised dismantling plant. BMW make this
process easy through its Lohhof plant near Munich. It uses high tech gadgetry and methods to
rapidly dismantle cars. It is reported that on average 2000 BMW cars are dismantled by this
unit creating about 1700 tonnes of body shells, 200 tonnes of operating fuel, 20 tonnes of plastic
and about 30 tonnes of no ferrous metals resulting in 1.5 million earned by recycled parts. It
has also become the preferred choice for other car manufacturers such Mercedes and Porsche.
Product re-call or Call-backs which are also part of the reverse logistics process.
Manufacturer often have to re-call vehicles either because it not giving the guaranteed
performance, for safety reasons or violation of certain government regulation. These causes a
huge financial burden on companies. BMW too faced these scenarios but used this as an
opportunity to increase brand image and customer satisfaction. As shown in figure 11, the
called back products are inspected and evaluated before they can be sent to the refurbis hing,
re-manufacturing processes or for waste disposal. For example, in 2014 BMW had a massive
re-call for over 1.6 million 3 series cars manufactured from 2000 to 2006 due to a faulty air-
bag system which was a safety issue. There also cases when parts have to be replaced. These
replaced parts are repaired either sent to dealer as new spare parts or used back in the
production.

3.7 Environmental Sustainability

The Munich-based company were one of the first in the industry to achieve the ISO14001 and
is recognized world over for its commitment to environmental responsibility. It was ranked
No.1 in the Dow Jones sustainability index for automobile industry every year since 2005
(DMSB, 2014). Resource Efficiency and life cycle management are the main pillars of the
groups sustainability program. The intelligent use of raw materials and valuable resources
begins much before the disposal stage. As discussed in the previous section the recycling
process start from the outset. During production itself surplus or reusable waste are put back
into the forward chain. In addition the firm uses various Green supply chain practices to achieve
environmental sustainability. The firm also assess its suppliers in energy efficiency through
regular audits and together develop action plans for improvement. In case the suppliers are not
meeting the groups sustainability cause their contracts are terminated. The group is also
involved in cross industry initiatives such as the Aluminium Stewardship Initiative (ASI) which

20
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

tries to achieve sustainable extraction, production and use of aluminium throughout the value
chain.

4. SWOT Analysis BMW Supply Chain

Figure 12: S.W.O.T Analysis of BWSs Global Supply Chain

In our research we found the following strengths, weakness, threats and opportunities as shown
in figure 12. The most important being the brand reputation. It is known world over for it luxur y
and refined quality. With their continuous improvement practices and innovation througho ut
the chain they have been able to stay ahead of competition. The brand image also attracts the
best suppliers and dealers which further adds to the quality and responsiveness of their services
and products. Their value added production system that is characterized by flexible and
leagile processes such as BTO, JIT/JIS have brought about greater flexibility and agility of
their supply chain. Amongst the auto maker they have one most comprehensive and unique
reverse logistics process that enable them to achieve a greater environmental sustainability

21
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

index. In addition their acquisition of Rover group (MINI) and Rolls-Royce have further added
to existing brand image. The firm also benefited from technologies and practices used in their
supply chain along with increased knowledge of the market they were serving. Their constant
innovation and continuous improvement are ones that hard to match. The latest mobility
services drive now and the new i3 model are examples of this.

Having a global supply chain poses it own challenges which leads to some of the weaknesses.
For the study carried out we found that BMWs manufacturing cost are relatively higher than
many other firms. This mainly due higher purchasing cost as best of suppliers are used as well
the skilled workforce that is required. Though these are also their strengths. Also many of the
key components such as engines are imported which contribute to higher import costs.
However the firm are exploring options of setting up R&D facilities and local manufactur ing
of engines in countries like India drawing the line with China. BMW;s cost of repair compared
to other car makers in the premium segment is known to be high. Though the firm have brought
about extended warranty periods for their cars, there is still scope for improvement in this area.
Their customization of cars also do contribute to higher costs in manufacturing than those
achieved through mass economies of scale or mass production. But this gives opportunities to
the firm for improving the mass customization processes.

One of the main threats is the increasing competition in their market segment. Volkswagen in
the executive segment, Daimer-Chryslers Mercedes and Toyotas Lexus in the luxury segment
along with their competitive pricing take pie of BMWs market share. The other threats are the
risks involved in local sourcing which includes duplication of intellectual assets and grey
marketing. BMWs mainly faces these challenges in countries like Russia, Poland, Turkey and
some African nations. The fluctuating currency and recession in the European Union were the
other main threats to BMWs supply chain.

5. Recommendations
In this section we discuss the opportunities for BMW group and give our views on how the
firm can improve their supply chain activities considering the threats and weaknesses discussed
in the previous section. As discussed earlier the firm faces increasing completion form Japanese
brands in the premium segment. The firm would need to develop mechanisms to reduce costs

22
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

both in their manufacturing as well as transportation and distribution processes in order to


compete with Japanese firms pricing strategy. Japanese firms takes lesser time to launch a new
product compared to BMW. This another area where further improvements can be made in
terms of their design and prototyping which usually 5-6 years for a new product launch. BMW
makes big changes less frequently. Though these have their own advantages like incorporating
breakthroughs late in the production cycle, lead times can be reduced by evolving a strategy
where small incremental changes can be made more frequently as followed by Japanese firms.
As we have seen the concept development and nomination of these suppliers takes close 3 years
which can be further reduced. We also see that there are number of external supply chain
contacts which can be brought under one roof under a single partner or subsidiary company.
As we have seen BMW have effectively penetrated to newer developing markets where there
are lot of cash-strapped potential customers in the mid-income category. We recommend to
BMW to have R&D centres in these countries that can develop cars that cater to the
requirements of these markets. Such as more fuel efficient and lower priced version of electric
and hybrid cars. Some of their core suppliers could also set up base in these location saving on
inventory, transportation and distribution costs. But by doing so they can also reduce the threats
of grey marketing and duplication of intellectual assets. They can work with local governme nts
in framing policies and framework to keep this in check.

6. Conclusion
As seen in this study the automobile industry is faced with huge challenges due to the
fluctuating market environment, changing demands of the well informed customer and cut
throat competition. All these factors have made it imperative for automobile chains to be more
responsive and flexible. BMW have well understood these challenges associated with todays
environment and have incorporated various technologies, strategies and mechanism in their
supply chain. In spite of the odds the firm has shown great character and have demonstrated to
be a competitive enterprise and a long term player. Its triple bottom-line approach of economic,
social and environmental sustainability has enabled the firm to be one of the top auto makers
in the world.

23
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

7. References
Allocation Network,. 2014. "Integration of ASTRAS into BMW Group Processes and Systems."
www2.allocation.net. http://www2.allocation.net/bmw-group-success-story.html.

Ambe, M.,I.,Badenhorst.,Weiss,A.,J.,. 2010. "Strategic supply chain framework for the automotive
industry." African Journal of Business Management,Vol.4(10) pp.2110-2120.

Bartow, Dough.,. 2007. "Supply Chain Management in a Build-To-Order Environment." Automative


News, Manufacturing Conference. Deloitte.

BMW Group,. 2013. "BMW Intelligent Process." BMW Group.


http://www.bmwgroup.com/e/0_0_www_bmwgroup_com/produktion/fahrzeugfertigung/i
ntelligente_prozesse/intelligente_prozesse.html.

. 2015. "Building a better BMW : Value Added Production System." www.bmwusfactory.com.


https://www.bmwusfactory.com/manufacturing/building-a-better-bmw/value-added-
production-system/.

. 2014. "Supplier Network Overview." BMW Group.


http://www.bmwgroup.com/e/0_0_www_bmwgroup_com/verantwortung/lieferkette/uebe
rblick.html.

BMW Group,. 2008. "Supplier Parts Quality Management." Company Report.

. 2014. "Supply Chain Management." www.bmwgroup.com.


http://www.bmwgroup.com/com/en/responsibility/sustainability/supply-chain-
management/index.html.

BMW Group,. 2014. Sustainable Value Report. Company Report, BMW Group.

Chopra, Sunil.,Meindl,Peter.,. 2013. Supply Chain Management - Strategy,Planning and Operation.


Pearson Education Limited.

Deccan Herald. 2015. "BMW ups local sourcing to 50%,to launch 15 new models this yr." Deccan
Herald. 5 14. http://www.deccanherald.com/content/476178/bmw-ups-local-sourcing-
50.html.

Deloitte Consulting,. 2004. deloitte.com. June 17.


http://www.deloittee.com/dtt/article/sid%3d265551%26cid%3d42003.html.

DMSB,. 2014. BMWs Impact in South Carolina:Two Decades of Economic Development. Research
Paper, University of South Carolina.

24
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

Elkins, D.,A.,Huang,N.,Aiden,J.,M.,. 2004. "Agile manufacturing systems in the automotive industry."


International Journal of Production Economics,Vol.91 pp.201-214.

ERP Champs. 2012. "Just-In-Time Processing/RC-Remote Consulting Notes - BMW SPAB - TACHO
shipping control." ERP Champs. http://www.erpchamps.com/bmw-spab-tacho-shipping-
control-732516/.

Fawcett, S.,E.,Ellram., L.,M.,Ogden.,J.,A.,. 2007. Supply Chain Management: From vision to


implementation. New Jessey: Prentice Hall.

Gallagher, Patrick.,Karta,Sion.,. 2012. "BMW : Redefining Premium Brand Identity." Master's Thesis.

Gunasekarana, A.,Ngai,E.,W.,T.,. 2005. "Build-to-order supply chain management: a literature review


and framework for development." Journal of Operations Management,Vol.23 pp.423451.

Henry, Jim.,. 2009. BMW Says Flexible, Not Lean, Is The Next Big Thing in Autos. 11 24.
http://www.cbsnews.com/news/bmw-says-flexible-not-lean-is-the-next-big-thing-in-autos/.

Hines, T.,. 2006. Supply Chain Strategies :Customer-driven and customer focused. Boston: Elsevier.

James, Chris.,. 2013. "The Benefits of Local Sourcing & Procurement." BellwetherSoftware. 6 5.
http://bellwethercorp.com/the-benefits-of-local-sourcing-procurement/.

Joesph, R.,Benjamin,Huscroft.,. 2014. "Reverse Logistics - past research,current management issues,


and future directions." The International Journal of Logistics Management pp.304-327.

Kaps, T.,. 2006. "Production at Plant Rosslyn." AIDC Conference, ZA-T-1.

Kurylko, T.,Diana. 2012. "Central Distribution for BMW." autonews.com. 1 23.


http://www.autonews.com/article/20120123/RETAIL07/301239984/central-distribution-for-
bmw.

Milne, Richard.,. 2009. "Early warnings in the supply chain." Financial Times Europe,No.3 p.10.

Naylor, B.,N.,Mohammed,M.,Danny,B.,. 1999. "Leagility: interfacing the lean and agile


manufacturing paradigm in the total supply chain." International Journal of Production
Economics,Vol.62 pp.107-118.

Negi, S.,K.,Pratik. 2011. "Lean Flexible and JIT method in BMW manufacturing ." Master thesis,
Ahmedabad.

Ogle, Sam.,. 2013. "BMW optimises supply chain as sales continue to rise." Automative Supply Chain
Magazine, 4 5.

PricewaterHouse Cooper. 2008. "Economic Impact of Franchised Businesses,Vol.2." International


Franchise Asscoiation .

25
ANALYSIS OF BMW'S GLOBAL SUPPLY CHAIN - ITS PRODUCTION DISTRIBUTION - SOURCING STRATEGIES
AND MECHANISMS

QAD. 2005. Replenish on Time, In Sequence: The Benefits of Implementing the QAD JIT Sequencing
Solution. Whitepaper, QAD.

Sabel, F.,Charles.,Kern,Horst.,Herrigel,Gary.,. 1989. "COLLABORATIVE MANUFACTURING: New


Supplier Relations in the Automobile Industry and the Redefinition of the Industrial
Corporatio." Whitepaper.

Somasekhar, M.,. 2002. "BMW reverse logistics in practice." The Hindu Business Line, 6 4.

Swiecki, B.,Gerth,R.,J.,. 2008. "Collaboration in the Automotive Supply Chain - Realizing the Full
Potential of a Powerful Tool." Whitepaper.

Taylor, D.A.,. 2004. Supply chains. A managers guide. Pearson Education,USA.

Thomas, Kelly.,. 2013. The Automotive Supply Chain in the New Normal - Analysis of the Industry and
its supply chain oppurtunities. Whitepaper, JDA.

Tonanont, A.,Yimsiri,S.,Jitpitaklert,W.,Rogers,K.J. 2008. "Performance evaluation in reverse logistics


with data envelopment analysis." Proceedings of the 2008 Industrial Engineering Research
Conference pp.764-769.

Treville, de.,Suzanne.,Shapiro.,D.,Roy.,Hameri.,Ari-Pekka.,. 2004. "From supply chain to demand


chain: the role of lead time reduction in improving demand chain performance." Journal of
Operations Management,Vol.21 pp.613-627.

WWL,. 2012. Wallenius Wilhelmsen Logistics (WWL). www.2wglobal.com/www/aboutUs/cases/.

Xu Bin, Liu Ying.,. 2012. "The case study: How BMW dealt with exchange rate risk." Financial Times -
ft.com/management. 10 29. http://www.ft.com/cms/s/0/f21b3a92-f907-11e1-8d92-
00144feabdc0.html#axzz3a5UhHx5B.

Zhan, X.,Chen,R. 2006. "Forecast-driven or customer-order-driven? An empirical analysis of the


Chinese automotive industry." International Journal of Operations and Production
Management,Vol.26(6) pp.668-688.

26

You might also like