You are on page 1of 34

AGRO-HYDROLOGIC STUDIES F0R

SMALL WATER IMPOUNDING PROJECT

Project : Maglambong SWIP (Default : BSWM SWIP)


Location : Bgy. Maglambong, Monreal, Masbate (Default Diliman, Quezon City)

1. Project Data

a. Drainage Area, D.A. : 75.00


= 0.75
= 0.29

b. Mainstream Length from outlet to highest ridge, L : 1,100.00


= 0.68

c. Mainstream Length from outlet to point nearest


Basin Centroid, Lc : 550.00
= 0.34

d. Total Fall from Highest Ridge to outlet, H : 230

e. Watershed Gradient, Y : 20.91

f. Soil Type of Watershed : Clay

g. Soil Group for Watershed Index Determination (A, B, C, or D) : D

2. Computation of Basin Lag Time(TL), Time of Concentration(Tc), Time-to-Peak (TP),


and Peak Rate of Run-off(qp)

a. Basin Lag Time, TL(unadjusted) = 0.93

Drainage Area Coefficient: 1.2


1.2 for mountainous drainage area
0.72 for foothill drainage area
0.35 for valley drainage area

b. Adjusted Estimate of TL, INCR. D: 0.40 = 0.99

c. Time of Concentration, Tc = 1.41

d. Time to Peak, Tp = 1.19

e. Peak Rate Run-off, qp = 0.15

3. Determination of Precipitation Depth, P for Return Period of N yrs.


Using Rainfall-Intensity-Duration-Frequency-Curve
Station: Catbalogan Western, Samar
a : 51.105 b : 0.10 c : 0.202
d : 0.62 Return Period : 25 yrs.

Rainfall Intensities and Depths for Multiples of


Unit Duration( 25-year Return Period )

Seq. No Duration,D Rainfall Intensity Precipitation Depth


i Hr. mm/hr. Pi= ID, mm

1 0.40 150.48 60.19


2 0.80 104.52 83.62
3 1.20 83.22 99.86
4 1.60 70.46 112.74
5 2.00 61.81 123.62
6 2.40 55.48 133.15
7 2.80 50.60 141.68
8 3.20 46.71 149.46
9 3.60 43.51 156.63
10 4.00 40.82 163.30
11 4.40 38.54 169.55
12 4.80 36.55 175.46
13 5.20 34.82 181.05
14 5.60 33.28 186.38
15 6.00 31.91 191.47

Calculation and Rearrangement of Rainfall Increments


(2/3 Position)

Seq. No. Rainfall Increments Rearranged Rainfall


i (mm) Increments, 2/3 Position

1 P1 = 60.19 P14 = 5.33


2 P2 = 23.43 P13 = 5.59
3 P3 = 16.24 P12 = 5.90
4 P4 = 12.88 P10 = 6.67
5 P5 = 10.88 P9 = 7.17
6 P6 = 9.52 P7 = 8.53
7 P7 = 8.53 P6 = 9.52
8 P8 = 7.77 P5 = 10.88
9 P9 = 7.17 P3 = 16.24
10 P10 = 6.67 P2 = 23.43
11 P11 = 6.26 P1 = 60.19
12 P12 = 5.90 P4 = 12.88
13 P13 = 5.59 P8 = 7.77
14 P14 = 5.33 P11 = 6.26
15 P15 = 5.09 P15 = 5.09
4. Hyrologic Abstraction and Unit Hydrograph Derivation

a. Maximum Potential Difference, S = 84.67


Watershed Index : 75

b. Initial Abstraction, Ia = 16.93

c. Retention Depth, f(INCR.D) = 0.408


Retention Rate,mm/hr = 1.02

Rainfall Excess Computation Using Hydrologic Abstraction and


2/3 Position Maximization Pattern

Seq. No. Rainfall Increments Abstraction Retention Rainfall Excess


i (mm.) (mm.) (mm.) (mm.)

1 5.33 5.33 0.00 0.00


2 5.59 5.59 0.00 0.00
3 5.90 5.90 0.00 0.00
4 6.67 0.11 0.00 6.67
5 7.17 0.00 0.41 6.76
6 8.53 0.00 0.41 8.13
7 9.52 0.41 9.12
8 10.88 0.41 10.47
9 16.24 0.41 15.83
10 23.43 0.41 23.02
11 60.19 0.41 59.78
12 12.88 0.41 12.48
13 7.77 0.41 7.37
14 6.26 0.41 5.85
15 5.09 0.41 4.68

Derivation of Synthetic Unit Hydrograph

Seq. No. Time Dimensionless Hydrograph Unit Hydrograph


i Hrs. T/Tp (q/qp)i Ui Uu=Ui/K
###
1 0.40 0.34 0.188 0.029 0.025
2 0.80 0.67 0.735 0.112 0.096
3 1.20 1.01 1.012 0.154 0.133
4 1.60 1.35 0.788 0.120 0.103
5 2.00 1.68 0.484 0.074 0.063
6 2.40 2.02 0.298 0.045 0.039
7 2.80 2.36 0.184 0.028 0.024
8 3.20 2.70 0.113 0.017 0.015
9 3.60 3.03 0.070 0.011 0.009
10 4.00 3.37 0.043 0.007 0.006
11 4.40 3.71 0.027 0.004 0.004
12 4.80 4.04 0.017 0.003 0.002
13 5.20 4.38 0.010 0.002 0.001
14 5.60 4.72 0.006 0.001 0.001
15 6.00 5.05 0.000 0.000 0.000
Total >>> 0.604 0.521
###
Correction Factor, K = 1.160 ###
###
To check, K must be equal to 1 ###
###
Factor, K = 1.00 THEN, OK
###
###
|:: ###
FLOOD HYDROGRAPH FOR THE DESIGN FLOOD ###
###
Seq. No. Time, Hrs Discharge, Q cms

0 0.00 0.00
1 0.40 0.00
2 0.80 0.00
3 1.20 0.00
4 1.60 0.16
5 2.00 0.81
6 2.40 1.74
7 2.80 2.59
8 3.20 3.33
9 3.60 4.13
10 4.00 5.36
11 4.40 8.02
12 4.80 12.13
13 5.20 13.54
14 5.60 11.28
15 6.00 8.34
16 6.40 6.10
17 6.80 4.23
18 7.20 2.70
19 7.60 1.67
20 8.00 1.03
21 8.40 0.63
22 8.80 0.38
23 9.20 0.23
24 9.60 0.13
25 10.00 0.05
26 10.40 0.02
27 10.80 0.01
28 11.20 0.00
29 11.60 0.00
30 12.00 0.00
12.00
11.60
11.20
10.80
10.40
10.00
9.60
9.20
8.80
8.40
8.00
7.60
FLOOD HYDROGRAPH

7.20
6.80
Time, Hrs.
6.40
6.00
5.60
5.20
4.80
4.40
4.00
3.60
3.20
2.80
2.40
2.00
1.60
1.20
0.80
0.40
0.00

8.00

6.00

4.00

2.00

0.00
16.00

14.00

12.00

10.00
Q, cms.
12.00
11.60
11.20
10.80
10.40
10.00
9.60
9.20
Computation of Mean and 80 % Dependable Rainfall

Project: Maglambong SWIP Data Entries OK (Yes or No): Yes


Location: Bgy. Maglambong, Monrea (Pls put yes after filing-up the
R-Station: Catbalogan, Samar table below)

Month Decade Mean 80% Dep Isohyetal Adjusted Rain


Rain Rain Reading Mean 80% Dep
Catbalogan, Samar At Project Site

Jan 1 12.10 9.98 200.00 49.59 40.90


2 16.50 10.30 67.62 42.21
3 20.20 10.61 82.79 43.48
Feb 4 12.30 17.48 95.00 29.66 42.15
5 13.80 14.65 33.27 35.32
6 13.30 15.72 32.07 37.90
Mar 7 11.00 8.98 95.00 25.36 20.71
8 13.60 10.10 31.36 23.29
9 16.60 3.62 38.28 8.35
Apr 10 20.00 5.62 80.00 16.99 4.77
11 34.90 6.27 29.64 5.32
12 39.30 6.58 33.38 5.59
May 13 30.90 11.45 125.00 25.05 9.28
14 49.40 22.97 40.05 18.62
15 73.90 16.95 59.91 13.74
Jun 16 48.40 16.03 160.00 53.22 17.63
17 43.60 28.50 47.95 31.34
18 53.50 49.54 58.83 54.48
Jul 19 56.80 43.74 175.00 50.92 39.21
20 70.60 28.07 63.29 25.17
21 67.80 24.27 60.78 21.76
Aug 22 98.90 20.12 200.00 80.64 16.40
23 82.60 17.36 67.35 14.15
24 63.80 35.93 52.02 29.29
Sep 25 76.80 17.93 190.00 86.04 20.09
26 58.10 24.35 65.09 27.28
27 34.70 35.65 38.87 39.94
Oct 28 54.20 11.42 260.00 52.66 11.10
29 94.60 32.08 91.91 31.17
30 118.80 18.87 115.43 18.33
Nov 31 39.00 26.42 300.00 87.31 59.15
32 53.80 22.01 120.45 49.28
33 41.20 19.30 92.24 43.21
Dec 34 32.90 18.29 300.00 110.90 61.65
35 24.20 25.24 81.57 85.08
36 31.90 20.18 107.53 68.02
Total 1624.00 706.58 2180.00 1115.37
FIELD WATER BALANCE COMPUTATION

Project Name: Maglambong SWIP


Bgy. Maglambong, Monreal, Masbate

Percolation: 1.75 mm/day Irrigation Eff.= 51 %(for Rice)


S.W.H.C.: 20 % 54 %(for Upland Crops)
PET Stn : Catbalogan, Samar
Aver.PET: Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
3.40 3.50 3.90 4.70 5.20 5.00 4.80 3.90 3.70 3.30 2.40 2.20
Entries on Parameters OK: (Yes or NO) Yes (Pls enter Yes only when entries have no typing errors)

Starting Month (May-Jun, Jul-Aug, Nov-Dec): Jul-Aug Starting Decade: ( 15-18 ): 20

FIRST CROP: Paddy Rice ( 1 )


(Paddy Rice, Corn, Tobacco, Vegetables, Garlic, Onion) Previous/Initial STOR = 65.58 mm

DECADE RAIN, @ AVE. PET CROP CROP ROOT AET PERCO- CHANGE INITIAL STOR IRRIG DRAINAGE IRRIG SYSTEM
80 % COEFF. DEPTH LATION IN STOR STOR EFF IRRIG

20 25.17 48.00 1.00 0 48.00 17.50 -40.33 25.25 25.25 0.00 0.00 0.51 0.00
21 21.76 52.80 1.00 0 52.80 19.25 -50.29 -25.04 65.00 90.04 0.00 0.51 176.55
22 16.40 39.00 1.00 0 39.00 17.50 -40.10 24.90 24.90 0.00 0.00 0.51 0.00
23 14.15 39.00 1.00 0 39.00 17.50 -42.35 -17.44 50.00 67.44 0.00 0.51 132.24
24 29.29 42.90 1.00 0 42.90 19.25 -32.86 17.14 50.00 32.86 0.00 0.51 64.42
25 20.09 37.00 1.00 0 37.00 17.50 -34.41 15.59 50.00 34.41 0.00 0.51 67.48
26 27.28 37.00 1.00 0 37.00 17.50 -27.22 22.78 22.78 0.00 0.00 0.51 0.00
27 39.94 37.00 1.00 0 37.00 17.50 -14.56 8.22 50.00 41.78 0.00 0.51 81.93
28 11.10 33.00 1.00 0 33.00 17.50 -39.40 10.60 45.00 34.40 0.00 0.51 67.46
29 31.17 33.00 1.00 0 33.00 17.50 -19.33 25.67 25.67 0.00 0.00 0.51 0.00
30 18.33 36.30 1.00 0 36.30 19.25 -37.22 -11.55 45.00 56.55 0.00 0.51 110.88
31 59.15 24.00 1.00 0 24.00 17.50 17.65 62.65 10.00 0.00 52.65 0.51 0.00
32 49.28 24.00 1.00 0 24.00 17.50 7.78 17.78 0.00 0.00 17.78 0.51 0.00
Sub-Total 363.10 483.00 232.75 357.49 70.43 700.96

SECOND CROP: Paddy Rice ( 1 )


(Paddy Rice, Corn, Tobacco, Tomato, Peanut,Garlic, Onion) Previous/Initial STOR = 106.14 mm

DECADE RAIN, @ AVE. PET CROP CROP ROOT AET PERCO- CHANGE INITIAL STOR IRRIG DRAINAGE IRRIG SYSTEM
80 % COEFF. DEPTH LATION IN STOR STOR EFF IRRIG

33 43.21 24.00 1.00 0 24.00 17.50 1.71 107.85 107.85 0.00 0.00 0.51 0.00
34 61.65 22.00 1.00 0 22.00 17.50 22.15 130.00 80.00 0.00 50.00 0.51 0.00
35 85.08 22.00 1.00 0 22.00 17.50 45.58 125.58 80.00 0.00 45.58 0.51 0.00
36 68.02 24.20 1.00 0 24.20 19.25 24.57 104.57 80.00 0.00 24.57 0.51 0.00
1 40.90 34.00 1.00 0 34.00 17.50 -10.60 69.40 69.40 0.00 0.00 0.51 0.00
2 42.21 34.00 1.00 0 34.00 17.50 -9.29 60.11 60.11 0.00 0.00 0.51 0.00
3 43.48 37.40 1.00 0 37.40 19.25 -13.17 46.95 46.95 0.00 0.00 0.51 0.00
4 42.15 35.00 1.00 0 35.00 17.50 -10.35 36.60 36.60 0.00 0.00 0.51 0.00
5 35.32 35.00 1.00 0 35.00 17.50 -17.18 19.42 45.00 25.58 0.00 0.51 50.16
6 37.90 28.00 1.00 0 28.00 14.00 -4.10 40.90 40.90 0.00 0.00 0.51 0.00
7 20.71 39.00 1.00 0 39.00 17.50 -35.79 5.11 45.00 39.89 0.00 0.51 78.22
8 23.29 39.00 1.00 0 39.00 17.50 -33.21 11.79 10.00 0.00 1.79 0.51 0.00
9 8.35 42.90 1.00 0 42.90 19.25 -53.80 -43.80 0.00 0.00 0.00 0.51 0.00
Sub-Total 552.28 416.50 229.25 65.47 121.94 128.38
|::

THIRD CROP: Peanut ( 2 )


(Tomato, Garlic, Onion, Garlic, Peanut, Fallow) Previous/Initial STOR = 6.56 mm

DECADE RAIN, @ AVE. PET CROP CROP ROOT AET PERCO- CHANGE INITIAL STOR IRRIG DRAINAGE IRRIG SYSTEM
80 % COEFF. DEPTH LATION IN STOR STOR EFF IRRIG

10 4.77 47.00 0 0.00 2.39 0.00 0.00 0.54 0.00


11 5.32 47.00 0.40 80 18.80 0.00 -13.48 -11.09 16.00 27.09 0.00 0.54 50.16
12 5.59 47.00 0.70 150 32.90 0.00 -27.31 -11.31 30.00 41.31 0.00 0.54 76.50
13 9.28 52.00 0.70 200 36.40 0.00 -27.12 2.88 40.00 37.12 0.00 0.54 68.74
14 18.62 52.00 0.95 250 49.40 0.00 -30.78 9.22 50.00 40.78 0.00 0.54 75.52
15 13.74 57.20 0.95 300 54.34 0.00 -40.60 9.40 60.00 50.60 0.00 0.54 93.70
16 17.63 50.00 0.95 400 47.50 0.00 -29.87 30.13 80.00 49.87 0.00 0.54 92.36
17 31.34 50.00 0.75 500 37.50 0.00 -6.16 73.84 73.84 0.00 0.00 0.54 0.00
18 54.48 50.00 0.75 600 37.50 0.00 16.98 90.82 90.82 0.00 0.00 0.54 0.00
19 39.21 48.00 0.55 600 26.40 0.00 12.81 103.63 103.63 0.00 0.00 0.54 0.00
Sub-Total 199.99 340.74 0.00 246.77 0.00 456.98
TOTAL 1,115.37 1,240.24 462.00 669.73 192.37 1,286.32
DERIVATION OF RESERVOIR INFLOW

PROJECT: Maglambong SWIP WATERSHED AREA: 75.00 HAS.


Bgy. Maglambong, Monreal, Masbate

RNGROUP (1 or 2): 2 ISLAND (Luzon, Visayas,Mindanao): Visayas


REGION NO(6-8): 8 (Make sure that all entries are correct)
DATA ENTRIES OK?: Yes (Please enter YES when no errors are noted in the sheet)

RAINFALL RUNOFF DIRECT BASEFLOW RESERVOIR INFLOW


DECADE Mean COEFFICIENTS RUNOFF
(mm.) RC (mm.) (mm.) (mm.) (m^3)

Jan 1 49.59 0.38 18.84 0.70 19.54 14,658


2 67.62 0.38 25.70 0.70 26.40 19,797
3 82.79 0.38 31.46 0.70 32.16 24,119
Feb 4 29.66 0.28 8.30 0.68 8.98 6,735
5 33.27 0.28 9.32 0.68 9.99 7,495
6 32.07 0.28 8.98 0.68 9.66 7,242
Mar 7 25.36 0.25 6.34 0.66 7.00 5,252
8 31.36 0.25 7.84 0.66 8.50 6,376
9 38.28 0.25 9.57 0.66 10.23 7,673
Apr 10 16.99 0.00 0.00 0.64 0.64 478
11 29.64 0.00 0.00 0.64 0.64 478
12 33.38 0.00 0.00 0.64 0.64 478
May 13 25.05 0.14 3.51 0.62 4.13 3,097
14 40.05 0.14 5.61 0.62 6.23 4,672
15 59.91 0.14 8.39 0.62 9.01 6,757
Jun 16 53.22 0.22 11.71 0.61 12.32 9,237
17 47.95 0.22 10.55 0.61 11.16 8,366
18 58.83 0.22 12.94 0.61 13.55 10,163
Jul 19 50.92 0.30 15.28 0.59 15.87 11,901
20 63.29 0.30 18.99 0.59 19.58 14,685
21 60.78 0.30 18.24 0.59 18.83 14,120
Aug 22 80.64 0.34 27.42 0.58 28.00 21,000
23 67.35 0.34 22.90 0.58 23.48 17,611
24 52.02 0.34 17.69 0.58 18.27 13,703
Sep 25 86.04 0.34 29.25 0.59 29.84 22,383
26 65.09 0.34 22.13 0.59 22.72 17,041
27 38.87 0.34 13.22 0.59 13.81 10,357
Oct 28 52.66 0.51 26.86 0.61 27.46 20,598
29 91.91 0.51 46.88 0.61 47.48 35,612
30 115.43 0.51 58.87 0.61 59.47 44,606
Nov 31 87.31 0.70 61.12 0.65 61.77 46,324
32 120.45 0.70 84.31 0.65 84.96 63,719
33 92.24 0.70 64.57 0.65 65.21 48,910
Dec 34 110.90 0.70 77.63 0.69 78.32 58,741
35 81.57 0.70 57.10 0.69 57.79 43,345
36 107.53 0.70 75.27 0.69 75.96 56,971
TOTAL >>> 2,180.00 916.75 22.85 939.60

M0NTH %BASEFLOWRUNOFF COEFFICIENT LINEAR CURVE FIT


JAN 9.10 0.38
FEB 8.80 0.28 A= 12.52
MAR 8.60 0.25 B= 14.05
APR 8.30 0.00
MAY 8.10 0.14
JUN 7.90 0.22
JUL 7.70 0.30
AUG 7.60 0.34
SEP 7.70 0.34
OCT 7.90 0.51
NOV 8.40 0.70
DEC 9.00 0.70
RESERVOIR CURVE FITTING

Project Name : Maglambong SWIP


Bgy. Maglambong, Monreal, Masbate

Countour Interval 1

CONTOUR AREA AVERAGE INCREMENTAL ACCUMULATED


ELEV. WITHIN AREA VOLUME STORAGE
CONTOUR (sq.m.) (cu.m.) (cu.m.)

97 520.00 0.00 0.00 0 ###


98 1,400.00 960.00 960.00 960 ###
99 2,800.00 2,100.00 2,100.00 3,060 ###
100 4,920.00 3,860.00 3,860.00 6,920 ###
101 7,380.00 6,150.00 6,150.00 13,070 ###
102 11,040.00 9,210.00 9,210.00 22,280 ###
103 15,040.00 13,040.00 13,040.00 35,320 ###
104 19,080.00 17,060.00 17,060.00 52,380 ###
105 27,600.00 23,340.00 23,340.00 75,720 ###
106 34,640.00 31,120.00 31,120.00 106,840 ###
107 42,880.00 38,760.00 38,760.00 145,600 ###
108 47,520.00 45,200.00 45,200.00 190,800 ###
###
###
###
###
###
###
###

C1 = 15,000.00 C2 = 12,000.00
A1 = 49.637910 A2 = 70.536920
B1 = 0.070428 B2 = 0.034985
R1 = 99.18 R2 = 99.34

Drainage Area = 0.75 SQ.KM

Sediment Volume = 17,151.94 6,860.78 (10 years)

Elev. of Sediment 101.07 99.54 (10 years)

DESIGNER'S OPTION Settings: storage


MIN. ELEV: 93.00 , (9,297) cu. m.
MAX Elev: 100.00 , 9,517 cu. m.
Active Storage: 18,814 cu. m.

COMPARISON OF ACTUAL AND FITTED VALUES

ACTUAL FITTED
AREA CAPACITY Fit AREA fit Capa

98 1,400 960 652 78


99 2,800 3,060 3,079 4,145
100 4,920 6,920 5,852 9,517
101 7,380 13,070 9,016 16,596
102 11,040 22,280 12,622 25,898
103 15,040 35,320 16,726 38,087
104 19,080 52,380 21,392 54,018
105 27,600 75,720 26,688 74,787
106 34,640 106,840 32,694 101,794
107 42,880 145,600 39,496 136,826
108 47,520 190,800 47,191 182,158
0 0 (15,000) (12,000)
Elev., meter
Area - Elevation Curve
110

Area-Elevation 105

C 1= 15,000.00 100
R1 sq. = 99.181591236
A1 = 49.63791 95
B1 = 0.07043
90
0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000
Capacity - Elevation Area, sq. meter

C2 = 12,000.00
R2 sq. = 99.338107218
A2 = 70.53692
Elev., meter

B2 = 0.03499 Capacity - Elevation Curve


110
Final Values? (Yes or No): Yes
105
(Pls put Yes when final C-values
are obtained)
100

95

90
0 50,000 100,000 150,000 200,000 250,000
Capacity, cu. meter
RESERVOIR OPERATION STUDIES

PROJECT : Maglambong SWIP


LOCATION: Bgy. Maglambong, Monreal, Masbate
MAKE SURE THAT ALL DEFAULTS IN RAIN, W-BAL, INFLOW & C-FIT IS "YES"

CPATTERN: Paddy Rice - Paddy Rice - Peanut


( 30.00 50.00 10.00 )
NWS ELEV= 106.50 NWS STOR= 118,177 A1= 49.63791 A2= 70.53692
Min ELEV= 104.00 Min STOR= 54,018 B1= 0.070427505 B2= 0.03498521068
Strt ELEV 105.25 Strt STOR 80,891 C1= 15,000.00 C2= 12,000.00
Data Entries OK? Yes (Please enter "Yes" when no errors are noted in the above entries in red)

First Crop: Paddy Rice Area: 30.00 ha


DECADE INFLOW SYSTEM EVAP RATE DEMAND EVAP LOSS TOTAL STORAGE ELEV SPILL SHORTAGE
REQMT RELEASE
i (m.^3) (m.) (m.) (m.^3) (m.^3) (m.^3) (m.^3) (m.) (m.^3) (m.^3)
20 14,685 0.000 0.048 0 1,421 1,421 94,226 105.75 0 0
21 14,120 0.177 0.053 52,965 1,372 54,329 54,018 104.00 0 (1,364)
22 21,000 0.000 0.039 0 931 931 74,087 104.97 0 0
23 17,611 0.132 0.039 39,672 931 37,680 54,018 104.00 0 1,992
24 13,703 0.064 0.043 19,326 918 13,703 54,018 104.00 0 5,623
25 22,383 0.067 0.037 20,244 798 21,042 55,359 104.07 0 0
26 17,041 0.000 0.037 0 880 880 71,520 104.86 0 0
27 10,357 0.082 0.037 24,579 885 25,464 56,413 104.13 0 0
28 20,598 0.067 0.033 20,238 726 20,964 56,047 104.11 0 0
29 35,612 0.000 0.033 0 856 856 90,803 105.62 0 0
30 44,606 0.111 0.036 33,264 1,140 34,404 101,005 105.97 0 0
31 46,324 0.000 0.024 0 821 821 118,177 106.50 28,331 0
32 63,719 0.000 0.024 0 864 864 118,177 106.50 62,855 0
Pre. ELEV= 106.50 Pre. STOR= 118,177
Second Crop: Paddy Rice Area: 50.00
DECADE INFLOW SYSTEM EVAP DEMAND EVAP LOSS TOTAL STORAGE ELEV SPILL SHORTAGE
REQMT RATE RELEASE
i (m.^3) (m.) (m.) (m.^3) (m.^3) (m.^3) (m.^3) (m.) (m.^3) (m.^3)
33 48,910 0.000 0.024 0 864 864 118,177 106.50 0 0
34 58,741 0.000 0.022 0 792 792 118,177 106.50 57,949 0
35 43,345 0.000 0.022 0 792 792 118,177 106.50 42,553 0
36 56,971 0.000 0.024 0 871 871 118,177 106.50 56,100 0
1 14,658 0.000 0.034 0 1,224 1,224 118,177 106.50 13,434 0
2 19,797 0.000 0.034 0 1,224 1,224 118,177 106.50 18,573 0
3 24,119 0.000 0.037 0 1,346 1,346 118,177 106.50 22,773 0
4 6,735 0.000 0.035 0 1,260 1,260 118,177 106.50 5,475 0
5 7,495 0.050 0.035 25,080 1,192 26,272 99,401 105.92 0 0
6 7,242 0.000 0.028 0 920 920 105,723 106.13 0 0
7 5,252 0.078 0.039 39,110 1,148 40,258 70,716 104.82 0 0
8 6,376 0.000 0.039 0 1,027 1,027 76,066 105.05 0 0
9 7,673 0.000 0.043 0 1,190 1,190 82,549 105.32 0 0

Third Crop: Peanut Area: 10.00 ha


Pre. ELEV= 105.32 Pre. STOR= 82,673
DECADE INFLOW SYSTEM EVAP RATE DEMAND EVAP LOSS TOTAL STORAGE ELEV SPILL SHORTAGE
REQMT RELEASE
i (m.^3) (m.) (m.) (m.^3) (m.^3) (m.^3) (m.^3) (m.) (m.^3) (m.^3)
10 478 0.000 0.047 0 1,337 1,337 81,810 105.29 0 0
11 478 0.050 0.047 5,016 1,300 6,316 75,973 105.05 0 0
12 478 0.077 0.047 7,650 1,219 8,869 67,582 104.68 0 0
13 3,097 0.069 0.052 6,874 1,262 8,136 62,542 104.44 0 0
14 4,672 0.076 0.052 7,552 1,202 8,754 58,460 104.24 0 0
15 6,757 0.094 0.057 9,370 1,262 10,632 54,585 104.03 0 0
16 9,237 0.092 0.050 9,236 1,073 9,804 54,018 104.00 0 (568)
17 8,366 0.000 0.050 0 1,117 1,117 61,266 104.38 0 0
18 10,163 0.000 0.050 0 1,222 1,222 70,208 104.80 0 0
19 11,901 0.000 0.048 0 1,288 1,288 80,821 105.25 0 0
RESERVOIR FLOOD ROUTING

TIME INCR: 0.40 SPILLWAY


PROJ : Maglambong SWIP RCF WIDTH: 6.00
Location: Bgy. Maglambong, Monreal, Masbate A2 = 70.53692 CREST EL: 106.50
B2 = 0.0349852107 NWS STO: 118,177
C2 = 12,000.00 NWS+1 STO: 158,040
TIME INFLOW TRIAL EL OUTFLOW CHANGE IN STORAGE COMP EL
Iq Ivol ELt Oq Ovol STORAGE
hr cms. m^3 m. cms. m^3 m^3 m^3 m.

0.00 0.00 0.00 106.5000 0.00 0.00 0.00 118,177 106.5000


0.40 0.00 0.00 106.5000 0.00 0.00 0.00 118,177 106.5000
0.80 0.00 0.00 106.5000 0.00 0.00 0.00 118,177 106.5000
1.20 0.00 0.00 106.5000 0.00 0.00 0.00 118,177 106.5000
1.60 0.16 118.20 106.5032 0.00 1.33 116.87 118,294 106.5033
2.00 0.81 700.42 106.5226 0.03 26.34 674.08 118,968 106.5226
2.40 1.74 1,831.53 106.5699 0.19 161.05 1,670.48 120,639 106.5698
2.80 2.59 3,115.28 106.6417 0.55 528.69 2,586.58 123,225 106.6418
3.20 3.33 4,266.26 106.7260 1.10 1,183.54 3,082.72 126,308 106.7260
3.60 4.13 5,377.08 106.8139 1.80 2,085.50 3,291.58 129,600 106.8138
4.00 5.36 6,835.75 106.9082 2.67 3,214.44 3,621.30 133,221 106.9082
4.40 8.02 9,636.10 107.0315 3.96 4,772.22 4,863.89 138,085 107.0315
4.80 12.13 14,507.31 107.2087 6.10 7,244.23 7,263.08 145,348 107.2086
5.20 13.54 18,476.28 107.3921 8.61 10,594.44 7,881.84 153,230 107.3921
5.60 11.28 17,868.51 107.4910 10.09 13,464.72 4,403.79 157,634 107.4910
6.00 8.34 14,125.76 107.4839 9.98 14,446.35 (320.59) 157,313 107.4839
6.40 6.10 10,395.85 107.4120 8.90 13,595.52 (3,199.67) 154,113 107.4122
6.80 4.23 7,436.90 107.3122 7.48 11,799.54 (4,362.65) 149,751 107.3122
7.20 2.70 4,991.95 107.2010 6.00 9,708.71 (4,716.77) 145,034 107.2011
7.60 1.67 3,146.79 107.0916 4.65 7,670.08 (4,523.29) 140,511 107.0916
8.00 1.03 1,937.41 106.9931 3.54 5,898.54 (3,961.13) 136,550 106.9930
8.40 0.63 1,191.60 106.9093 2.68 4,476.51 (3,284.91) 133,265 106.9094
8.80 0.38 730.59 106.8400 2.03 3,386.99 (2,656.40) 130,608 106.8404
9.20 0.23 443.16 106.7840 1.55 2,573.51 (2,130.35) 128,478 106.7841
9.60 0.13 260.46 106.7381 1.19 1,969.37 (1,708.90) 126,769 106.7384
10.00 0.05 130.41 106.6900 0.85 1,464.90 (1,334.49) 125,435 106.7023
10.40 0.02 53.60 106.6728 0.73 1,138.43 (1,084.83) 124,350 106.6727
10.80 0.01 25.80 106.6400 0.54 914.38 (888.58) 123,461 106.6483
11.20 0.00 11.03 106.6289 0.47 726.28 (715.24) 122,746 106.6286
11.60 0.00 2.86 106.6100 0.37 609.23 (606.37) 122,140 106.6118
12.00 0.00 0.00 106.5800 0.23 435.13 (435.13) 121,704 106.5996
DISCHARGE Q, cms.

0.00 0.00 0
INFLOW-OUTFLOW HYDROGRAPH 0.40 0.00 0.00
16 0.80 0.00 0.00
14 1.20 0.00 0.00
1.60 0.16 0.00
12 2.00 0.81 0.03
10 2.40 1.74 0.19
2.80 2.59 0.55
8 3.20 3.33 1.10
6 3.60 4.13 1.80
4.00 5.36 2.67
4 4.40 8.02 3.96
2 4.80 12.13 6.10
5.20 13.54 8.61
0 5.60 11.28 10.09
0.00
0.40
0.80
1.20
1.60
2.00
2.40
2.80
3.20
3.60
4.00
4.40
4.80
5.20
5.60
6.00
6.40
6.80
7.20
7.60
8.00
8.40
8.80
9.20
9.60
10.00
10.40
10.80
11.20
11.60
12.00
6.00 8.34 9.98
TIME, Hrs. 6.40 6.10 8.90
6.80 4.23 7.48
7.20 2.70 6.00
7.60 1.67 4.65
8.00 1.03 3.54
8.40 0.63 2.68
8.80 0.38 2.03
9.20 0.23 1.55
9.60 0.13 1.19
10.00 0.05 0.85
10.40 0.02 0.73
10.80 0.01 0.54
11.20 0.00 0.47
11.60 0.00 0.37
12.00 0.00 0.23
ENGINEERING DESIGN STUDIES

PROJECT: Maglambong SWIP


LOCATION: Bgy. Maglambong, Monreal, Masbate

A. COMPUTATION OF DAM HEIGHT

1. Creek Bed Elevation, m : 96.00


2. 25 - year Sediment Volume, m^3 : 17,151.00
3. Minimum Storage Elevation, m = 104.00
4. Maximum Active Storage Elevation, m = 106.50
5. Peak Flood Inflow, cms. = 13.54
6. Peak OutFlow, cms. = 10.09
7. Maximum Surcharge Elevation, m = 107.49
8. Wave Run-up, m = 1.00
Fetch Length, km. : 0.30
Wind Velocity, kph : 30.00

9. Preliminary Dam Crest Elevation, m = 108.49


10. Preliminary Dam Height, m. = 12.49
11. Embakment Settlement(5 % of 10) = 0.60
12. Final Dam Crest Elevation, m = 109.09
13. Final Dam Height, m = 13.09
say, 13.00
B. COMPUTATION OF DAM CREST WIDTH

1. Minimum Width for Maintenance, Wo, m. = 4.00


2. W1, m. = 6.03
3. W2, m. = 5.67
4. Final Width, W, m. = 6.00

C. SPILLWAY HYDRAULICS AND DESIGN COMPUTATION

1. Tail Water Elevation (Use Natural


Ground Elevation at End of Basin), m. : 96.00
2. H, m. = 10.50
3. Spillway Width, b, m. : 6.00
4. Jump Height, d2(From Nomograph)
Chute Length, C : 100.00
q, cfs/ft = 18.08
C/H = 9.52
a,(Referring to the Nomograph) = 0.20
d2(From Nomograph), m. : 1.22
5. Depth Before jump, d1, m. = 0.30
6. Froude Number, F = 3.27
7. Use Type IV USBR Stilling Basin
8. Length of Basin, L, m. = 6.00
9. Other Basin Dimension
Chute Blocks
Height, d1, m. = 0.30
Width, w1, m. = 0.30
Spacing, s1, m. = 0.75
No. of Blocks = 6

Baffle Blocks
Height, h3, m. = 0.00
Width, w3, m. = 0.00
Spacing, s3, m. = 0.00
End Sill
Height, h4, m. = 0.38
|::

Distance Between Baffle Blocks and


Chute Blocks = 1.00
10. Channel Freeboard, fc, m. = 0.60
11. Basin Freeboard, fb, m. = 0.60
( For Cantilever Retaining Wall Parameters, refer to Table 5 )

C. DESIGN OF OUTLET WORKS


From Reservoir Operation Studies, select a critical
Demand(Qd) - Head(H) combination. A critical combination would be
a large demand under low head.
1. Demand from ROS, m^3/Decade : 19,836
2. Designed Q, m^3/sec. = 0.023
3. Elevation @ the Outlet : 104.00
4. WS Elev. from ROS, m. : 104.97
5. Available Head, H, m. = 0.97
5. Determine Pipe Diameter using Formula,
Q = (2gH/KL)^1/2
Trial Pipe Diameter, d, m. : 0.20
Pipe Length, L, m. : 36.00
Roughness Coefficient, n : 0.015
Total Coefficient of Loss, KL = 11.42
Qtheoritical, m^3/sec. = 0.041
Qd, m^3/sec. = 0.023
Final Pipe Diameter, d, m. = 0.20
To determine at what head and water level where the designed
Q can still be supplied, we have:

HT(m) WS Elev.(m.) Q(cms.)


2.50 106.50 0.065 ,Qd can be supplied
2.00 106.00 0.058 ,Qd can be supplied
1.50 105.50 0.050 ,Qd can be supplied
1.00 105.00 0.041 ,Qd can be supplied
0.50 104.50 0.029 ,Qd can be supplied
0.00 104.00 0.000 ,Qd can't be supplied

D. DESIGN OF IMPACT TYPE ENERGY DISSIPATOR


1. Hydraulic Head, H, m. = 2.50
2. Pipe Diameter, dt, m. = 0.20
3. Equivalent Opening, ds, m. = 0.18
4. Velocity, Vs, mps. = 7.00
5. Froude Number, F = 5.31
6. Basin Width, W, m. = 1.30
7. Other Basin Dimensions(Refer to
Standard sheet )
H, m. = 1.03
a, m. = 0.22
b, m. = 0.49
e, m. = 0.65
L, m. = 2.40

E. SEEPAGE ANALYSIS AND DESIGN OF TOE DRAIN

1. Trial Height of Toe Drain, ht, m. : 2.00


2. Dam Crest Length, Ldam, m. : 191.00
3. Upstream Slope(Horizontal Component) : 2.75
4. Downstream Slope(Horizontal Component) : 2.50
5. Seepage Length, Lw/o drain, m. = 49.00275
6. Seepage Length, Lw/ drain, m. = 43.00275
7. Yo = 1.11
8. Seepage through embankment, Qe, cms. = 0.000170
9. For Safety, Qdrain must be = 5*Qe = 0.000850
10. Computed Length of drain, Ldrain, m. = 40.80
11. Actual Length of Drain, m.(From Site
Development Plan) : 48.00
13. Yo(with drain) = 1.26
14. Seepage through embankment with drain,
Qew/drain, cms. = 0.000193
15. Seepage through the Drain, Qdrain, cms. = 0.000640
16. Qdrain/Qembankment = 3.32
Therefore, Use 2.00
F. DESIGN OF ANTI-SEEP COLLAR

1. Creep Ratio for Soft Clay = 3.00


2. Length of Pipe, Lt, m. : 36.00
3. Difference in Water Levels, Ht, m. = 2.50
4. Number of Anti-seep Collars, N = 5
5. Depth of Anti-seep Collars, y, m. = 0.40

G. DESIGN OF UPSTREAM SLOPE PROTECTION

1. Diameter of Boulders, dm, m. = 16.00


2. Average Boulder Diameter, dav, m. = 0.20
3. Average Weight of Boulder, Wav. lbs. = 24.00
Note:
40 % of Riprap(Hand-laid) layers should consist of smaller
sizes than the 24 -lb boulders.

H. DESIGN OF MAIN CANAL

1. Design Flow, Q, cms. = 0.023


2. Roughness Coefficient, n : 0.015
3. Bottom width, b, m. : 0.30
4. Side Slope, m : 0.00
5. Canal Bed Gradient, s
Main Canal STA. 0+000 - STAT. 500 : 0.002
:
:
:

STA. 0+000 - STAT. 500


Trial d, m. : 0.150
Actual Qn/s^1/2 = 0.008
Computed Qn/s^1/2 with reference to d = 0.008
Final d, m. = 0.15
Permissible V, mps. : 0.30
Hence, Canal Hydraulic Elements are:
Q, m. = 0.023
n = 0.015
m = 0.00
s = 0.002
b, m. = 0.30
d, m. = 0.15
D, m. = 0.45
V, mps. = 0.51
Lateral B concrete canal
1. Design Flow, Q, cms. : 0.089
2. Roughness Coefficient, n : 0.018
3. Bottom width, b, m. : 0.40
4. Side Slope, m : 0.00
5. Canal Bed Gradient, s
STA. 888 - STAT. 888 +800 : 0.003
: end of main canal
:
:

STA. 888 - STAT. 888 +800


Trial d, m. : 0.30
Actual Qn/s^1/2 = 0.029
Computed Qn/s^1/2 with reference to d = 0.029
Final d, m. = 0.30
Permissible V, mps. : 0.30
Hence, Canal Hydraulic Elements are:
Q, m. = 0.089
n = 0.02
m = 0.00
s = 0.003
b, m. = 0.40
d, m. = 0.30
D, m. = 0.60
V, mps. = 0.74
Farm Canal Right earth
1. Design Flow, Q, cms. : 0.089
2. Roughness Coefficient, n : 0.030
3. Bottom width, b, m. : 0.30
4. Side Slope, m : 1.00
5. Canal Bed Gradient, s
STA. 888+800 - STAT. 888+800+400 : 0.008
:
:
:

STA. 888+800 - STAT. 888+800+400


Trial d, m. : 0.23
Actual Qn/s^1/2 = 0.030
Computed Qn/s^1/2 with reference to d = 0.030
Final d, m. = 0.23
Permissible V, mps. : 0.30
Hence, Canal Hydraulic Elements are:
Q, m. = 0.089
n = 0.03
m = 1.00
s = 0.008
b, m. = 0.30
d, m. = 0.23
D, m. = 0.53
V, mps. = 0.75

Lateral A concrete canal


1. Design Flow, Q, cms. : 0.292
2. Roughness Coefficient, n : 0.018
3. Bottom width, b, m. : 0.70
4. Side Slope, m : 0.00
5. Canal Bed Gradient, s
STA. 888 - STAT. 888+230 : 0.003
:

STA. 888 - STAT. 888+230


Trial d, m. : 0.42
Actual Qn/s^1/2 = 0.096
Computed Qn/s^1/2 with reference to d = 0.097
Final d, m. = 0.42
Permissible V, mps. : 0.30
Hence, Canal Hydraulic Elements are:
Q, m. = 0.292
n = 0.02
m = 0.00
s = 0.003
b, m. = 0.70
d, m. = 0.42
D, m. = 0.72
V, mps. = 1.00

I. DESIGN OF DROP STRUCTURES


Sta. 888+230 Sta 888 + 230 to 248 ( elev. 104.35 and elev. 96.84)
1. Depth of Approach, do, m. : 0.45
2. Velocity of Aproach, vo, mps. = 0.17
3. Height of Drop, h, m. : 7.50
4. Equivalent width @ rectangular section = 0.3
5. Depth before jump, d1
Trial d1, m. : 0.015
Actual vo^2/2g + do + h value = 7.951
Computed vo^2 + do + h w/ reference to d1 = 1.476
Final d1, m. = Try Again
Velocity, v1, mps. = #VALUE!
6. Depth of Jump, d2, m. = #VALUE!
7. Length of Apron, a, m. = #VALUE!

Lateral A concrete canal


1. Design Flow, Q, cms. : 0.292
2. Roughness Coefficient, n : 0.018
3. Bottom width, b, m. : 0.70
4. Side Slope, m : 0.00
5. Canal Bed Gradient, s
STA. 888 - STAT. 888+230 : 0.002
:

STA. 888 - STAT. 888+230


Trial d, m. : 0.49
Actual Qn/s^1/2 = 0.118
Computed Qn/s^1/2 with reference to d = 0.118
Final d, m. = 0.49
Permissible V, mps. : 0.30
Hence, Canal Hydraulic Elements are:
Q, m. = 0.292
n = 0.02
m = 0.00
s = 0.002
b, m. = 0.70
d, m. = 0.49
D, m. = 0.79
V, mps. = 0.86

Lateral A concrete canal


1. Design Flow, Q, cms. : 0.292
2. Roughness Coefficient, n : 0.018
3. Bottom width, b, m. : 0.50
4. Side Slope, m : 0.00
5. Canal Bed Gradient, s
STA. 888 - STAT. 888+230 : 0.003
:

STA. 888 - STAT. 888+230


Trial d, m. : 0.40
Actual Qn/s^1/2 = 0.096
Computed Qn/s^1/2 with reference to d = 0.057
Final d, m. = Try Again
Permissible V, mps. : 0.30
Hence, Canal Hydraulic Elements are:
Q, m. = 0.292
n = 0.02
m = 0.00
s = 0.003
b, m. = 0.50
d, m. = 0.40
D, m. = 0.70
V, mps. = 1.46
end of main canal

You might also like