Objectives
The objective of the present report is
Methods of Pre-stressing
Pre-tensioning
Post-tensioning
Introduction
Pre-tensioning
Post-tensioning
Post-tensioning Systems
Single strand
Single strand
Common geometries*
Two-way system
Suitable span: 12.2 m
Limiting criterion: Deflection
Rebar**: 2.94 kg/m2
PT: 3.87 kg/m2
CONCRETE:
Fc^28 Compressive strength of concrete 28 days.
Fcd Design value for compressive strength on concrete.
0.6 fc^28 = 21 N/MM^2
PRE STRESSING STEEL:
Ap cross sectional area of pj steel 146 mm^2
Fpy yield strength of PT steel 1570 N/MM^2
Fpu characteristic strength of PT steel 1770 N/MM^2
PRE-TENSIONING STEEL:
Ep modulus of elasticity of pre stressing steel 1.95 10^5 N/MM^2
(very low relaxation (3%)
Admissible stressing 0.75 fpu
Reinforcing steel:
Fsy yield strength of reinforcing steel is 460 N/MM^2
Long-term losses (assumed to be 10%)
Details of building
Type of structure: commercial building
- Loadings:
Live load p = 2.5 kN/m2
q = 5.0 kN/m2
Plan showing dimensions
Design
Assumption l/h = 35
Self wt of slab g = yc h
L length of span 8.4
h 0.24 mt
h thickness of slab.
Yc volumetric wt.of concrete 2.5 KN/M^3
g=6KN/M^3
q =5 KN/M^3
(g+q)/g) = 6+5/6 = 1.83 ((g+q) service load
g self wt )
(l/h as a function of (g+q/g))
Transverse direction:
g+q/g = 1.83
k = 0.24 1000/ 7.8 m^225
k = 0.158
on design chart 2 for a k value of 0.158 & (g+q/g) value of 1.83 the value of u/g is found be 1.41
u= 8.46 kn/m^2
P = (ul^2/8hp ) 8.46 7.8^2/( 8 0.167)
P = 3.85 kn/m
On 8.4 mt width p=8.4385
P =3234 kn
Pc 181 kn
No. Of strands Np = p/pl =3234/181 = 17.9
18 mono strands of dia 15mm on 8.4 mt width
On 7.2 mt width np = 7.2/8.4 7.9 = 15.3
16 mono strands of dia 15mm on 7.2 mt width.
Execution
Materials & Equipment
Anchorage Markings
Laying of Tendon
Concrete pouring
Pre stressing
grouting
MATERIALS AND EQUIPMENT
a) FORMWORK
b) CONCRETE
c) STRANDS
d) TENDONS
e) DUCTS
f) ANCHORAGES
g) WEDGES
Formwork
strands
Wedges
POST TENSIONING METHOD
Anchorage marking
Laying of tendons
Concrete pourig
Mix design of M35
Grade of Concrete : M35
Characteristic Strength (Fck) : 35 Mpa
Standard Deviation : 1.91 Mpa*
Target Mean Strength : T.M.S.= Fck +1.65 x S.D.
(from I.S 456-2000) = 35+ 1.651.91
= 38.15 Mpa
Test Data For Material:
Aggregate Type : Crushed
Specific Gravity Cement : 3.15
Coarse Aggregate : 2.67
Fine Aggregate : 2.62
Water Absorption
Coarse Aggregate : 0.5%
Fine Aggregate : 1.0 %
Concrete pouring
Mix Design:
Take Sand content as percentage of total aggregates = 36%
Select Water Cement Ratio = 0.43 for concrete grade M35
Select Water Content = 172 Kg
(From IS: 10262 for 20 mm nominal size of aggregates Maximum Water Content = 186 Kg/m 3 )
Hence, Cement Content= 172 / 0.43 = 400 Kg /m 3
Formula for Mix Proportion of Fine and Coarse Aggregate:
1000(1-a 0 )= {(Cement Content / Sp. Gr. Of Cement) + Water Content +(F a / Sp. Gr.* P f )} 1000(1-
a 0 )= {(Cement Content / Sp. Gr. Of Cement) + Water Content +C a / Sp. Gr.* Pc )}
Where
C a = Coarse Aggregate Content
F a = Fine Aggregate Content
P f = Sand Content as percentage of total Aggregates = 0.36
P c = Coarse Aggregate Content as percentage of total Aggregates.
= 0.64
a 0 = Percentage air content in concrete (As per IS :10262 for 20 mm nominal size of
aggregates air content is 2 %) = 0.02
Hence, 1000(1-0.02) = {(400 /3.15) + 172 +(F a / 2.62 x 0.36)}
Fa = 642 Kg/ Cum
As the sand is of Zone II no adjustment is required for sand.
Sand Content = 642 Kg/ Cum
1000(1-0.02)= {(400 /3.15) + 172 +(C a / 2.67 x 0.64)}
Hence, Ca = 1165 Kg/ Cum
Prestressing jack
Prestressing powerpack
Thinner slabs
Lesser weight