You are on page 1of 6

Date - 6.2.

2009
KAIZEN SHEET TS-16949
Doc. No. - F: MR: 8316 / 02
Area - Plating Tin plater
Kaizen Team Leader - Vivek sanan
Kaizen Team - Deepak bhati,Balraj And team,Suresh
Kaizen Facilitator - Neeraj Gupta

Subject Safety Risk/ loose wiring/Play in machine


Before After

Furnace Front

Furnace Back Furnace Back

SAFETY RISK- Loose Rewired Panels


Wiring in Panels

Radiant Cooler Exit Radiant Cooler Exit

COVERED WITH NEW


JUNCTION BOX
Roller Stand Roller Stand
SAFETY RISK
Date - 6.2.2009
KAIZEN SHEET TS-16949
Doc. No. - F: MR: 8316 / 02
Area - Plating Tin plater
Kaizen Team Leader - Vivek sanan
Kaizen Team - Deepak bhati,Balraj And team,Suresh
Kaizen Facilitator - Neeraj Gupta
Subject Safety Risk/ loose wiring/Play in machine
SAFETY RISK

Radiant Cooler Radiant Cooler

Stacker Stacker

Heater wiring through MCB

Open wiring of
Heaters

Heater box covered with


new designed system

worn out chain rollers New chain rollers


Date - 6.2.2009
KAIZEN SHEET TS-16949
Doc. No. - F: MR: 8316 / 02
Area - Plating Tin plater
Kaizen Team Leader - Vivek sanan
Kaizen Team - Deepak bhati,Balraj And team,Suresh
Kaizen Facilitator - Neeraj Gupta
Subject Safety Risk/ loose wiring/Play in machine

No Light in that area


Provided lights

Rusty/wornout carriers Carrier repaired


& Painted

Safety Safety
risk risk New coverd panel box
fittment
e
After

Furnace Front

Furnace Back

ant Cooler Exit

D WITH NEW
N BOX
e

Radiant Cooler

ng through MCB

x covered with
ned system

ain rollers
e

coverd panel box


ent