You are on page 1of 1

FIELD Quality plan

Sewage Treatment Plants at


Doddabele,Yellamalappachetty
KEC-WATERLEAU QP.No-1
and Intermediate Sewage pumping Station and
(JV) REV.no-0
Pumping Mains at Sadarmangala

PROCTOR'S COMPACTION TEST


(STANDARD PROCTOR) As per IS 2720 (PART 7)

Sample No Lab Ref No.


Source ID Inside Plant Date of Sampling
Loaction of Sampling Date of Test
Mould No : wt. of Mould, W1 (g) : 1966 Volume of mould , V (cc) : 1000
Trial No : I II III IV V VI

wt. of Wet Soil + Mould, W2 (g) 3503 3610 3840 3820 3790 3730
wt. of Wet Soil, W3=(W2-W1) (g) 1539 1644 1874 1854 1774 1784
Wet Density, Yb = W3/V (g/cc) 1.539 1.644 1.874 1.854 1.774 1.784
Container No. 107 105 24 21 12 71
wt. of Container,W5 (g) 45.17 45.87 57.91 56.1 48.95 46.27
wt. of Wet Soil + Cont., W6 (g) 145.2 140.08 160.9 170.2 149.2 150.1
wt. of Dry Soil + Cont.,W7 (g) 135.05 125.8 144.8 152.1 130.2 128.9
wt. of Water, W8=(W6-W7) (g) 10.15 14.28 16.1 18.1 19 21.2
wt. of Dry Soil, W9=(W7-W5) (g) 89.88 79.93 86.89 96 81.25 82.63
Water Content w =W8/W9 (%) 11.29 14.90 16.53 18.85 23.38 25.66
Dry Density Yd = 100x(Yb/100+w) (g/cc) 1.38 1.41 1.50 1.64 1.44 1.42

1.85

1.80
Rammer Wt. : 2.6 kg
1.75
Blows/layer : 25/55 blows
1.70 No. of layers : 3 layers

1.65

1.60
Dry Density

1.55
RESULTS
1.50
MDD = 1.64
1.45 OMC = 18.85%

1.40

1.35

1.30
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00

OMC

Remarks :