You are on page 1of 15

Clearance Form / Phiu Xc nhn Cng vic

Cam Ranh International Passenger Terminal, Cam Ranh International Airport


Nh ga hnh khch quc t Cam Ranh, Sn bay quc t Cam Ranh

Bid Package/Gi Thu


Form No./S phiu:

Location of Ceiling to Be Closed

Level/Zone/Room:..................

Grid Ref:.............................

Specifics:.............................

Ceiling Closed Date:...............

CLEARANCE CONTENT BY CONTRACTOR 1/ NI DUNG CNG VIC CN XC NHN T NH THU 1


BP07A CONTRACTOR / NH THU BP07A

BP07B CONTRACTOR/ NH THU BP07B

BP08 CONTRACTOR/ NH THU BP08

BP21 CONTRACTOR/ NH THU BP21

CRTC Turner
CAM RANH INT'L TERMINAL COMPANY

Clearance Form / Phiu Xc nhn Cng vic


Cam Ranh International Passenger Terminal, Cam Ranh International Airport I

Nh ga hnh khch quc t Cam Ranh, Sn bay quc t Cam Ranh CAM RANH INTL TERMINAL COMPANY

Bid Package/Gi Thu


Form No./S phiu:

BP22 CONTRACTOR/ NH TH U BP22

BP09 CONTRACTOR/ NH TH U BP09

BP03 CONTRACTOR/ NH TH U BP03


BP02B CONTRACTOR/ NH TH U BP02B

Checklist for Works Above Ceilings


Complete (Y/N)

BP07A- Plumbing & Drainage


Installation of Main Header Pipes
Installation of Branch Pipes
Installation of valves & accessories
Labelling of Pipework
Pre-commissioning pressure and leak tests
All Valves are accessible
Exposed Services Painted Black where required.
Mark-up has been provided to show ceiling contactor where access is required for T&C and maintenance.
BP07A- HVAC
Installation of Main Branch Duct
Installation of Main Branch CHW Pipes
Installation of Refrigeration Pipe
Installation of Branch Ducts and droppers / flexible duct
Installation of VCD's
Installation of FD & SD's, drop tests complete where required
Insulation Complete
Labeling of ducts complete
Leakage Testing Complete
All Dampers are accessible
All Dampers are in the open position
Exposed Services Painted Black where required.
Mark-up has been provided to show ceiling contactor where access is required for T&C and maintenance.
Installation of Valves and accessories
Labeling of pipework complete
Pre-Commissioning Pressure Testing Complete
FCU's Installed and ductwork connections made
Fans Installed and ductwork connection made
VAV's installed and Ductwork connection made
VAV controller installed and set to open
Exposed Services Painted Black where required.
Mark-up has been provided to show ceiling contactor where access is required for T&C and maintenance.
1. BP07A- Fire Protection
Installation of Main Sprinkler and Water Throat Pipes
Installation of Branch Sprinkler and Water Throat Pipes
Installation of Branch Pipes and droppers to sprinkler heads
Installation of valves & accessories
Labelling of pipework complete
Pre-Commissioning Pressure Testing Complete
Exposed Services Painted Black where required.
Mark-up has been provided to show ceiling contactor where access is required for T&C and maintenance.
2. BP07A-IBMS, FA and ESC
All main run trunking & cable tray installed
All conduit installed
1 of 3

Checklist for Works Above Ceilings


Complete (Y/N)

Cables Pulled and Installed to source


Cabling installed for IBMS DDC, and to equipment
Cables terminated to equipment above ceiling such as boards, isolators, FCU, FAN, Door contact, motorize damper,
Fire Alarm Conduit and Cabling installed to termination point at ceiling
ESC Conduit and Cabling installed to termination point at ceiling
Exposed Services Painted Black where required.
Mark-up has been provided to show ceiling contactor where access is required for T&C and maintenance.
3. BP07B- Electrical services
All main run trunking & cable tray installed
All conduit installed
Cables Pulled and Installed to source
Cabling installed for lights, small power
Isolator installed for Equipment above ceiling
Cables terminated to equipment above ceiling such as boards, isolators, fused spurs, etc.
Lighting Control Cabling & Systems installed including control boxes
Exposed Services Painted Black where required.
Mark-up has been provided to show ceiling contactor where access is required for T&C and maintenance (Access
4. BP08- ELV-DATA- SECURITY ACS (CCTV, ACS, PA, MSC, SCN, WIFI, PABX, IPTV) & BP23B
Cables Pulled and Installed to source
Cabling installed for CCTV, PA, MSC, WIFI, PABX, IPTV
Cabling installed for ACS
Cabling installed for SCN (Copper cable)
Cabling installed for SCN (fiber cable)
Cabling installed for FIDS
Cables terminated to equipment at DA
Mark-up has been provided to show ceiling contactor where access is required for T&C and maintenance.
5. BP21- SECURITY SCREENING SYSTEM
Cables Pulled and Installed to source (fiber cable)
Cabling installed for security screening equipment
Cables terminated to equipment at control room
Mark-up has been provided to show ceiling contactor where access is required for T&C and maintenance.
6. BP22- BAGGAGE HANDLING SYSTEM
All main run BHS Conveyor & cable tray installed Fire damper and rubber curtain are installed
All conduit installed
Cabling installed for BHS equipment
Cables terminated to equipment at BHS control room
Exposed Services Painted Black where required.
Mark-up has been provided to show ceiling contactor where access is required for T&C and maintenance.
7. Others- All MEP packages

2 of 3

Checklist for Works Above Ceilings


Complete (Y/N)
Services are installed at correct levels and will not impede ceiling installation
All Temporary Pipework / Cabling Removed
All MEP equipment that requires access for maintenance should be no more than 600 mm above ceiling and if not
should be accessible by means of unobstructed access via a method to be demonstrated by contractor
Fire stopping is complete and correctly labelled.
B. BR09- Interior Finishing Works
Complete Black Painted for interior concrete where having ALP1
CMU or Lightweight Wall close to above slab and seal
Supporting for glazing wall or glass door below
ACB wall on top of internal glazing wall
Close and fill opening between Wall and any other system (Not BP09 scope but other package to complete)
Complete GPB around the interface between faade glass and aluminum ceiling; and GPB under Glass Railing
Complete installation for compact partitions supporting and CSB in WCs
Bolt tightening
All other Works above Ceiling level
9. BROS- Structure Steel and Roofing
Complete inspection roof frame
Complete painting on roof frame
Complete raining water pipe
Complete connection Gutter and Below water pipe
Glass steel supporting
10. BP02B- Concrete works
Concrete ceiling inspection done
Concrete expansion join filler and sealant
CXR-BP... -CLF -0001 REV 00 Request Date/Ngy Gi Yu Cu:

Acceptance Chp thun


Accepted/ng Rejected/Khng ng
Signature AND Full name Ch k V H tn

Accepted/ng Rejected/Khng ng
Signature AND Full name Ch k V H tn

Accepted/ng Rejected/Khng ng
Signature AND Full name Ch k V H tn

Accepted/ng Rejected/Khng ng
Signature AND Full name Ch k V H tn

CXR-BP... -CLF -0001 REV 00 Request Date/Ngy Gi Yu Cu:

Accepted/ng Rejected/Khng ng
Signature AND Full name Ch k V H tn

Accepted/ng Rejected/Khng ng
Signature AND Full name Ch k V H tn

Accepted/ng Rejected/Khng ng
Signature AND Full name Ch k V H tn
Accepted/ng Rejected/Khng ng
Signature AND Full name Ch k V H tn

GND Floor
Z-1 Z-2 Z-3

Y Y Y
Y Y Y
N N N
N N N
Y Y Y
N N N
N N N
N N N

Y Y Y
Y Y Y
NA Y NA
N N N
N N N
N N N
Y Y Y
N N N
N N N
N N N
N N N
N N N
N N N
N N N
N N N
N N N
N N N
N Y N
Y Y Y
N N N
N N N
N N N

Y Y Y
Y Y Y
N N N
N N N
N N N
N N N
N N N
N N N

Y Y Y
Y Y Y
GND Floor
Z-1 Z-2 Z-3

Y Y Y
N N N
N N N
Y Y Y
N N N
N N N
N N N

Y Y Y
Y Y Y
Y Y 6-Nov

Y Y 6-Nov
10- Nov 8-Nov 12-Nov
30- Nov 28-Nov 30-Nov
02- Nov 30-Nov 02-Dec

N N N
N N N

Y Y Y
Y Y Y
N N N
Y Y Y
N N N
N N N
N N N
N N N

NA 18-Nov
NA
NA 18-Nov
NA
NA 20-Nov
NA
N N N

31-Dec 31-Dec 31-Dec


31-Dec 31-Dec 31-Dec
31-Dec 31-Dec 31-Dec
31-Dec 31-Dec 31-Dec

N N N
N N N

GND Floor
Z-1 Z-2 Z-3
N N N
N N N
N N N

N N N
....-......-....

....-......-....
1st Floor
Z-4 Z-5 Z-1 Z-2 Z-3 Z-4 Z-5

Y Y Y Y Y Y Y
Y Y Y Y Y Y Y
N N N N N N N
N N N N N N N
Y Y Y Y Y Y Y
N N N N N N N
N N N N N N N
N N N N N N N

Y Y Y Y Y N Y
Y Y Y Y Y Y Y
NA NA NA NA NA NA NA
N N N N N N N
N N N N N N N
N N N N N N N
Y Y N Y Y N N
N N N N N N N
N N N N N N N
N N N N N N N
N N N N N N N
N N N N N N N
N N N N N N N
N N N N N N N
N N N N N N N
N N N N N N N
N N N N N N N
N N Y N Y N N
Y Y Y Y Y N Y
N N N N N N N
N N N N N N N
N N N N N N N

Y Y Y Y Y Y Y
Y Y Y Y Y Y Y
N N N N N N N
N N N N N N N
N N N N N N N
N N N N N N N
N N N N N N N
N N N N N N N

Y Y Y Y Y y Y
Y Y Y Y Y Y Y
1st Floor
Z-4 Z-5 Z-1 Z-2 Z-3 Z-4 Z-5

Y Y Y Y Y Y Y
N N N N N N N
N N N N N N N
Y Y Y Y Y Y Y
N N NA N NA NA NA
N N N N N N N
N N N N N N N

Y Y Y Y Y Y 7-Nov
10-Nov 12-Nov
Y Y Y 10-Nov 12-Nov
8-Nov 10-Nov
Y Y 7-Nov 9-Nov 12-Nov
8-Nov 10-Nov
Y Y 7-Nov 9-Nov 12-Nov
13-Nov 14-Nov 11-Nov 10-Nov 14-Nov 15-Nov 16-Nov
1-Dec 03-Nov 30-Nov 28-Nov 30-Nov 01-Dec 03-Dec
03-Dec 05-Dec 02-Dec 30-Nov 02-Dec 03-Dec 05-Dec

N N N N N N N
N N N N N N N

Y Y Y N N Y Y
N N Y Y N N N
N N N N N N N
Y Y Y N N Y Y
N N N N N N N
N N N N N N N
N N N N N N N
N N N N N N N

NA NA NA NA NA 20-Nov
NA
NA NA NA NA NA 20-Nov
NA
NA NA NA NA NA 20-Nov
NA
N N N N N N N

NA NA NA NA NA 31-Dec 31-Dec

NA NA NA NA NA NA NA
NA NA NA NA NA NA NA
NA NA NA NA NA NA NA
N N N N N N N
N N N N N N N

1st Floor
Z-4 Z-5 Z-1 Z-2 Z-3 Z-4 Z-5
N N N N N N N
N N N N N N N
N N N N N N N

N N N N N N N
2nd Floor Roof
Z-1 Z-2 Z-3 Z-4 Z-5 Z-1 Z-2 Z-3 Z-4 Z-5

N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N

N N N N N
N N N N N
NA NA NA NA NA
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N

N N N N N 5-Nov Y 5-Nov 15-Nov 15-Nov

N N N N N 5-Nov Y 5-Nov 15-Nov 15-Nov

N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N

N N N N N
N N N N N
2nd Floor Roof
Z-1 Z-2 Z-3 Z-4 Z-5 Z-1 Z-2 Z-3 Z-4 Z-5

N N N N N
N N N N N
N N N N N
N N N N N 5-Nov Y 5-Nov 15-Nov 15-Nov

NA NA NA N N
N N N N N
N N N N N

N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N

N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N

NA NA NA 20-Nov 20-Nov

NA NA NA 20-Nov 20-Nov

NA NA NA NA NA
N N N N N

NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
N N N N N
N N N N N

2nd Floor Roof


Z-1 Z-2 Z-3 Z-4 Z-5 Z-1 Z-2 Z-3 Z-4 Z-5
N N N N N
N N N N N
N N N N N

N N N N N