AVANCE DE PROYECTO
FBRICA DE PINTURAS
CATEDRTICO:
INSTRUCTOR: BR.
JULIO LPEZ
ESTUDIANTES:
NDICE
Contenido
INTRODUCCIN ................................................................................................................................... 3
OBJETIVOS ........................................................................................................................................... 4
OBJETIVO GENERAL ......................................................................................................................... 4
OBJETIVOS ESPECFICOS .................................................................................................................. 4
MARCO TERICO ................................................................................................................................. 5
DESARROLLO ....................................................................................................................................... 8
CONTENIDOS PARA ESTE AVANCE .................................................................................................. 8
........................................................................................................................................................... 16
CONCLUSIONES ................................................................................................................................. 33
BIBLIOGRAFA .................................................................................................................................... 34
ANEXOS ............................................................................................................................................. 35
Catlogo de posibles Luminarias: ...................................................................................................... 35
2
Diseo de Fbrica de Pinturas Instalaciones Elctricas I-2017
INTRODUCCIN
El presente avance, abarca el diseo elctrico del local de produccin correspondiente a la fbrica
de pinturas.
La industria de pinturas elabora una amplia gama de productos, entre los cuales destacan las
pinturas en dos categoras clasificadas que pueden ser: como producto de consumo, en Bienes de
Consumo Durables, debido a que tienen un ciclo de vida bastante largo y normalmente sufren
desperfectos y desgastes despus de varios aos de uso; o como bienes industriales, en Productos
para Mantenimiento y Reparacin. Y como las pinturas tienen como propsito proteger todo tipo
de estructuras y superficies as como proporcionar una mayor esttica, deben de estar muy bien
elaboradas y para eso se requiere de una buena maquinaria y de un buen establecimiento.
Sabiendo la importancia de una buena produccin se debe tener en cuenta que hay que utilizar los
recursos necesarios de una manera til para dicha produccin, es por esto que en este reporte se
enfatizar en la excelente distribucin, para ello se har un diseo de luminarias, protecciones de
mquinas y protecciones sobre fallas al momento de la produccin para garantizar que no habrn
perdidas si empezare a fallar la alimentacin principal, ya que antes se ha previsto un generador.
El diseo se acopla a las necesidades para ser perdurable en el espacio y tiempo.
3
Diseo de Fbrica de Pinturas Instalaciones Elctricas I-2017
OBJETIVOS
OBJETIVO GENERAL
OBJETIVOS ESPECFICOS
Investigar sobre diseos elctricos de plantas industriales para hacer una correcta
definicin del sistema a disear por reas especficas de trabajo.
Realizar un diseo confiable que permita en todo momento un desarrollo pleno de la
produccin y garantizar las condiciones elctricas necesarias.
Identificar las principales necesidades en el proceso de produccin de pinturas y optimizar
los recursos sin afectarla.
4
Diseo de Fbrica de Pinturas Instalaciones Elctricas I-2017
MARCO TERICO
Con el fin de dar un panorama ms amplio en el tema de las pinturas, en este captulo se presenta
la explicacin de algunas clasificaciones, materias primas y procesos fundamentales para la
fabricacin del producto. La pintura, es un producto presentado en forma lquida que al ser
aplicado sobre una superficie se transforma por medio de un proceso de curado en una pelcula
slida, plstica y adherente que protege y/o decora dicha extensin. Estas se forman mezclando
pigmento con aglutinante que acta como medio fluido.
Resina. Componente que sufre un proceso de polimerizacin o secado dando lugar a productos
slidos, se puede clasificar como:
Alqudica. Lquido viscoso formado por la reaccin de un grupo de policidos con uno de
polialcoholes modificados con ciertas proporciones de aceite de tipo secante o cido graso. El
producto final debe ser diluido en varsol. Presenta caractersticas importantes tales como la
estabilidad a largos periodos de almacenamiento, y adicionalmente, pueden ser modificada para
proporcionar propiedades que van desde pelculas duras, baja flexibilidad y de secado rpido hasta
pelculas suaves de secado lento, generando economa en tiempo y dinero.
Puede clasificarse segn la relacin del modificante graso dependiendo de su nivel de saturacin o
instauracin de este en la cadena. Tambin se especifican de acuerdo al porcentaje final de
material graso en la resina conocido como longitud o contenido de aceite, por lo cual se pueden
clasificar en corta, media, larga y muy larga.
5
Diseo de Fbrica de Pinturas Instalaciones Elctricas I-2017
Pigmentos. Partculas insolubles dispersas en una pintura, las cuales dan a la pelcula seca
propiedades caractersticas de color y opacidad. Pueden ser de dos tipos:
Inhibidores. Este tipo retarda o previene la corrosin de metales mediante mecanismos qumicos
y/o electroqumicos. El plomo rojo y el cromato de zinc son ejemplos de pigmentos inhibidores.
Cargas. Son materiales minerales inertes micronizados a diferentes mallas. Estas son de gran
importancia debido a su composicin qumica y caractersticas fsicas, dndole propiedades
especificas a la pintura. Para tal fin es necesario conocer algunos criterios especficos de estas
cargas como lo son:
Estructura morfolgica. Define a las cargas por su composicin qumica y determina la geometra
de las partculas. Las cargas laminares en agua tienen una polaridad dielctrica que influye en la
viscosidad de los recubrimientos. La granulometra de las partculas es relevante con respecto a la
mezcla para la homogeneizacin de estas, con el fin de que no pierda sus caractersticas propias.
Las propiedades fsico-qumicas de las cargas poseen cierta influencia en las propiedades de la
pintura.
Vinilos. Tipo de pinturas a base de agua, cuyo formador de pelcula son emulsiones a base de
polmeros vinil acrlicos. Aunque son solubles en agua, una vez secas son resistentes a la misma.
Destaca especialmente por la rapidez del secado.
6
Diseo de Fbrica de Pinturas Instalaciones Elctricas I-2017
Esmaltes. Pinturas de tipo alqudicas que proveen una excelente proteccin al acero estructural
adems de buen brillo, retencin de color y buena durabilidad. A continuacin se presentan los
tipos disponibles.
Esmaltes horneables. El curado de este tipo de pintura se produce por horneo, ideal para
estructuras metlicas. Se debe presentar una reaccin de una resina alqudica con una
nitrogenada y con presencia de calor. Se puede encontrar esmaltes horneables aromticos y
alifticos.
Anticorrosivos. Esmalte a base solvente de acabado mate, diseada para mejorar la resistencia y
durabilidad de los esmaltes sobre las superficies metlicas ferrosas, cuyos pigmentos son: xidos
de zinc, hierro, entre otros.
FASES DE FABRICACIN
Las fases que se siguen en la industria de las pinturas en general siguen el mismo esquema,
considerando similares etapas de proceso para ambos tipos de pinturas.
Estabilizacin. Dependiendo del tipo de pintura el objetivo vara, dado que se busca complementar
la formulacin para obtener una pintura con las caractersticas determinadas y requeridas por el
autor.
EL AIRE
El aire es un gas que envuelve la Tierra y que resulta absolutamente imprescindible para la respiracin de
todos los seres vivos. Est compuesto de una mezcla mecnica de varios gases, prcticamente siempre en
la misma proporcin y en la que destaca el Nitrgeno que es neutro para la vida animal y el Oxgeno, que es
esencial para la vida en todas sus fomas.
La tabla 1.1 muestra la composicin de aires reales, el que puede considerarse limpio y un ejemplo de
aire contaminado.
LA VENTILACIN
Se entiende por ventilacin la sustitucin de una porcin de aire, que se considera indeseable, por otra que
aporta una mejora en pureza, temperatura, humedad, etc.
a) Determinar la funcin a realizar (el calor a disipar, los txicos a diluir, los slidos a transportar, etc.).
CONCEPTOS Y MAGNITUDES
En el movimiento del aire a travs de un conducto distinguiremos, Fig. 2.1:
VENTILACIN INDUSTRIAL
En efecto, en funcin del grado de contaminacin del local se deber aplicar un mayor o menor nmero de
renovaciones/hora de todo el volumen del mismo, segn se observa en la tabla 2.6.
Esta tabla se basa en criterios de Seguridad e Higiene en el trabajo y pretende evitar que los ambientes lleguen a
un grado de contaminacin ambiental que pueda ser perjudicial para los operarios, pero sin partir ni del nmero
de los mismos ni de criterios ms cientficos.
Obsrvese que, a medida que el grado de posible contaminacin del recinto es mayor, aumenta la cantidad de
renovaciones a aplicar, siendo ms dificil determinar con precisin cual es el nmero exacto de renovaciones
para conseguir un ambiente limpio con plenas garantas, por lo que ser la propia experiencia la que nos oriente
en casos como stos, especialmente si se alcanzan niveles de contaminacin importantes.
La tabla anterior puede simplificarse an ms, en base al volumen del recinto a considerar (tabla 2.7) que da
bue- nos resultados con carcter general.
NIVEL SONORO
Con toda seguridad, una cuestin que preocupa a cualquier tcnico ante el proyecto de una instalacin en la
que intervienen ventiladores, es la del ruido que hace un ventilador.
Dado que el ruido existe siempre a nuestro alrededor, quizs lo ms importante sea determinar, no el ruido de
un aparato en s, sino el aumento de molestia que se produce sobre el ruido ya existente al poner en marcha un
ventilador.
El extractor de aire industrial que usaremos en nuestra instalacin ser el modelo THMH 56 4T 1.5.
Cuyas especificaciones estn en la tabla anterior.
Para el sistema de extarccion de aire empezaremos con el calculo de numero ectractores industriales para cada
rea.
Planta:
Volumen de la planta:
= (31)(22)(4.5) = 30693
Numero de extractores:
3
Caudal mximo del extractor: 11400
15 3069
3
= = 3 = 4.04 4
11400
nota: segn los lineamientos de ventilacin industrial y segn la tabla de numero de renovaciones por hora, la
renovacin de una fabrica en general es de 5 10 renovaciones por hora, pero nuestro criterio se basara en
que el numero de renovaciones por hora lo definiremos por el volumen de las zonas de la fabrica que
queremos ventilar.
Resumen de clculos.
resumen de calculo de extractores en la fabrica
ZONAS A VENTILAR LONGITUD ANCHO ALTURA VOLUMEN N. caudal potencia n. de
renovaciones maximo (HP) extractores
por hora
33(1)
= (1000) = 8934
450 30
log10 (234 + 30 + 1)
1CM = 5x10^-4mm^2
8934CM = 4.467mm^2 cuyo dimetro es 2.38mm
aproximando al calibre minimo permitido por la norma se elige el conductor
AWG 2/0 que tiene un dimetro igual a 10.52 mm.
A = 30m B = 42m n = 7 m=8 D = 6m
El conductor se enterrara a 70cm
h = 0.7m d = 0.01052 L = (7*30)+(8*42)=546m
1 62 1 3 5 7 9 11
= ln ( ) + ln ( ) = .
2 16(0.7)(0.01052) 4 6 8 10 12
= 0.65 + (0.172)(7) = .
1 1 1 1 1 1 1
= ( + + + + + ) = .
2(0.7) 6 + 0.7 2(6) 3(6) 4(6) 5(6)
165 + 2000
= = 2156
1
31.51520
= = 4.502
7
40.8032
= = 5.1004
8
. .
= = .
. + .
300 2(2.4)
= (ln ( ) 1) = 107.5057
2 2.4 0.01589 0.5
1 1
= = = 0.0093
107.5057
= 3
1
= = 0.33S
3
0.33
= = = 35.8
0.0093
33(1)
= (200) = 2558
450 30
log10 (234 + 30 + 1)
1CM = 5x10^-4mm^2
2558CM = 1.28mm^2 cuyo dimetro es 1.27mm
aproximando al calibre minimo permitido por la norma se elige el conductor
AWG 2/0 que tiene un dimetro igual a 10.52 mm.
A = 5m B = 5m n = 6 m=6 D = 1m
El conductor se enterrara a 70cm
h = 0.7m d = 0.01052 L = (5*6)+(5*6)=60m
1 12 1 3 5 7 9
= ln ( ) + ln ( ) = .
2 16(0.7)(0.01052) 4 6 8 10
= 0.65 + (0.172)(6) = .
1 1 1 1 1
= ( + + + ) = .
2(0.7) 1 + 0.7 2(1) 3
165 + 2000
= = 2156
1
1 1
= 0.443 300 ( + ) = 24.79
25 60
300 2(2.4)
= (ln ( ) 1) = 107.5057
2 2.4 0.01589 0.5
1 1
= = = 0.0093
107.5057
= 18
1
= = 0.055S
20
0.055
= = = 5.97
0.0093
Recepcin, Oficina del gerente general:
rea: 3mX3.5m
altura: 2.85m
techo claro: 0.5
piso claro: 0.3
paredes claras:0.5
ndice de local:
(3.5)(3)
= = = 0.8
( + ) (2)(3.5 + 3)
factor de utilizacin:
Entonces:
500 3.5 3
= = = .
0.35 0.8
Con lo anterior obtenemos el nmero de luminarias.
18750.0
= = = .
2 3900
Ahora la distribucin:
2x36W LED
2x36W LED
RESUMEN DEL CALCULO DE NUMERO DE LUMINARIAS DEL LOCAL
umero
Longitud( Ancho intensidad P. por n. de de Potencia
LOCALIZACION Altura(m) f.m t(lm) l(lm)
m) (m) (lux) tubo(W) tubos luminari (W)
as
Resepcion y oficina del
3 3.5 2 500 0.8 0.35 0.8 18750 36 2 3900 2 144
gerente general
BAOS 2 1.5 2.85 500 0.85 0.3675 0.8 5102 36 2 3900 1 72
area de contabilidad y
4.5 3 2 500 0.9 0.385 0.8 21916 36 3 3900 2 216
area de ventas
sala de reuniones 3 4 2 500 0.85 0.3675 0.8 20408 36 3 3900 2 216
gerente de planta y
3 2.5 2 500 0.68 0.314 0.8 14928 36 2 3900 2 144
gerente de compra
control de calidad 6 4 2 500 1.12 0.4392 0.8 34153 36 2 3900 4 288
Almacen de materia
15 8 3.15 500 1.66 0.4964 0.8 151088 36 4 3900 9 1296
prima
Area de producto
25 6 3.65 500 1.46 0.469 0.8 147761 36 3 3900 16 1728
terminado
cuarto de bomba de agua 5 5 2.15 500 1.16 0.4456 0.8 35065 36 2 3900 4 288
planta 33 21.64 3.65 500 3.58 0.5558 0.8 803032 180 1 25000 32 5760
planta de tratamineto de
5 10 3.65 500 0.9 0.385 0.8 81169 36 3 3900 7 756
aguas residuales
taller de mantenimiento 5 6 3.65 500 0.8 0.35 0.8 53571 36 3 3900 5 540
cuarto de control 3 5 3.65 500 0.68 0.4852 0.8 19322 36 3 3900 2 216
BAOS PLANTA 500 36 3 3900 1 108
area libre 9.5 11.5 3.65 400 1.46 0.4852 0.8 112582 36 4 3900 7 1296
Area de cargas 36 2 3900 4 288
P 13212
Diseo de Fbrica de Pinturas Instalaciones Elctricas I-2017
PRESUPUESTO
OBRAS ELECTRICAS
UNI
No PARTIDAS CANTIDAD P.U. SUB TOTAL TOTAL
D.
1.0 AREA DE OFICINAS
$3,981.50
1.1 ILUMINACIN
Suministro e instalacin de tubos LED de 2X36 W
a 120 voltios, en los cuerpos existentes de las
luminarias, incluir alambrado, canalizacion,
1.1.1 16 c/u US$ 65.00 $1,040.00
accesorios, cambio soportes media luna y de
difusor acrilico, polarizacin de carcaza con
terminal de ojo, incluye costos de importacion.
Suministro e instalacin de tubos LED de 3X36 W
a 120 voltios, en los cuerpos existentes de las
luminarias, incluir alambrado, canalizacion,
accesorios, cambio soportes media luna y de
1.1.2 6 c/u US$ 78.00 $468.00
difusor plstico blanco cuadriculado tipo rejilla,
polarizacin de carcaza con terminal de ojo y sus
respectivos tornillos y anclas, incluye costos de
importacion.
Cambio de interruptor doble exsitente por
interruptores de palanca doble con terminal
conexin a tierra AFCI GFCI 15A, 120/277 V, 4
switch GFCI para areas humedas y el resto AFCI
de uso normar carcaza termo plstica resistente
1.1.3 9 c/u US$ 44.00 $396.00
de alto impacto, placas de acero inoxidable en
caja rectangular plstica 4"x2" AMANCO similares
a Leviton o PASS AND SEYMOUR, canalizacion,
alambrado, conectores y sus respectivos tornillos
y anclas, incluyen costos de inportacion.
Suministro e Instalacin de placas ciegas acero
1.1.4 inoxidable en cajas de tomas fuera de operacin 1 c/u US$ 1.50 $1.50
a desmontar.
1.2 TOMACORRIENTES
Suministro e Instalacin de Tomacorriente doble
polarizado, 20 amp/125 voltios, placa plstica
color BLANCO, con supresor de picos LEVITON
T5380-W, o equivalente, con luz indicadora, filtro
de ruido EMI/RFI, MCOV 150 Vrms, 720 Joules,
1.2.1 18 KAmp. L-N, 9 KAmp L-G, 9 KAmp G-N. o 36 c/u US$ 35.00 $1,260.00
equivalente. en caja plstica AMANCO
rectangular 4"x2" , incluye alambrado, rezane en
pared, pintado, canalizacin y polarizacin. Una
toma es dedicada para proyector en cielo falso,
incluyen precios de importacion.
1.3 AIRE ACONDICIONADO
alimentacion especial para AC 60,000BTU piso
techo y termico 20A/2polos, incluye
1.3.1 2 c/u US$ 33.00 $66.00
canalizacion, caja NEMA 3R con proteccion para
interperie, cableado y sus respectivos conectores.
1.4 TABLEROS Y CAJAS
Suministro e Instalacin de Supresor de
Transitorios de Sobre Voltaje 240/120 voltios,
US$
1.4..1 Clase B, monofsico 80 K Amperios, montado a la 1 c/u $750.00
750.00
par de Tablero Elctrico con su proteccin
trmica 30A/2polos.
2 alimentacion trifasica en area de produccion
$39,780.00
sistema de alimentacion trifasica a 480V, incluye
2.1 canalizacion, cableado, conectores accesorios y
conectores
sistema de alimentacion para la maquinaria a US$
2.1.1 23 c/u $15,410.00
480V, incluye canalizacion, cableado y accesorios. 670.00
sistema de subtableros trifasicos para la
US$
2.1.2 maquinaria, incluye accesorios, canalizacion y 3 c/u $7,650.00
2,550.00
accesorios
sistema de subtableros trifasicos con barras
US$
2.1.3 alimentadoras y main modificado a 300A, para la 2 c/u $5,400.00
2,700.00
maquinaria, incluye accesorios y canalizacion
Panel de control general 480V, con barras
alimentadoras de 1200A y main de 1200A, 3x3m,
incluye interruptores termomagneticos 40-250A
US$
2.1.4 NSX 250-3P marca Schneider Electric, 1 c/u $11,320.00
11,320.00
Canalizacion alimentadora subterranea a una
profundidad de 500mm, incluye accesorios y
pozo de registro.
3 Planta (zonas 10, 11, 12, 15 y 19)
$29,168.00
3.1 ILUMINACIN
Suministro e Instalacin de LuminariaLED de
altura, 120 V, tubo led tipo luz de da, de
empotrar en cielo falso, difusor plstico blanco
cuadriculado, tipo rejilla, incluye alambrado,
polarizacin con conductor chaqueta aislante US$
3.1.1 32 c/u $9,680.00
verde y terminal de ojo, canalizacin a 302.50
interruptores con contacto a tierra polarizado de
15A, 120/277V y placa de acero inoxidable en
caja rectangular 4x2 plstica AMANCO, incluye
picado, rezane y pintado de paredes.
3.2 TOMACORRIENTES
Suministro e Instalacin de Tomacorriente doble
polarizado, 20 amp/125 voltios, placa plstica
color BLANCO, con supresor de picos LEVITON
T5380-W, o equivalente, con luz indicadora, filtro
de ruido EMI/RFI, MCOV 150 Vrms, 720 Joules,
US$
3.2.1 18 KAmp. L-N, 9 KAmp L-G, 9 KAmp G-N. o 11 c/u $1,408.00
128.00
equivalente. en caja plstica AMANCO
rectangular 4"x2" , incluye alambrado, rezane en
pared, pintado, canalizacin y polarizacin. Una
toma es dedicada para proyector en cielo falso,
incluyen precios de importacion.
suministro e instalacion de tomacorrientes
US$
3.2.2 especiales a 240V, incluye canalizacion y 14 c/u $2,680.00
120.00
cableado, caja nema 3R y accesorios
3.3 TABLERO Y CAJAS
Suministro e Instalacin de Sub Tablero
monofsico area industrial, de 24 espacios,
barras de 200 A, 120/240 V, MAIN de 200A/2P,
incluye: balanceo de cargas, polarizacin,
US$
3.3.1 envietado y protecciones termomagnticas, 4 c/u $2,800.00
700.00
instalar en el area industrial e incorporar el
alumbrado a dicho tablero, incluye coneccion con
tuberia IMC canalizacion IMC y la caja de
distribucion metalica 5x5
3.4 VENTILACION
Suministro e instalacion de Extractores de aire
industruales monofasicos trifilar a 220V, 1.5HP,
cuyo caudal maximo de aire es de 11400 m^3/h,
incluye canalizacion, alambrado, traga aire en las US$
3.4.1 16 c/u $12,600.00
paredes y accesorios, tambien incluye un 725.00
controlador programable digital FPGA para que
trabajen por partes distintas en el dia y en la
noche.
4 SUBESTACIN
$55,700.00
Banco de transformadores monofasicos
Y/dn 21KV/480 voltios de 750 KVA, incluye
sus respectivos aisladores de recina epoxica
23KV, pararrayos, cortacircuito, red de
4.1 1 S.G. $22,000.0 $22,000.00
tierra con al menos 36 barras de 5/8 por 0
2.4m, unidas con cable AWG 2/0 hasta
obtener menos de 3 Ohms de resistencia a
tierra, emplear soldadura exotrmica.
Tramo de 70 metros de lnea primaria, 3
fase ms neutro, ACSR 1/0 areo, en postes
de 35 pies, uno de concreto y el otro
metlico, separados dos metros del tapial
existente, incluye dos retenidas, estructura
4.2 de remate corrido con cortacircuito en 1 S.G. $2,500.00 $2,500.00
poste de entrega #1, y estructura de remate
una fase ms neutra en poste #2, dejar
espacio para retenida. Incluye la poda,
retiro y desalojo que sea necesaria para los
libramientos requeridos por la normativa.
Trmites, factibilidad de servicio y pagos en
DEUSEM y/o Organismo de Inspeccin para
4.3 la conexin del punto de entrega al 1 S.G. $2,000.00 $2,000.00
transformador, planos, medidor y dems
cargos.
Supresor de 100 Kamp trifasico 240/120 V a
4.4 1 u $1,000.00 $1,000.00
instalar en TG
transfoormador seco trifasico de 75KVA
480/240V incluye red de tierra con al
menos 6 barillas de 5/8" y 2.4 m de longitud
4.5 1 S.G. $3,200.00 $3,200.00
unidas con cable AWG 2/0 hasta obtener al
menosde 18 ohms de resistenciaa tierra,
emplear soldadura exotermica
suministro e instalacion de generador
4.6 trifasico de 100KVA con su respectivo 1 u $25,000.0 $25,000.00
interruptor de transferencia t accesorios 0
5 MANO DE OBRA
$80,800.00
se mando un equipo de 20 electricistas con
supervision y 10 ayudantes capacitados, se les
5.1 120.00 dias $25.00 $78,000.00
dio hrramientas, equipo y equipo de seguridad
para la ejecucion.(ejecusion de 120 dias habiles)
gastos adminisrativos de la empresa contratista,
con un personal de 3 personas encargadas de sema
5.2 1.00 $75.00 $1,200.00
transacciones, de distribucion de pagos, nales
administracion de recursos, etc.
sema
5.3 asesoria de profesiones encargados del proyecto 1.00 $100.00 $1,600.00
nales
OBRA ELECTRICA $209,429.50
Beneficio de US$
la obra 25% Total 52,357.38
Tener en cuenta los tipos de materiales a utilizar para no cometer un error en el diseo y
posteriormente en la instalacin de ellos.
http://quieroapuntes.com/fabricas-de-pinturas.html
https://orff.uc3m.es/bitstream/handle/10016/8056/PFC_JoseManuel_Sanchez_Lahuerta.pdf
http://controlluminicoeinstalaciones.blogspot.com/2010/09/planos-de-instalaciones-
electricas.html
www.ledelsalvador.com
www.vidr.com