You are on page 1of 5

PVSYST V6.

43 21/02/17 Page 1/5

Grid-Connected System: Simulation parameters

Project : Grid-Connected Project at Sinodiya


Geographical Site
Situation Latitude 26.9N Longitude 74.9E
Time defined as Legal Time Time zone UT+5.5 Altitude 366 m
Albedo 0.20
Meteo data: Sinodiya Meteonorm 7.1 (2001-2010), Sat=100% - Synthetic

Simulation variant : New simulation variant


Simulation date 21/02/17 22h59
Simulation for the first year of operation

Simulation parameters
Collector Plane Orientation Tilt 28 Azimuth 0
20 Sheds Pitch 6.60 m Collector width 3.00 m
Inactive band Top 0.00 m Bottom 0.00 m
Shading limit angle Gamma 19.62 Occupation Ratio 45.5 %
Shadings electrical effect Cell size 15.6cm Strings in width 1

Models used Transposition Perez Diffuse Perez, Meteonorm


Horizon Free Horizon
Near Shadings Mutual shadings of sheds Electrical effect

PV Array Characteristics
PV module Si-poly Model CS6X - 320P
Original PVsyst database Manufacturer Canadian Solar Inc.
Number of PV modules In series 19 modules In parallel 691 strings
Total number of PV modules Nb. modules 13129 Unit Nom. Power 320 Wp
Array global power Nominal (STC) 4201 kWp At operating cond. 3745 kWp (50C)
Array operating characteristics (50C) U mpp 618 V I mpp 6057 A
Total area Module area 25192 m Cell area 23008 m

Inverter Model PVS800-57-0500kW-A


Original PVsyst database Manufacturer ABB
Characteristics Operating Voltage 450-825 V Unit Nom. Power 500 kWac
Inverter pack Nb. of inverters 7 units Total Power 3500 kWac

PV Array loss factors


Array Soiling Losses Loss Fraction 3.0 %
Thermal Loss factor Uc (const) 29.0 W/mK Uv (wind) 0.0 W/mK / m/s
Wiring Ohmic Loss Global array res. 1.7 mOhm Loss Fraction 1.5 % at STC
Serie Diode Loss Voltage Drop 0.7 V Loss Fraction 0.1 % at STC
LID - Light Induced Degradation Loss Fraction 2.0 %
Module Quality Loss Loss Fraction -0.4 %
Module Mismatch Losses Loss Fraction 1.0 % at MPP
Module average degradation Year no 1 Loss factor 0.4 %/year
Mismatch due to degradation Imp dispersion RMS 0.4 %/year Voc dispersion RMS 0.4 %/year
Incidence effect, ASHRAE parametrization IAM = 1 - bo (1/cos i - 1) bo Param. 0.05
PVSYST V6.43 21/02/17 Page 2/5

Grid-Connected System: Simulation parameters (continued)

System loss factors


AC loss, transfo to injection Grid Voltage 33 kV
Wires: 3x185.0 mm 4000 m Loss Fraction 0.2 % at STC
External transformer Iron loss (24H connexion) 4101 W Loss Fraction 0.1 % at STC
Resistive/Inductive losses 2655.6 mOhm Loss Fraction 1.0 % at STC
Unavailability of the system 7.3 days, 3 periods Time fraction 2.0 %

User's needs : Unlimited load (grid)


PVSYST V6.43 21/02/17 Page 3/5

Grid-Connected System: Main results


Project : Grid-Connected Project at Sinodiya
Simulation variant : New simulation variant
Simulation for the first year of operation

Main system parameters System type Grid-Connected


PV Field Orientation Sheds disposition, tilt 28 azimuth 0
PV modules Model CS6X - 320P Pnom 320 Wp
PV Array Nb. of modules 13129 Pnom total 4201 kWp
Inverter Model PVS800-57-0500kW-A Pnom 500 kW ac
Inverter pack Nb. of units 7.0 Pnom total 3500 kW ac
User's needs Unlimited load (grid)

Main simulation results


System Production Produced Energy 7228 MWh/year Specific prod. 1720 kWh/kWp/year
Performance Ratio PR 77.3 %

Normalized productions (per installed kWp): Nominal power 4201 kWp Performance Ratio PR
8 1.0
PR : Performance Ratio (Yf / Yr) : 0.773
Lc : Collection Loss (PV-array losses) 1.23 kWh/kWp/day
Ls : System Loss (inverter, ...) 0.15 kWh/kWp/day
7 Yf : Produced useful energy (inverter output) 4.71 kWh/kWp/day

0.8
6
Normalized Energy [kWh/kWp/day]

5
Performance Ratio PR

0.6

0.4
3

2
0.2

0 0.0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

New simulation variant


Balances and main results

GlobHor T Amb GlobInc GlobEff EArray E_Grid EffArrR EffSysR


kWh/m C kWh/m kWh/m MWh MWh % %
January 128.7 15.57 183.5 171.3 650.2 629.1 14.07 13.61
February 146.5 19.18 191.3 178.9 663.4 642.1 13.76 13.32
March 190.4 25.35 218.4 202.7 730.4 707.9 13.27 12.87
April 208.1 30.39 212.4 196.3 690.9 669.5 12.91 12.51
May 215.7 34.07 199.5 182.3 639.5 620.1 12.73 12.34
June 190.0 32.57 171.2 155.3 556.0 539.1 12.89 12.50
July 174.0 30.25 159.2 144.0 524.6 508.0 13.08 12.66
August 156.0 28.78 152.2 138.3 504.9 488.3 13.16 12.73
September 171.3 29.01 185.6 170.8 613.6 594.8 13.12 12.72
October 163.7 27.35 201.7 187.4 671.8 651.1 13.22 12.81
November 125.3 21.78 171.8 159.7 588.2 569.5 13.59 13.16
December 121.3 17.44 178.4 166.6 628.5 608.4 13.99 13.54

Year 1991.0 26.01 2225.3 2053.8 7462.1 7227.7 13.31 12.89

Legends: GlobHor Horizontal global irradiation EArray Effective energy at the output of the array
T Amb Ambient Temperature E_Grid Energy injected into grid
GlobInc Global incident in coll. plane EffArrR Effic. Eout array / rough area
GlobEff Effective Global, corr. for IAM and shadings EffSysR Effic. Eout system / rough area
PVSYST V6.43 21/02/17 Page 4/5

Grid-Connected System: Loss diagram


Project : Grid-Connected Project at Sinodiya
Simulation variant : New simulation variant
Simulation for the first year of operation

Main system parameters System type Grid-Connected


PV Field Orientation Sheds disposition, tilt 28 azimuth 0
PV modules Model CS6X - 320P Pnom 320 Wp
PV Array Nb. of modules 13129 Pnom total 4201 kWp
Inverter Model PVS800-57-0500kW-A Pnom 500 kW ac
Inverter pack Nb. of units 7.0 Pnom total 3500 kW ac
User's needs Unlimited load (grid)

Loss diagram over the whole year

1991 kWh/m Horizontal global irradiation


+11.8% Global incident in coll. plane

-2.5% Near Shadings: irradiance loss


-2.4% IAM factor on global
-3.0% Soiling loss factor

2054 kWh/m * 25192 m coll. Effective irradiance on collectors


efficiency at STC = 16.67% PV conversion

8623 MWh Array nominal energy (at STC effic.)


-0.2% Module Degradation loss (for year #1)
-0.1% PV loss due to irradiance level

-9.7% PV loss due to temperature

-0.1% Shadings: Electrical Loss , sheds1 strings in width


+0.4% Module quality loss

-2.0% LID - Light induced degradation


-1.0% Module array mismatch loss
-1.2% Ohmic wiring loss
7462 MWh Array virtual energy at MPP

-2.0% Inverter Loss during operation (efficiency)


0.0% Inverter Loss over nominal inv. power
0.0% Inverter Loss due to power threshold
0.0% Inverter Loss over nominal inv. voltage
0.0% Inverter Loss due to voltage threshold
7312 MWh Available Energy at Inverter Output

0.0% System unavailability


-0.1% AC ohmic loss
-1.1% External transfo loss

7228 MWh Energy injected into grid


PVSYST V6.43 21/02/17 Page 5/5

Grid-Connected System: P50 - P90 evaluation


Project : Grid-Connected Project at Sinodiya
Simulation variant : New simulation variant
Simulation for the first year of operation

Main system parameters System type Grid-Connected


PV Field Orientation Sheds disposition, tilt 28 azimuth 0
PV modules Model CS6X - 320P Pnom 320 Wp
PV Array Nb. of modules 13129 Pnom total 4201 kWp
Inverter Model PVS800-57-0500kW-A Pnom 500 kW ac
Inverter pack Nb. of units 7.0 Pnom total 3500 kW ac
User's needs Unlimited load (grid)

Evaluation of the Production probability forecast


The probability distribution of the system production forecast for different years is mainly dependent
on the meteo data used for the simulation, and depends on the following choices:
Meteo data source Meteonorm 7.1 (2001-2010), Sat=100%
Meteo data Kind Not defined Year 1995
Specified Deviation Year deviation from aver. 3%
Year-to-year variability Variance 2.5 %

The probability distribution variance is also depending on some system parameters uncertainties
Specified Deviation PV module modelling/parameters 2.0 %
Inverter efficiency uncertainty 0.5 %
Soiling and mismatch uncertainties 1.0 %
Degradation uncertainty 1.0 %
Global variability (meteo + system) Variance 3.5 % (quadratic sum)

Annual production probability Variability 256 MWh


P50 7228 MWh
P90 6900 MWh
P75 7055 MWh

Probability distribution
0.50
0.45
P50 = 7228 MWh
0.40 E_Grid simul = 7228 MWh
0.35
P75 = 7055 MWh
Probability

0.30
0.25
0.20
P90 = 6900 MWh
0.15
0.10
0.05
0.00
6400 6600 6800 7000 7200 7400 7600 7800 8000
E_Grid system production MWh

You might also like