You are on page 1of 8

Block C

Concrete Abstract UOM QTY


M10
P c c Footing Cum 64.902
64.90
R c c Footing Cum
402.71
Pedestal concrete Cum 72.25
Column Upto Plinth Beam Cum 145.00
plinth beam P c c Cum 45.77 45.77

plinth beam R c c Cum 305.10


Damp proof course Cum 38.84
Ground floor slab Cum 836.15
Column GF-FF Cum 113.40
First floor slab Cum 692.64
Column FF-SF Cum 113.40
Second floor slab Cum 701.12
Column 2ndF -3rd F Cum 113.40
Third floor slab Cum 875.58
Column 3rd F- Terrace Cum 113.40
Terrace Slab Cum 780.53
Column Above Terrace Cum
OHT Cum
LMR Cum
TOTAL 5414.20

Blockwork Abstract AAC 200mm thick

Ground floor 191.88 46.8762


First floor 192.29 40.0713
Second floor 149.47 53.7923
Third floor 139.63 51.925
Terrace floor 90.873 50.318
TOTAL 764.14 242.98
Plastering- Abstract Wall

Ground floor 3771.87 2287.59


First floor 4155.82 2369.45
Second floor 2547.40 1479.57
Third floor 2571.24 1503.41
Above Terrace
Total 13046.33 7640.02
Painting Ceiling OBD
Ground floor 1210.092 483.307
First floor 1256.33 529.545
Second floor 837.475 110.69
Third floor 828.2275 101.4425
Above Terrace

Total 4132.1245 1224.9845


Painting Wall OBD
Ground floor 1470.55 775.46
First floor 932.133 833.685
Second floor 1078.11 413.80
Third floor 1068.86 404.56
Above Terrace

Total 4549.648 2427.5025


Flooring Ceramic tiles
Ground floor flooring 1443.53 511.4075
First floor flooring 1689.05 533.67
Second floor flooring 1054.215 423.33
Third floor flooring 1010.1925 410.3775

Total 5196.99 1878.79


M20 M25 M30

402.7148

72.252

305.1008

Solid Solid
AAC 100mm thick Solid block 200mm block block
100mm 150mm

19.4283 111.600745 5.589 8.3835


19.4283 111.600745 5.589 8.3835
19.4283 111.600745 5.589 8.3835
8.0415 66.908896 4.68875 8.066625
39.171 0.692 0.692
105.50 402.40 22.15 33.22
Ceiling
1484.28
1786.37
1067.83
1067.83

5406.31
Emulsion
726.785
726.785
726.785
726.785

2907.14
Emulsion
695.09
932.133
664.30
664.30

2955.8305
IPS flooring
932.1225
1155.382
630.885
599.815

3318.20
Block C
Concrete Abstract UOM QTY
M10
P c c Footing Cum 74.384
74.38
R c c Footing Cum
402.71
Pedestal concrete Cum 72.25
Column Upto Plinth Beam Cum 145.00
plinth beam P c c Cum 45.77 45.77

plinth beam R c c Cum 305.10


Damp proof course Cum 38.84
Ground floor slab Cum 836.15
Column GF-FF Cum 113.40
First floor slab Cum 692.64
Column FF-SF Cum 113.40
Second floor slab Cum 701.12
Column 2ndF -3rd F Cum 113.40
Third floor slab Cum 875.58
Column 3rd F- Terrace Cum 113.40
Terrace Slab Cum 780.53
Column Above Terrace Cum
OHT Cum
LMR Cum
TOTAL 5423.68

Blockwork Abstract AAC 200mm thick

Ground floor 191.88 46.8762


First floor 192.29 40.0713
Second floor 149.47 53.7923
Third floor 139.63 51.925
Terrace floor 90.873 50.318
TOTAL 764.14 242.98
Plastering- Abstract Wall

Ground floor 3771.87 2287.59


First floor 4155.82 2369.45
Second floor 2547.40 1479.57
Third floor 2571.24 1503.41
Above Terrace
Total 13046.33 7640.02
Painting Ceiling OBD
Ground floor 1210.092 483.307
First floor 1256.33 529.545
Second floor 837.475 110.69
Third floor 828.2275 101.4425
Above Terrace

Total 4132.1245 1224.9845


Painting Wall OBD
Ground floor 1470.55 775.46
First floor 932.133 833.685
Second floor 1078.11 413.80
Third floor 1068.86 404.56
Above Terrace

Total 4549.648 2427.5025


Flooring Ceramic tiles
Ground floor flooring 1443.53 511.4075
First floor flooring 1689.05 533.67
Second floor flooring 1054.215 423.33
Third floor flooring 1010.1925 410.3775

Total 5196.99 1878.79


M20 M25 M30

402.7148

72.252

305.1008

Solid Solid
AAC 100mm thick Solid block 200mm block block
100mm 150mm

19.4283 111.600745 5.589 8.3835


19.4283 111.600745 5.589 8.3835
19.4283 111.600745 5.589 8.3835
8.0415 66.908896 4.68875 8.066625
39.171 0.692 0.692
105.50 402.40 22.15 33.22
Ceiling
1484.28
1786.37
1067.83
1067.83

5406.31
Emulsion
726.785
726.785
726.785
726.785

2907.14
Emulsion
695.09
932.133
664.30
664.30

2955.8305
IPS flooring
932.1225
1155.382
630.885
599.815

3318.20