GROUP MEMBERS:
improves coordination
prunes redundant data
among departments
2. Subcontractor Comparison
user to compare with the subcontractors - enables them to visualise their measurement in 3D,
information. leveraging the latest developments in automated take-off.
- allow the user have better view and make - helps users to visualize and understand the drawing have
comparison with one another about the cost and a general idea of the building before build.
quality.
Limitations :
3. Virus Attack
1. Permanently deleted
The job file that had been created in When no anti-virus was installed, the virus can
Buildsoft will be permanently deleted attack the computer system and also all the
when doing the amendment on the existing content of the computer.
2. Typing errors
data.
This software has not created to check or
identify the typing errors like numbers or
figure that already type in.
Cubicost Glodon
Cost
- Extremely costly to own Cubicost
license and installed in a QS firm.
- Fees will be incurred when users which
to update.
Summary & Recommendations
Feature Glodon Cost X Buildsoft Cubit Vico Office
3D Model
Visualization
Simplicity
Auto-revisioning
Able to read
different types of
drawings
Part B
Compare benefits and constraints of Building Information Modelling (BIM), CAD
Measurement and Manual Measurement in each stage.
Briefing/
Preparation Stage
Building Information Modelling (BIM)
BENEFITS CONSTRAINTS
Cost Experience
- Does not require purchasing of - Cost plan is required to be produced
software - Need experience to produce cost
- Only require printing, which is cheap plan
Training
- Software requires training and fresh
graduates are usually more well
versed in manual measurement
Design Stage
Building Information Modelling (BIM)
BENEFITS CONSTRAINTS
Changes
- In this stage, there can be many
changes
- Hard to make changes in calculating
and could miss out certain elements
Limitation
- Could take time due to human
limitations
Pre-construction
Stage
Building Information Modelling (BIM)
BENEFITS CONSTRAINTS
Time Saving
- Simplify the process of measurement
and pricing as it features an automatic
quantity taking off and cost estimation.
Computer-Aided Design
BENEFITS CONSTRAINTS
Data managing
- Able to manage data effectively by
categorizing it into two categories :
a. Graphic
b. Non-graphic
Manual Measurement
BENEFITS CONSTRAINTS
Waste Reduction
- Quantities extracted are very
accurate.
- Reduces waste of storage space and
labour cost.
Computer-Aided Design
BENEFITS CONSTRAINTS
Error Identification
- Hard to spot error as there is no tools
Information
- Does not provide much information,
like 5D, 6D
Other Stage
Building Information Modelling (BIM)
BENEFITS CONSTRAINTS
BENEFITS CONSTRAINTS
Commonly usable
- CAD files can be read in a variety of
software in the market today
- Most of them provide free file readers
- ( Very convenient)
Manual Measurement
BENEFITS CONSTRAINTS
Experience Time
- Easy to understand - Time is needed to scan and print
- Does not require much copies
experience/knowledge
Information
- No information generated like BIM