You are on page 1of 2
s tech JC-TECH CONSTRUCTION CORPORATION J L1B1 PAULA SALUD SUBD. BRGY. MAYAMOT, ANTIPOLO CITY IC PAE NCReIMeOETE a eae ane (CONSTRUCTION oy, EMAIL: jctechconstruction@gmail.com Project: LOW RISE PARTITIONS PHASE 3 Location: ‘Quezon City Client: MLE. Sicat Construction, Date: 10/1/2017 Attn: ‘Michaol Allan E. Sicat President/CEO sir, We are pleased to submit herewith our quotation for the fabrication of additional metal low partition and shelves , supply labor and materials emounting to: (One Hundred Eighteen Thousand Three Hundred Fifty Pesos Only (Php135,263.00) SUMMARY OF COST Item Description Total Amount “General Requirements _. 490.00, Fabrication & Installation of Metal Panel P 61,774.00 : Fabrication and lastallation of Table Se en 6,953.00 | 3 face [ep 6st0.00 ie & 5,223.00 TOTAL AMOUNT | P 118,350.00 Terms and Conditions: 1. All works not included in this proposal shall be considered as Variation Orders 2. Days of off-site Fabrication: 15 days 3. Days to install on-site: 2 days (Weekend) 4, Payment Term: 50% Downpayment e 59,175.00 100% Final Billing (Upon Project Completion) 59,175.00 5. Warranty: 1 Year rector JC-Tech Construction Corporation tem Descrition ay | une | unitrrice TOTAL 57 [eval cia = i z ~"=[-" Wabiialion/ Dera ao. a Faise Sipenison 1a 14,190.00 5 Fabian’ instalation of etal Pana Wp st al sid nsdn LieCLT etal Bae KE tal 517400 3___ [Fabrication and Installation of Table _ ‘Wisrne Pjwaad) 6,983.00 95200 a Pain Wares Metal Panel (Frame & Panel Plywood Tabla 0-1 1.10 (Varah) _ 26TH iets Was ana Nair Director JG-Tech Construction Corporation

You might also like