Project: LOW RISE PARTITIONS PHASE 3
Location: ‘Quezon City
Client: MLE. Sicat Construction,
Date: 10/1/2017
Attn: ‘Michaol Allan E. Sicat
President/CEO
sir,
We are pleased to submit herewith our quotation for the fabrication of additional metal low
partition and shelves , supply labor and materials emounting to:
(One Hundred Eighteen Thousand Three Hundred Fifty Pesos Only (Php135,263.00)
SUMMARY OF COST
Item Description Total Amount
“General Requirements _. 490.00,
Fabrication & Installation of Metal Panel P 61,774.00
: Fabrication and lastallation of Table Se en 6,953.00 |
3 face [ep 6st0.00
ie & 5,223.00
TOTAL AMOUNT | P 118,350.00
Terms and Conditions:
1. All works not included in this proposal shall be considered as Variation Orders
2. Days of off-site Fabrication: 15 days
3. Days to install on-site: 2 days (Weekend)
4, Payment Term:
50% Downpayment e 59,175.00
100% Final Billing (Upon Project Completion) 59,175.00
5. Warranty: 1 Year
rector
JC-Tech Construction Corporationtem Descrition ay | une | unitrrice TOTAL
57 [eval cia = i z
~"=[-" Wabiialion/ Dera ao. a Faise
Sipenison 1a
14,190.00
5 Fabian’ instalation of etal Pana
Wp st
al sid nsdn
LieCLT etal
Bae KE tal
517400
3___ [Fabrication and Installation of Table _
‘Wisrne Pjwaad)
6,983.00
95200
a Pain Wares
Metal Panel (Frame & Panel
Plywood Tabla 0-1 1.10 (Varah) _
26TH
iets Was ana Nair
Director
JG-Tech Construction Corporation