THIRUMALAI CHEMICALS LIMITED, RANIPET

DOCUMENTATION SCHEDULE

TCL/PR16500/F209/010/2017-18 Dosing Pump

After Ordering
With Offer Final
SL. NO Document Description (For Approval)
Prints Qty Prints Qty Prints 3sets of dossier Qty
+ 3 sets of CDs

1 Quality Assurance Plan X X


2 Data Sheet X
3 P & I Diagrams
4 Vendor List for Bought out items X
5 Utility Requirements
6 Motor Details X X
7 Base Plate Details X
8 GA / Dimensional Drawings X X
9 Foundation Details with Load Data X X
10 Design Calculations
11 Fabrication Drawings
12 Cross Sectional Drawings X X
13 Interlock & Instrument Loop Diagrams
14 Terminal Connection Diagrams
15 Electrical Circuit Diagrams
16 Layout Plans
17 Material Sub Orders X
18 Material Test Plan
19 Hydro Test Procedures
20 Pneumatic Test Procedures
21 Material Test Certificates
22 Final Test Certificates X X
23 Performance Test Certificates X X
24 Lubrication Schedule X X
25
Final Inspection Reports including 3 set of X X
final dossier + 3 sets soft copy in CD
26 Heat Treatment Procedures
27 Heat Treatment Certificates
28 Installation Manual X X
29 Operation Manual X X
30 Bar Chart giving Schedule
31 IBR Certificates
32 Guarantee Certificate X X
33 Packing List X X
Notes
A - Within 7 days C - Within 2 weeks
B - Within 10 days D - Along with Despatch of equipmet /
At the time of Inspection
PRPD CHKD APPD
Single loadcell platform Weighing scale
Description Unit Value Remarks
Capacity Kg 60
Accuracy g 5
Platform size mm 450X550 Vendor to Specify
Load cell Tool Steel IP-67
Frame work MOC MS
Platter MOC SS304

Electric wire rope hoist


Description Unit Value Remarks
Capacity Ton 2
Span m Vendor to Specify
Lift m Vendor to Specify
Crabe Ton Vendor to Specify
Crane m Vendor to Specify
Crane Height m Vendor to Specify
Hook approach m Vendor to Specify
Corner load Ton Vendor to Specify
Wheel base m Vendor to Specify