KA31903 Reinforced Concrete Design 1 Dr. N. Sheena H.

Harith
Semester I 2017/2018

RC1 DESIGN PROJECT

1.0 OBJECTIVES
1. The KA 31903 design project requires each team to demonstrate a good knowledge of reinforced conctrete
design.
2. Additionally, each team must demonstrate good report writing.

2.0 APPROACH
It is anticipated that each team will work at least 3 hours per week on the project. The expected timeline for
activities, goals achieved, and submissions for the project will be as follows:
Week Dates Activities and Goals
2 18/09 22/09 Draw or find UMS architectural and engineering building drawings
3 25/09 29/09 Estimate permanent and service loads on structure
4 02/10 06/10 Conduct analysis and determine shear & bending moment
7 23/10 27/10
Design of reinforced concrete slabs
8 30/10 03/11
9 06/11 10/11
Design of reinforced concrete beams
10 13/11 17/11
11 20/11 24/11 Design of reinforced concrete columns
12 27/11 01/12
13 04/12 08/12 Write and Review Final report
14 11/12 15/12
15 18/12 21/12 Report Submission (Last submission: 21/12/2017, 5.00 PM)

3.0 PROJECT TEAMS


The design project teams are as follows:
Team Chief Project A&D A&D A&D A&D
Engineer Manager Engineer Engineer Engineer Engineer
1
2
3
4
5
6
7
8
9
10
11
12

As such all team members are expected to contribute equally to the overall project. Please keep track of your
individual contributions and those of other members in your group. At the end you will be required to grade your
KA31903 Reinforced Concrete Design 1 Dr. N. Sheena H. Harith
Semester I 2017/2018

RC1 DESIGN PROJECT

team members efforts and contributions. If possible, briefly indicate individual efforts and contributions in the
preliminary and final project reports.

4.0 ROLE DEFINITIONS

4.1 Project Manager:


The project manager is responsible for the planning, scheduling, coordination, and completion of the overall
design project.
The project manager will also run intelligence and interference for the group.
The project manager will help the chief engineer (CE) and the analysis and design (A&D) engineers to complete
the design project.
The project manager will make the final presentation along with his team.
The CE and the A&D engineers help the project manager to develop the group presentation.

4.2 Chief Engineer:


The chief engineer is responsible for the overall accuracy of the completed work.
The chief engineer will provide significant assistance to the A&D engineers to complete the project.
The chief engineer will also double check the results
The chief engineer will write the report with the help of the information and drawings provided by the A&D
engineers.
The chief engineer can communicate with the instructor about design issues.
The chief engineer will assist the PM to develop the presentation.

4.3 Analysis and Design Engineers:


The analysis and design engineers are responsible for working on the details of the project.
They will work together and with the CE and the PM to complete the project accurately and in time.
The A&D engineers are the backbone of the design firm. They should maintain a close working relationship
with the CE.
They will collaborate with the CE to develop the report and with the PM to develop the presentation.

5.0 DESIGN PROJECT


Prepare the structural floor plan and layout of UMS buildings
Prepare the layout plan of each floor which shows the location of all beams and columns.
The team then designed a structural framing system.
Design the frame according to the Eurocode 2: Design of concrete structures - Part 1-1: General rules and rules
for buildings
The design is to meet both strength and serviceability requirements when subjected both to gravity loads and
lateral loads.
KA31903 Reinforced Concrete Design 1 Dr. N. Sheena H. Harith
Semester I 2017/2018

RC1 DESIGN PROJECT

The project teams goal was to design an architectural plan and structural system that is cost effective, safe, and
accommodating to the proposed use.
All principle structural members were designed, including slabs, beams and columns.
All standard load combinations are considered and members are designed to resist the ultimate, factored loads.

6.0 PROJECT REPORTS


The project reports should be brief readable document that summarize the relevant results from the analyses and
design of the frame. They should include relevant drawings of the designed structure. The report should have
enough information to assess the accuracy and the approach used for the design. Relevant Eurocode 0, 1 and 2
Specifications should be cited using their Specification numbers.

7.0 PROJECT PRESENTATION


The presentation will be evaluated based on report.

9.0 GUIDELINES FOR THE FINAL PROJECT REPORT


The final design project report must be a concise, organized, and easy-to-read document. The exact layout and
table of contents of the final design project report is shown in the attachment.
FACULTY OF ENGINEERING (CIVIL ENGINEERING PROGRAM)
KA30603: DESIGN OF STEEL AND TIMBER STRUCTURES
SEMESTER 2 SESSION 2016/2017 (BK2014)

Title: 4-storey building structure.

Lecturer: Dr. Noor Sheena Herayani Harith


Date: XX May 2017

GROUP X

Name Matrix No. Role Signature


ACKNOWLEDGEMENT

In preparing this project, we hereby would like to acknowledge


PROJECT DESCRIPTION

The buildings represent a


TABLE OF CONTENTS

CHAPTER TITLE PAGE

ACKNOWLEDGEMENTS i
PROJECT DESCRIPTION ii
TABLE OF CONTENTS iii
LIST OF ABBREVIATIONS vi
LIST OF SYMBOLS vii

1 Layout of Building 1
1.1 Architecture Drawing 5
1.1.1. Plan View 15
1.1.2. Side View
1.1.3.
1.1.4.
1.2 Structural Drawing
1.2.1. Plan View
1.2.2.
1.2.3.
2 Loading
3 Analysis and Design
3.1. Design of Beam
3.2. Design of Column
3.3. Design of Connection
4 Design Summary
5 Appendix
Project Title: Designed by: Sheet No.
Checked by:
Design Title: Date
Reference Calculation Output
No. ID number Design: KA30603: Structural Steel and Timber Design
1 1/A Connection Date: xx May 2017 Wednesday
Name 1 Matrix No. 1
SCALE
Name 2 Matrix No. 2
Name 3 Matrix No. 3
Name 4 Matrix No. 4 1:100
Name 5 Matrix No. 5
Faculty of Engineering Civil Engineering Program HK01 Group 1