You are on page 1of 88

Ooredoo - CME Site Installation Solution

(3G Project )
V1.4

HUAWEI TECHNOLOGIES CO., LTD.


Revision History
Ver. Date Author Review Change Description

Huawei HQ & ME
1.0 Aug 22, 2013 Fan Yunpeng First Release
CME Technical Team
1. Update Tie back and Dead man description;
2. Update the length of Commscope jumpers and
hybrid tail description;
3. Update Tilt arm description for antenna part Page
Huawei HQ & ME
1.1 Sep 25, 2013 Fan Yunpeng 72
CME Technical Team
4. Update filter installation scenarios introduction
Page 75-77
5. Update Installation Position Layout Page 15&21
6. Update the cable routing Page 81-83
1. Update the length of jumper from 2100M RRU to
Huawei HQ & ME
1.2 Sep 28, 2013 Fan Yunpeng 2100M filter in old CME standard Page 75
CME Technical Team
2. Update the 2G transmission connection Page 45
1. Update new 2100M filter installation method in Eirbe
Huawei HQ & ME only Page 82;
1.3 Oct 6, 2013 Fan Yunpeng
CME Technical Team 2. Update Tieback and Dead man clamp introduction
Page 18-19
Huawei HQ & ME 1. Update Alarm cable connection sequence in
1.4 Oct 6, 2013 Fan Yunpeng
CME Technical Team HUAWEI Mini-shelter Page 49
HUAWEI TECHNOLOGIES CO., LTD. Page 2
Content
1. Site Modernization Scenario

2. Third vendor material list for 1 standard sector

3. Site Modernization Reference Design

I. Scenario1: RRU and Antenna install on same pole

II. Scenario2: RRU and Antenna install on different pole

4. HUAWEI Mini-shelter Installation

5. Grounding

6. Color ring

7. Labeling

8. Antenna connection

9. Filter Installation

HUAWEI TECHNOLOGIES CO., LTD. Page 3


1.1 Main Scenario 1 GF Tower

HUAWEI Mini-shelter + Tower


Swap Huawei indoor/outdoor cabinet by HUAWEI Mini-shelter , Swap existing 2G antenna by Triple Band antenna, Antenna
and HUAWEI RRUs installing on the tower

HUAWEI TECHNOLOGIES CO., LTD. Page 4


1.2 Main Scenario 2 RT Pole

HUAWEI Mini-shelter + RT Pole


Swap Huawei indoor/outdoor cabinet by HUAWEI Mini-shelter, Swap existing 2G antenna by Triple Band antenna, Antenna
and HUAWEI RRUs installing on the rooftop pole.

HUAWEI TECHNOLOGIES CO., LTD. Page 5


1.3 Main Scenario 3 RT SST

HUAWEI Mini-shelter + RT SST


Swap Huawei indoor/outdoor cabinet by HUAWEI Mini-shelter, Swap existing 2G antenna by Triple Band antenna, Antenna
and HUAWEI RRUs installing on the rooftop Self-support Tower.

HUAWEI TECHNOLOGIES CO., LTD. Page 6


1.4 Main Scenario 4 Can not follow CME Site

HUAWEI Mini-shelter + RT Pole


Antenna/RRU/Junction BOX installing on site, and
installing on different pole.

HUAWEI TECHNOLOGIES CO., LTD. Page 7


Content
1. Site Modernization Scenario

2. Third vendor material list for 1 standard sector

3. Site Modernization Reference Design

I. Scenario1: RRU and Antenna install on same pole

II. Scenario2: RRU and Antenna install on different pole

4. HUAWEI Mini-shelter Installation

5. Grounding

6. Color ring

7. Labeling

8. Antenna connection

9. Filter Installation

HUAWEI TECHNOLOGIES CO., LTD. Page 8


2.1 Commscope Material Overview
Key Points:

Triple band antenna I. HUAWEI RRU install outside,


RF 1/2 Jumper cable

Commscope supply all of third vender

material(include
HUAWEI RRU

Antenna/Cable/Connector);
Standard hybrid tails
1 for each RRU II. One trunk cable per sector, Supplies 4

RRUs with separate power circuits;


Protective
enclosure for
connections
III. Hybrid trunk Cable Assemblies
Standard hybrid trunk
cable available in 5 M increments.
RTF-16SM-812-SPE
16 single mode fibers
8 x 12 AWG power IV. Iraq select triple-band antenna, so there
conductors

Fiber patch panel


are maximum three RRUs in per sector.

HUAWEI TECHNOLOGIES CO., LTD. Page 9


2.2 Material List with Commscope
Remote Fiber Feeder Material List
Calculated
U of M Part Number Description
Quantity
3 30 METERS RTA812-16S06-30M Remote Fiber Feeder 16 SM Fibers, 8 x 12 AWG power conductors

3 EACH FE-12104-G-R4 Fiber and power cable connection enclosure, manages 1 810/812 hybrid trunk, 4 hybrid jumpers, IP67
RTA212-4S09-
9 EACH Hybrid jumper, 4 fibers terminated DLC, breakout A for junction box, breakout B for Huawei with flush cut power cord.
1.5/2.0M
3 EACH 29958 Hoisting grip, RTA812 series hybrid cables

9 KIT OF 10 SHK-19-1-P-10 Hybrid cable hanger, supports RTA812 series cable, stainless hardware, 1 run stack, kit of 10

3 EACH GND-1M Grounding lead for junction box, 1M

1 EACH RTF-SMPK-24 Patch Panel kit includes: Fixed Shelf, Single mode Panel, Qty 24 -SM fiber LC cords, 3ft

6 EACH OG3LX6-S-CS1-HC Fiber loopback connector, single mode, use one per unused fiber pair

Other Material List


Calculated
U of M Part Number Description
Quantity
3 EACH RVVPX310B1Q 790-960 / 1710-2690 / 1710 2690/1710-2690 / 1710 - 2690MHz Penta Band Remote Tilt Panel Antenna, Internal Bias-T

18 EACH F4A-DMDM-2M-P FSJ4-50B SureFlex Jumper with straight body style interface type 7-16 DIN Male and 7-16 DIN Male 2 meter

3 EACH QSIK-1S-U Sector installation kit. Includes hangers, grounding wire and lugs, buss bar, weatherproofing tape, cable ties

6 KIT RRM-6 Mounts 2 Huawei RRU's

Key Points:
This material list only for Standard site(3 sectors and 3 RRUs in per-sector), the length/type/amount that all of cables(RF jumper cable/Hybrid tail/Hybrid trunk
cable) is sample. We need to follow the actually survey data.

HUAWEI TECHNOLOGIES CO., LTD. Page 10


Content
1. Site Modernization Scenario

2. Third vendor material list for 1 standard sector

3. Site Modernization Reference Design

I. Scenario1: RRU and Antenna install on same pole

II. Scenario2: RRU and Antenna install on different pole

4. HUAWEI Mini-shelter Installation

5. Grounding

6. Color ring

7. Labeling

8. Antenna connection

9. Filter Installation

HUAWEI TECHNOLOGIES CO., LTD. Page 11


3.1.1.1 RRU and Antenna Install on Same Pole GF Site

4-legs GF tower 3-legs GF tower Mast in the yard

HUAWEI TECHNOLOGIES CO., LTD. Page 12


3.1.1.2 RRU and Antenna Install on Same Pole RT Site

Self-supported Pole on Self-supported Pole on


Self-supported Pole on rooftop
Self-supported Mast rooftop rooftop
(Two Sector in same level)
(Two Sector in different level) (Each sector in one pole)

HUAWEI TECHNOLOGIES CO., LTD. Page 13


3.1.2.1 RRU and Antenna Install on Same Pole
3M Pole Triple-band
ANT
Key Points:
Expansion Expansion
RRU RRU
I. Triple Band
Antenna/RRUs/Filter/Junction BOX
install on same 3M pole, and assembled

900MHz
in warehouse;
2100MHz
RRU RRU
II. All of equipments installation location
follow this design:
a) Each sector installs 3pcs RRM6;
1800MHz
RRU
900MHz&
2100MHz
b) 900/2100M RRUs install second
Filter
level, 1800M RRU and filters install
third level,

JUNCTION
BOX

CME Antenna Design CME RRU Location


(Side view) (Back View)

HUAWEI TECHNOLOGIES CO., LTD. Page 14


3.1.2.2 Installation Position Layout
Unit: mm
3000
2800
2700
2620
2548
2140
1880
1840
1100
1060
740
320
120
Antenna Clamp

Top

80
RRM6 900M 900M&2100M Junction
Reserved Box
RRU Filter
Dead Man
Clamp Reserved 2100M RRU 1800M RRU

Future 900M 1800M


Band Filter Filter
Mini
Bracket
Bus Bar

HUAWEI TECHNOLOGIES CO., LTD. Page 15


3.1.2.3 RRU and Antenna Install on Same Pole
RF 1/2 Jumper Lengths 3m Pole
Filter Band Position ANT. Qty Company
HUAWEI (900)
RRU 900 MHz(2G) MIDDLE 1.0m 2
(900)
900MHz Filter BOTTOM 1.5m 2
900MHz Hybrid fiber tail

1800 MHz(2G) BOTTOM 1.5m 2 Commscope


2100 MHz(3G) MIDDLE 1.0m 2

Triple-band Antenna
2100MHz Filter BOTTOM 1.5m 2

HUAWEI
Hybrid fiber tail Lengths 3m Pole
RRU
(1800) Band Position Jun.BOX Qty Company
1800MHz Hybrid fiber tail

900 MHz(2G) MIDDLE 2.0m 1


1800 MHz(2G) BOTTOM 1.5m 1 Commscope
2100 MHz(3G) MIDDLE 2.0m 1
900MHz RF jumper cable
1800MHz RF jumper cable

Grounding cable 3m Pole


2100MHz RF jumper cable

Filter
HUAWEI (2100)
RRU Equipment Position Mini-bus bar Qty Type Company
2100MHz Hybrid fiber tail

(2100)
900 MHz(2G) MIDDLE 2.0m 1 16mm2
900MHz Filter BOTTOM 1.0m 1 16mm2
1800 MHz(2G) BOTTOM 1.0m 1 16mm2
Junction
BOX
2100 MHz(3G) MIDDLE 2.0m 1 16mm2 Commscope
2100MHz Filter BOTTOM 1.0m 1 16mm2
Hybrid fiber Tail Junction BOX BOTTOM 1.0m 1 16mm2
Mini
bus bar Grounding cable Main-bus bar On Tower It depends 1 16mm2
RF 1/2 Jumper cable

HUAWEI TECHNOLOGIES CO., LTD. Page 16


3.1.3.1 Antenna system members Tie Back & Dead Man
Tie Back: Dead Man:
1. Fixing and supporting 1. Installing 2pcs Dead
Antenna system on the Man clamps on 3m pole,
tower, prevent swaying; above Antenna support
2. One sector need to install (Arm);
2pcs; installation position 2. When adjusting Antenna
is both ends of 3m pole; azimuth, lose Antenna
3. One side installs on the support (near 3m pole
3m pole, other side side), then adjusting
installs on the tower; azimuth by hand;
4. Except RT Pole and can 3. Except can not follow
not follow CME site, CME site, other sites
other sites need to need to install Dead
install Tie Back on site man in warehouse

HUAWEI TECHNOLOGIES CO., LTD. Page 17


3.1.3.2 Antenna system members Tie Back introduction

For GF tower

For RF tower

This side fix on 3m Key Points: This side fix on tower


pole (antenna side)
1. Installation method of GF and RF are same;
2. Only two park is different:
I. The length of GF is longer RF
II. Part No.1 of GF is bigger than RF Part No.1

HUAWEI TECHNOLOGIES CO., LTD. Page 18


3.1.3.3 Antenna system members Dead man clamp introduction
RT site
Dead man clamp GF site

Spacer

There have one


spacer, so dead
X Dead man
clamp RF
antenna
man clamp should support
be install this side


HUAWEI TECHNOLOGIES CO., LTD. Page 19
Content
1. Site Modernization Scenario

2. Third vendor material list for 1 standard sector

3. Site Modernization Reference Design

I. Scenario1: RRU and Antenna install on same pole

II. Scenario2: RRU and Antenna install on different pole

4. HUAWEI Mini-shelter Installation

5. Grounding

6. Color ring

7. Labeling

8. Antenna connection

9. Filter Installation

HUAWEI TECHNOLOGIES CO., LTD. Page 20


3.2.1 RRU and Antenna Install on Different Pole

Mobile Site and Guyed Mast Site, Antenna and RRU


install Different pole, RRU assembly install on the top of
bottom section

HUAWEI TECHNOLOGIES CO., LTD. Page 21


3.2.2.1 RRU and Antenna Install on Different Pole
3M Pole
Key Points:
Expansion Expansion
RRU RRU
I. Mobile Site and Guyed Mast Site,
Antenna and RRU install Different pole,
RRU assembly install on the top of

900MHz
bottom section
2100MHz
RRU RRU
II. All of equipments installation location
follow this design:
a) Each sector installs 3pcs RRM6;
1800MHz
RRU
900MHz&
2100MHz
b) 900/2100M RRUs install second
Filter
level, 1800M RRU and filters install
third level,
c) Antenna installs on the separate
JUNCTION
BOX
pole or reuse existing pole

CME Antenna Design CME RRU Location


(Side view) (Back View)

HUAWEI TECHNOLOGIES CO., LTD. Page 22


3.2.2.2 Installation Position Layout (RRU and Junction Box)
Unit: mm
3000
2800
2700
2620
2548

1880
1840
1100
1060

320
120 Clamp

Top

80
RRM6 900M 900M&2100M Junction
Reserved Box
RRU Filter
Dead Man
Clamp Reserved 2100M RRU 1800M RRU

Future 900M 1800M


Band Filter Filter
Mini
Bracket
Bus Bar

HUAWEI TECHNOLOGIES CO., LTD. Page 23


3.2.2.3 Installation Position Layout (Antenna)

Unit: mm
3000

2140

740

120
Antenna

Top

Dead Man
Clamp

Bracket

HUAWEI TECHNOLOGIES CO., LTD. Page 24


3.2.2.4 RRU and Antenna Install on Different Pole
RF 1/2 Jumper Length
Band Position ANT. Qty Company
Filter
HUAWEI (900) 900 MHz(2G) MIDDLE 1.0m 2
RRU
(900)
900MHz Filter BOTTOM ? 2
1800 MHz(2G) BOTTOM ? 2 Commscope
900MHz Hybrid fiber tail

2100 MHz(3G) MIDDLE 1.0m 2


2100MHz Filter BOTTOM ? 2

7/8 Feeder cable Length

Triple-band Antenna
Band Position Jun.BOX Qty Company
HUAWEI 900 MHz(2G) MIDDLE It depends 2
RRU 1800 MHz(2G) BOTTOM It depends 2 Reuse
(1800)
2100 MHz(3G) MIDDLE It depends 2
1800MHz Hybrid fiber tail

Hybrid fiber tail Length


Band Position Jun.BOX Qty Company
900 MHz(2G) MIDDLE 2.0m 1
1800 MHz(2G) BOTTOM 1.5m 1 Commscope
Filter 2100 MHz(3G) MIDDLE 2.0m 1
HUAWEI (2100)
RRU
Grounding cable Length
2100MHz Hybrid fiber tail

(2100)

Equipment Position Mini-bus bar Qty Type Company


900 MHz(2G) TOP 2.0m 1 16mm2
Junction
900MHz Filter TOP 1.0m 1 16mm2
BOX 1800 MHz(2G) MIDDLE 1.0m 1 16mm2
2100 MHz(3G) BOTTOM 2.0m 1 16mm2 Commscope
Hybrid fiber Tail 2100MHz Filter BOTTOM 1.0m 1 16mm2
Mini Grounding cable
bus bar
Junction BOX BOTTOM 1.0m 1 16mm2
RF 1/2 Jumper cable
Main-bus bar On Tower It depends 1 16mm2
7/8 Feeder cable

HUAWEI TECHNOLOGIES CO., LTD. Page 25


3.3.1 Cable Routing in Junction Box
Power Installation Fiber Installation
(power cables removed for clarification)
Completed Installation
(fiber cables removed for clarification)
Be sure that 1/4" (.64cm) of outer jacket is inside of the Be sure that 1/4" (.64cm) of outer jacket is inside of
Fiber Enclosure for proper weather seal. the Fiber Enclosure for proper weather seal. All
Fiber bends minimum 1.18" (30mm) radius inside of
the Fiber Enclosure.

E A B C D A B C D E A B C D
E
E - Hybrid trunk
cable
A - GU900 RRU B - G1800 RRU C U2100 RRU D - EXP

HUAWEI TECHNOLOGIES CO., LTD. Page 26


3.3.2 Cable Connection in Junction Box
900MHz RRU 900MHz 1800MHz 2100MHz
EXP Key Points:
RRU RRU RRU
1800MHz RRU

#CPRI1

#CPRI0

#CPRI1

#CPRI0

#CPRI1

#CPRI0
# # #
2 # 2 # 2 # I. All of fiber tail and
1 1 1
2100MHz RRU
power cable should
be connected on the
connector;

+0V -48V Fiber


II. The unused ports in
the junction box on
connection
upside should be
install fiber loopback
connector or
protector by oneself.

Power
connection
Hybrid trunk cable Hybrid trunk cable
(8pcs Power lines) (8pcs Fiber tails)

HUAWEI TECHNOLOGIES CO., LTD. Page 27


3.4.1 Install Hybrid Trunk Cable
Material Qty Company Remark
Hybrid trunk cable 3 One sector by one Hybrid trunk cable
Fix 3-Hybrid trunk cables by 3-run hanger every
Hanger \ Commscope 1-meter,

Steel tie 4 Carry excess Hybrid trunk cable by 4-bolts


Hybrid trunk
Bolt/Nut \ Fix excess Hybrid trunk cable by steel tie,
cable HUAWEI
PVC Pipe 4 Cover it on bolt, protect Hybrid trunk cable
Hanger

Fix excess Hybrid trunk cable solution summary


I. The distance that between existing ladder to Ground is not available.
Solution_1 II. Install new Vertical ladder up existing cable ladder, then install 4 hangers on it
and fix excess Hybrid trunk cable on it(Near tower)
I. The distance that between existing ladder to Ground is available.
II. Install new Vertical ladder or steel beam on existing vertical steel beam under
Solution_2
existing cable ladder, then install 4 hangers on it and fix excess Hybrid trunk
cable on it(Near tower)
I. Cable tray for Hybrid cable on site;
Solution_3 II. Install new Vertical ladder on ground, install 4 bolts on it and fix excess Hybrid
trunk cable on it(Near tower)

HUAWEI TECHNOLOGIES CO., LTD. Page 28


3.4.2 Fix Excess Hybrid Trunk Cable Solution_1
Key Points:
I. The distance that between
existing ladder to Ground is
not available.
II. Install new Vertical ladder up
Hybrid
trunk cable existing cable ladder, then
install 4 bolts on it and fix
excess Hybrid trunk cable on
New Vertical Bolt/Nut it(Near tower)
ladder III. According left chart to route
Hybrid trunk cable
HUAWEI
Mini- IV. Excess cable should be
Existing cable shelter
coiled at the base of the
ladder
tower min 152.4mm / 6 bend
radius

HUAWEI TECHNOLOGIES CO., LTD. Page 29


3.4.3 Fix Excess Hybrid Trunk Cable Solution_2
Key Points:
I. The distance that between
existing ladder to Ground is
available.
II. Install new Vertical ladder or
steel beam on existing
vertical steel beam under
existing cable ladder, then
install 4 bolts on it and fix
Steel beam or
excess Hybrid trunk cable on
Vertical ladder Bolt/Nut
it(Near tower)
III. According left chart to route
Hybrid trunk cable
IV. Excess cable should be
coiled at the base of the
tower min 152.4mm / 6 bend
radius

HUAWEI TECHNOLOGIES CO., LTD. Page 30


3.4.4 Fix Excess Hybrid Trunk Cable Solution_3

Key Points:

I. Cable tray for Hybrid cable on site;

II. Install new Vertical ladder on ground, install

4 bolts on it and fix excess Hybrid trunk

cable on it(Near tower)

III. According left chart to route Hybrid trunk

cable

Bolt and IV. Excess cable should be coiled at the base


PVC pipe
of the tower min 152.4mm / 6 bend radius

HUAWEI TECHNOLOGIES CO., LTD. Page 31


3.4.5 Fix Excess Hybrid Trunk Cable
Coiled Hybrid Key Points:

Sector_1

Sector_2

Sector_3
Trunk
I. Excess cable should be coiled
at the base of the tower min
(R)
152.4mm / 6 bend radius (R)
II. First, Hybrid trunk cable should be
fixed by cable tie for each sector;
Color rings then fix three sectors Hybrid trunk
for three cables together;
sectors
III. Take color rings on both end of
coiled Hybrid trunk cable, such as
left chart.
Coiled IV. This chart only descript that how
Hybrid
to coiled three Hybrid trunk
Trunk
cables, according to different
Color rings
scenario follow different fixed
for three
sectors position

HUAWEI TECHNOLOGIES CO., LTD. Page 32


3.4.6 Install Hybrid Trunk Cable(Fix hybrid cable near antenna side)

Hoisting grip
Hybrid trunk cable
Hoisting
fixed on the bracket by
grip
hanger

Material Qty Company Remark Hoisting grip

I. Lift Hybrid trunk cable


While Hoisting
Hoisting grip 3pcs II. Fix Hybrid trunk cable on
bracket near antenna side
I. Lace up grips installed every 200 (60m) intervals on cable and attached
to tower vertical cable support
Commscope
II. Ensure there is a free path so the cable end does not get snagged to
I. Hybrid trunk cable fixed on
Hanger 3-6pcs obstacles
the bracket by hanger

III. Attach protective tube to rope

HUAWEI TECHNOLOGIES CO., LTD. Page 33


Content
1. Site Modernization Scenario

2. Third vendor material list for 1 standard sector

3. Site Modernization Reference Design

I. Scenario1: RRU and Antenna install on same pole

II. Scenario2: RRU and Antenna install on different pole

4. HUAWEI Mini-shelter Installation

5. Grounding

6. Color ring

7. Labeling

8. Antenna connection

9. Filter Installation

HUAWEI TECHNOLOGIES CO., LTD. Page 34


4.1.1 HUAWEI Mini-shelter Installation Solution

Swap existing
outdoor cabinet
by HUAWEI Mini-
HUAWEI
shelter
Mini-shelter
800 mm (W) x800
mm (D) x 2030 mm
(H) (including plinth)
Huawei BTS3900A Huawei Mini Shelter
H1600 x 600 x 480 mm H1900*940*780 mm
(overall with plinth) (overall with plinth)

Before swap After swap Installation solution


Shelter Install new concrete slab, Delta outdoor cabinet install on it
HUAWEI Mini-shelter
Outdoor cabinet Reuse existing bracket(Beam channel) or install rooftop

HUAWEI TECHNOLOGIES CO., LTD. Page 35


4.1.2 HUAWEI Mini-shelter introduction

Fan assembly

Air conditioner
Bracket for converting 21
inch wide into 19 inch wide Temperature and
humidity sensor
Space for customer

Power subrack Computer tray


and folder

Space for battery Air filter

Battery rack

Cable hole

HUAWEI TECHNOLOGIES CO., LTD. Page 36


4.2.1 HUAWEI Mini-shelter Installation Solution New Concrete Slab

Key Points:

I. At green field sites, cabinets should be installed on a concrete slab and this slab should

be big enough to accommodate 2 cabinets to allow for future expansion;

II. A key consideration in the location of the cabinet is to install the cabinet as close as possible

to the vertical feeder runway on the tower so as to minimize the volt drop to the RRUs

HUAWEI TECHNOLOGIES CO., LTD. Page 37


4.2.2 HUAWEI Mini-shelter Installation Solution On Rooftop
Key Points:

I. At roof top sites, cabinets can directly install on the roof top(no need

foundation or beam channel);

HUAWEI TECHNOLOGIES CO., LTD. Page 38


4.2.3 HUAWEI Mini-shelter Installation Solution On Beam channel
Beam channel site Key Points:
1. At roof top sites, cabinets can install on existing beam
channel:
I. Directly fix HUAWEI Mini-shelter on the beam channel;
II. Add new bracket, then fix HUAWEI Mini-shelter on it

Add a new
bracket, then
HUAWEI Mini-
HUAWEI
shelter directly New bracket
Mini-shelter
install on the
Base of install on it
beam channel
HUAWEI Mini- Existing Beam (No final
Existing beam
shelter channel solution)
channel

HUAWEI TECHNOLOGIES CO., LTD. Page 39


4.3 HUAWEI Mini-shelter Cable Type
-48V power cable HUAWEI CDUD To Rectifier
No From To Type Length Qty Remark
1 GU BBU DC breaker 3V3 power cable 2.5m 1 or 2 HUAWEI supply
2 MW IDU DC breaker \ \ \ Reuse the existing MW power cable
3 DC Breaker RRU 12/10/08AWG \ \ This -48V power cable include in Hybrid trunk cable, Commscope supply

AC power cable HUAWEI Mini-shelter


No From To Type Qty Remark
1 HUAWEI Mini-shelter ACDB 16mm2(4 wires) 1 HUAWEI Supply
Grounding cable
No From To Type Qty Remark
Plinth Mini bus bar
1 Hybrid trunk cable 16mm2 3 Commscope
/ Inside Mini bus bar
2 BBU Inside Grounding points 6mm2 1
3 IDU Inside Grounding points 6mm2 1
4 DDF Inside Grounding points 6mm2 1
5 SLPU Inside Grounding points 6mm2 1 HUAWEI
6 Base grounding points Plinth ground bar 6mm2 1
7 Indoor ground bar Plinth ground bar 16mm2 1
8 Plinth ground bar Main bus bar 16mm2 1

Transmission cable
No From To Type Qty Remark
1 GU BBU MW IDU 75 E1(For 2G) 1
HUAWEI Supply
2 GU BBU MW IDU LAN(For 3G) 1

1m fiber tail HUAWEI BBU To Patch Panel


Name Position Length Mode Connector Qty Remark
G900 1m SM LC-LC 3pcs
I. There are 24pcs fiber tail in
U900 1m SM LC-LC 3pcs Patch Panel kits, SM and
From HUAWEI BBU to Patch Panel
G1800 1m SM LC-LC 3pcs LC-LC, The length is 1M;
U2100 1m SM LC-LC 3pcs II. Fiber tail will be protected
by Wrap pipe
Wrap pipe From HUAWEI BBU to Patch Panel, protect outside 1m fibre tail 1m \ \ 1pcs

HUAWEI TECHNOLOGIES CO., LTD. Page 40


4.4.1 HUAWEI Mini-shelter Layout for User Equipments
1U Spare space
2U SLPU Key Points:
3U
4U
5U
I. Scenario1: The height of
Spare space
6U
7U
IDU is 1U, follow left
8U
9U DDF
layout;
10U
11U
Spare space II. Scenario2: There are
12U
GU BBU
13U more than 1pcs IDU(1U)
14U Patch Panel
15U IDU or the height of IDU is
16U Spare space
17U more than 1U in site,
18U
19U Power System move up Patch Panel/GU
20U
21U BBU/DDU. Make sure
that Spare space
BAT_2
between DDF and GU
BBU is 2U; IDU & Power
System is 1U
BAT_1

HUAWEI TECHNOLOGIES CO., LTD. Page 41


4.4.2 HUAWEI Mini-shelter Power Overview

HUAWEI Mini-shelter power switch


LLVD
BLVD
Sector1 Sector2 Sector3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

25A 25A 40A 40A 16A 16A 16A 25A 25A 25A 16A 16A 16A 16A 16A 16A 16A 16A 16A 16A 16A 16A

GU GU MW MW 2G_900 2G_1800 3G_2100 2G_900 2G_1800 3G_2100 2G_900 2G_1800 3G_2100


Exp Exp Exp Exp Exp Exp Exp Exp Exp
BBU_1 BBU_2 IDU_1 IDU_2 RRU RRU RRU RRU RRU RRU RRU RRU RRU

I. As shown the picture, all of power cables where include in Hybrid trunk cable of 3-sectors should be connect to LLVD breaker;
II. All of cables where connect to the breaker should be remain proper length, so as to take out the power system in future.
III. If this is 3G site, 2pcs UPEU boards installed in GU BBU, so breaker 8 and 9 are for GU BBU. If this is 2G site, only breaker 8 is for GU BBU.

HUAWEI TECHNOLOGIES CO., LTD. Page 42


4.4.3.1 BBU connection Board card and SFP in only 2G Site
Connection for G900 Connection for G1800

GTMU/PCS UMPT/PCS WBBP/PCS WBBP/PCS WBBP/PCS


Configuration
(For G900/1800) (For W2100) (For W2100) (For U900) (Expansion)
Remark

I. Should be according to
configuration to insert board card;
II. If some cards inserted in BBU,
SFP module should be install
900/1800 1 X X X X
and fiber cables also connect
from BBU to Patch Panel (Please
according to Chart 4.4.4 & 4.4.5,
checking connection)

HUAWEI TECHNOLOGIES CO., LTD. Page 43


4.4.3.2 BBU connection Board card and SFP in 3G Site
Connection for U900 Connection for G900 Connection for G1800

Connection for W2100

GTMU/PCS UMPT/PCS WBBP/PCS WBBP/PCS WBBP/PCS


Configuration
(For G900/1800) (For W2100) (For W2100) (For U900) (Expansion)
Remark

900/1800/2100 1 1 1 1 1 I. Should be according to


configuration to insert board card;
1800/2100 1 1 1 1 1
II. If some cards inserted in BBU,
SFP module should be install
and fiber cables also connect
900/2100 1 1 1 1 1 from BBU to Patch Panel (Please
according to Chart 4.4.4 & 4.4.5,
checking connection)

HUAWEI TECHNOLOGIES CO., LTD. Page 44


4.4.4 HUAWEI Mini-shelter Fiber Connection (BBU to RRU)
Example: (config C) G900/G1800/U900/U2100 - 333/666/111/222

Sector_1 Sector_1 Sector_1 Sector_2 Sector_2 Sector_2 Sector_3 Sector_3 Sector_3


RRU RRU RRU RRU RRU RRU RRU RRU RRU
900MHz 1800MHz 2100MHz 900MHz 1800MHz 2100MHz 900MHz 1800MHz 2100MHz

CPRI0 CPRI1 CPRI0 CPRI1 CPRI0 CPRI1


G900M U900M G900M U900M G900M U900M

1 7 4 10 2 8 5 11 3 9 6 12

1 2 3 4 5 6
7 8 9

10 11 12

I. All of fiber ports that on BBU and RRU side should be insert SFP module;
II. All of RRU`s CPPI ports should be connected fiber tail.

HUAWEI TECHNOLOGIES CO., LTD. Page 45


4.4.5 HUAWEI Mini-shelter Patch Panel
#1 CPRI 0
Hybrid Tail RRU #1
Top Junction Box Huawei 3929 RRU 900 MHz

#2 CPRI 1
Duplex LC Patch Array
Top
#1 1 1 #1 #1 CPRI 0
1
#2 2 2 #2 Hybrid Tail RRU #2
Bottom

Top
Huawei 3929 RRU 1800 MHz
#3 3 3 #1
2 #2 CPRI 1
#4 4 4 #2
Bottom

Top
#5 5 5 #1 #1 CPRI 0
3
#6 6 6 #2 Hybrid Tail RRU #3
Bottom

Top
Huawei 3829 RRU 2100 MHz
#7 7 7 #1
4 #2 CPRI 1
#8 8 8 #2
Bottom

#1 CPRI 0
Hybrid Tail RRU #4
Huawei RRU
Future
(Future)
#2 CPRI 1
Hybrid Cable Sector 1

Hybrid Cable Sector 2 Hybrid Cable Sector 3


Patch Panel(24 fiber ports)

Sector1 Sector2 Sector3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Fibre Patch Panel 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

G U G U G U
G U G U G U
Repeat for Sector 2 1 E 2 E E E 1 E 2 E E E 1 E 2 E E E
Repeat for Sector 3 9 9 9 9 9 9
8 x 1 x x x 8 x 1 x x x 8 x 1 x x x
0 0 0 0 0 0
0 p 0 p p p 0 p 0 p p p 0 p 0 p p p
0 0 0 0 0 0
0 0 0 0 0 0
Future use RRU#4/spare (S1)
Future use RRU#4/spare (S1) 1 7 4 \ 10 \ \ \ 2 8 5 \ 11 \ \ \ 3 9 6 \ 12 \ \ \
Future 2100 MHz use/spare (S1)
2100 MHz UMTS (S1)
I. As shown the picture, 24-ports of Patch Panel divide 3 parts for 3 sectors(face to Patch Panel,
1800 MHz LTE (S1)
from left to right);
1800 MHz GSM (S1)
900 MHz UMTS (S1)
II. All of fiber tails which include in Hybrid trunk cable must be connected;
900 MHz GSM (S1)
III. Unused fiber connector `s protector should be reserved

HUAWEI TECHNOLOGIES CO., LTD. Page 46


4.4.6.1 HUAWEI Mini-shelter Transmission Cable Connection - 2G
FE port For 2G IP E1 port For 2G E1
transmission (in future) transmission

3G(2100) IP Transmission 2G(/9001800) E1 Transmission


BBU IDU BBU SLPU DDF IDU
LAN E1 E1 E1
cable cable cable cable

Key Points:
I. E1 transmission for 2G;
II. E1 transmission, existing DDF and E1 cable where is near IDU side will be reused, and BBU side reuse or new connect;
III. Connect E1 cable on DDF, follow existing connection;
IV. About the FE cable, all of sites should be connect for in future IP transmission

HUAWEI TECHNOLOGIES CO., LTD. Page 47


4.4.6.2 HUAWEI Mini-shelter Transmission Cable Connection - 3G
FE port For 3G IP
transmission

3G(2100) IP Transmission

BBU IDU
LAN
cable

Key Points:
I. IP transmission for 3G, FE cable will be used;
II. If this site is 3G site, FE cable should be connected from BBU FE port to IDU, show as upper figurer;
III. Please confirm by transmission department which port will be used in IDU side.

HUAWEI TECHNOLOGIES CO., LTD. Page 48


4.4.7 HUAWEI Mini-shelter External Alarm Cable Connection

Alarm DDF_1

EXT-ALM1 EXT-ALM0

Key Points:
I. Connect alarm cable from BBU UPEU ports(EXT_ALM0/EXT_ALM1) to Alarm module in Delta by Alarm DDF_2

2pcs LAN cables;

Signal HUAWEI Mini- Cable color Cable color


Alarm name BBU port Remark
resource shelter port DDF side BBU side
AC power failure alarm 1 White/Orange+, Orange- White/Orange+, Orange-
LLVD1 disconnection alarm 2 White/Green+, Green White/Green+, Blue- BBU and Alarm module
UPEU
Single module or multiple modules side, the LAN cable
3 White/Blue+, Blue- EXT-ALM0 White/Blue+, Green
faults alarms sequence are same
SPD failure alarm 4 White/Brown , Brown- White/Brown , Brown-
POWER Load or battery fuse burn-out alarm 5 White/Orange+, Orange- White/Orange+, Orange-
Battery temperature alarms or BBU and Alarm module side,
6 White/Green+, Green UPEU White/Green+, Blue-
environment temperature alarms the LAN cable sequence
EXT-ALM1
Door alarms 7 White/Blue+, Blue- White/Blue+, Green are same
Aviation light failure /Air conditioner
8 White/Brown , Brown- White/Brown , Brown-
fault or fan fault alarms

HUAWEI TECHNOLOGIES CO., LTD. Page 49


4.5.1 Routing Hybrid Trunk Cable in HUAWEI Mini-shelter

MBHS78-1-F
MBHS78-1-F

MBHS78-3-F

HUAWEI TECHNOLOGIES CO., LTD. Page 50


4.5.2 Routing Hybrid Trunk Cable in HUAWEI Mini-shelter

Wrong example Right example

Key Points:
1. There is no need to apply silicone sealant at this point. The supplied gland entries are sufficient for sealing.

HUAWEI TECHNOLOGIES CO., LTD. Page 51


4.5.3 HUAWEI Mini-shelter Glanding Arrangement

Sector_3

Sector_2

Sector_1

HUAWEI TECHNOLOGIES CO., LTD. Page 52


4.5.4 Seal inside cable hole
Before After

Rubber
2
circle

Cable size is less than cable Use rubber circle/black tape/waterproof Ensure that cable hole
hole in HUAWEI Mini-shelter tape to wrap cable sealed off completely

HUAWEI TECHNOLOGIES CO., LTD. Page 53


4.6 Battery Sensor

Battery Sensor

New Version HUAWEI Mini-shelter:


1. Insert the Battery sensor(Left picture) into the foam block by pushing it to the hole in the middle;
2. Sensor must be fully covered in foam;
3. Place/squeeze the Temperature sensor between the middle batteries in the highest row of battery shelves.

HUAWEI TECHNOLOGIES CO., LTD. Page 54


4.7 Key Points for HUAWEI Mini-shelter

Key Points:
I. If MW IDU install in HUAWEI Mini-
shelter, cut E1 cable total length
remains 2m; If MW IDU NOT install
in HUAWEI Mini-shelter, keep all the
E1 cable E1 cable and coil on right side
II. Excess LAN cable(3G transmission)
need to cut it and remain enough is
ok.
LAN cable

HUAWEI TECHNOLOGIES CO., LTD. Page 55


4.8 Commissioning
Setting the Date and Time

Main Menu Second-Level Menu Third-Level Menu Default Value Setting Value

Set to the local date


Data and time -
and time.

Setting Wizard Date and Time Set to the local time


Time zone UTC +08:00 Beijing
zone.

NTP Enable No No/Yes

Setting Battery Parameters


Second-Level Fourth-
Main Menu Third-Level Menu Default Value Setting Value
Menu Level Menu
Set to actual condition.
Battery1-2 NOTE
Yes
Connected If only one battery string is
Basic Parameters connected, set Battery 2 Connected
to No.
Parameters Settings Battery Parameters
Capacity of one battery
Rated Capacity 170 Ah
string

Other Parameters Installation time 20100101 Set to the current date

HUAWEI TECHNOLOGIES CO., LTD. Page 56


Content
1. Site Modernization Scenario

2. Third vendor material list for 1 standard sector

3. Site Modernization Reference Design

I. Scenario1: RRU and Antenna install on same pole

II. Scenario2: RRU and Antenna install on different pole

4. HUAWEI Mini-shelter Installation

5. Grounding

6. Color ring

7. Labeling

8. Antenna Connection

9. Filter Installation

HUAWEI TECHNOLOGIES CO., LTD. Page 57


5.1.1 Power/Grounding Cable Connection Solution
Cable Terminal
Cable Type Position Picture
Demission Size

PGND (From RRU and Junction Box to Mini


16mm2 Mini bus bar (In warehouse operation)
bus bar)

PGND (From HUAWEI Mini-shelter AC power HUAWEI Mini-shelter power system (On site
16mm2 16mm2
system to bus bar) operation)

AC Power cable (From HUAWEI Mini-shelter


16mm2 HUAWEI Mini-shelter and ACDB(On Site Operation)
power system to ACDB)

DC Power (Hybrid trunk cable, from Junction


3.5mm2 HUAWEI Mini-shelter (On Site Operation)
Box to HUAWEI Mini-shelter)

DC Power (BBU DC Power cable, from BBU


3.5mm2 HUAWEI Mini-shelter (On Site Operation)
to HUAWEI Mini-shelter power system)

DC Power (IDU DC Power cable, from BBU 4mm2


3.5mm2 HUAWEI Mini-shelter (On Site Operation)
to HUAWEI Mini-shelter power system)

DC Power (Hybrid tail, from RRU to Junction


3.5mm2 Junction Box (In warehouse operation)
Box)

DC Power (Hybrid Trunk cable, from Junction


3.5mm2 HUAWEI Mini-shelter (On Site Operation)
Box to HUAWEI Mini-shelter)

Key Points:
1. All of cables connector should be use bootless before connection

HUAWEI TECHNOLOGIES CO., LTD. Page 58


5.1.2 Power/Grounding Cable Connection Solution _ Example

Mini bus bar on the ACDB Side Junction Box


bracket of 3m Pole

Key Points:
1. All of cables connector should be use bootless before connection

HUAWEI TECHNOLOGIES CO., LTD. Page 59


5.2.1 Grounding RRU Power Cable


Ensure that the exposed shield layer of the power cable is properly tightened using the clip.

HUAWEI TECHNOLOGIES CO., LTD. Page 60


5.2.2 Grounding Mini Bus Bar Near Antenna

Key Points:

I. Each RRU & Junction Box connect one PGND cable to Mini

Bus Bar;

II. Mini Bus Bar connect one PGND cable to the main Bus Bar

on Tower or Rooftop

III. All of grounding cable should be use terminal

HUAWEI TECHNOLOGIES CO., LTD. Page 61


5.2.3 Grounding In Junction Box for Hybrid Trunk Cable

Key Points:

I. Ensure that the exposed

shield layer of the hybrid

cable is properly tightened

using the clamp;

II. Connect to Mini bus bar


Outside PGND Port
Junction BOX PGDN Kits from outside PGDN port

on Junction BOX

Inside Outside
HUAWEI TECHNOLOGIES CO., LTD. Page 62
5.2.4 Grounding - HUAWEI Mini-shelter
Installing the main ground cable Connecting the base ground cable

Indoor
ground bar

Plinth
ground bar Key Points:
1. Main grounding cable is 16mm2, from plinth ground bar to outdoor ground
bar (grounding cable is in accessory box);
2. Base grounding cable is 6mm2, from base of cabinet to plinth ground bar
Outdoor
ground bar 3. Indoor grounding cable is 16mm2, from indoor ground bar to plinth ground
bar (only connect to plinth ground bar side, other side already connected)

HUAWEI TECHNOLOGIES CO., LTD. Page 63


5.2.5 Grounding Equipments in HUAWEI Mini-shelter
Plinth ground bar
Grounding points for
Inside user equipments

Sector_1 Hybrid
Sector_2 Hybrid
Sector_3 Hybrid
Indoor grounding cable

Main grounding cable


Base grounding cable
Key Points:
1. Inside user equipments connect to inside grounding points;
2. Hybrid grounding and others cables connect to plinth grounding bar;

HUAWEI TECHNOLOGIES CO., LTD. Page 64


Content
1. Site Modernization Scenario

2. Third vendor material list for 1 standard sector

3. Site Modernization Reference Design

I. Scenario1: RRU and Antenna install on same pole

II. Scenario2: RRU and Antenna install on different pole

4. HUAWEI Mini-shelter Installation

5. Grounding

6. Color ring

7. Labeling

8. Antenna Connection

9. Filter Installation

HUAWEI TECHNOLOGIES CO., LTD. Page 65


6.1 Color ring Hybrid Trunk Cable

Color ring for Hybrid trunk cable(Junction BOX to Patch Panel) Sector_1 Sector_2 Sector_3

Sector Position Color ring Remark


1 1Red
2 Near Junction BOX 1Yellow
Color ring
3 1Blue for Hybrid
1 1Red trunk cable
Both end of coiled Hybrid trunk
2 1Yellow
cable
3 1Blue Each of color ring keep
1 1Red 10mm distance
Near HUAWEI Mini-
2 1Yellow
shelter(outside)
3 1Blue
1 1Red
2 Inside HUAWEI Mini-shelter 1Yellow
3 1Blue

Key Points:
I. Different color ring descript different sector; Red/Yellow/Blue color ring
descript Sector1/2/3

HUAWEI TECHNOLOGIES CO., LTD. Page 66


6.2 Color ring RF Jumper Cable and Hybrid Tail
Color ring Hybrid tail/RF jumper cable(Both ends of cable) GU900 G1800 U2100
ANT-TX/RXA +45 ANT-TX/RXA -45
Sector Band
(Main) (Diversity)
GU900 MHz(2G) 1White 1Red 1Red
Sector_1
1 G1800 MHz(2G) 1White 2Red 2Red

U2100 MHz(3G) 1White 3Red 3Red

GU900 MHz(2G) 1White 1Yellow 1Yellow


GU900 G1800 U2100
2 G1800 MHz(2G) 1White 2Yellow 2Yellow

U2100 MHz(3G) 1White 3Yellow 3Yellow

GU900 MHz(2G) 1White 1Blue 1Blue


Sector_2
3 G1800 MHz(2G) 1White 2Blue 2Blue

U2100 MHz(3G) 1White 3Blue 3Blue

GU900 G1800 U2100


Key Points:
I. Different color ring descript different sector; Red/Yellow/Blue color ring descript
Sector1/Sector2/Sector3;
II. The count of color ring descript different frequency band, for example: one color
Sector_3

ring is GU900;two color ring is G1800; three color ring is U2100;


III. 1 White coloring tag to Main RF jumper cable and Hybrid tail

HUAWEI TECHNOLOGIES CO., LTD. Page 67


Content
1. Site Modernization Scenario

2. Third vendor material list for 1 standard sector

3. Site Modernization Reference Design

I. Scenario1: RRU and Antenna install on same pole

II. Scenario2: RRU and Antenna install on different pole

4. HUAWEI Mini-shelter Installation

5. Grounding

6. Color ring

7. Labeling

8. Antenna Connection

HUAWEI TECHNOLOGIES CO., LTD. Page 68


7.1 Labeling Information in HUAWEI Mini-shelter
Power label Fiber label Grounding label Alarm label Transmission label

Delta DC Switch ACDB Patch Panel BBU Inside mini bus bar Alarm moudule BBU UPEU BBU GTMU SLPU DDF MW IDU

GU900_Sector1 DBS3900 RECT 220Vac L1 G900_Sector1 G900_Sector1 Sector1 PGND TO UPEU EXP_ALM0 TO Alarm module No.1-4 TO SLPU E1_2G TO DBS 3900 E1_2G TO SLPU E1_2G TO DDF E1_2G

G1800_Sector1 DBS3900 RECT 220Vac L2 U900_Sector1 U900_Sector1 Sector2 PGND TO UPEU EXP_ALM1 TO Alarm module No.5-8 \ TO DDF E1_2G TO MW IDU E1_2G \

U2100_Sector1 DBS3900 RECT 220Vac L3 G1800_Sector1 G1800_Sector1 Sector3 PGND DBS3900 SingleRAN_3G DBS3900 SingleRAN_3G

GU900_Sector2 DBS3900 RECT Neutral U2100_Sector1 U2100_Sector1 MW IDU PGND

G1800_Sector2 OR: G900_Sector2 G900_Sector2 DDF PGND

U2100_Sector2 HUAWEI DBS3900 U900_Sector2 U900_Sector2 GU BBU PGND

GU900_Sector3 G1800_Sector2 G1800_Sector2 SLPU PGND

G1800_Sector3 U2100_Sector2 U2100_Sector2

U2100_Sector3 G900_Sector3 G900_Sector3

MW IDU_1 U900_Sector3 U900_Sector3

MW IDU_2 G1800_Sector3 G1800_Sector3

GU BBU U2100_Sector3 U2100_Sector3

Key Points:
I. Upper are all of labels for cables in HUAWEI Mini-shelter;
II. Each both end of cable should be slicked label
III. Each subcon makes sure that all of operation sites select the same labels

HUAWEI TECHNOLOGIES CO., LTD. Page 69


Content
1. Site Modernization Scenario

2. Third vendor material list for 1 standard sector

3. Site Modernization Reference Design

I. Scenario1: RRU and Antenna install on same pole

II. Scenario2: RRU and Antenna install on different pole

4. HUAWEI Mini-shelter Installation

5. Grounding

6. Color ring

7. Labeling

8. Antenna Connection

9. Filter Installation

HUAWEI TECHNOLOGIES CO., LTD. Page 70


8.1.1 Triple-band Antenna Connection

Key Points:
I. AISG cable does not use when
this site 900MHz low frequency
ports will be utilized; otherwise
need to connect AISG cable
3G_2100MHz 2G_1800MHz
from Antenna to RRU;
II. Go through 900MHz low
frequency ports transfer AISG
2G_900MHz information, so as to adjust
different frequency electronic
tilt;
Relation of ports between RRU and Antenna
ANT-TX/RXA +45 ANT-TX/RXA -45
III. If some ports do not use,
Band
(Main) (Diversity)
reserve it and tighten protector
GU900 MHz(2G) TX/RX A TX/RX B
G1800 MHz(2G) TX/RX A TX/RX B what attach the ports
U2100 MHz(3G) TX/RX A TX/RX B

HUAWEI TECHNOLOGIES CO., LTD. Page 71


8.1.2 Penta-band Antenna Connection
2G_900MHz
Key Points:
I. AISG cable does not use when
this site 900MHz low frequency
3G_2100MHz 2G_1800MHz ports will be utilized; otherwise
need to connect AISG cable
from Antenna to RRU;
II. Go through 900MHz low
frequency ports transfer AISG
information, so as to adjust
different frequency electronic
Relation of ports between RRU and Antenna tilt;
ANT-TX/RXA +45 ANT-TX/RXA -45
No. Band
(Main) (Diversity) III. If some ports do not use,
1-2 GU900 MHz(2G) TX/RX A TX/RX B
3-4 G1800 MHz(2G) TX/RX A TX/RX B reserve it and tighten protector
5-6 U2100 MHz(3G) TX/RX A TX/RX B what attach the ports
7-8 EXP
9-10 EXP

HUAWEI TECHNOLOGIES CO., LTD. Page 72


8.2 E-Tilt(AISG)

AISG Cable
Triple-band Antenna

1800MHz
RRU

AISG Port RET Port

Key Points:
I. Connect AISG cable from 1800MHz RRU to Triple-band Antenna by AISG cable, We can use E_Tilt.

HUAWEI TECHNOLOGIES CO., LTD. Page 73


8.3 Multi-band Antenna Bracket
U-Bolt for Antenna Key Points:
1. If mechanical tilt is 0, the Tilt arm of upper
mounting bracket no need installation;
Tilt arm 2. If mechanical tilt is more than 0, it should be
according to RF team feedback, installing
it to change the mechanical tilt;
3. Mechanical tilt angles of 0through to 8in

Pole
1increments can be obtained with the correct
adjustment of the tilt arm bracket, as below figure

HUAWEI TECHNOLOGIES CO., LTD. Page 74


8.4 Waterproof for RF Jumper Cable
Key Points:
3 1. First, wrap waterproof tape 1 layer; then warp PVC tape
100mm

1
3 layers; last, take a black cable tie near connector side;
2. Before wrapping waterproof tape, stretch the tape evenly
until the length of the tape becomes twice its original length.
3. Do not stretch the PVC insulation tape when wrapping the
PVC insulation tape.
1 4. Wrap each layer of tape around the connector tightly and
1. Waterproof Tape 2. PVC Tape 3. Cable Tie neatly, and ensure that each layer of tape overlaps.
5. More than 50% of the preceding layer. Ensure that
neighboring layers are stuck to each other.
6. Ensure that the adhesive surface of the tape overlaps the
Example Figure
lower layer.
7. The waterproof tape length is around 110~120mm as shown
110-120mm left figure;
8. Cables shall go straight to the antenna without any bending
on antenna and RRU site.

HUAWEI TECHNOLOGIES CO., LTD. Page 75


Content
1. Site Modernization Scenario

2. Third vendor material list for 1 standard sector

3. Site Modernization Reference Design

I. Scenario1: RRU and Antenna install on same pole

II. Scenario2: RRU and Antenna install on different pole

4. HUAWEI Mini-shelter Installation

5. Grounding

6. Color ring

7. Labeling

8. Antenna Connection

9. Filter Installation

HUAWEI TECHNOLOGIES CO., LTD. Page 76


9.1.1 900MHz&2100MHz Filter installation Scenario 1
Filter Jumper
Scenario 1 CME standard Band installation From To cable Remark
position Length
Old standard All the existing 3M jumpers
900MHz RRU Filter 2.0m
(900M RRU install in replaced by 2M
the first level, 1800M
900MHz Filter Antenna 1.5m New one
install in the second Third Level
level, and 2100M 2100MHz RRU Filter 1.5m New one
install in the bottom
level) 2100MHz Filter Antenna 1.5m Reuse

900MHz RRU Filter 1.0m New one


3G site,
if existing jumpers are 2M, we
only install New Standard 900MHz Filter Antenna 2.0m can keep it. if it is 3M jumper,
900/2100M (900M and 2100M need to change to 1.5M jumper
filters on RRU install in second Third Level
level and 1800M RRU 2100MHz RRU Filter 1.0m New one
site
install in bottom level) if existing jumpers are 2M, we
2100MHz Filter Antenna 2.0m can keep it. if it is 3M jumper,
need to change to 1.5M jumper
Reuse existing jumper for RRU
and filter connection, According
Can not follow CME 900/2100M
On the Pole \ \ \ actually status to select length
site Hz
of jumper cable for filter and
antenna connection

HUAWEI TECHNOLOGIES CO., LTD. Page 77


9.1.2 900MHz&2100MHz Filter installation Scenario 2
Filter Jumper
Scenario 2 CME standard Band installation From To cable Remark
position Length
Old standard All the existing 3M jumpers
900MHz RRU Filter 2.0m
(900M RRU install replaced by 2M
in the first level, 900MHz Filter Antenna 1.5m New one
1800M install in Third Level
the second level, 2100MHz RRU Filter 1.5m New one
and 2100M install
2100MHz Filter Antenna 1.5m New one
in the bottom level)
3G expansion 900MHz RRU Filter 1.0m New one
New Standard
site in phase2, (900M and 2100M if existing jumpers are 2M, we
install 2100M RRU install in can keep it. if it is 3M jumper,
900MHz Filter Antenna 2.0m
RRU and second level and Third Level need to change to 1.5M
900/2100M 1800M RRU jumper
filters on site install in bottom 2100MHz RRU Filter 1.0m New one
level)
2100MHz Filter Antenna 1.5m New one
Reuse existing jumper for
RRU and filter connection,
Can not follow 900/2100 According actually status to
On the Pole \ \ \
CME site MHz select length of jumper cable
for filter and antenna
connection

HUAWEI TECHNOLOGIES CO., LTD. Page 78


9.1.3 900MHz&2100MHz Filter installation Scenario 3
Filter
Jumper
installati
Scenario 3 CME standard Band From To cable Remark
on
Length
position
New Standard 900MHz RRU Filter 1.0m New one
(900M and 2100M
RRU install in 900MHz Filter Antenna 1.5m New one
Follow CME second level and 2100MHz Third Level RRU Filter 1.0m New one
site in phase2, 1800M RRU
assembly in install in bottom 2100MHz Filter Antenna 1.5m New one
WH level)
According actually status
Can not follow 900/2100MH On the
\ \ \ to select length of jumper
CME site z Pole
cable

HUAWEI TECHNOLOGIES CO., LTD. Page 79


9.2 900MHz&2100MHz Filter installation method

Old Standard New Standard

3M Pole Triple-band
I. 900M RRU install in the ANT
I. 900M and 2100M RRU 3M Pole Triple-band
ANT
first level, 1800M install 900MHz Expansion
install in second level
RRU RRU Expansion Expansion
in the second level, and and 1800M RRU install RRU RRU

2100M install in the in bottom level;


bottom level; II. 900MHz&2100MHz
1800MHz Expansion
II. 900MHz&2100MHz RRU RRU
Filter install in bottom 2100MHz 900MHz
RRU RRU
Filter install in the level.
bottom level

2100MHz 1800MHz
900MHz&2 900MHz&2
RRU RRU
100MHz 100MHz
Filter Filter

JUNCTION JUNCTION
BOX BOX

HUAWEI TECHNOLOGIES CO., LTD. Page 80


9.3 900MHz&2100MHz Filter installation method
Can not follow CME

New 2100M filter (only for Eirbe), other province use


900M filter
old 2100M filter, installation same as 900M filter

900/2100MHz filter directly install on the pole. According actually status to select length of
jumper cable

HUAWEI TECHNOLOGIES CO., LTD. Page 81


9.4 New 2100MHz Filter installation method
Key Points:
900M filter 1. New 2100M filter only install in
900M filter Eirbe;
2. Dismantle bracket of 900M filter,
then install 900M filter on new
2100M filter by bracket belong
with 2100M filter;
3. Connect only 1pcs grounding
cable on 900M grounding point
to grounding bar
Grounding point
900M filter 900M filter

Bracket

New 2100M
filter
New 2100M
filter

HUAWEI TECHNOLOGIES CO., LTD. Page 82


Thank You
www.huawei.com
Appendix 1: Cable Routing for RF Cable (In Warehouse)

RF jumper
cable

Antenna

Top

900M 900M&2100M Junction


Reserved Box
RRU Filter

Reserved 2100M RRU 1800M RRU

900/2100M Filters
900M&2100M
and 1800M RRU
1m RF jumper
1.5m RF jumper
cables
cables

HUAWEI TECHNOLOGIES CO., LTD. Page 84


Appendix 2: Cable Routing for Hybrid Tail (In Warehouse)

Hybrid Tail
Antenna

Top

Junction 1800M 2100M


Box Reserved
RRU RRU

900M&2100M Filter 900M RRU Reserved

1800M 900M&2100M
1.5m Hybrid Tail 2.0m Hybrid Tail

HUAWEI TECHNOLOGIES CO., LTD. Page 85


Appendix 3: Cable Routing for Grounding Cable (In Warehouse)

Junction BOX
PGDN cable Antenna

Top

Junction
1800M 2100M
Box Reserved
RRU RRU

900M&2100M Filter 900M RRU Reserved

1800M 900M&2100M
PGND cable PGDN cable

HUAWEI TECHNOLOGIES CO., LTD. Page 86


Appendix 4: Fixing Bracket Layout (In Warehouse)

Unit: mm
2620

1825

120

Top

Fixing
Bracket
Upper Lower
Bracket Bracket

HUAWEI TECHNOLOGIES CO., LTD. Page 87


Appendix 5: Cable Clamp Layout (In Warehouse)

Unit: mm
3000
2800
2560
1840
1060

Top

Clamp

HUAWEI TECHNOLOGIES CO., LTD. Page 88